Lignite mines 08102020_180-7.79_ROUTINE.pdf
PDF 4 MB Posted
- Attached to
- George Washington and Jefferson National Forests
- Solicitation number
- 693C73-23-B-000011
About this file
This solicitation is for road repairs and erosion control services for the George Washington and Jefferson National Forests in Virginia. The project consists of erosion and sediment control, clearing and grubbing, grading, roadside cleanup, riprap, road and ditch reconditioning, aggregate surfacing, culvert replacement and installation in various materials, contractor design of box and arch culverts, and other miscellaneous work. The work will be split into multiple schedules with a total expected cost between $5-10 million. Sealed bids from certified small businesses are due on the date specified in Block 13a of the solicitation, available on www.sam.gov by searching for number 693C73. Annual representations and certifications must be completed on www.sam.gov and form VETS-4212 on dol.gov. Questions should be sent to eflhd.contracts@dot.gov. Bidders must register in SAM for payment. Photo ID and escort are required to access buildings. Bidders are encouraged to submit bids electronically per instructions in the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Inspection Date: 08/10/2020
Route: 180 Milepost: 7.7900 Structure No:
OVER
County, (Signature)
BRIDGE INSPECTION AND MANAGEMENT PROGRAM
Craig Virginia
S. PRG. BARBOURS CR. BR./M.CULV. S. PRG. BARBOURS CR.
INSPECTION TEAM LEADER: David Rasmussen
U.S. DEPARTMENT OF AGRICULTURE
S. PRG. BARBOURS CR. BR./M.CULV.
GEORGE WASHINGTON & JEFFERSON NATIONAL FORESTS
USDA FOREST SERVICE, REGION 8
080815000003221
ROAD BRIDGE INSPECTION REPORT (streamlined form)
INSPECTION TYPE: ROUTINE
Version 3.1(s)
Structure Name: (8)Structure No:
(5D)Route:
Forest:
17.1 15.3
(45)No. Main Spans: 1
(46)No. Appr Spans: 0
No. Substrs: 2
Rating Date:
(41) Posting Status:
(70) Posting Capacity:
(31)Design Load: Yes/No Due (63,65)Method of Load Rating: Freq. Date Current Posting Signs Yes No N Are weight limit signs posted at each end? X N
Correct Signage? N
Yes No Special Inspection Equipment Needed:
Type 3 Type 3S2 Type 3-3
X
Date:
Inspection Team: Leader: Jurisdiction:
Weather: Latitude:
(9)Location: Str. Life Remaining
Inspection Done By: Inspection Done By Name:
Critical Findings:
Narrative Report: (Add additional sheets if necessary)
Misc. INFRA Data
State VIRGINIA
County CRAIG
ADT 10
(34)Skew:
Substr Type:
(44B)Superstr Type:
Specialized Inspections Required
(23 CFR 650.303)
Correct Requirements?
Description:
.5 MI. E. ST RTE 617
Re-rating required ?
FS - Forest Service Supervisor's Office
Inspection Template Revision Date:
FS
3:30 PM
District:
15.80 (27)Year Built:
(6)Feature Crossed:
S. PRG. BARBOURS CR. BR./M.CULV.
David Rasmussen 37.61772223
S. PRG. BARBOURS CR.
Infra data used for this report was pulled on: 03/24/2020
2:45 PM
(92A) Fracture Critical (92B) Underwater (92C) Special
HS20‐44
LRFR REPORTED AS TONS
Time Completed:08/10/2020 Time Started:
INSPECTION INFORMATION
India Drew, David Rasmussen Longitude:
Verified
(102) Direction of Traffic
Substr Material:
Recommended Inspection Frequency:
USDA FOREST SERVICE, REGION 8
(11)Milepost: 7.7900
BRIDGE IDENTIFICATION AND LOCATION
080815000003221
GEORGE WASHINGTON & JEFFERSON NATIONAL FORESTS
(32)Approach Roadway Width:
(48)Max Span:
(52)Deck Width out-out: 17.30(51)Roadway Width (Curb to Curb):
Security ID 0808EASTERN DIVIDE
12.00
BRIDGE DESCRIPTION and MEASUREMENTS
George Washington & Jefferson
(49)Overall Br Length: 14.50
Timber
NBIS Bridge Opening:
99.99 30
Other
(53)Vertical(47)Horizontal 1 LANE BRIDGE, 2-WAY TRAFFIC (28A) Lanes on the Structure 1
Wall Abutment
Open, No Restriction
At Or Above Legal Loads
SPECIALIZED INSPECTIONS:
(43B)Superstr Type:
BRIDGE RATING SUMMARY:
Not Applicable (108A) Wearing
Surface:
(107)Deck StructureType:
(43A)Superstr Material:
(44A)Appr. Superstr Mat'l: Aggregate
Timber, Nail-Lam, Treated
Masonry
3/25/2020 V3.1(s) Streamlined
Mostly Sunny and Hot
Months Inspection Cost
-80.05908333
Structure Name: (8)Structure No:
(5D)Route:
Forest:
Development Status: Date:
DATA Safe
Vehicle Type Date Oper. Load
HL-93 9/24/15 8 - LRFR REPORTED AS RATING FACTOR 1.10
HS20-44
Type 3 9/24/15 3 - LRFR REPORTED AS TONS 54.00
Type 3S2 9/24/15 3 - LRFR REPORTED AS TONS 94.00
Type 3-3 9/24/15 3 - LRFR REPORTED AS TONS 105.00
NRL
SU4 9/24/15 3 - LRFR REPORTED AS TONS 50.00
SU5 9/24/15 3 - LRFR REPORTED AS TONS 56.00
SU6 9/24/15 3 - LRFR REPORTED AS TONS 62.00
SU7 9/24/15 3 - LRFR REPORTED AS TONS 69.00
EV2
EV3
Permit 1
Permit 2
Permit 3
Permit 4
Special
Alt. Interstate
H Loading
Railroad
Uniform
Gross Load Only
Gross Load
S. PRG. BARBOURS CR. BR./M.CULV. 080815000003221
180 7.7900
Method
0.85
Inv. Posting
EXISTING - ACTIVE Jurisdiction: FS - FOREST SERVICE
S. PRG. BARBOURS CR.(6)Feature Crossed:
LOAD RATING DATA
GEORGE WASHINGTON & JEFFERSON NATIONAL FORESTS
BRIDGE IDENTIFICATION AND LOCATION
George Washington & Jefferson District: EASTERN DIVIDE Security ID 0808
Safe
(11)Milepost:
Milepost: 7.7900
CODE
Good
1. Good
2. Good
3. Good
4. Good
* 1. Good C1. N/A C2. Good C3. N/A C4. Fair C5. Good C6. Fair C7. N/A
* 1. 1 Girder Good
a. Girder Diaphragms N/A
b. Girder Bracing N/A
* 2. N/A
* 3. N/A
* 4. N/A
a. Trusses Bracing N/A
b. Trusses Chord N/A
c. Trusses Portal N/A
d. Trusses Vertical/Diagonal N/A
C1. Good C2. N/A C3. N/A ostly Sunny a N/A
*1. Good *2. Good *3. Good *4. Good *5. N/A *6. Good *7. Good *8. N/A *9. N/A *10. Good *11. N/A *12. N/A *13. N/A *14. N/A *15. N/A *16. N/A *17. N/A *18. N/A
2 Includes wingwalls integral with the abutment or the portion of the wingwall below the bearing seat.
Piers Bearing Seats
Piers Erosion or Scour
1 Also includes wingwalls connected to the superstructure above the beam seat.
Stringer
Abutments Erosion or Scour
Abutments Piles/Bracing
Bearing Devices Paint Deflection Under Load Vibration Under Load
Abutments Weep Holes
A B
U T
M E
N T
S
Abutments Footings/Sills
Abutments Wing Walls
Abutments Alignments
Abutments Bearing Seats
Abutments Settlement
Trusses
Deck Joints Curbs
Elastomeric Bearing Pad
59. SUPERSTRUCTURE:
Sidewalks Drains and Drainage Rideability Cleanliness Utilities
Nail water on deck at inspection but typical nail laminated deck problem
Floor Beam
60. SUBSTRUCTURE:
Piers Caps
Abutments Caps
Abutments Backwalls
Some aggregate on deck
PT Timber Nail laminated deck
Structure No.:
Date:
Structure Name:
Route:
Wearing Surfaces
Deck Slab/Panels/Joists
(Overall Code for item, to be reported to FHWA, in bold box)
58. DECK:
S. PRG. BARBOURS CR. BR./M.CULV.
APPROACH CONDITION:
Surfacing
Shoulder Embankment
Roadway Embankment
Approach Settlememt
08/10/2020
080815000003221
CONDITION CODES and REMARKS
REMARKS
Piers Footings
* Only these items are used in the determination of the overall condition rating for that category, i.e. Deck, Superstructure, Substructure.
Other items should be rated and remarked on but NOT included in determining the overall category rating. Items enumerated using a C
(ex. C1) should be commented on but not rated. See the FHWA Coding Guide for further information as to what is included in condition ratings.
P
IE
R S
Piers Settlement
Piers Alignment (Tiping, Tilting)
Masonry Abutments on Bedrock
Piers Piles and Bracing
Piers Columns or Walls
Milepost: 7.7900
CODE
1. Good
2. Good
3. Good
4. Good
5. Good
6. Good
N/A *1. Shape N/A *2. N/A *3. N/A *4. N/A
5. N/A
36. TRAFFIC SAFETY FEATURES:
36A. 0 36B. N
36C. N 36D. N
1.
N/A
2. G
72. APPROACH ROADWAY ALIGNMENT: 6
1. 8
2. 6
29. ROAD ADT 10
67. STRUCTURAL EVALUATION 7
68. DECK GEOMETRY: 7
69. UNDERCLEARANCE: N
71. WATERWAY ADEQUACY: 7
113. SCOUR CRITICAL BRIDGES: 8
CONDITION RATING OF EACH MEMBER OR ELEMENT
-NOT APPLICABLE
-APPLICABLE, BUT NO OBSERVED. (Give reason unless obvious)
-ELEMENT IN NEW OR GOOD CONDITION WITH NO REPAIRS NECESSARY.
-ELEMENT IS STILL PERFORMING THE FUNCTION FOR WHICH IT WAS INTENDED BUT MAY NEED MAINTENANCE.
-ELEMENT IS PERFORMING AT REDUCED CAPACITY.
Channel Scour/Erosion Channel Protection Vegetation Waterway Obstruction/Drift
(Overall Code for item, to be reported to FHWA, in bold box)
61. CHANNEL and CHANNEL PROTECTION:
APPRAISAL CODES and REMARKS
A P
P R
A
IS
A L o f e le m e n ts
080815000003221
S. PRG. BARBOURS CR. BR./M.CULV. Date:
180 Structure No.:
Structure Name:
Route:
CONDITION CODES and REMARKS (continued)
G = GOOD
F = FAIR
Approach signing not needed.
All 4 Object Markers in place
REMARKS
Approach Guardrails
Approach Rail Ends
Signing
Object Markers
Horizontal
Vertical
Seams or Joints Material Condition Foundations Headwall/Wingwall
* Only these items are used in the determination of the overall condition rating for that category, i.e. Deck, Superstructure, Substructure. Other items should be rated and remarked on but NOT included in determining the overall category rating. Items enumerated using a C (ex. C1) should be commented on but not rated. See the
FHWA Coding Guide for further information as to what is included in condition ratings.
Observed Lateral Movement Clear Height
P = POOR
Abutments on visible bedrock
Approach at A2 enters a vertical curve
NOB
62. CULVERTS
CONDITION of Elements Bridge Railing
Rail Transitions
Milepost: 7.7900 Structure No.:
Work Item Category
Detailed Work Item Description C.F.
Related
Inspection Routine bridge inspection every 2 years
Deck
Approach Condition
Approach Condition
Traffic Safety Features
Traffic Safety Features
Inspection
Date:S. PRG. BARBOURS CR. BR./M.CULV.
Route:
Structure Name:
080815000003221
08/10/2020
UnitWork Item Quantity
RECOMMENDED WORK ITEMS
7001001
7004001
8001002
Work Item Code
9001002
8002002
9001001
Clean Deck 295
General / Brush Approaches 1
SF
LS/B
LSRoutine Bridge Inspection / Routine
Bridge Railing / Upgrade Bridge Railing
Approach Railing / Install Bridge Approach Rail
27LF
LS
LF
Surfacing / Place Aggregate Surfacing
1LSRoutine Bridge Inspection / Simple
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Date:
Route: Milepost: Structure No:
Structure Name: S. PRG. BARBOURS CR. BR./M.CULV. 08/10/2020
180 7.7900 080815000003221
BRIDGE PHOTOS
Insert photo here.
Approach Ahead on Station
Insert photo here.
Approach Back on Station
Structure Name: S. PRG. BARBOURS CR. BR./M.CULV. 08/10/2020
180 7.7900 080815000003221
BRIDGE PHOTOS
Insert photo here.
Looking Upstream from Deck
Insert photo here.
Looking Downstream from Deck
Structure Name: S. PRG. BARBOURS CR. BR./M.CULV. 08/10/2020
180 7.7900 080815000003221
BRIDGE PHOTOS
Insert photo here.
Looking Downstream - Elevation Profile
Insert photo here.
Looking Upstream - Elevation Profile
Structure Name: S. PRG. BARBOURS CR. BR./M.CULV. 08/10/2020
180 7.7900 080815000003221
BRIDGE PHOTOS
Insert photo here.
Abutment 1
Mostly Sunny and Hot
Abutment 2
Structure Name: S. PRG. BARBOURS CR. BR./M.CULV. 08/10/2020
180 7.7900 080815000003221
BRIDGE PHOTOS
Insert photo here.
Underside of Deck - Typ.
Insert photo here.
Top of Deck - Typ.
Structure Name: S. PRG. BARBOURS CR. BR./M.CULV. 08/10/2020
180 7.7900 080815000003221
BRIDGE PHOTOS
Insert photo here.
Minor Loss of Mortar - Abutment 2
Insert photo here.
Minor Loss of Mortar - Abutment 1
BRIDGE PHOTOS
Insert photo here.
Minor Impact Damage - Upstream Curb
Insert photo here.
Nails backing out of Running Plank
Structure Name: S. PRG. BARBOURS CR. BR./M.CULV. 08/10/2020 180 7.7900 080815000003221
Structure Name: Date:
Route: Milepost: 7.7900
9.8
2018 2020 2022 2024 2026 2028 2030
3.0 9.45 10
5.0 10.3 10.3
10.0 10.8 10.75
15.0 10.9 10.73
Mostly Sunny and Hot
Water Surface
Distance Measured from Upstream Side
Channel Cross Section
Horizontal Dist Measured from A-1
08/10/2020
Structure No: 080815000003221
S. PRG. BARBOURS CR. BR./M.CULV.
Input Cross-Section Data:
Height (feet) from thalweg to bottom of lowest superstructure member
Horizontal Dist.
Location Notes
Top of Deck
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0
Top of Rail
(Substructure elements can be inserted in the cross‐section using Insert, Shapes )
Milepost:
ID
Description
Needed for Real Property Verification
N Re-rating required? (Enter Y/N) N Specialized Equipment Required? (Enter Y/N)
Insp Remarks
Approach Rail Ends (36D) N
India Drew, David Rasmussen David Rasmussen
Insp Team
Transition (36B) N Approach Guardrail (36C) N
Traffic Rail Safety Features Appraisal Bridge Rail (36A) 0
Approach Align (72) 6
Underclr (69) N Waterway Adq (71) 7
Str Eval (67) 7 Deck Geom (68) 7
Main Data Appraisal Data
Done By Name (Unit) Supervisor's Office
Inspected By* David Rasmussen Done By (Org) FS - Forest Service
Scour Crit Br (113) 8 Insp Resp Name FS - FOREST SERVICE
Culvert Cond (62) N/A Channel Cond (61) 8
Supstr Cond (59) 7 Substr Cond (60) 7
Wear Srfc Cond 7 Deck Cond (58) 7
Inspection Cost $0.00 Aprch Cond Good
Main Data Appraisal Data
Insp Team Leader
Inspection_Type (System Generated) (System Generated) Inspection Date 08/10/2020 ROUTINE Inspection Freq 24
Infra Summary Data
Structure Name: S. PRG. BARBOURS CR. BR./M.CULV. 8/10/2020
Route: 180 7.7900 Structure No: 080815000003221
| 2020-08-20T08:18:00-0400 | |
| DAVID RASMUSSEN |
File details come from the government source that posted it. Updated .