Plans Set_2 of 7_17282_2026.pdf
PDF 5 MB Posted
- Solicitation number
- RFQ 171 260000000309 3
- Issued by
- Sanilac County, Lansing City, Michigan
About this file
This is a plans set document for the Lexington Harbor-Marina Redevelopment project (751/17282) in Michigan, specifically the second set of seven architectural and engineering plans. The plans set provides detailed design specifications and technical drawings for the harbor-marina redevelopment initiative. The document contains comprehensive construction and site development plans necessary for project execution and contractor bidding purposes. The plans establish the physical scope and design parameters for the redevelopment project, including site layout, infrastructure improvements, and facility specifications required for the harbor and marina facilities.
The plans set serves as a critical reference document for prospective bidders and contractors to understand the full scope of work, design intent, and technical requirements for the Lexington Harbor-Marina Redevelopment project. This document is essential for cost estimation, scheduling, and method statement development during the bidding process, and will govern construction execution once a contract is awarded.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTROL POINT TABLE
POINT #
CP1
CP2
CP3
CP4
CP5
CP6
CP7
CP8
CP9
CP10
CP11
CP12
CP13
NORTHING
649844.6485
649844.9011
649887.5917
649893.9480
650021.5989
650044.5078
650013.3018
650119.0428
650093.3998
650157.8916
650174.6458
650250.4600
650223.0703
EASTING
13613669.2581
13613744.4242
13614096.3013
13613671.8198
13613662.8787
13613660.7729
13614073.9631
13614066.5567
13613700.4537
13613690.9242
13614044.6180
13614039.3078
13613648.2658
DESCRIPTION
CENTERLINE OF GANGWAY PLATFORM A
SW. CORNER OF DOCK A
NE. CORNER OF DOCK A
NW. CORNER OF DOCK A
CENTERLINE OF GANGWAY PLATFORM B
SW. CORNER OF DOCK B
SE. CORNER OF DOCK B
NE. CORNER OF DOCK B
NW. CORNER OF DOCK B
SW. CORNER OF DOCK C
SE. CORNER OF DOCK C
NE. CORNER OF DOCK C
NW. CORNER OF DOCK C
S
U
U
T
U
D
2 58
L
L
L L L L
L
LLLLLL
L L
L L
L L L L L
L
LLL L
L
LL
L
L
L
L
L
L
L
L
NORTH
60'30'0
SCALE: 1" = (AT 24"x36")
P:\2018\18-36 LSH - LEXINGTON STATE HARBOR\CAD\SHEETS\PHASE 2 - MARINA SHEETS\CM-1.XX.DWG
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2026 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
B & C DOCK SITE PLAN ENLARGEMENT - SEE CM-4.02
A DOCK & SERVICE PIER SITE PLAN ENLARGEMENTS - SEE CM-4.03
UP
LA
ND
S
IT
E
PL
AN
E
NL
AR
GE
ME
NT
SE
E
CM
-4 .01
P:\2018\18-36 LSH - LEXINGTON STATE HARBOR\CAD\SHEETS\PHASE 2 - MARINA SHEETS\CM-1.XX.DWG
30'
USACE FEDERAL NAVIGATION
CHANNEL BOUNDARY
LAKE HURONEXISTING USACE STONE BREAKWATER
STRUCTURE & CONCRETE PATHWAY
APPROXIMATE EDGE OF WATER
EXISTING FLOATING DOCK SYSTEM (N.I.C.)
EXISTING MDNR
BOATER SERVICE
BUILDING
HURON AVENUE
EXISTING
TRAFFIC CIRCLE
EXISTING BUILDING
EXISTING
BUILDING
EXISTING SITE
PARKING LOT
EXISTING
PAVILION
EXISTING
RESTROOM
BUILDING
CP3
CP2
CP4
CP6
CP7
CP8CP9
CP10
CP11
C12
CP13
FLOATING DOCK SYSTEMS ''B'' & ''C'' W/ SPUD PILE
ANCHORAGE (SEE SPUD PILE ANCHORAGE TABLE)
FLOATING DOCK SYSTEM ''A'' W/ SPUD PILE
ANCHORAGE (SEE SPUD PILE ANCHORAGE TABLE)
12'-6'' x 21' SERVICE PIER BUILDING (SEE A-1.00)
8' x 80' GANGWAY RAMP
6' x 60' GANGWAY RAMP
GANGWAY SUPPORT PLATFORM B
GANGWAY SUPPORT PLATFORM A
ESTIMATED DOCK AREAS
DOCK A 6,591 SF
DOCK B 8,442 SF
DOCK C 7,064 SF
TOTAL 22,097 SF
SPUD PILE ANCHORAGE REQUIREMENTS
DOCK A 35 PILES
DOCK B 50 PILES
DOCK C 28 PILES
TOTAL 113 PILES (MIN.)
B DOCK
C DOCK
A DOCK SERVICE PIER
APPROXIMATE PROPERTY LINES, TYP.
LEXINGTON
HARBOR
MARINA SLIP SUMMARY
30' 28
33' 1
38' 38
38' (ADA) 2
45' 15
45' (ADA) 2
55' 1
60' 9
BROADSIDE 6
BROADSIDE (ADA) 1
TOTAL 103
VILLAGE OF LEXINGTON
TIERNEY PARK
C DOCK
B DOCK
NOTES:
1. TOPOGRAPHIC SURVEY PERFORMED BY EDGEWATER
RESOURCES 7/30/2023 (NAVD88).
2. AVERAGE WATER LEVEL ON 5/26/2023 = 580.12' (NAVD88).
3. HORIZONTAL DATUM IS MICHIGAN STATE PLANE GRID,
SOUTH ZONE, NAD83, INTERNATIONAL FOOT.
4. VERTICAL DATUM IS NAVD88.
5. LEGAL BOUNDARY SURVEY PERFORMED BY POLARIS
SURVEYING, LLC ON 11/20/2024.
6. CONTRACTOR TO VERIFY LIMITS OF EXISTING
CONCRETE SIDEWALK, DIMENSIONS VARY.
7. ALL LONGITUDINAL AND SIDE SLOPES ON GANGWAYS,
DOCKS, AND CONCRETE WALKWAYS SHALL NOT
EXCEED 5% AND 2% RESPECTIVELY.
CP1
CP5
O
VE
R
AL
L
SI
TE
P
LA
N
H U
R O
N A
VE
, L
EX
IN
G
TO
N , M
I 4
M
AR
IN
A R
ED
EV
EL
O
PM
EN
T
LE
XI
N
G
TO
N S
TA
TE
H A
R B
O R
CM-1.01
CH
FL
CH
18-036
4/24/2026
BID
751/17282 BDW
L
L
L L
L
EJ
EJ
EJ
EJ
EJ
EJ EJ
EJ
EJ EJ
EJ
EJ
EJ
EJ EJ EJ
EJ
EJ
EJ
EJ
EJ
CONTROL POINT TABLE
POINT #
CP1
CP2
CP3
CP4
CP5
CP6
CP7
CP8
CP9
CP10
CP11
CP12
CP13
NORTHING
649844.6485
649844.9011
649887.5917
649893.9480
650021.5989
650044.5078
650013.3018
650119.0428
650093.3998
650157.8916
650174.6458
650250.4600
650223.0703
EASTING
13613669.2581
13613744.4242
13614096.3013
13613671.8198
13613662.8787
13613660.7729
13614073.9631
13614066.5567
13613700.4537
13613690.9242
13614044.6180
13614039.3078
13613648.2658
DESCRIPTION
CENTERLINE OF GANGWAY PLATFORM A
SW. CORNER OF DOCK A
NE. CORNER OF DOCK A
NW. CORNER OF DOCK A
CENTERLINE OF GANGWAY PLATFORM B
SW. CORNER OF DOCK B
SE. CORNER OF DOCK B
NE. CORNER OF DOCK B
NW. CORNER OF DOCK B
SW. CORNER OF DOCK C
SE. CORNER OF DOCK C
NE. CORNER OF DOCK C
NW. CORNER OF DOCK C
NORTH
20'10'0
SCALE: 1" = (AT 24"x36")
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2026 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
10'
B & C DOCKS - SEE CM-4.02
A DOCK - SEE CM-4.03
EXISTING MDNR BOATER SERVICE BUILDING
EXISTING
BUILDING
EXISTING CONCRETE SIDEWALK, TYP.
BENCHES & CONCRETE PADS
(100 SF TOTAL)
EXISTING
FUEL TANKS
EXISTING TIMBER
BOARDWALK
APPROXIMATE EDGE OF WATER
8' x 80' GANGWAY
7'-3"
'-0
7'-10"
90'-4"
168'-0"
8'- 0''
GANGWAY ACCESS
PLATFORM BCM-5.01
GANGWAY ACCESS
PLATFORM ACM-5.04
CP4
CP6
CP9
CM-5.09
CM-5.09
6' x 60' GANGWAY
RAMP B CM-5.09
8' x 80' GANGWAY
RAMP (A)CM-5.09
CM-5.06
1 SSP MOUNTED
ACCESS LADDERCM-5.10
5 & 6
34'-4"
8'-0''
TOE KICK EDGE
PROTECTION C-5.02
1 & 3
CONCRETE WALK
REPLACEMENT (900 SF)
CONCRETE PROMENADE REPLACEMENT (2,185 SF) TYP. CONC. CONTROL JOINTTYP. CONC. EXPANSION JOINT
EXISTING UTILITY TRANSFORMER.
& CONCRETE PAD BENEATH
'-4
5'-0"
6'-10"
31'-11"
R10' -0"
3'-
8'-0"
3'-
1 2"
CONCRETE WALK REPLACEMENT
& MARINA UTILITY PENETRATIONS,
TYP. (APPROX. 675 SF TOTAL)
R10'-0"
27'-4"
7'- 2"
38'-4"
'-1
1"
9'-10"
R18 '-0"
UTILITY TRANSFORMER & CONC. PAD BENEATH
(SEE ELEC. SHEETS)
RPZ BACKFLOW PREVENTER &
ENCLOSURE STRUCTURE (SEE U-4.01)
TYPICAL LITTER RECEPTACLE WITH CONC.
PAD BENEATH - 2 TOTAL (10 SF TOTAL)
CP2
'-0
R68'-6"
1'-0"
R3'-6"
5'- 7"
1'-0" TYP.
EXISTING FUEL TRANSITION SUMP &
CONC. APRON (SEE FUEL SHEETS)
TYPICAL LIGHTING BOLLARD WITH CONC. PAD
BENEATH - 4 TOTAL (SEE ELEC. SHEETS)
EXISTING OVERHEAD LIGHT
APPROXIMATE PROPERTY LINES, TYP.
LEXINGTON
HARBOR
NOTES:
1. TOPOGRAPHIC SURVEY PERFORMED BY EDGEWATER RESOURCES 7/30/2023 (NAVD88).
2. AVERAGE WATER LEVEL ON 5/26/2023 = 580.12' (NAVD88).
3. HORIZONTAL DATUM IS MICHIGAN STATE PLANE GRID, SOUTH ZONE, NAD83, INTERNATIONAL FOOT.
4. VERTICAL DATUM IS NAVD88.
5. LEGAL BOUNDARY SURVEY PERFORMED BY POLARIS SURVEYING, LLC ON 11/20/2024.
6. CONTRACTOR TO VERIFY LIMITS OF EXISTING CONCRETE SIDEWALK, DIMENSIONS VARY.
7. ALL LONGITUDINAL AND SIDE SLOPES ON GANGWAYS, DOCKS, AND CONCRETE WALKWAYS SHALL
NOT EXCEED 5% AND 2% RESPECTIVELY.
R12 '-0
R20'-0"
7'-5"
8'-0"3'-0" 10'-0" 2'-0"
CP1
CP5
MDP PANEL & CONC. PAD
BENEATH (SEE ELEC. SHEETS)
6'-10"
U
PL
AN
D
S
IT
E W
O R
K
EN
LA
R
G
EM
EN
T
H U
R O
N A
VE
, L
EX
IN
G
TO
N , M
I 4
M
AR
IN
A R
ED
EV
EL
O
PM
EN
T
LE
XI
N
G
TO
N S
TA
TE
H A
R B
O R
CM-4.01
CH
FL
CH
18-036
4/24/2026
L
L
L L L L
L
LLLLLL
L L
L L
L L L L L
L
L
L
L
L
CONTROL POINT TABLE
POINT #
CP1
CP2
CP3
CP4
CP5
CP6
CP7
CP8
CP9
CP10
CP11
CP12
CP13
NORTHING
649844.6485
649844.9011
649887.5917
649893.9480
650021.5989
650044.5078
650013.3018
650119.0428
650093.3998
650157.8916
650174.6458
650250.4600
650223.0703
EASTING
13613669.2581
13613744.4242
13614096.3013
13613671.8198
13613662.8787
13613660.7729
13614073.9631
13614066.5567
13613700.4537
13613690.9242
13614044.6180
13614039.3078
13613648.2658
DESCRIPTION
CENTERLINE OF GANGWAY PLATFORM A
SW. CORNER OF DOCK A
NE. CORNER OF DOCK A
NW. CORNER OF DOCK A
CENTERLINE OF GANGWAY PLATFORM B
SW. CORNER OF DOCK B
SE. CORNER OF DOCK B
NE. CORNER OF DOCK B
NW. CORNER OF DOCK B
SW. CORNER OF DOCK C
SE. CORNER OF DOCK C
NE. CORNER OF DOCK C
NW. CORNER OF DOCK C
NORTH
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2026 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
1 SCALE: 1"=20'
B & C DOCK SITE PLAN ENLARGEMENT
CP6
CP9 CP8
CP7
CP10
CP11
CP12CP13
'-0
9'-
0"
'-0
'-0
8'-0"
8'-0"
34'-0"
30'-0" TYP. 36'-0"
30'-0" TYP.
8'- 0"
4'-0" TYP.
4'-0" TYP.
8'-0"
C2
C3
C6
C7
C8
C9
C1 0 -
C1 1 -
C1 2 -
C1 3 -
C1 4 -
C1 5 -
C1 6 -
C1 7 -
C1 8 -
C1 9 -
C2 0 -
C2 1 -
C2 4 -
C2 5 -
C2 6 -
C2 7 -
C2 8 -
C2 9 -
C3 0 -
C3 1 -
C3 2 -
C3 3 -
C3 4 -
C3 5 -
C3 6 -
C3 7 -
C3 8 -
C3 9 -
C4 0 -
C4 1 -
C4 2 -
C1
B1
B2
B3
B4
B5
B6
B7
B8
B9
B1 0 -
B1 1 -
B1 2 -
B1 3 -
B1 4 -
B1 5 -
B1 6 -
B1 7 -
B1 8 -
B2 0 -
B1 9 -
B2 2 -
B2 1 -
B2 4 -
B2 3 -
B2 6 -
B2 5 -
B2 8 -
B2 7 -
B3 0 -
B2 9 -
B3 2 -
B3 1 -
B3 4 -
B3 3 -
B3 6 -
B3 5 -
B3 8 -
B3 7 -
CM-5.07
APPROX. FLOATING DOCK JOINT, TYP.
(JOINT LOCATIONS VARY)
TYP. ACCESS
LADDERCM-5.10
UPLAND SITE PLAN - SEE CM-4.01
CM-5.07
B DOCK
C DOCK
392'-0"
410'-0"
6'-
0"
8'- 0"
8'-0"
4'-0" TYP.
35'-0" TYP.
43'-0"
46'-0" TYP.
4'-0" TYP.
5'-0" TYP.42'-6"39'-0" TYP.
22'-6"
USACE FEDERAL NAVIGATION
CHANNEL BOUNDARY
APPROXIMATE EDGE OF WATER
C4
C5
C2 3 -
C2 2 -
C4 3 -
C4 4 -
B3 9 -
FLOATING DOCK SYSTEMS ''B'' & ''C'' W/ SPUD PILE ANCHORAGE
(SEE SPUD PILE ANCHORAGE TABLE & DTL 1 - CM-5.10)
TYP. 6x6 TIMBER FENDERS & MOORING CLEATS
(SEE TYPICAL FLOATING DOCK LAYOUT DETAILS)
TYP. MARINA PEDESTAL
(SEE MARINA ELECTRICAL SHEETS)
SUBSTATION AREA B
21'-3"5'-
0"
SUBSTATION
AREA C 17'-6" 5'-
0"
TYP. END WALL
SIGNAGE DTL.CM-5.10
TYP. SLIP
SIGNAGE DTL.CM-5.09
TYP. MOORING
CLEATSCM-5.09
4 & 5
6' x 60' GANGWAY
RAMP B
CM-5.09
GANGWAY
PLATFORM B CM-5.01
40'20'0
SCALE: 1" = (AT 24"x36")20'
APPROXIMATE PROPERTY LINES, TYP.
LEXINGTON
HARBOR
ESTIMATED DOCK AREAS
DOCK A 6,591 SF
DOCK B 8,442 SF
DOCK C 7,064 SF
TOTAL 22,097 SF
SPUD PILE ANCHORAGE REQUIREMENTS
DOCK A 35 PILES
DOCK B 50 PILES
DOCK C 28 PILES
TOTAL 113 PILES (MIN.)
MARINA SLIP SUMMARY
30' 28
33' 1
38' 38
38' (ADA) 2
45' 15
45' (ADA) 2
55' 1
60' 9
BROADSIDE 6
BROADSIDE (ADA) 1
TOTAL 103
C DOCK
B DOCK
NOTES:
1. TOPOGRAPHIC SURVEY PERFORMED BY EDGEWATER
RESOURCES 7/30/2023 (NAVD88).
2. AVERAGE WATER LEVEL ON 5/26/2023 = 580.12' (NAVD88).
3. HORIZONTAL DATUM IS MICHIGAN STATE PLANE GRID,
SOUTH ZONE, NAD83, INTERNATIONAL FOOT.
4. VERTICAL DATUM IS NAVD88.
5. LEGAL BOUNDARY SURVEY PERFORMED BY POLARIS
SURVEYING, LLC ON 11/20/2024.
6. CONTRACTOR TO VERIFY LIMITS OF EXISTING
CONCRETE SIDEWALK, DIMENSIONS VARY.
7. ALL LONGITUDINAL AND SIDE SLOPES ON GANGWAYS,
DOCKS, AND CONCRETE WALKWAYS SHALL NOT
EXCEED 5% AND 2% RESPECTIVELY.
35'-0" TYP.35'-0"
'-0
CP5
CM-5.09
D O
C K
B
C S
IT
E
PL
AN
E N
LA
R
G
EM
EN
T
H U
R O
N A
VE
, L
EX
IN
G
TO
N , M
I 4
M
AR
IN
A R
ED
EV
EL
O
PM
EN
T
LE
XI
N
G
TO
N S
TA
TE
H A
R B
O R
CM-4.02
CH
FL
CH
18-036
4/24/2026
LLL L
L
LL
L
LL
L
L
L
LL
L
L
L
CONTROL POINT TABLE
POINT #
CP1
CP2
CP3
CP4
CP5
CP6
CP7
CP8
CP9
CP10
CP11
CP12
CP13
NORTHING
649844.6485
649844.9011
649887.5917
649893.9480
650021.5989
650044.5078
650013.3018
650119.0428
650093.3998
650157.8916
650174.6458
650250.4600
650223.0703
EASTING
13613669.2581
13613744.4242
13614096.3013
13613671.8198
13613662.8787
13613660.7729
13614073.9631
13614066.5567
13613700.4537
13613690.9242
13614044.6180
13614039.3078
13613648.2658
DESCRIPTION
CENTERLINE OF GANGWAY PLATFORM A
SW. CORNER OF DOCK A
NE. CORNER OF DOCK A
NW. CORNER OF DOCK A
CENTERLINE OF GANGWAY PLATFORM B
SW. CORNER OF DOCK B
SE. CORNER OF DOCK B
NE. CORNER OF DOCK B
NW. CORNER OF DOCK B
SW. CORNER OF DOCK C
SE. CORNER OF DOCK C
NE. CORNER OF DOCK C
NW. CORNER OF DOCK C
NORTH
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2026 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
SCALE: AS SHOWN (AT 24"x36")
1 SCALE: 1"=20'
A DOCK OVERALL SITE PLAN ENLARGEMENT
2 SCALE: 1"=10'
A DOCK SERVICE PIER SITE PLAN ENLARGEMENT
CP3
CP3
A2
CP4
A3 - BS - ADA A4 - BS A7 - BS
A9 - 45'
A10 - 45'
A11 - 45'
A12 - 45'
A13 - 45' - ADA
A14 - 45' - ADA
A15 - 45'
A16 - 45'
A17 - 45'
A18 - 38'
A19 - 38' - ADA
A20 - 38' - ADA
A21 - 38'
354'-0"
147'-6"
'-0
69'-0"
35'-0" TYP. 39'-0" TYP. 19'-6"
6'- 0"
'-0
8'- 0"
APPROX. FLOATING DOCK JOINT, TYP.
(JOINT LOCATIONS VARY)UPLAND SITE PLAN - SEE CM-4.01
A DOCK
CM-5.07
TYP. ACCESS
LADDERCM-5.10
CM-5.07
EXISTING FLOATING DOCK SYSTEM (N.I.C.)
USACE FEDERAL NAVIGATION
CHANNEL BOUNDARY
A DOCKS SERVICE PIER ENLARGEMENT - SEE ENLARGEMENT 2 ON CM-4.03
8'-0"
12'-6'' x 21' SERVICE PIER
BUILDING (SEE A-1.00)
147'-6''
'-0
12'-6'' x 21' SERVICE PIER
BUILDING (SEE A-1.00)
8'- 0''
'-0
8'-0''
CM-5.07
19'-6''
CM-5.07
39'-0"
A9 - 45'
A10 - 45'
A11 - 45'
A12 - 45' APPROXIMATE USACE FEDERAL
NAVIGATION CHANNEL BOUNDARY
A DOCK
SERVICE PIER
5'-0"
4'-0" TYP.
SERVICE
PIER
FLOATING DOCK SYSTEM ''A'' W/ SPUD PILE ANCHORAGE
(SEE SPUD PILE ANCHORAGE TABLE & DTL 1 - CM-5.10)
FLOATING DOCK SYSTEM ''A'' W/ SPUD PILE ANCHORAGE
(SEE SPUD PILE ANCHORAGE TABLE & DTL 1 - CM-5.10)
5'-0"
TYP. 6x6 TIMBER FENDERS (SEE TYPICAL FLOATING DOCK LAYOUT DETAILS)
TYP. MARINA PEDESTAL
(SEE MARINA ELECTRICAL SHEETS)
TYP. MOORING CLEATS
(SEE TYPICAL FLOATING DOCK LAYOUT DETAILS)
TYP. 6x6 TIMBER FENDERS & MOORING CLEATS
(SEE TYPICAL FLOATING DOCK LAYOUT DETAILS)
ACCESS LADDER
DETAILCM-5.10
TYP. END WALL
SIGNAGE DTL.CM-5.10
TYP. SLIP
SIGNAGE DTL.CM-5.10
TYP. MOORING
CLEATSCM-5.09
4 & 5
TYP. MOORING
CLEATSCM-5.09
4 & 5
8' x 80' GANGWAY
RAMP ACM-5.09
CM-5.09
GANGWAY
PLATFORM A CM-5.04
REMOVE CLEAT TO ALLOW
FOR 6' MIN. CLEARANCE
FOR ADA ACCESS
CP2
APPROXIMATE PROPERTY LINES, TYP.
LEXINGTON
HARBOR
LEXINGTON
HARBOR
ESTIMATED DOCK AREAS
DOCK A 6,591 SF
DOCK B 8,442 SF
DOCK C 7,064 SF
TOTAL 22,097 SF
SPUD PILE ANCHORAGE REQUIREMENTS
DOCK A 35 PILES
DOCK B 50 PILES
DOCK C 28 PILES
TOTAL 113 PILES (MIN.)
MARINA SLIP SUMMARY
30' 28
33' 1
38' 38
38' (ADA) 2
45' 15
45' (ADA) 2
55' 1
60' 9
BROADSIDE 6
BROADSIDE (ADA) 1
TOTAL 103
A6 - BS
A5 - BSA2 - BSA1 - BS
A3 - BS - ADA A4 - BS A5 - BS A6 - BS A7 - BS
CP1
NOTES:
1. TOPOGRAPHIC SURVEY PERFORMED BY EDGEWATER
RESOURCES 7/30/2023 (NAVD88).
2. AVERAGE WATER LEVEL ON 5/26/2023 = 580.12' (NAVD88).
3. HORIZONTAL DATUM IS MICHIGAN STATE PLANE GRID,
SOUTH ZONE, NAD83, INTERNATIONAL FOOT.
4. VERTICAL DATUM IS NAVD88.
5. LEGAL BOUNDARY SURVEY PERFORMED BY POLARIS
SURVEYING, LLC ON 11/20/2024.
6. CONTRACTOR TO VERIFY LIMITS OF EXISTING
CONCRETE SIDEWALK, DIMENSIONS VARY.
7. ALL LONGITUDINAL AND SIDE SLOPES ON GANGWAYS,
DOCKS, AND CONCRETE WALKWAYS SHALL NOT
EXCEED 5% AND 2% RESPECTIVELY.
D O
C K
A
SI
TE
P
LA
N
E N
LA
R
G
EM
EN
TS
H U
R O
N A
VE
, L
EX
IN
G
TO
N , M
I 4
M
AR
IN
A R
ED
EV
EL
O
PM
EN
T
LE
XI
N
G
TO
N S
TA
TE
H A
R B
O R
CM-4.03
CH
FL
CH
18-036
4/24/2026
NORTH
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2026 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
B DOCK
C DOCK
USACE FEDERAL NAVIGATION
CHANNEL BOUNDARY
A DOCK
ICE SUPPRESSION PLAN NOTES:
1. ALL DEICERS TO INCLUDE 100' CORD LENGTHS & 15A PLUGS.
2. INDUSTRIAL MOUNTS TO BE FURNISHED WITH 1.5" X 6" GALVANIZED PIPE WITH THREADED ENDS AND A PIPE CAP
3. BID TO INCLUDE ADDITIONAL TWO (2) SPARE KASCO 4400D DEICERS AND TWO (2) SPARE INDUSTRIAL MOUNTS WITH PIPES
KASCO 4400D DEICER, TYP. (50 TOTAL + SPARES)
KASCO 4400D DEICER
WITH INDUSTRIAL MOUNT, TYP. (12 TOTAL + SPARES) 40'20'0
SCALE: 1" = (AT 24"x36")20'
LEXINGTON
HARBOR
IC
E
SU
PP
R
ES
SI
O
N P
LA
N
E N
LA
R
G
EM
EN
T
H U
R O
N A
VE
, L
EX
IN
G
TO
N , M
I 4
M
AR
IN
A R
ED
EV
EL
O
PM
EN
T
LE
XI
N
G
TO
N S
TA
TE
H A
R B
O R
CM-4.04
CH
FL
CH
18-036
4/24/2026
EJ
EJ
EJ
EJ
EJ
EJ EJ
EJ
EJ EJ
EJ
EJ
EJ
EJ EJ EJ
EJ
EJ
EJ
EJ
EJ
NORTH
20'10'0
SCALE: 1" = (AT 24"x36")
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2026 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
10'
B & C DOCKS - SEE CM-4.02
A DOCK - SEE CM-4.03
EXISTING MDNR BOATER SERVICE BUILDING
EXISTING
BUILDING
EXISTING TIMBER
BOARDWALK
APPROXIMATE EDGE OF WATER
C-5.03
1TYPICAL BENCH &
CONC. PAD BENEATH
7'-10"
90'-4"
7'-3"
34'-4" CONCRETE WALK
REPLACEMENT (900 SF)
TYP. CONC. CONTROL JOINTCONCRETE WALK REPLACEMENT & MARINA UTILITY
PENETRATIONS, TYP. (APPROX. 675 SF TOTAL)CONCRETE PROMENADE REPLACEMENT (2,185 SF) TYP. CONC. EXPANSION JOINT
'-4
R10'-0"
38'-4"
TYPICAL LITTER RECEPTACLE WITH
CONC. PAD BENEATH - 2 TOTAL C-5.02
8'-0''
7'- 2"
'-0
R68'-6"
1'-0"
R3'-6"
5'- 7"
9'-10"
R18 '-0"
1'-0" TYP.
TYPICAL LIGHTING BOLLARD WITH CONCRETE
PAD BENEATH - 4 TOTAL (SEE ELEC. SHEETS)
REPLACEMENT MARINA
ENTRANCE SIGN
(CONFIRM W/ ENGINEER)
PLANTING AREA
(510 SF) PLANTING AREA
(600 SF)
EXISTING OVERHEAD LIGHT
APPROXIMATE PROPERTY LINES, TYP.
LEXINGTON
HARBOR
NOTES:
1. TOPOGRAPHIC SURVEY PERFORMED BY EDGEWATER
RESOURCES 7/30/2023 (NAVD88).
2. AVERAGE WATER LEVEL ON 5/26/2023 = 580.12' (NAVD88).
3. HORIZONTAL DATUM IS MICHIGAN STATE PLANE GRID,
SOUTH ZONE, NAD83, INTERNATIONAL FOOT.
4. VERTICAL DATUM IS NAVD88.
5. LEGAL BOUNDARY SURVEY PERFORMED BY POLARIS
SURVEYING, LLC ON 11/20/2024.
6. CONTRACTOR TO VERIFY LIMITS OF EXISTING
CONCRETE SIDEWALK, DIMENSIONS VARY.
168'-0"8'-0" 3'-0"
10'-0" 2'-0"
'-0
5'-0"
6'-10"
R12 '-0
R20'-0"
7'-5"
PLANTING
AREA
(450 SF)
31'-11"
R10' -0"
3'-
8'-0"
3'-
1 2"
27'-4"
8'- 0''
'-1
1"
RESTORATION
AREA (920 SF)
RESTORATION
AREA (400 SF)
PLANTING KEY
PURPLE LOVEGRASS (ERAGROTIS SPECTABILIS)
AT 24'' O.C. SPACING (#1 POT SIZE)
RESTORE DISTURBED AREAS
WITH TOPSOIL & SEED
6'-
U
PL
AN
D
L
AN
D
SC
AP
E
SI
TE
P
LA
N
H U
R O
N A
VE
, L
EX
IN
G
TO
N , M
I 4
M
AR
IN
A R
ED
EV
EL
O
PM
EN
T
LE
XI
N
G
TO
N S
TA
TE
H A
R B
O R
LS-1.01
CH
FL
CH
18-036
4/24/2026
S
U
U
T
U
D
U E
U E
U E
UE
UE
UE
UE
W W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS SS SS
W W
W
W W W W W W W W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
ST
ST
ST
ST
ST
ST
ST ST ST ST ST ST
STSTSTSTSTSTSTSTSTST
ST ST ST ST ST ST ST ST ST
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS
SS
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM
2 58
S SS SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W W
W W
W W
W W
W W
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
W W W W W W W W W W W W W W W W
W W
W
W WH
W W
W W
W W
W W W W W W W W W W W W
W W W W W W W W W W W W W W W W W W H
W H
I
FP FP FP FP FP FP FP FP FP FP FP
H
H
I
FP
FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP
FP
FP
FP
FP
FP FP FP FP FP FP FP FP FP FP FP FP
HHH
H HH
G GD
CO
C O
C O
NORTH
60'30'0
SCALE: 1" = (AT 24"x36")
P:\2018\18-36 LSH - LEXINGTON STATE HARBOR\CAD\SHEETS\PHASE 2 - MARINA SHEETS\U-1.XX.DWG
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2026 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
B & C DOCK UTILITY PLAN ENLARGEMENT - SEE U-4.02
A DOCK UTILITY PLAN ENLARGEMENTS - SEE U-4.03
UP
LA
ND
U
TI
LI
TY
E
NL
AR
GE
ME
NT
SE
E
U- 4.0
P:\2018\18-36 LSH - LEXINGTON STATE HARBOR\CAD\SHEETS\PHASE 2 - MARINA SHEETS\U-1.XX.DWG
30'
LAKE HURONEXISTING USACE STONE BREAKWATER
STRUCTURE & CONCRETE PATHWAY
APPROXIMATE EDGE OF WATER
EXISTING FLOATING DOCK SYSTEM (N.I.C.)
EXISTING MDNR
BOATER SERVICE
BUILDING
HURON AVENUE
EXISTING
TRAFFIC CIRCLE
EXISTING BUILDING
EXISTING
BUILDING
EXISTING
PAVILION
EXISTING
RESTROOM
BUILDING
EXISTING FUEL TANKS
EXISTING 2'' WATER MAIN
EXISTING STORMWATER LINE
EXISTING COMMUNICATIONS LINE
EXISTING SANITARY LINE
EXISTING SANITARY MANHOLE
UTILITY LEGEND:
EXISTING WATER LINE
EXISTING SANITARY LINE
EXISTING COMMUNICATIONS LINE
EXISTING UNDERGROUND ELECTRIC LINE
EXISTING STORM SEWER LINE
NEW FIRE PROTECTION LINE
NEW WATER LINE
NEW SANITARY LINE
SSSS
PLUMBING NOTES:
1. ALL PLUMBING MATERIALS SHALL BE COMPLIANT WITH MICHIGAN PLUMBING CODE
2. POTABLE WATER & DRY FIRE MAINS SHALL BE SCH.40 GALVANIZED PIPE WITH GROOVED FITTINGS
3. POTABLE BRANCH LINES SHALL BE PEX-A AND BE PROTECTED FROM UV EXPOSURE.
4. FLEXIBLE POTABLE WATER LINES SHALL BE BRAIDED STAINLESS STEEL CONNECTORS, MEET NSF 61, RATED
FOR USE IN POTABLE WATER SYSTEMS WITH FITTINGS TO MATCH ADJACENT PIPE.
5. ALL UTILITY PEDESTALS SHALL BE SEPARATED FROM THE MAIN WITH INDIVIDUAL VALVES. ALL VALVES SHALL
BE BALL TYPE, MEET NSF 61 AND BE PER TABLE 605.7.
6. CONTRACTOR RESPONSIBLE FOR DISINFECTION AND BACTERIOLOGICAL TESTING PER CODE REQUIREMENTS
PRIOR TO USE AND FINAL ACCEPTANCE.
7. CONTRACTOR RESPONSIBLE FOR PRESSURE TESTING ALL DRY FIRE SYSTEMS PRIOR TO FINAL ACCEPTANCE.
8. ALL PLUMBING SYSTEMS TO INCLUDE ACCESSIBLE SEASON DRAINS AT THE DOWNSTREAM ENDS OF THE
SYSTEM.
9. ALL HOSE BIBS TO INCLUDE VACUUM BREAKERS PER SPECIFICATIONS
10. SEE ELECTRICAL PLANS FOR FIRE PEDESTAL LOCATIONS.
11. FUEL, COMMUNICATIONS, & ELECTRICAL LINES & EQUIPMENT NOT SHOWN OR NOT SHOWN FULLY WITHIN
UTILITY PLAN (SEE FUEL AND ELECTRIC SHEETS).
APPROXIMATE PROPERTY LINES, TYP.
USACE FEDERAL NAVIGATION
CHANNEL BOUNDARY
LEXINGTON
HARBOR
VILLAGE OF LEXINGTON
TIERNEY PARK
O
VE
R
AL
L U
TI
LI
TY
P
LA
N
H U
R O
N A
VE
, L
EX
IN
G
TO
N , M
I 4
M
AR
IN
A R
ED
EV
EL
O
PM
EN
T
LE
XI
N
G
TO
N S
TA
TE
H A
R B
O R
U-1.01
CH
FL
CH
18-036
4/24/2026
BID
751/17282 BDW
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
STSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
C O
M C
O M
C O
M C
O M
C O
M C
O M
C O
M C
O M
C O
M C
O M
C O
M
SS
SS
S
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
SS
SS
W W
W W
W W
W
W
W W W W W W W W W W W W W W W W W W W W W W W W W
W
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W W
W W
W W
W W
W W
W W
W W
W W
W
WWWWWWWWWW
W
W W
W W
W W
W W
W W
W
WWWWW WWWW
W W
W W
W W
W W
W W
W W
W W
I
I
FP FP FP FP FP FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FPFPFPFPFP
H
CO
CO
NORTH
20'10'0
SCALE: 1" = (AT 24"x36")
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2026 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
10'
B & C DOCKS SEE U-4.02
A DOCK - SEE U-4.03
EXISTING MDNR BOATER SERVICE BUILDING
EXISTING
BUILDING
EXISTING
FUEL TANKS
EXISTING UTILITY TRANSFORMER &
CONCRETE PAD BENEATH
APPROXIMATE EDGE OF WATER
UTILITY LEGEND:
EXISTING WATER LINE
EXISTING SANITARY LINE
EXISTING COMMUNICATIONS LINE
EXISTING UNDERGROUND ELECTRIC LINE
EXISTING STORM SEWER LINE
NEW FIRE PROTECTION LINE
NEW WATER LINE
NEW SANITARY LINE
SSSS
EXISTING 2'' WATER MAIN
EXISTING COMMUNICATIONS LINE
EXISTING SANITARY MANHOLE
EXISTING STORMWATER LINE
FLEXIBLE CONNECTION & GANGWAY
CONN. PLATFORMS (TYP.)
2'' HDPE SANITARY FORCEMAIN45 DEGREE FITTINGS (TYP.)
2-1/2'' VALVE (SEE DTL 8 ON C-5.02)
2-12'' x 2-12'' WATER SERVICE TEE
2-1/2'' HDPE WATER SERVICE
3'' TO 2-12'' WATER SERVICE REDUCER
2-12'' HDPE WATER SERVICE
2-12'' HDPE WATER SERVICE
2-1/2'' VALVE (SEE DTL 8 ON C-5.02)
EXISTING FUEL TRANSITION SUMP &
CONC. APRON (SEE FUEL SHEETS)
UTILITY TRANSFORMER & CONC. PAD
BENEATH (SEE ELEC. SHEETS)
C-5.01
5RPZ BACKFLOW PREVENTER
& ENCLOSURE STRUCTURE
REMOVE AND REPLACE EXISTING DETERIORATED SEASONAL 3'' WATER LINE HUB FITTING. CHIP
AWAY EXISTING CONCRETE FOOTING AS NEEDED FOR REMOVAL. RESTORE CONCRETE FOOTING
POST REPLACEMENT. ALL WORK TO BE PER MICHIGAN PLUMBING CODE. CONFIRM WITH ENGINEER.
TYPICAL LIGHTING BOLLARD WITH CONCRETE
PAD BENEATH - 4 TOTAL (SEE ELEC. SHEETS)
3'' HDPE WATER SERVICE
2-12'' HDPE WATER SERVICE
EXISTING OVERHEAD LIGHT
APPROXIMATE PROPERTY LINES (TYP.)
LEXINGTON
HARBOR
PLUMBING NOTES:
1. ALL PLUMBING MATERIALS SHALL BE COMPLIANT WITH MICHIGAN PLUMBING CODE
2. POTABLE WATER & DRY FIRE MAINS SHALL BE SCH.40 GALVANIZED PIPE WITH GROOVED FITTINGS
3. POTABLE BRANCH LINES SHALL BE PEX-A AND BE PROTECTED FROM UV EXPOSURE.
4. FLEXIBLE POTABLE WATER LINES SHALL BE BRAIDED STAINLESS STEEL CONNECTORS, MEET NSF 61, RATED FOR USE IN POTABLE WATER SYSTEMS WITH FITTINGS
TO MATCH ADJACENT PIPE.
5. ALL UTILITY PEDESTALS SHALL BE SEPARATED FROM THE MAIN WITH INDIVIDUAL VALVES. ALL VALVES SHALL BE BALL TYPE, MEET NSF 61 AND BE PER TABLE 605.7.
6. CONTRACTOR RESPONSIBLE FOR DISINFECTION AND BACTERIOLOGICAL TESTING PER CODE REQUIREMENTS PRIOR TO USE AND FINAL ACCEPTANCE.
7. CONTRACTOR RESPONSIBLE FOR PRESSURE TESTING ALL DRY FIRE SYSTEMS PRIOR TO FINAL ACCEPTANCE.
8. ALL PLUMBING SYSTEMS TO INCLUDE ACCESSIBLE SEASON DRAINS AT THE DOWNSTREAM ENDS OF THE SYSTEM.
9. ALL HOSE BIBS TO INCLUDE VACUUM BREAKERS PER SPECIFICATIONS
10. SEE ELECTRICAL PLANS FOR FIRE PEDESTAL LOCATIONS.
11. FUEL, COMMUNICATIONS, & ELECTRICAL LINES & EQUIPMENT NOT SHOWN OR NOT SHOWN FULLY WITHIN UTILITY PLAN (SEE FUEL AND ELECTRIC SHEETS).
C-5.02
9CONNECT TO EXISTING SANITARY
MANHOLE STRUCTURE
SANITARY CLEANOUT
SANITARY CLEANOUT
MDP PANEL & CONC. PAD
BENEATH (SEE ELEC. SHEETS)
SEE ELECTRICAL SHEETS FOR REQUIRED
ELECTRICAL, PHONE, & DATA CONDUIT LOCATIONS
U
PL
AN
D
U
TI
LI
TY
P
LA
N E
N
LA
R G
EM
EN
T
H U
R O
N A
VE
, L
EX
IN
G
TO
N , M
I 4
M
AR
IN
A R
ED
EV
EL
O
PM
EN
T
LE
XI
N
G
TO
N S
TA
TE
H A
R B
O R
U-4.01
CH
FL
CH
18-036
4/24/2026
BID
751/17282 BDW
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
SS SS SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W W W
W W
W W
W W
W W
W
W W
W W
W
W
W W
W W
W W
W
W W W W W W W W W W W W W W W W W W W W W W W W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W H
W H
I
FP
FP
FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP
FP
FP
FP
FP
FP
FP
FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP
HHH
H HH
C O
NORTH
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2026 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
1 SCALE: 1"=20'
B & C DOCK UTILITY PLAN ENLARGEMENT
UPLAND UTILITY PLAN ENLARGEMENT - SEE CM-4.01
MARINA UTILITY PEDESTAL - SEE ELECTRICAL
DRAWINGS FOR PEDESTAL PLAN (TYP.) CM-5.06
DRY FIRE INLET (TYP.) CM-5.08
2.5'' DRY FIRE HOSE
CONNECTION (TYP.)
MARINA PLUMBING
DETAIL (TYP.)
CM-5.08
CM-5.08
UTILITY LEGEND:
EXISTING WATER LINE
EXISTING SANITARY LINE
EXISTING COMMUNICATIONS LINE
EXISTING UNDERGROUND ELECTRIC LINE
EXISTING STORM SEWER LINE
NEW FIRE PROTECTION LINE
NEW WATER LINE
NEW SANITARY LINE
SSSS
40'20'0
SCALE: 1" = (AT 24"x36")20'
PLUMBING NOTES:
1. ALL PLUMBING MATERIALS SHALL BE COMPLIANT WITH MICHIGAN PLUMBING CODE
2. POTABLE WATER & DRY FIRE MAINS SHALL BE SCH.40 GALVANIZED PIPE WITH GROOVED FITTINGS
3. POTABLE BRANCH LINES SHALL BE PEX-A AND BE PROTECTED FROM UV EXPOSURE.
4. FLEXIBLE POTABLE WATER LINES SHALL BE BRAIDED STAINLESS STEEL CONNECTORS, MEET NSF 61, RATED FOR USE IN POTABLE WATER SYSTEMS WITH FITTINGS
TO MATCH ADJACENT PIPE.
5. ALL UTILITY PEDESTALS SHALL BE SEPARATED FROM THE MAIN WITH INDIVIDUAL VALVES. ALL VALVES SHALL BE BALL TYPE, MEET NSF 61 AND BE PER TABLE 605.7.
6. CONTRACTOR RESPONSIBLE FOR DISINFECTION AND BACTERIOLOGICAL TESTING PER CODE REQUIREMENTS PRIOR TO USE AND FINAL ACCEPTANCE.
7. CONTRACTOR RESPONSIBLE FOR PRESSURE TESTING ALL DRY FIRE SYSTEMS PRIOR TO FINAL ACCEPTANCE.
8. ALL PLUMBING SYSTEMS TO INCLUDE ACCESSIBLE SEASON DRAINS AT THE DOWNSTREAM ENDS OF THE SYSTEM.
9. ALL HOSE BIBS TO INCLUDE VACUUM BREAKERS PER SPECIFICATIONS
10. SEE ELECTRICAL PLANS FOR FIRE PEDESTAL LOCATIONS.
11. FUEL, COMMUNICATIONS, & ELECTRICAL LINES & EQUIPMENT NOT SHOWN OR NOT SHOWN FULLY WITHIN UTILITY PLAN (SEE FUEL AND ELECTRIC SHEETS).
APPROXIMATE EDGE OF WATER
4" VALVE & 3 4" PEX-A TO EACH PEDESTAL (TYP.)
2-1/2'' SCH. 40 GALV. WATER SERVICE
FLEXIBLE CONNECTIONS REQUIRED AT ALL
DOCK JOINTS - JOINT LOCATIONS VARY
4'' SCH. 40 GALV. DRY FIRE LINE, FLEXIBLE CONNECTIONS
REQUIRED @ ALL DOCK JOINT LOCATIONS (TYP.)
FLOATING DOCK JOINT, TYP.
(LOCATIONS VARY)
SEASONAL DRAIN
VALVE & CAP (TYP.)
WATER HAMMER ARRESTOR AT
END OF EACH MAIN PIER (TYP.)
FLEXIBLE CONNECTION @
END OF GANGWAY (TYP.)
2'' SCH. 40 GALV. WATER SERVICE
2-1/2'' TO 2'' WATER
SERVICE REDUCER
2-1/2'' TO 2'' WATER SERVICE REDUCER
WATERMAIN TEE
DRY FIRE PROTECTION LINE TEE
45 DEGREE FITTINGS (TYP.)
ELEC. SUBSTATION
(SEE ELEC. SHEETS)
ELEC. SUBSTATION
(SEE ELEC. SHEETS)
2-1/2'' VALVE (SEE DTL 8 ON C-5.02)
2-1/2'' VALVE (SEE DTL 8 ON C-5.02)
2'' S.S. FLEXIBLE CONNECTION AT ALL JOINTS
2-1/2'' S.S. FLEXIBLE CONNECTION AT ALL JOINTS
2'' SCH. 40 GALV. WATER SERVICE
2'' S.S. FLEXIBLE CONNECTION AT ALL JOINTS
APPROXIMATE PROPERTY LINES (TYP.)
USACE FEDERAL NAVIGATION
CHANNEL BOUNDARY
LEXINGTON
HARBOR
4'' SCH. 40 GALV. DRY FIRE LINE, FLEXIBLE CONNECTIONS
REQUIRED @ ALL DOCK JOINT LOCATIONS (TYP.)
D O
C K
B
C U
TI
LI
TY
P
LA
N
E N
LA
R
G
EM
EN
TS
H U
R O
N A
VE
, L
EX
IN
G
TO
N , M
I 4
M
AR
IN
A R
ED
EV
EL
O
PM
EN
T
LE
XI
N
G
TO
N S
TA
TE
H A
R B
O R
U-4.02
CH
FL
CH
18-036
4/24/2026
SS
SS
SS
SS
SS
SS
SS
W W
W W
W W
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
W W W W W W W W W W W W W W W W W W W W W W W W W W W WH
W W W W
I
FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP
H
H
G GD
CO
C O
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WH
WFP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP
H
FP
H
G GD
CO
NORTH
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2026 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
SCALE: AS SHOWN (AT 24"x36")
1 SCALE: 1"=20'
A DOCK OVERALL UTILITY PLAN ENLARGEMENT
1 SCALE: 1"=10'
A DOCK SERVICE PIER UTILITY PLAN ENLARGEMENT
UPLAND UTILITY PLAN ENLARGEMENT - SEE U-4.01
EXISTING FLOATING DOCK SYSTEM (N.I.C.)
A DOCK SERVICE PIER UTILITY PLAN ENLARGEMENT - SEE ENLARGEMENT 2 ON U-4.03
12'-6'' x 21' SERVICE PIER BUILDING (SEE A-1.00)
4" VALVE & 3 4" PEX-A TO EACH PEDESTAL (TYP.) 2'' SCH. 40 GALV. WATER SERVICE (TYP.)
FLEXIBLE CONNECTIONS REQUIRED AT ALL
DOCK JOINTS - JOINT LOCATIONS VARY
4'' SCH. 40 GALV. DRY FIRE LINE, FLEXIBLE CONNECTIONS
REQUIRED @ ALL DOCK JOINT LOCATIONS (TYP.)
MARINA UTILITY PEDESTAL (TYP.) - SEE MARINA
ELECTRICAL DRAWINGS FOR PEDESTAL PLANS
2.5'' DRY FIRE HOSE
CONNECTION (TYP.)
FLOATING DOCK JOINT, TYP. (LOCATIONS VARY)
MARINA PLUMBING
DETAIL (TYP.)
SEASONAL DRAIN VALVE & CAP (TYP.)
WATER HAMMER ARRESTOR AT END OF EACH MAIN PIER (TYP.)
UTILITY LEGEND:
EXISTING WATER LINE
EXISTING SANITARY LINE
EXISTING COMMUNICATIONS LINE
EXISTING UNDERGROUND ELECTRIC LINE
EXISTING STORM SEWER LINE
NEW FIRE PROTECTION LINE
NEW WATER LINE
NEW SANITARY LINE
SSSS
12'-6'' x 21' SERVICE PIER BUILDING (SEE A-1.00)
4" VALVE & 3 4" PEX-A TO EACH PEDESTAL (TYP.)
2'' SCH. 40 GALV. WATER SERVICE
FLEXIBLE CONNECTIONS REQUIRED AT ALL
DOCK JOINTS - JOINT LOCATIONS VARY
4'' SCH. 40 GALV. DRY FIRE LINE,
FLEXIBLE CONNECTIONS REQUIRED @
ALL DOCK JOINT LOCATIONS (TYP.)
TYP. MARINA UTILITY PEDESTAL - SEE MARINA
ELECTRICAL DRAWINGS FOR PEDESTAL PLANS
DRY FIRE INLET (TYP.)
2.5'' DRY FIRE HOSE
CONNECTION (TYP.)
FLOATING DOCK JOINT, TYP.
(LOCATIONS VARY)
MARINA PLUMBING
DETAIL (TYP.)
SEASONAL DRAIN VALVE & CAP (TYP.)
WATER HAMMER ARRESTOR AT END OF EACH MAIN PIER (TYP.)
W/ FLEXIBLE CONN. & EACH END OF GANGWAY
CM-5.08
CM-5.08
CM-5.06
6CM-5.08
CM-5.08
CM-5.08
CM-5.06
6 LIBERTY PROVORE - 380 - SD GRINDER PUMP SYSTEM
SANITARY CHECK VALVE (TYP.)
SANITARY CLEANOUT
SANITARY PUMPOUT
SANITARY TEE (TYP.)
2'' x 1-1/2'' WATER SERVICE TEE
45 DEGREE
FITTINGS (TYP.)
FUEL & SANITARY EQUIPMENT
(SEE ENLARGEMENT BELOW)
TYP. HOSE REEL
(BOTH SIDES OF EACH DISPENSER)
GAS DISPENSER
SANITARY PUMP OUT
WASH WATER
SERVICE PIER SIGN & LIGHT
DIESEL DISPENSER
SPILL KIT
GAS DISPENSER
GRINDER PUMP
SUPPORT SYSTEMCM-5.06
2'' HDPE SANITARY FORCEMAIN
2'' HDPE SANITARY FORCEMAIN
4'' GRAVITY PVC SANITARY LINE
LIBERTY PROVORE - 380 - SD GRINDER PUMP SYSTEM
ELEC. SUBSTATION
(SEE ELEC. SHEETS)
2'' S.S. FLEXIBLE CONNECTION AT ALL JOINTS
RPZ BACKFLOW PREVENTER (TYP.)
BALL VALVE (TYP.)
WASH WATER
2-12'' TO 2'' WATER SERVICE REDUCER
2'' SCH. 40 GALV. WATER SERVICE
APPROXIMATE PROPERTY LINES (TYP.)
USACE FEDERAL NAVIGATION
CHANNEL BOUNDARY
LEXINGTON
HARBOR
LEXINGTON
HARBOR
PLUMBING NOTES:
1. ALL PLUMBING MATERIALS SHALL BE COMPLIANT WITH MICHIGAN PLUMBING CODE
2. POTABLE WATER & DRY FIRE MAINS SHALL BE SCH.40 GALVANIZED PIPE WITH GROOVED FITTINGS
3. POTABLE BRANCH LINES SHALL BE PEX-A AND BE PROTECTED FROM UV EXPOSURE.
4. FLEXIBLE POTABLE WATER LINES SHALL BE BRAIDED STAINLESS STEEL CONNECTORS, MEET NSF 61, RATED FOR USE IN POTABLE WATER SYSTEMS WITH FITTINGS
TO MATCH ADJACENT PIPE.
5. ALL UTILITY PEDESTALS SHALL BE SEPARATED FROM THE MAIN WITH INDIVIDUAL VALVES. ALL VALVES SHALL BE BALL TYPE, MEET NSF 61 AND BE PER TABLE 605.7.
6. CONTRACTOR RESPONSIBLE FOR DISINFECTION AND BACTERIOLOGICAL TESTING PER CODE REQUIREMENTS PRIOR TO USE AND FINAL ACCEPTANCE.
7. CONTRACTOR RESPONSIBLE FOR PRESSURE TESTING ALL DRY FIRE SYSTEMS PRIOR TO FINAL ACCEPTANCE.
8. ALL PLUMBING SYSTEMS TO INCLUDE ACCESSIBLE SEASON DRAINS AT THE DOWNSTREAM ENDS OF THE SYSTEM.
9. ALL HOSE BIBS TO INCLUDE VACUUM BREAKERS PER SPECIFICATIONS
10. SEE ELECTRICAL PLANS FOR FIRE PEDESTAL LOCATIONS.
11. FUEL, COMMUNICATIONS, & ELECTRICAL LINES & EQUIPMENT NOT SHOWN OR NOT SHOWN FULLY WITHIN UTILITY PLAN (SEE FUEL AND ELECTRIC SHEETS).
D O
C K
A U
TI
LI
TY
P
LA
N
E N
LA
R
G
EM
EN
T
H U
R O
N A
VE
, L
EX
IN
G
TO
N , M
I 4
M
AR
IN
A R
ED
EV
EL
O
PM
EN
T
LE
XI
N
G
TO
N S
TA
TE
H A
R B
O R
U-4.03
CH
FL
CH
18-036
4/24/2026
BID
751/17282 BDW
SIGNAGE PER
ELECTRICAL PLANS
SIGNAGE PER ELECTRICAL PLANS
File details come from the government source that posted it. Updated .