Plans - NP ROCR 15(2).pdf
PDF 33 MB Posted
- Attached to
- Rock Creek Park - Joyce Road Bridge
- Solicitation number
- 693C73-24-B-000010
About this file
The document appears to be a solicitation for a federal contract opportunity related to the replacement of the Joyce Road bridge over Luzon Branch in Washington, DC. The project, designated as NP ROCR 15(2) with Solicitation Number 693C73-24-B-000010, is expected to cost between $2,000,000 and $5,000,000. The scope of work includes the replacement of the bridge, modifications to existing walls, rip rap installation, new approach slabs, mill and overlay, and other miscellaneous work. The solicitation is set aside for certified Small Business Concerns, and bids are due on a date to be specified in the SF 1442 form. Contractors must be registered in the System for Award Management (SAM) database to submit a bid and receive payment. The solicitation documents can be downloaded from the www.sam.gov website, and all questions should be directed to eflhd.contracts@dot.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - Project NP ROCR 15(2).pdf | ||
| FP14_Eng.pdf | ||
| ADV Bidders Qualifications Form.doc | DOC document | |
| Geotechnical Report.pdf | ||
| IFB Solicitation - NP ROCR 15(2).pdf | ||
| Bridge Inspection Report_3450-003P.pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| VETS-4212 Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NP ROCR 15(2)D.C.
PMIS No.: 195422 NPS No.: 821/173688
Title Sheet
Symbols And Abbreviations
Location Map
Typical Sections
Tabulation of Quantities
Plan And Profile
Erosion & Sediment Control Narrative
DESCRIPTION
INDEX TO SHEETS
PLANS FOR PROPOSED
PLANS PREPARED BY
U.S. DEPARTMENT OF THE INTERIOR
WASHINGTON, DC
N
KEY MAP
WASHINGTON DC AND METROPOLITAN AREA
15 12 6 0 15
SCALE IN MILES
VIRGINIA
SPRINGFIELD
ALEXANDRIA
ANDREWS
AIR FORCE
BASE
BETHESDA
MCLEAN
ARLINGTONFALLS
CHURCH
VIENNA
SILVER
SPRING
HYATTSVILLE
ROCK
CREEK
PARK
FT
MYER
B A
L T
W A S
H
P A
R K
W A
Y
GEORGE
P A
R K
W A
Y
MARYLAND
WASH. DC
W A S
H
D
IS
T R
IC
T O
F C O
LU
M B
IA
A R
LIN
G T O
N C
O
FA
IR
FA
X C
O
M O
N T G
O M
E R Y C
O
P R
IN
C E G
E O
R G E S C
O
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH:
ADT (2023)
ADT (2043)
DHV
%Truck
D
V (MPH)
N/A
N/A
SPECIFICATIONS:
DESIGN DESIGNATION:
e(max)
C/A None
N
PROJECT NP ROCR 15(2)
NATIONAL PARK SERVICE
(STRUCTURE NO. 3450-003P)
JOYCE ROAD BRIDGE AT MILITARY ROAD NW RECONSTRUCTION
NP ROCR 15(2)
PROJECT
abutment in place, new approach slabs, and mill & overlay.
to accommodate the new bridge, rip rap to protect existing over Luzon Branch including modifications to existing walls
This work includes replacement of the Joyce Road Bridge
0.03 Miles
N/A
Know what'sbelow.
before you dig.Call
R
U.S. Department of Transportation
Administration
Federal Highway
SHEET
NO
A01
A04
LANE MILES:
100% PLANS
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
BRIDGE INSPECTION REPORT
ROAD: WIDTH
8" - 14"
2.5" - 3.5" 8" - 14"
2.5" - 3.5"
ROAD: WIDTH
22'
22'
ASPHALT CONCRETE
Last date of inspection: 06/17/2021
Structure No. 3450-003P
Joyce Road Bridge
Joyce Road (Existing)
Joyce Road (New)
Project Manager
DAN WESTON
Lead Designer
JACOBS
April, 2024
4%
0.04 Miles
Survey Information SheetA05
D01
Soil Disturbance and Stream Impact Plan
Project No. NP ROCR 15(2)
A02-A03
Missouri Ave
Military Rd
C o n n e c tic u t A v e th
S t
N W
Chase
Chevy Park
Takoma
Spring
Silver
N e w H a m p s h ir e A v e
S o u th D a k o ta A v eW is c o n s in A v e
C o n n e c ti c u t A v e
Chillum
G e o r g ia A v e
O r e g o n
A v e
R o c k
C re e k
O F C
O
LU
M B
IA
D
IS
T R
IC
T
M A R Y
LA
N D
Summaries & Schedules
Bridge PlansR01-R45
Temporary Traffic Control Narrative
Temporary Traffic Control PlanN03-N04
Signing and Pavement Marking PlanP01
S01-S17 Standards and Details
10.50
Scale in Miles
A01
A06 Horizontal Alignment Information
C03-C05
M03 Erosion & Sediment Control Plan
ROCK CREEK PARK
B01
C01-C02
M01-M02
M04
M05 Landscape and Seeding Plan
N01
Temporary Traffic Control Sign Legend & NotesN02
Signature
Date
STATE PROJECT
NUMBER
SHEET
:2
M p r il
D e f a u lt
R O
C R
(2
T T
L .d g n
April 3, 2024
Signature x 99.9
T-45
2,645.9
T-3 x 99.9
T-45
2,645.9
T-3
FOREST BOUNDARY
NATIONAL PARK or
SECTION LINE16
SECTION LINE4
SECTION LINE
COUNTY BOUNDARY
CITY BOUNDARYCITY BOUNDARY
NATIONAL BOUNDARY
STATE BOUNDARY
TOWNSHIP or RANGE LINE
PROPERTY LINE
BRASS CAP
STEEL PIN
Top of Triangle Points North
TRAVERSE POINT (Horizontal & Vertical)
TRAVERSE POINT (Horizontal)
COORDINATE GRID TICK
SPOT ELEVATION
HUB & TACK
26 25 69426 25 694ROUTE NUMBERS
TOP OF CUT
TOE OF FILL
TRANSITION
SINGLE TRACK
ROADWAY, EXISTING
INTERMITTENT DRAINAGE/ SMALL CREEK
SPRING
LARGE CREEK/RIVER
RAILROAD
TRAIL
MULTIPLE TRACK
EOP
EOG
PAVEMENT REMOVAL/ROADWAY OBLITERATION
LAKE, POND or RESERVOIR; MARSHLAND
SLOPE STAKE
INTERSTATE U.S. STATE
AREA PATTERN
MILL AND OVERLAY
SIDEWALK ASPHALT/CONCRETE
FULL DEPTH PAVEMENT
OVERLAY
c
Inside diameter ID
High water HW
Hexagon hex.
Headwall hdwl.
Joint jt.
Low water LW
Longitudinal(longitude) long.
Length of spiral Ls
(spiral curve transition)
Length of curve Lc
Length of curve(simple curve) L
Left lt., Lt. or LT
Latitude lat.
Lamination lam.
(curve delta or deflection)
Curve total angle
(spiral curve transitions)
Curve central angle
Culvert culv.
Corrugated metal pipe CMP
Continuous cont.
Construction joint Constr. jt.
Connection conn.
Column col.
Clear clr.
Centers ctrs.
Center to center cc, c-c or c. to c.
Centerline C
Concrete Pavement
GACPGyratory Mix, Asphalt
Gage(gauge) ga.
Galvanized galv.
Expansion joint exp. jt.
Excavation exc.
ESALEquivalent Single Axle Load
Equation EQ or eq.
End section ES
Embankment emb.
[El. 94.16]
Elevation with number El. 94.161
Elevation elev.
Edge of pavement EP or EOP
East E
Average daily traffic ADT
Alternate alt.
Ahead AH
Aggregate aggr.
Abutment Abut.
BWBroken White
Bench mark BM
Beginning beg.
Bearing brg.
Balance point BP
BATBackslope Anchor Terminal
Back BK
Footing ftg.
FATFlared Anchor Terminal
Drop Inlet DI
Drawing(s) dwg(s), or drwg(s)
DSYDouble Solid Yellow
Distance dist.
Diaphragm diaph.
Diameter D, dia., or
Diagonal diag.
Design speed V
Design hourly volume DHV
West W
Vertical point of intersection VPI
Vehicle per hour vph embankment
Mechanically stabilized MSE
Monument mon. or MON
Minimum min.
Mile[Kilometer] post M.P[K.P.]
Maximum max.
Material matl.
Mainline M.L.
Typical typ.
Township T.
Thread thd.
easement
Temporary construction TCE
Temporary benchmark TBM
(spiral curve transition)
Tangent distance Ts
(tangent length)
Tangent distance T
On centers o. c.
Outside diameter OD
Out to out o. to o.
Original ground OG
North N
Normal crown NC or NCR
Nominal Max. Size Aggregate NMSA
Point on tangent POT
Point on spiral POS
Point on curve POC
Point of tangent to spiral PS or TS
Point of tangent PT
Point of spiral to tangent PST or ST spiral
Point of spiral to reverse SRS
Point of spiral to curve PSC or SC
Point of intersection PI
Point of curve to spiral PCS or CS
Point of curve PC
Point of compound curve PCC
Plate pl.
Pavement pvmt.
Route Rte.
Roadway Rdwy.
Right-of-way R/W
Right Rt., rt.or RT
Required reqd.
Reinforcement (reinforced) reinf.
Radius R
Symmetrical sym.
Superelevation rate e
Structure struc.
Stringer stgr.
Stiffener stiff.
SBTSteel Backed Timber
Station Sta.
Standard std.
Spiral central angle s
Spacing, spaces or spaced spa.
South S
SWSolid White
Section Sec.
DIVERSION CHANNEL
TEST PIT
N
MATERIAL SOURCE
NORTH ARROW
BORING LOCATION
RIPRAP/CULVERT RIPRAP
CHECK DAM
DIVERSION BERM
SILT FENCE
P/LP/L
SF
A02
SYMBOLS AND ABBREVIATIONS
Sheet 1 of 2
NP ROCR 15(2)D.C.
ROCK CREEK PARK
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
L
B-1
TP-1
:4
S e p te m b e r
D e f a
R
O C
R
(2
S Y
M .d g n
STATE PROJECT
NUMBER
SHEET
R/W R/W
R/W R/W
36 31
6 1
No Symbol
No Symbol
FOUND
36 31
6 1
36 31
6 1
400 No Symbol
PROPERTY CORNER
PARCEL NUMBER
EASEMENT (Permanent - Construction)
RIGHT-OF-WAY LINE
with MONUMENT
RIGHT-OF-WAY LINE
P/E C/E
FOUND
36 31
6 1
PROJECTED
SECTION CORNER
SECTION CORNER4
SECTION16
P/E C/E
TB or TP
P P or
UD
W W
FO=Fibre optics
T=Telephone, E&T=Joint Electrical and Telephone
E=Electrical for distribution line
P=Electrical for transmission line
OVERHEAD(POWER POLE) UTILITIES
E=electrical, FO=fiber optics SD=storm drain, T=telephone, W=water G=gas, O=oil, P=power, SS=sanitary sewer, UNDERGROUND UTILITIES
No Symbol
TB or TP
P P or or
UD
W W
TREELINE; TREE
BUILDING
UNDERDRAIN
BOX CULVERT
CULVERT with DROP INLET
PIPE CULVERT with HEADWALL
PIPE CULVERT with END SECTION
PIPE CULVERT (arrow shows flow)
BRIDGE
STREET LIGHT
TELEPHONE BOOTH or PEDESTAL
SUPPORT POLE with ANCHOR
RETAINING WALL
SIGNS
PORTABLE
POST MOUNTED
GUARDRAIL
CATTLEGUARD
GATE with FENCE
FENCE
wall facewall face
TB or TP or
MEDIAN & SIDE (CONCRETE) BARRIER
No Symbol
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:PROPOSEDEXISTING
SYMBOLS AND ABBREVIATIONS
Sheet 2 of 2
A03
Filter Bag
Traffic Management Plan
NP ROCR 15(2)D.C.
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
UDUD
FB
TMP
:2
M a y
D e f a
R
O C
R
(2
S Y
M .d g n
STATE PROJECT
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
LOCATION MAP
0.250.1250
Scale in Miles
12+25
End Work
10+55
Begin Work
C re e kR o c k th
S t
N W
C o n n e c tic u t A v e
Military Rd
O r e g v e
Missouri Ave
G e o r g ia A v e
Jo yc e
R oa d
A04
E 1301223.50
N 472182.67
E 1301350.21
N 47229096 sheet M03 and as approved by the CO.
the roadway within the limits of disturbance shown on between the limits of the full road closure and outside
Locate construction staging area along Joyce Road
NOTE:
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
STATE PROJECT
NUMBER
SHEET
:0
O c to b e r
D e f a
R O
C R
(2
M A
P .d g
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
40'20'0
Scale in Feet
POINT ID
PROJECT CONTROL POINTS:
REBAR & CAP 171.48 1301163.390 472106.425106
REBAR & CAP 177.66 1301231.577 472223.105105
REBAR & CAP 182.84 1301319.203 472292.477104
REBAR & CAP 183.91 1301428.119 472321.219103
NORTHING EASTING ELEVATION REMARKS
PROJECT: ROCR 15 (2)
GEOID: GEOID12B (Conus)
VERTICAL DATUM: NAVD 1988
ZONE: MARYLAND 1900
HORIZONTAL DATUM: NAD 1983 (Conus)
COORDINATE SYSTEM 1983
UNITED STATES - STATE PLANE
PROJECT COORDINATE SYSTEM
PROJECT DATUM:
TBAR
T-105
N
NTS
JO
Y C E R
O A
D
LUZON
BRANCH
Wall
Stone
Cor.
Sign
TBAR
T-106
Az 95.15°
40.39'
Az 81 .04°
34.68
INLET
DROP
Wall
Stone
Cor.
A z
.3
.1
N
NTS
L U
Z O
N B
R A
N C
H
Wall
Stone
Cor.
JO
Y C
E R
O A
D
INLET
DROP
TBAR
T-106
SD
SD
A05
TBAR
T-104
Culvert
N
NTS
JO
YCE
ROAD
A z
1.
1.
To C
P
A z .2
.8
Az 7 5.2
3°112 .65
To C P 1
Wall
Conc.
Pole
Power
NTS
JO
YC
E R O
A D
LUZON
BRANCH
TBAR
T-103
N
Az 92.35°
20.28'
Az 2 55.
23°112 .65 'To C
P 1
A z
.2
.6
NOTE:
clockwise from north.
Azimuth angles are measured
SURVEY INFORMATION SHEET
Relocated overhead power & communications lines
N
JOYCE ROAD
L U
Z O
N B
R A
N C
H
M
ILIT
A R Y R
O A D
TBAR
T-103
TBAR
T-104
TBAR
T-105
SD
SD
TBAR
T-106
SD
SD
Power
SS
Power
WEIGHT
LIMIT
TONS
12'- 6"
12'- 6"
WEIGHT
LIMIT
TONS
WEIGHT
LIMIT
TONS
Az 81 .04°
34.68
Az 95.15°
40.39'
A z
.3
.1
TBAR
T-106
T o C
P
A z
.3
.1
A z
.8
.7
A z .6 2°
1.
To C
P
Az 106.04°
31.61'
T o C
P
STATE PROJECT
NUMBER
SHEET
:4
F e b r u a r y
A
-R
O C
R (2
S
U R
.d
A06
INFORMATION
HORIZONTAL ALIGNMENT
NP ROCR 15(2)D.C.
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
:3 a r c h
D e f a
R O
C R
(2
H A
I.
d g n
STATE PROJECT
10+55.00 to 10+81.39
TRANSITION SECTION
JOYCE ROAD
Varies Varies
Travel Lane Travel Lane
Limits of Construction
CL
Existing ground
Existing curb and gutter (protect in place)Existing ground
Existing curb and gutter (protect in place)
Asphalt pavement milling, 2 1/2-inch depth and variesProposed profile grade
NOTES:
than 1/4 inch in accordance with Section 502.
slabs and joints. Clean and seal cracks wider check the condition of the existing PCC base
After removing the existing asphalt pavement, 4.
502-1.
CO, according to Section 502. See Detail ET patch deteriorated slabs, where directed by the repair deteriorated PCC pavement joints and
After removing the existing asphalt pavement, 3.
across the bridge.
Provide smooth transition to 4% superelevation
2. Match exisiting cross-slope at both tie-in points.
conditions as approved or directed by the CO.
1. Work limits may be changed to fit field
PROPOSED:EXISTING:
Tack coat
Existing asphalt concrete pavement (2 1/2") concrete pavement (8" - 14")
Existing portland cement
B01
TYPICAL SECTIONS
NO SCALE
roughness, placed in two equal lifts with tack coat between lifts maximum size aggregate, 0.3 to <3 million ESAL, (PG 64-22), Type IV 2 1/2-inch asphalt concrete pavement, gyratory mix, 3/8-inch nominal
11+78.02 to 12+25.00
TRANSITION SECTION
JOYCE ROAD
Varies Varies
Travel Lane Travel Lane
Limits of Construction
CL
Existing ground
Existing curb and gutter (protect in place)Existing ground
Existing curb and gutter (protect in place)
Asphalt pavement milling, 3 1/2-inch depth and varies Proposed profile grade
PROPOSED:EXISTING:
Tack coat
Existing asphalt concrete pavement (3 1/2") concrete pavement (8" - 14")
Existing portland cement roughness, placed in two equal lifts with tack coat between lifts maximum size aggregate, 0.3 to <3 million ESAL, (PG 64-22), Type IV 3 1/2-inch asphalt concrete pavement, gyratory mix, 3/8-inch nominal
Concrete pavement restoration, pavement patch, see notes 3 and 4
Concrete pavement restoration, pavement patch, see notes 3 and 4
NP ROCR 15(2)D.C.
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
11'11'
22'
11'11'
22'
:1 p r il
D e f a
B
R O
C R
(2
T Y
P .d g n
STATE PROJECT
TABULATION OF QUANTITIES
C01
Sheet 1 of 2
NP ROCR 15(2)D.C.
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
:2
O c to b e r
D e f a
C
R O
C R
(2
S O
A Q
.d g n
STATE PROJECT
TABULATION OF QUANTITIES
C02
Sheet 2 of 2
NP ROCR 15(2)D.C.
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
:0
O c to b e r
D e f a
R O
C R
(2
S O
A Q
.d g n
STATE PROJECT
C03
SUMMARIES & SCHEDULES
NP ROCR 15(2)D.C.
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
:2
P
J u n e
D e f a
R O
C R
(2
T A
B S
.d g n
STATE PROJECT
C04
NP ROCR 15(2)D.C.
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
:0
S e p te m b e r
D e f a
R O
C R
(2
T A
B S
.d g n
STATE PROJECT
C05 NP ROCR 15(2)D.C.
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
:5
S e p te m b e r
D e f a
R O
C R
(2
T A
B S
.d g n
STATE PROJECT
S D
P
P
NP ROCR 15(2)D.C.
ROCK CREEK PARKROCK CREEK PARKROCK CREEK PARK
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
Bottom of batter
10+55
Begin Work 12+25
End Work
10+55
Begin Work
12+25
End Work
N 472290.96
E 1301350.21
N 472290.96
E 1301350.21N 472182.67
E 1301223.50
E 1301223.50
N 472182.67
10+55.00
Begin mill and overlay
10+81.39
End mill and overlay
10+97.56
Begin bridge
11+56.98
End bridge Proposed profile grade
Existing Ground
11+78.02
Begin mill and overlay
12+25.00
End mill and overlay
Bridge Structure No. 3450-003P
20'10'0
Scale in Feet
10+97.56
10+97.56
11+56.98
11+56.98
D01
PLAN AND PROFILE
JOYCE ROAD 10+55 TO 12+25
Luz on
Bra nch
3. See Temporary Traffic Control Plans for road closures.
2. See Erosion & Sediment Control Plans for stream access locations.
1. See Signing Plan for permanent sign placement.
NOTES:
Approach slab Approach slab
-4%
-4%
-4%
-4%
Existing headwall
Existing stormdrain overhead electric and telephone lines
Approximate location of relocated
11+56.98
End bridge for more details
See Bridge Plans
Riprap class 3
10+97.56
Begin bridge
See Bridge Plans
Joyce Road Bridge
Proposed EOP (typ.)
Existing EOP (typ.)
Centerline
Mill and ove rlay
10+ 55.0
0 to 10+
81.3
Existing Ground
180'
181'
182' 181'
180'
179'
178'
177'
180'
179'
178'
177'
0' 179'
Match Existing
Match Existing
Match Existing
Match Existing
+7.7
+1.456%
.7
' VC100
15.89K =
'221.51SSD =
10+00
RT
10+20 10+40 10+60 10+80 11+00 11+20 11+40 11+60 11+80 12+00 12+20 12+40 12+60 12+80
LT
N29° 40'
40" E
N61°29'56"E e = ___
'111.08L =
'57.01T =
'200.00R =
(RT)31°49'16"Δ =
11+20.83PI
.8
.8
.9
T
.6412
7 3/4 "
.7246
8 3/4 "
.7
'-9
Transition Transition
Transition Transition
11+78.02 to 12+25.00
Mill and overlay
STATE PROJECT
NUMBER
SHEET
:4
O c to b e r
D e fa
D R
O C
R (2
P
N P
.d
f) Locate portable toilets on flat surfaces away from drainage and stream paths;
e) Create stabilized staging area;
d) Preserve vegetative buffer at site perimeter;
c) Protect wetlands, stream and undisturbed areas within the site (construction fence, flagging, etc.);
b) Limit disturbance to those areas planned for disturbance;
a) Install temporary diversion berm and bypass pumping;
Phase II: During Joyce Road bridge reconstruction disturbed.
c) Use construction fencing to define the boundaries of the project and limit access to areas of the site that are not to be
b) Establish vehicle tracking control at entrance access of paved Joyce Road;
site(silt fence, inlet protection, etc.);
a) Install perimeter controls as needed on downgradient perimeter and general vicinity of the site of Joyce Road Bridge
Phase I: Pre-construction
Once installed, do not modify the type, size, or location of any control or practice without approval of the CO.
Upon completion of any ground disturbing activity, immediately stabilize the associated disturbed areas.
Employ temporary stabilization practices in incremental stages when necessary as construction proceeds.
and maintained until permanent protection is established.
All erosion and sediment practices are to be installed prior to any major soil disturbance, in their proper sequence, EROSION & SEDIMENT CONTROL CONSTRUCTION SEQUENCE areas outside the limits of work.
Preserve existing vegetation, trees, and shrubs when possible, and as directed by the CO. Do not disturb or clear vegetated
Direct stormwater to vegetated buffer areas and do not discharge directly into surface waters.
Do not washout concrete trucks onsite.
Do not allow any construction equipment to operate or access the down-slope side of the perimeter control measures.
placement.
washed away by high water or runoff. Stabilize excess borrow material removed from the construction site at the site of
Do not place excavated soil material adjacent to creeks, streams, or bodies of water in a manner that will cause it to be
No construction access will be permitted through a wetland or a waterway unless specifically shown on these plans.
erosion and sediment control devices in accordance with state and county requirements; as well as, Subsection 107.10.
Construction of Roads and Bridges on Federal Highway Projects (FP-14) and the Special Contract Requirements. Install all of rivers, creeks, and streams. Soil erosion control measures are also defined/outlined in the Standard Specifications for
The work consists of applying measures throughout the life of the project to control erosion and to minimize the sedimentation
The Erosion and Sediment Control Narrative is intended to act as a guideline for preventing erosion and controlling sediment.
40 CFR 112. Report spills large enough to discharge surface waters to the National Response Center at 1-800-424-8802.
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) Plan following the requirements under
GENERAL NOTES AND GUIDELINES
A copy of Soil Map is included in the Stormwater Management Report.
fill 442 cuyd. The receiving water is Luzon Branch which is a tributary to Rock Creek.
The total area of soil disturbance for the project is approximately 4,050 sqft, volume of excavation 575 cuyd and volume of minor grading around new abutments to establish positive drainage.
Soil disturbing activities include: Clearing, excavation and roadway removal for new bridge abutments and approach slabs, and
SOILS
construction is planned under a full roadway closure with minimum days of roadway down-time.
and retaining walls are to remain and be protected in place. Mill and Overlay of approach roadway is also proposed. Bridge
The proposed Joyce Road bridge abutments will be designed to be placed behind the existing abutments. Existing bridge abutments elements, cracking of asphalt pavement surface, and failed joints. Joyce Road Bridge currently has a weight limit of 15 tons.
Branch located in northwest Washington, DC. The existing bridge is in poor condition due to deterioration of the superstructure
This project consists of replacing the single-span concrete tee beam of Joyce Road Bridge (Structure No. 3450-003P) over Luzon
PROJECT DESCRIPTION
approval from the CO.
and all upslope areas are stabilized and vegetation is established, remove all perimeter controls after obtaining
Once finished grading is achieved and all construction operations in each work area have been completed inlet protection, and tree protection at the locations specified in the plans or as directed by the CO.
Prior to any clearing, grubbing, and excavation, install perimeter controls, temporary
d) Remove all other perimeter controls when directed by the CO.
c) Remove silt fence only after all upslope areas are stabilized and vegetation is well established;
b) Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas;
a) Apply permanent turf establishment to any remaining disturbed areas;
construction, do the following as directed by the CO:
Phase III: Post-construction of Joyce Road bridge after completion of Joyce Road bridge
CONTROL NARRATIVE
EROSION AND SEDIMENT
Sheet 1 of 2
M01 NP ROCR 15(2)D.C.
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
:5
M a y
D e f a
R O
C R
(2
E S
N .d g n
STATE PROJECT
VEGETATIVE STABILIZATION
Item Rate (pounds per acre)
700Fertilizer (10-20-20)
Agricultural Limestone (85 percent CaCO )
Name of Seed
Total =
In accordance with Subsection 625.07 apply seed at the following rates for each season as stated below:
Catalina Perennial Ryegrass
Impact Kentucky Bluegrass
Chewing Fescue
Redcoat Tall Fescue
Barlexas Tall Fescue
February 15 to November 15
Rates (pounds per acre)
Seeding Seasons and
Total =
Catalina Perennial Ryegrass
Impact Kentucky Bluegrass
Chewing Fescue
Redcoat Tall Fescue
Barlexas Tall Fescue
November 16 to February 14
250.0
25.0
25.0
62.5
62.5
75.0
30.0
30.0
75.0
75.0
90.0
Mulch Rate (pounds per acre)
In accordance with Subsection 625.08 apply mulch at the following rates:
Straw
Fiber Mulch
5000 (1 to 2 inch mat)
5000 (1 to 2 inch mat)
In accordance with Subsection 625.06, apply limestone and fertilizer at the following rates:
prepared according to Section 625.
There will be 0.07 acres in need of stabilization as a result of this project. Areas of turf establishment will be that has been tracked offsite onto the roadway for proper disposal.
integrity. Wash, replace, or add stone whenever the exit fails to perform effectively. Immediately brush or sweep up soil
Stabilized construction exits- Inspect stabilized construction exits every seven days. Check for mud/sediment buildup and pad clogged inlet protections or replace clogged or damaged inlet protections as necessary.
Inlet protection - Inspect to ensure that inlet protections remain firmly in place and are not damaged or clogged. Clean
Immediatly cease pumping and replace damaged filter bags, or bags that have reached their rated capacity.
Filter bags - Check filter bags daily during dewatering operations for punctures, tears, or other damage, and for capacity.
following a rain event. Repair and replace any damaged measures by the end of the day.
Inspect and maintain erosion control facilities daily during construction activities and immediately according to Section 157, the details shown in the plans, and the individual permitting requirements.
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
repair or replace as necessary. Remove sediment from behind the silt fence when it becomes 0.5 feet deep at the fence.
Silt fence - inspect for buildup of excess sediment, undercutting, sags, and other failures. If the fabric becomes damaged, daily during wet weather. Repair or replace any damaged measures by the end of the day.
Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of 0.25 inches or more, and
MAINTENANCE AND INSPECTION PROCEDURES
CONTROL NARRATIVE
EROSION AND SEDIMENT
Sheet 2 of 2
M02 NP ROCR 15(2)D.C.
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
:4
J u n e
D e f a
R O
C R
(2
E S
N .d g n
STATE PROJECT
(U .S .A
N P S
O W
N E
R
S S
NP ROCR 15(2)D.C.
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
10+55
Begin Work
12+25
End Work
N 472290.96
E 1301350.21
N 472182.67
E 1301223.50
30'15'0
Scale in Feet
See Detail ET157-2
Inlet protection Type E
Construction Limits
Limits of Disturbance
See Detail E157-02
Install silt fence (typ.)
M03
CONTROL PLAN
EROSION & SEDIMENT
construction entrance, diversion berm and bypass pumping.
6. See Standards and Details for details regarding the silt fence, inlet protection, filter bag, equipment.
grubbing and temporary stabilization may occur for construction access, lay down and
5. Limits of disturbance define additional areas within the projects limits where clearing, conditions. Do not excavate outside the limits of construction without approval of the CO.
4. Construction limits define limits of excavation and grading for temporary and permanent diversion berm.
3. When work requiring stream diversion is complete, remove all materials used to construct
2. See Bridge Plans for proposed bridge construction and details of riprap.
1. See Construction Plans for proposed roadway construction work.
NOTES:
Ordinary high water
Ordinary high water
Place riprap, Method A, Class 3
Bypass pumping discharge
Potential location for bypass pumping
See Detail E157-09 in channel and bypass pumping
Install temporary diversion berm
Limits of disturbance
Construction limits
Luz on
Bra nch
Luzo n Br anch
See Detail E157-01
Construct temporary stabilized construction exit
See Detail E157-10
Place filter bag(s)
See Detail E157-09 in channel and bypass pumping
Install temporary diversion berm perimeter controls as required or directed by the CO.
10. Locate stockpile areas within limits of disturbance or on Joyce Road and provide accessibility.
9. The temporary stabilized construction exit also serves as the entrance due to limited site
Temporary fence is considered tree protection.
according to Subsection 619.06. Maintain temporary fence for length of construction.
8. Furnish temporary fence according to Subsection 619.02. Install temporary fence directed by the CO.
partially remove the diversion berm in the event of a significant weather event as a storm event in the forecast. Remove all equipment from the channel and completely or
7. Do not install the diversion berm and bypass pumping when there is a high probability of disturbance (does not include stream)
Place temporary fence along limits of
FB
LOD
L O
D
LOD
LOD
LO
D
L O
D
LO
D
LOD
LOD
LOD
L O
D
L O
D
LODLODLOD
LO
D
LODLOD
LOD
L O
D
STATE PROJECT
NUMBER
SHEET
:5
O c to b e r
D e f a
R O
C R
(2
E S
P .d
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
STATE PROJECT
NUMBER
SHEET
S S
10+55
Begin Work
12+25
End Work
N 472290.96
E 1301350.21
N 472182.67
E 1301223.50
30'15'0
Scale in Feet
Construction Limits
IMPACT PLAN
SOIL DISTURBANCE & STREAM
3. See Bridge Plans for proposed bridge construction and details of riprap.
2. See Construction Plans for proposed roadway construction work.
1. See Erosion and Sediment Control Plans for proposed sediment control measures.
NOTES:
Ordinary high water
Ordinary high water
Construction limits
LEGEND
Temporary Stream Impacts:
Permanent Stream Impacts:
Square Feet
Luz on
Bra nch
Luzo n Br anch
M04
Linear Feet
:5
O c to b e r
D e f a
R
O C
R (2
S
D P
.d
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
20'10'0
Scale in Feet
7. Plant trees according to Detail E626-01.
Cornus mas can be substituted for cercis canadensis.
6. Adjust the number of planting species based on species availability and as directed by the CO.
5. Exact tree and shrub planting locations will be determined by the CO.
4. Apply turf establishment in disturbed areas within the limits of disturbance according to Section 625.
3. See Bridge Plans for proposed bridge construction and details of riprap.
2. See Construction Plans for proposed roadway construction work.
1. See Erosion and Sediment Control Plans for proposed sediment control measures.
NOTES:
Luz on
Bra nch
L u z o n B ra n c h
M05
Tree
Establishment
Turf
LEGEND:
Limits of Disturbance
Ordinary high water
LANDSCAPE AND SEEDING PLAN
LOD
L O
D
LOD
LOD
LO
D
L O
D
LO
D
LOD
LOD
LOD
L O
D
L O
D
LOD
LODLOD
LO
D
LOD
LOD
LOD
L O
D
STATE PROJECT
NUMBER
SHEET
:3
O c to b e r
D e f a
R
O C
R (2
S
D P
.d
N01
NARRATIVE
TEMPORARY TRAFFIC CONTROL
TRAFFIC MANAGEMENT PLAN (TMP) NOTES:
TMP TEAM - ROLES & RESPONSIBILITIES
6 months.
The overall duration of the road closure and detour for construction is expected to be
EXPECTED CONSTRUCTION SCHEDULE
Military Road NW.
Joyce Road NW and Missouri Ave NW, 30 mph on 16th Street NW, and 35 mph on traffic around the closure. Existing speed limits on the detour route are 25 mph on access road. A signed detour route will be established to route vehicular and bicyclist south of the bridge, and the intersection north of the bridge with the golf course
Joyce Road will be closed between its intersection with Missouri Avenue NW to the planned under a full roadway closure with minimum days of roadway down-time.
Joyce Road Bridge currently has a weight limit of 15 tons. Bridge construction is superstructure elements, cracking of asphalt pavement surface, and failed joints.
Washington, DC. The existing bridge is in poor condition due to deterioration of the
Bridge (Structure No. 3450-003P) over Luzon Branch located in northwest
This project consists of replacing the single-span concrete tee beam of Joyce Road
PROJECT DESCRIPTION
PCMS to southbound 16th Street NW for the duration of the closure.
installed in the same location for the duration of the closure. Relocate the southbound
PCMS's to read "JOYCE RD CLOSED - FOLLOW DETOUR". Keep the northbound PCMS
"JOYCE RD CLOSED - BEGIN xx/xx/xx". Once the road is closed, reprogram the
Road no less than three weeks prior construction beginning. Program PCMS's to read
Locate one Portable Changeable Message Sign (PCMS) in each direction of Joyce traffic control plan no less than 45 days prior to the road closure.
Regional Office of Communications and DDOT in writing of the planned work and
Notify Rock Creek Golf Course, NPS Rock Creek Park, NPS National Capital
STAKEHOLDER OUTREACH
Additional monitoring may be required at the direction of the CO.
Beach Drive NW and Joyce Road NW3.
16th Street NW and Missouri Avenue NW2.
16th Street NW and Joyce Road NW1.
include the following intersections:
observations will be used to reevaluate and alter the detour route. Monitoring should frequency of legitimate complaints. If deemed necessary by the CO, these traffic. Monitoring may include recording/logging of queue lengths, delays, and
Monitor traffic on detour route as directed by the CO to ensure no adverse effects to
MONITORING/IMPLEMENTATION
by EFL/NPS. Night time work is not permitted on the project.
Day time work hours are between 7:00AM - 7:00PM Monday to Friday or as approved
N03 - N04 will be provided to avoid the roadway closure.
access road for the duration of the contract. A traffic diversion as displayed on Sheets south of the bridge, and the intersection north of the bridge with the golf course
Joyce Road will be closed between its intersection with Missouri Avenue NW to the
WORK ZONE IMPACTS ASSESSMENT
NP ROCR 15(2)D.C.
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
:1
O c to b e r
D e f a
N
R O
C R
(2
T T
C
L e g e n d .d g n
STATE PROJECT
SIGN LEGEND & NOTES
TEMPORARY TRAFFIC CONTROL
N02
R11-2
M4-10R
M4-9L
JOYCE RD.
W16-8P
SIGN LOCATION NUMBERS:
JOYCE RD.
W20-3
W16-8P
ROAD
CLOSED
M4-8A
W20-2
W20-2
JOYCE RD.
W16-8P modified
M4-9
M4-9R
JOYCE RD.
W16-8P modified
M4-9R
JOYCE RD.
W16-8P
M4-9L
JOYCE RD.
W16-8P
M4-8A
ROAD
CLOSED
R11-2 modified
M4-9c
W16-8P
C
M4-9cR
M4-8A
D
USE MORROW DRIVE
AHEAD
ROAD
CLOSED
Mounted on Type 3 Barricade
M4-10L
JOYCE RD.
W16-8P
GOLF COURSE ONLY
ROAD CLOSED
500 FEET AHEAD
modified
R11-3A
Mounted on Type 3 Barricade
M4-10L
A
MAINTENANCE OF TRAFFIC NOTES:
and/or the deflection zone of physical barriers.
Do not store equipment and/or materials within the established clear zone of roadways, 19.
Install temporary signs on wood posts in accordance with Details E635-01 and ET 635-14.18.
and stable and firmly installed.
Place temporary signs in appropriate places that are adequate for existing street conditions, 17.
signs are not permitted.
black/orange high-performance wide-angle retro-reflective aluminum sheeting. Roll-up/cloth
Use advance warning signs as noted on the plans. Advance warning signs will be 16.
will not be used on messaging signs.
signs will be accompanied by message signs that indicate detour street name. Abbreviations signage as noted on the plans will be installed to give the public guidance. Detour direction
Use Type 3 barricades for the roadway closure. Adequate roadway closure and detour 15.
foot pole with 6 inch series �"C"� letters.
Use 24-inch diameter �STOP/SLOW� paddles for flagging operations that are mounted on a 6-14.
communications.
flagging. Flaggers will be equipped with hand signaling devices and electronic devices for the CO. All flaggers will be certified and have their certification card in their possession when
Provide flagging operations for short term durations deemed necessary or as instructed by 13.
working in the field.
Wear safety vests, hard hats, and other required personal protection equipment when 12.
control. Acceptable certifying organizations are ATSSA, MDSHA, VDOT, or equivalent.
and provide evidence that they have successfully completed training in temporary traffic
Submit the name of the representative responsible for implementing the traffic control plan 11.
markings of compliance on the standards.
Ensure all traffic control devices comply with NCHRP 350 Crash Testing Standards and have 10.
traffic control devices reflectorized during nighttime hours.
requirements cited in the MUTCD for placement, flashing sequence and intensity. Make all each Type 3 barricade at locations shown on plans. Ensure warning lights meet the
Ensure work site is made safe for traffic during nighttime hours. Install a warning light on 9.
and/or suspension of work.
Failure to use approved devices which are required or requested by CO will result in fines 8.
Keep copies of TCP and permits on site and available for inspector's review at all times.7.
- Joyce Road SB before Golf Course access road “Joyce Rd”
- 16th Street SB before Joyce Rd: “Beach Drive”, “Picnic Areas”, “Joyce Road”
- 16th Street NB before Rittenhouse St: “Joyce Road”
- Military Road EB before ramp to Joyce Rd: “Golf Course” misinformation to drivers and pedestrians. These signs include, but are not limited to:
Securely cover all regulatory signs that conflict with temporary traffic control signs to avoid 6.
the same general location to maintain continuity of traffic flow and to minimize congestion.
Coordinate maintenance of traffic with other contractors and utility companies working in 5.
Provide 72 hours advance notice to CO and DDOT when making a change to the detour.4.
Install Portable Changeable Message Signs (PCMS) as specified in the TMP.3.
Remove or cover all traffic control devices from public space when not in use.2.
Notify fire and/or police departments of approved road closures.1.
SEQUENCE OF CONSTRUCTION NOTES:
the work zone.
Use flaggers for short duration flagging as needed to allow construction vehicles access to 5.
Avenue NW, and the intersection with the Golf Course access road.
Install traffic control devices to close Joyce Road between its intersection with Missouri 4.
Remove or relocate existing signs that may conflict with traffic control devices.3.
detour.
Following three week PCMS advance notice, install temporary traffic control signs for 2.
Install advance notice PCMS's.1.
Mounted on Type 3 Barricade modified R11-3A modified M4-9R
B modified M4-9c
W16-8P
USE MORROW DRIVE
JOYCE ROAD
ACCESS ONLY
GOLF COURSE
JOYCE RD.
W16-8P
NP ROCR 15(2)D.C.
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
DETOUR
AHEAD
DETOUR
END
DETOUR
DETOUR
AHEAD
DETOUR
DETOUR
DETOUR
END
DETOUR
END
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
:5
O c to b e r
D e fa
R
O C
R (2
T
T C
N o te s .d g n
STATE PROJECT
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
(U.S.A.)
NPS
U.S. RESERVATION 339
ROCK CREEK PARK
U.S. RESERVATION 339
ROCK CREEK PARK
10+55
Begin Work
N 472182.67
12+25
End Work
N 472290.96
E 1301223.50
E 1301350.21
Northbound detour direction of travel
Southbound detour direction of travel
Temporary sign structure
250'1250
Scale in Feet
Type 3 Barricade
PLAN
TEMPORARY TRAFFIC CONTROL
N03
VEHICLE DETOUR
modified
M4-9
JOYCE RD.
W16-8P
M4-9R
JOYCE RD.
W16-8P
M4-8A
W20-2
JOYCE RD.
W16-8P modified
R11-3A
JOYCE ROAD
ACCESS ONLY
GOLF COURSE
modified
M4-9
JOYCE RD.
W16-8P
GOLF COURSE ONLY
ROAD CLOSED
500 FEET AHEAD
modified
R11-3A
Mounted on Type 3 Barricade
M4-10L
ROAD
CLOSED
R11-2
M4-10L
Mounted on Type 3 Barricade
R11-2
M4-10R
ROAD
CLOSED
Mounted on Type 3 Barricade modified
M4-9R
JOYCE RD.
W16-8P
M4-9L
JOYCE RD.
W16-8P modified
M4-9R
JOYCE RD.
W16-8P
M4-8A
JOYCE RD.
W20-3
W16-8P
AHEAD
ROAD
CLOSED
W20-2
M4-9L
JOYCE RD.
W16-8P
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS © 2023 TomTom
DETOUR
DETOUR
END
DETOUR
DETOUR
AHEAD
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
END
DETOUR
DETOUR
AHEAD
DETOUR
' Mi n.
M in
0' M in
M in
STATE PROJECT
NUMBER
SHEET
:0
O c to b e r
D e f a
R O
C R
(2
T T
C .d
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
(U.S.A.)
NPS
U.S. RESERVATION 339
ROCK CREEK PARK
U.S. RESERVATION 339
ROCK CREEK PARK
10+55
Begin Work
N 472182.67
12+25
End Work
N 472290.96
E 1301223.50
E 1301350.21
Southbound detour direction of travel*
Temporary sign structure
400'200'0
Scale in Feet shown on Sheet N03 temporary traffic control signage
* Northbound cyclists will follow
PLAN
TEMPORARY TRAFFIC CONTROL
N04
BICYCLE DETOUR
M4-8A
M4-9cR modified
M4-9c
W16-8P
USE MORROW DRIVE
modified
M4-9c
W16-8P
USE MORROW DRIVE
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS © 2023 TomTom
D
A
C
B
END
DETOUR
STATE PROJECT
NUMBER
SHEET
:4 c to b e r
D e f a
R O
C R
(2
T T
C .d
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS
STATE PROJECT
NUMBER
SHEET
S D
S D
S S
Bottom of batter
20'10'0
Scale in Feet
11'-3"
Remove
Sta 11+46
W12-2 Sign
Remove and Replace
Sta 11+88
Sta 12+25
Tie into existing
4" solid double yellow centerline
End striping
Sta 10+55
Tie into existing
4" solid double yellow centerline
Begin striping
MARKING PLAN
SIGNING AND PAVEMENT
P01
Remove
Sta 11+46
WEIGHT
LIMIT
TONS
WEIGHT
LIMIT
TONS
.6412
7 3/4 "
.7246
8 3/4 "
.7
'-9
:5
O c to b e r
D e f a
R
O C
R (2
S
S .d
CNN CNN DKN No scale 1 OF 45
GENERAL NOTES AND INDEX
R01
:1
O c to b e r
D e f a
R -R
O C
R (2
B
R P
.d g n
GENERAL NOTES:
AASHTO LRFD Bridge Design Specifications, 8th Edition, 2017.
SPECIFICATIONS:
Design:
Field verify all dimensions.
Federal Highway Projects, FP-14.
Standard Specifications for Construction of Roads and Bridges on
Construction:
Future wearing surface: 30 psf
Railing weight: 240 plf
Concrete: 150 pcf
DESIGN LOADS
Dead Load:
HL-93. Maximum Dynamic Load Allowance, IM=33%
Live Loads:
roughened finish.
-inch, transverse 4
Rake top surface of each beam with an amplitude of
- inch unless otherwise noted.4
Chamfer exposed edges of all concrete
BI-48 with f'c = 8,500 psi at release and f'c = 10,000 psi at 28 days.
Furnish Class P(Prestressed) concrete for spread box beam type AASHTO days.
Furnish Class A(AE) concrete for substructure with f'c = 4500 psi at 28 days.
diaphragms, approach slab, and sleeper slab with f'c = 5000 psi at 28
Furnish Class D(AE) concrete for deck, sidewalks, bridge railing, end
MATERIALS:
Concrete:
substructure bridge elements conforming to ASTM A775.
Furnish epoxy coated reinforcing steel for all superstructure and
Provide 2-inch cover for reinforcing steel unless otherwise noted.
Furnish reinforcing steel conforming to AASHTO M 31, Grade 60 deformed.
Reinforcing Steel:
total 43,950 lbs, at which load f'si = 0.75 f'u = 202,500 psi.
conforming to AASHTO M 203, Grade 270. Pre-tension each strand to a
Furnish 0.6-inch diameter, seven wire, low-relaxation, prestressing strand
Prestressing Steel:
follow AASHTO LRFD Design, Method A.
AASHTO LRFD Construction Specifications, and 60 durometer hardness, Furnish bearing pads conforming to the requirements of Section 18.2 of
Bearings:
INDEX OF BRIDGE PLAN SHEETS
SHEET NO. SHEET TITLE
Boring Logs - 3
Boring Logs - 2
Boring Logs - 1
Reinforcing Steel Bar List - 6
Reinforcing Steel Bar List - 5
Reinforcing Steel Bar List - 4
Reinforcing Steel Bar List - 3
Reinforcing Steel Bar List - 2
Reinforcing Steel Bar List - 1
Drainage and Waterproofing Details
Approach Slab Details - 2
Approach Slab Details - 1
Approach Slab Plan - 2
Approach Slab Plan - 1
Bridge Railing Details
Sidewalk Details
Diaphragm Details - 2
Diaphragm Details - 1
Abutment 2 End Diaphragm
Abutment 1 End Diaphragm
Miscellaneous Details - 2
Miscellaneous Details - 1
Beam Details - 2
Beam Details - 1
Framing Plan
Typical Section and Elevations
Deck Plan - 2
Deck Plan - 1
Abutment 2 Reinforcement
Abutment 2 Layout
Abutment 1 Reinforcement
Abutment 1 Layout
Micropile Details
Micropile Layout
Existing NW Retaining Wall Details
Existing NE Retaining Wall Details
Existing SE Retaining Wall Details
Existing SW Retaining Wall Details
Existing Abutment 2 Details
Existing Abutment 1 Details
Riprap Layout
Foundation Layout
Plan and Elevation
Site Plan
General Notes and Index
Furnish micropiles according to Section 567.
Micropiles:
BRP NO.DATE
NP ROCR 15(2)
STATE PROJECT
ROCK CREEK PARK
NO.
NPS
NO.
PMIS
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
JOYCE ROAD BRIDGE
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE BRIDGE PLAN SHEETPROJECT TEAM LEADER
Christopher Naab, PE NOVEMBER 2023 1331
D.C.
173688 821/
195422
CNN CNN DKN 1" = 20'-0" 2 OF 45
SITE PLAN
R02
:4
O c to b e r
D e f a
-R
O C
R (2
B
R P
.d g n
Bridge length: 56'-0"
L u z o n B ra n c h
El. 180.83
Sta. 11+56.98 El. 176.96
Sta. 10+97.56
10+
10+
10+
10+
10+
11+00 11+20 11+40 11+60
11+80 12+00
12+10
Remove existing superstructure
Geotextile filter, Class 1, Type A
Placed riprap, Method A, Class 3
NW retaining wall
Remove portion of existing
NE retaining wall
Remove portion of existingSE retaining wall
Remove portion of existing
SW retaining wall
Remove portion of existing
CLEnd Bridge @ Rdwy.
CLBegin Bridge @ Rdwy.
RoadwayCL
CL Structure over Joyce Road
Existing Military Road NW
Abutment 2 seat
Remove top portion of existing
Abutment 1 seat
Remove top portion of existing
180'
0'
165'
175'
180'
185'
195'
NP ROCR 15(2)
STATE PROJECT
ROCK CREEK PARK
NO.
NPS
NO.
PMIS
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
JOYCE ROAD BRIDGE
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE BRIDGE PLAN SHEETPROJECT TEAM LEADER
Christopher Naab, PE NOVEMBER 2023 1331
D.C.
173688
NP ROCR 15(2)
STATE PROJECT
ROCK CREEK PARK
NO.
NPS
NO.
PMIS
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
JOYCE ROAD BRIDGE
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE BRIDGE PLAN SHEETPROJECT TEAM LEADER
Christopher Naab, PE NOVEMBER 2023 1331
D.C.
173688 821/
195422
DATUM 150.00 DATUM 150.00
CNN CNN DKN 1" = 20'-0" 3 OF 45
PLAN AND ELEVATION
R03
11+00
10+
10+
11+20 11+40 11+60
11+80
12+00
PC Sta. 10+63.82
PT Sta. 11+74.90
29'56"E oN61 0'4
0"E o
29N
Storm drain
L u z o n B ra n c h
Joyce Road superstructure
Remove existing
Curve Data:
= 111.08'
= 109.65'
= 57.01'
= 200.00'
= 31 49'16" (rt)
L
C
T
R
∆ o
Begin bridge
Elev. 176.96 Sta. 10+97.56
Elev. 180.83 Sta. 11+56.98
End bridge drain Storm road Existing grade
Profile
Begin bridge
Elev. 176.96 Sta. 10+97.56
End bridge
Elev. 180.83 Sta. 11+56.98 micro piles (typ.)
Abutment cap on
Min. pile tip
Elev. = 144.00
Min. pile tip
Elev. = 135.00
PLAN
ELEVATION
Parkway Bridge Railing George Washington Memorial beam Spread box
(to remain) Existing abutment 1
(to remain) Existing abutment 2
Abutment 1
Abutment 2
7.75%
B .V
.C
S ta
.7
E le v .8
P .I .V
.C
S ta
.7
E le v .7
E .V
.C
S ta
.7
E le v .4
1.45%
Class 3 Placed Riprap, Method A, 50-yr
WSEL = 171.8
100-yr
WSEL = 172.7
* Radial
:5
O c to b e r
D e fa
-R
O C
R
(2
B
R P
.d g n
PROFILE GRADE(Typ.)
57°05'19.40"
N47°48'39"E brg. Abut. 1CL
RoadwayCL
CL Structure
CL brg. Abut. 2
CL
@ Roadway Approximate existing ground
CL
sleeper slab (Typ.)
Approach slab and
CL
Abutment 1 - Fixed Abutment 2 - Expansion
HYDRAULIC DATA
Event
Storm
(cfs)
Flow
(ft.)
WSEL
(ft.)
Freeboard
Q2 166 168.6 6.6
Q10 468 170.1 5.1
Q25 731 171.0 4.2
Q50 996 171.8 3.4
Q100 1330 172.7 2.5
2'-7"(±) to 3'-2"(±) Beam seat clearance varies
2'-7"(±) to 3'-4"(±) Beam seat clearance varies
190'
180'
170'
170'
0'
185'
(Typ.) (See Sheet D01) Proposed Contours
Bridge
Proposed brg. to brg. along Structure
56'-0" Span along Roadway
59'-5½"
CNN CNN DKN As Noted 4 OF 45
FOUNDATION LAYOUT
R04
:0
O c to b e r
D e f a
-R
O C
R (2
B
R P
.d g n
ELEVATION
Scale: 1" = 10'-0"
PLAN
groundline
Existing
Elev. 163.00
Abut. 2 existing footing
Bridge length: 56'-0"
L u z o n B ra n c h
57°15'19.43"
67°30'47.81"
112°29'12.19"
118°24'45.44"
119°02'42.38"
118°54'43.69"
61°43'13.24"
89°16'57.30"
144°06'08.22"
126°36'54.48"
133°34'02.90"
2'-7"
90°34'09.50"
135°51'47.59"
StructureCL10+
11+00 11+20
11+40
11+60
11+80
N47°48'39"E
Abut. 1
Existing
Abut. 2
Existing retaining wall
Existing SE retaining wall
Existing SW retaining wall
Existing NW retaining wall
Existing NE
Micropile (Typ.)
Elev. 163.00
Abut. 1 existing footing
Elev. 177.50
Abut. 2
Elev. 173.86
Abut. 1
(Typ.)
Max. excavation slope
Scale: 1/16" = 1'-0"
1.5
Sta. 10+99.04
BearingCL RoadwayCL
CL
Sta. 11+55.22
Bearing
57°15'19.43"
0'
175'
170'
NP ROCR 15(2)
STATE PROJECT
ROCK CREEK PARK
NO.
NPS
NO.
PMIS
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
JOYCE ROAD BRIDGE
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE BRIDGE PLAN SHEETPROJECT TEAM LEADER
Christopher Naab, PE NOVEMBER 2023 1331
D.C.
173688 821/
195422
H E
L E
C
T E
L E
2' -6
2' -6 " "2
'-7
"8
'-1
2' -6
2' -6
"2
'-1
"4
'-7
"2
'-8
"8
'-2
"8
'-2
"8
'-4
"8
5'-4
"2
4'-11
"4
'-8
5'-6"
"8 74'-5
1'-6"
"8
10'-7
H E
L E
C
T E
L E
CNN CNN DKN As Noted 5 OF 45
RIPRAP LAYOUT
R05
:1
O c to b e r
D e f a
-R
O C
R (2
B
R P
.d g n
PLAN VIEW
Sta. 10+99.04
Bridge length: 56'-0"
L u z o n B ra n c h
OL = 27.88'
Sta. 10+91.34
OL = 18.45'
Sta. 10+91.19
OL = 27.07'
Sta. 11+05.69
OR = 13.76'
Sta. 11+28.34
OR = 12.80'
Sta. 11+29.91
OR = 21.05'
Sta. 11+36.09
OR = 27.27'
Sta. 11+25.50
Placed Riprap, Method A, Class 3 abutment
Front face existing
Class 1, Type A
Geotextile filter footing on top of existing
Granular backfill, No. 57
SECTION VIEW
Method A, Class 3
Placed Riprap, Scale: 1/8" = 1'-0"
Scale: 1/4" = 1'-0"
Notes:
1. Excavate in 5 foot increments for placement of riprap.
Abutment 1
Front face existing
CL Brg. @ Rdwy.CL
Bearing Abutment 1CL grade
Existing
NP ROCR 15(2)
STATE PROJECT
ROCK CREEK PARK
NO.
NPS
NO.
PMIS
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
JOYCE ROAD BRIDGE
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE BRIDGE PLAN SHEETPROJECT TEAM LEADER
Christopher Naab, PE NOVEMBER 2023 1331
D.C.
173688 821/
195422
BR-01
GR20BH
BH
'-3
'-0
'-0
1' -9
16'-4" (±
'3 .7
117°22'21.4"
90°0'0"
'0
90°0'0"
90°0'0"
Varies 6'-0"
3'-0"
CNN CNN DKN/WLD As Noted 6 OF 45
EXISTING ABUTMENT 1 DETAILS
R06
:0
O c to b e r
D e f a
-R
O C
R (2
B
R P
.d g n
Exisintg constr. jt. El. 174.00
Removal limit El. 172.80
Elevation
EXISTING ABUTMENT 1 REMOVAL DETAILS
Section
#4CE02, #4CE03, #4CE04
El. 173.36
See Detail A
#4CE04 #4CE03 #4CE02
Elevation Section
Plan
EXISTING ABUTMENT 1 CONCRETE COPING DETAILS
#4CE01
Chamfer
1" x1" on this sheet
See Embedment Detail
DETAIL A
deformed bar
#4 Epoxy-coated adhesive grout or epoxy with with non-shrink and anchor rebar or retaining wall existing abutment
Drill hole into
EMBEDMENT DETAIL
structure
Remove existing
Not to Scale
Scale: 1" = 1'-0"
#4CE02
#4CE03
#4CE04
face
Existing front face
Existing rear
Scale: 3/16" = 1'-0"
Scale: 3/16" = 1'-0"
Notes:
6.
5.
4.
3.
2.
1.
See "DRAINAGE AND WATERPROOFING DETAILS" sheet for additional information.
to AASHTO M 235.
that will be in contact with new concrete. Furnish epoxy resin adhesive conforming
Apply a bonding coat of an epoxy resin adhesive to the surfaces of the existing concrete following the manufacturer's recommendations.
Use a non-shrink grout or epoxy adhesive to anchor new rebar in existing concrete according to Subsection 552.19.
Thoroughly clean concrete surfaces that will be in contact with new concrete
Drill holes to appropriate depth according to manufacturer's recommendations.
Saw cut existing abutment to remove concrete and rebar to indicated elevations.
Rear face
Front face wall retaining
Existing SE
SUMMARY OF QUANTITIES
Item Unit Quantity
Concrete CUYD 6
Reinf. Steel LBS 487
* Existing Abutment & Retaining Walls
(See note 6)
8" underdrain with end caps
NP ROCR 15(2)
STATE PROJECT
ROCK CREEK PARK
NO.
NPS
NO.
PMIS
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
JOYCE ROAD BRIDGE
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE BRIDGE PLAN SHEETPROJECT TEAM LEADER
Christopher Naab, PE NOVEMBER 2023 1331
D.C.
173688 821/
Existing Abutment 1 & Souteast Retaining Wall Coping Details
V a r ie s
37'-9 7/8" (±) (Front face)
38'-6" (±) (Rear face)
#4CE01
38 Spa. @ 12" max ty p c lr
(typ.)
2" clr.
ty p c lr
" (±)8
37'-9
38'-6" (±)
1'-8" (±) ty p c
8" (±)
#4CE01 (alternate direction)
38 Spa. @ 12" max m in
2" m in e m b e d m e n t drilled hole
5/8" Ø min.
2'-0" (±)
1'-6" (±)
CNN CNN DKN/WLD As Noted 7 OF 45
EXISTING ABUTMENT 2 DETAILS
R07
:5
O c to b e r
D e f a
-R
O C
R (2
B
R P
.d g n
Removal limit El. 176.43
Elevation
EXISTING ABUTMENT 2 REMOVAL DETAILS
Section
#4CE07
El. 177.00
See Detail B
#4CE07
Elevation Section
Plan
EXISTING ABUTMENT 2 CONCRETE COPING DETAILS
#4CE07
#4CE07
#4CE07
#4CE05
Chamfer
1" x1"
DETAILS" sheet.
on "EXISTING ABUTMENT 1
See "EMBEDMENT DETAIL"
DETAIL B
structure
Remove existing
Face
Existing Front face rear
Existing
Notes:
2.
1.
See "DRAINAGE AND WATERPROOFING DETAILS" sheet for additional information.
See "EXISTING ABUTMENT 1 DETAILS" for "EMBEDMENT DETAIL" and additional notes.
Scale: 3/16" = 1'-0"
Scale: 3/16" = 1'-0"
Scale: 1" = 1'-0"
(See note 2)
8" underdrain with end caps
Front face wall retaining
Existing NEwall retaining
Existing NW
#4CE06
#4CE06 (Typ.)
#4CE05 (Typ.)
NP ROCR 15(2)
STATE PROJECT
ROCK CREEK PARK
NO.
NPS
NO.
PMIS
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
JOYCE ROAD BRIDGE
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE BRIDGE PLAN SHEETPROJECT TEAM LEADER
Christopher Naab, PE NOVEMBER 2023 1331
D.C.
173688 821/
195422
Existing Abutment 2, Northwest, & Northeast Retaining Wall Removal Details
Existing Abutment 2, Northwest, & Northeast Retaining Wall Coping Details
Existing Abutment 2, Northwest, & Northeast Retaining Wall Coping Details r
43'-1
#4CE05 or #4CE06
43 Spa. @ 12" max ty p c lr
(typ.)
2" clr.
ty p c
43'-1
2'-5" (±) ty p c lr
#4CE05 or #4CE06 (alternate direction)
43 Spa. @ 12" max m in
2"
2'-3" (±)
2'-3" (±)
(min.)
9" clr.
(min.)
9" clr.
CNN CNN DKN/WLD As Noted 8 OF 45
EXISTING SW RETAINING
R08
:5
O c to b e r
D e f a
-R
O C
R (2
B
R P
.d g n
WALL DETAILS
limits
Removal wall area existing retaining
Removal of portion of
Plan wall retaining existing
Front face
Elevation
Removal limit
El. 173.50
Removal limit
El. 169.28 abutment retaining wall &
Front face existing
Removal limit
El. 179.35
Removal limit
El. 173.50
Removal limit
El. 169.28
B
B
Section face batter
1/2":1' rear face front
Vertical rear face
Vertical stone
EXISTING SOUTHWEST RETAINING WALL REMOVAL DETAILS
EXISTING TOP OF
RETAINING WALL DETAIL
6 spa. @
#4CE09
#4CE11
#4CE09
(Typ.)
#4CE08
#4CE12
12" max
4 spa. @
El. 174.00
El. 169.78
#4CE13
#4CE15
#4CE11
#4CE10
#4CE13
El. 174.00 batter existing
Match face
Rear
#4CE10
El. 169.78
#4CE11
Front face
#4CE08
#4CE09
EXISTING SOUTHWEST RETAINING WALL
Plan
Elevation
A
A
ABUTMENT SECTION @
Beam
Deck
Sidewalk concrete curb
Bridge railing
End diaphragm
Abutment cap
(Typ.)
joint filler expansion rubber sponge
1" preformed
(Typ.)
elastomeric joint sealant expansion joint filler with 1"
Seal edges of preformed sponge retaining wall
Existing SW
CONCRETE COPING DETAILS
SW RETAINING WALL
Scale: 3/16" = 1'-0"
Scale: 1/2" = 1'-0"
Scale: 3/16" = 1'-0"
Scale: 3/8" = 1'-0" batter existing
Match
Front face
Rear face
El. 169.78
#4CE11
#4CE10
#4CE15
#4CE16
#4CE17
El. 179.39
El. 179.39
SECTION B-B
Scale: 3/16" = 1'-0"
SECTION A-A
Scale: 3/16" =…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .