Plans - NP-NAMA 12(3).pdf
PDF 27 MB Posted
- Attached to
- National Mall and Memorial Parks - Rehabilitation of Outlet Bridge and Resurfacing of East Basin Drive
- Solicitation number
- 693C73-21-B-000015
About this file
This solicitation seeks sealed bids from certified Small Business Concerns for the National Mall and Memorial Parks Project NP-NAMA 12(3). The project consists of rehabilitating Outlet Bridge and resurfacing East Basin Drive in the District of Columbia. Work includes asphalt milling and paving, concrete removal and repair, structural steel painting, stone masonry repainting, and other miscellaneous tasks. The project price range is estimated between $1,000,000 to $5,000,000. Interested vendors can access solicitation documents on www.beta.sam.gov by searching for solicitation number 693C73-21-B-000015. Completed representations, certifications, and Form Vets-4212 must be submitted electronically. Bids are due on a date specified in the solicitation, which is available on or around May 20, 2021. The soliciting agency is the Department of Transportation Federal Highway Administration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R01
1- J a n -2
1:
P
M M
P R
O J E
C T
S n a m a (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
X '' = 1'-0''
GENERAL NOTES AND INDEX
A C
T U
A L F I L E R N
A M
A
G
N .D
G N
GENERAL NOTES:
Design:
AASHTO LRFD Bridge Design Specifications, 8 Edition, 2017.
SPECIFICATIONS:
Dead Load:
Concrete: 150 psf
DESIGN LOADS:
HS-20
Live Loads:
Section 203.
reinforcement. Clean remaining exposed reinforcement in accordance with using mechanical splices or lap splice 30 bar diameters with remaining
Replace deteriorated reinforcement as directed by CO with new reinforcement
Provide 2-inch cover for reinforcing steel unless otherwise noted.
Furnish reinforcing steel conforming to AASHTO M 31, Grade 60 deformed.
Reinforcing Steel:
SCOPE OF WORK:
on Federal Highway Projects, FP-14.
Standard Specifications for Construction of Roads and Bridges
Construction:
Verify all dimensions and locations in field prior to ordering materials.
Miscellaneous:
Repair seawall according to Subsection 620.01(c) Class B masonry.
Stone Masonry:
joint, and stacked stone wingwall vertical joints.
Subsection 712.01(h) for bridge deck expansion joints, bridge deck median
Furnish pre-compressed foam-supported silicone joint seals conforming to
Joint Seals:
10. Overlay of approach slabs with asphalt concrete pavement.
9. Overlay of concrete deck with Polyester Polymer Concrete (PPC).
8. Asphalt pavement micro milling of bridge deck and approach slabs.
7. Repointing of stone masonry.
6. Seawall repair requiring cofferdam.
5. Cleaning and resealing of vertical wall joints.
4. Removal and replacement of bridge deck expansion joints.
3. Cleaning and painting of bridge rail.
2. Cleaning and painting of structural steel.
1. Superstructure and substructure concrete repair.
INDEX OF BRIDGE PLAN SHEETS
Joint Repair Details - 2
Joint Repair Details - 1
Concrete Repair Details - 2
Concrete Repair Details - 1
Seawall Repair - 2
Seawall Repair - 1
Framing Plan
Typical Section
Concrete Repair - Pier 2 Plan and Elevation - 2
Concrete Repair - Pier 2 Plan and Elevation - 1
Concrete Repair - Pier 1 Plan and Elevation - 2
Concrete Repair - Pier 1 Plan and Elevation - 1
Concrete Repair - Abutment 2 Plan and Elevation
Concrete Repair - Abutment 1 Plan and Elevation
East and West Fascia Elevation
Plan View
General Notes and Index
SHEET NO. SHEET TITLE
NOTES FOR GAS LINE:
Address: 6801 Industrial Road, Springfield, VA Phone: 703-750-4745 Point of Contact: Joseph Atmore (JAtmore@washgas.com)
Washington Gas velocity or 40 mm/sec of transient peak velocity.
above the gas mains at ground level do not exceed 25 mm/sec of continuous peak particle Utilization of vibration sensors is required to ensure vibration limits near the abutment walls gas main adjacent to the abutment walls.
Vibrations generated from the proposed construction activity might impact the buried
3. Vibration Note concrete repair activity that is within 10 feet away from the suspended gas main.
Suspended gas main shall be covered with an insulated concrete blanket for any
2. Concrete Repair Note
Ensure pipe support spans do not exceed 20 feet.
Additional pipe supports are required to be installed prior to removal.
painting procedures and repair structures.
pipe supports require to be temporarily removed in order to conduct the proposed structural steel blasting, Contact Washington Gas if any using lifting system (including jacking operations) and/or
1. Protect Note
Additional safety precautions are required to protect the existing gas main.
structural steel, and existing paint color on bridge rail.
on bridge rail. Furnish top coating to match existing paint color on
Provide a 3 coat Type 1 or Type 2 paint system on structural steel, and
White Metal (SSPC-SP 5). Prepare bridge rail with hand tools.
cross-bracing, and utility ducts according to Section 563, Prepare structural steel surfaces, including beams, diaphragms, Paint:
Concrete:
24 hours for deck expansion joint headers.
Furnish Flexible, High Impact Elastomeric concrete with f'c = 1500 psi at contractor to ensure compatibility and schedule of PPC work.
top of deck repair. Coordinate HES deck repair material with PPC supplier and
Furnish Class High Early Strength (HES) concrete f'c = 3000 psi at 48 hours for
4 hours.
Furnish Polyester Polymer Concrete (PPC) for overlays, f'c = 3000 psi at on plans.
-inch unless otherwise noted 4 3Chamfer exposed edges of all concrete
Furnish Class A(AE) concrete, f'c = 4000 psi at 28 days for seawall cap.
Class A(AE) concrete, f'c = 4000 psi at 28 days for substructure repair.
Furnish Class High Early Strength (HES) concrete f'c = 3000 psi at 48 hours or
MATERIALS:
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
171525 DC NP-NAMA 12(3)212009
204832
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE
DRAWN BY
Chang Soo ParkRE/HS CSP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128417
Structure Number 3400-031P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EAST BASIN DRIVE OVER WASHINGTON CHANNEL
NATIONAL MALL AND MEMORIAL PARKS
REHABILITATION OF OUTLET BRIDGE
January 2021
R02
M
P R
O J E
C T
S n a m a (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
PLAN VIEW
1- J a n -2
1:
P
M
N
T id a l
B a s in
35+00
55+00 56+00
36+00
126'-0"
42'-0" 42'-0" 42'-0"
S id e w a lk
S o u th b o u n d l a n e s
O u t to o u t
M e d ia n
N o r th b o u n d l a n e s
P a r a p e t
P a r a p e t
C u r b expansion joint
Remove and replace
Southbound Lanes
C East Basin Drive
Northbound Lanes
C East Basin Drive
L
L
B e g in m ic r o m il l
B e g in a p p r o a c h s la b
S ta
.6
B e g in m ic r o m il l
B e g in a p p r o a c h s la b
S ta
.9
E n d m ic r o m il l
E n d a p p r o a c h s la b
S ta
.8
E n d m ic r o m il l
E n d a p p r o a c h s la b
S ta
.0
C P ie r
L C P ie r
L
LC
A b u tm e n t
LC
A b u tm e n t expansion joint
Remove and replace
S e a w a ll R e p a ir
3/4" expansion joint
Clean and reseal
Scale: 18" = 1'-0"
PLAN
As shown expansion joint
Remove and replace expansion joint
Remove and replace
A C
T U
A L F I L E R N
A M
A
P
L A
N .D
G N
Span 1 Span 2 Span 3
See Joint Repair Details-2 sheet all four corners of bridge (Typ.)
Stone parapet joint
Stone parapet joint joint parapet
Stone joint parapet
Stone
Place PPC overlay on bridge deck (Typ.)
Place PPC overlay on bridge deck (Typ.)
Place 2"
Asphalt overlay on approach slabs (Typ.)
See Note 3.
Place 2"
Asphalt overlay on approach slabs (Typ.)
See Note 3.
76E-28(HP) on approach slabs.
-inch NMSA, 3 to <30 million ESAL, PG 8
33. Use 2" GACP, construction submittal requirements.
equipment into the waterway. See Subsection 104.03(b) for
2. Set up cranes in the southbound west lane to lower barges and restrictions.
1. See Subsections 156.07(k) and 156.07(l) for lane closure
Approach slab (Typ.)
20'-0"
Approach slab (Typ.)
20'-0"
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
171525 DC NP-NAMA 12(3)212009
204832
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE
DRAWN BY
Chang Soo ParkRE/HS CSP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128417
Structure Number 3400-031P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EAST BASIN DRIVE OVER WASHINGTON CHANNEL
NATIONAL MALL AND MEMORIAL PARKS
REHABILITATION OF OUTLET BRIDGE
January 2021
P T
.4
P C
.0
P C
.2
P C
.1
P T
.5
Curve = ALIGNB-2
PI 54+65.95
R = 740.00'
T = 46.73'
L = 93.33'
D
Curve = ALIGNA-5
PI 34+54.35
D
R = 700.00'
T = 68.49'
L = 136.55'
Curve = ALIGNA-6
PI 37+85.74
D
R = 310.00'
T = 200.67'
L = 356.18'
Curve = ALIGNB-3
PI 57+29.64
D
R = 390.00'
T = 151.52'
L = 289.04'
R03
M
P R
O J E
C T
S n a m a (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
X '' = 1'-0''
A C
T U
A L F I L E R N
A M
A
E
A S
T A
N D W
E S
T F
A S
C I A E
L E
V A
T I O
N .D
G N
EAST AND WEST FASCIA ELEVATION
1- J a n -2
1:
P
M Fix Fix FixExp. Exp.Exp.
ELEVATION
(Looking East)
A
Scale: 1" = 10'
Scale: 1" = 10'
VIEW A-A
38'-0" 38'-0" 38'-0"
A
48'-0"
C A b u t.
L
55'-0" 3 Spans @ 42'-0" = 126'-0"
L L
C A b u t.
LC
P ie r
C P ie r
Fix Fix FixExp. Exp.Exp.
ELEVATION
(Looking West)
B
Scale: 1" = 10'
Scale: 1" = 10'
VIEW B-B
38'-0" 38'-0" 38'-0"
B
26'-6"
C A b u t.
L
26'-6" 3 Spans @ 42'-0" = 126'-0"
L L
C A b u t.
LC
P ie r
C P ie r
MHW Elev. +1.58
MLW Elev. -1.21
MHW Elev. +1.58
MLW Elev. -1.21
Top of concrete apron concrete repair (Typ.)
Bottom of fascia concrete repair (Typ.)
Bottom of fascia
(Typ.)
3x12 Timber rail
(Typ.)
Concrete post on piles
Tremie concrete on piles
Tremie concrete
6'-0" Pier footing (Typ.)
joint
Clean and reseal joint
Clean and reseal joint
Clean and reseal joint
Clean and reseal information.
See "Joint Repair Details-2" sheet for additional1.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
171525 DC NP-NAMA 12(3)212009
204832
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE
DRAWN BY
Chang Soo ParkRE/HS CSP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128417
Structure Number 3400-031P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EAST BASIN DRIVE OVER WASHINGTON CHANNEL
NATIONAL MALL AND MEMORIAL PARKS
REHABILITATION OF OUTLET BRIDGE
January 2021
-15
-10
-5
-15
-10
-5
R04
M
P R
O J E
C T
S n a m a (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
2.5' x 1'
1- J a n -2
1:
P
M
ELEVATION
(Looking South)
PLAN
A C
T U
A L F I L E R N
A M
A
C
O N
C R
E T
E R
E P
A I R A
B U
T M
E N
T P
L A
N A
N D E
L E
V A
T I O
N .D
G N
3'-4" 4 Spacings at 5'-0"=20'-0"3'-6"
No scale
2'-7"
MHW Elev. +1.58
MLW Elev. -1.21
Elev. 4.3 +/-
1'-6"2'-0""4 15'-1 7'-0"4 Spacings at 5'-0"=20'-0"
2'-2"
2'-2"
"4 14'-3 "2
132'-7 "4 14'-3
3' x 3'3' x 3'
2.5' x 1'
4' x 1.5' 1' x 2'
ABUTMENT 1 PLAN AND ELEVATION
CONCRETE REPAIR -
2.5' x 1'
Footing
3/4" Joint
Bearing seat of column
Front face of abutment wall
Abutment column
Top of abutment breast wall
Bottom of abutment column
" Joint4 3 " Joint4
2' x 3'
See Notes and jacking structural support
Repair may require
"4 123'-10
N
7. Verify dimensions in the field and adjust as required.
6. See "Concrete Repair Details" sheets for additional information.
maintain structural integrity.
Remove substructure column concrete one column at a time to 5.
inch. 8 1jacking. Maximum jacking height is surface to determine the need for structural support and column concrete removal exceeds 4 inch depth from any
Stop work and notify the CO immediately when substructure 4.
require jacking (typical for all substructure units).
-inch thick elastomeric bearing pad under all beams that 2 1by
3. Remove and replace the existing 10-inch wide by 7-inch long immediately after lifting the girders.
hydraulic jack and place supports below the girders without exceeding the maximum lifting displacement. Lock the safety factor of 2.0. Lift all girders at the same time and according to Section 104. Use hydraulic jacks with a minimum
2. Design the lifting system and submit to the CO for approval inch8 1Maximum lifting limit displacement: ∆ =
LL = 48 kips
1. Unfactored loads per girder: DL = 25 kips
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
171525 DC NP-NAMA 12(3)212009
204832
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE
DRAWN BY
Chang Soo ParkRE/HS CSP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128417
Structure Number 3400-031P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EAST BASIN DRIVE OVER WASHINGTON CHANNEL
NATIONAL MALL AND MEMORIAL PARKS
REHABILITATION OF OUTLET BRIDGE
January 2021
-10
-5
-15
R05
M
P R
O J E
C T
S n a m a (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
X '' = 1'-0''
'8
2' x 1' 3' x 3'
3' x 3'
1- J a n -2
1:
P
M
PLAN
ELEVATION
(Looking North)
ABUTMENT 2 PLAN AND ELEVATION
CONCRETE REPAIR -
A C
T U
A L F I L E R N
A M
A
C
O N
C R
E T
E R
E P
A I R A
B U
T M
E N
T P
L A
N A
N D E
L E
V A
T I O
N .D
G N
1.5' x 2'
MHW Elev. +1.58
MLW Elev. -1.21
Elev. 4.3 +/-
Top of abutment breast wall
Bottom of abutment column
Bearing seat of column
Abutment column
Front face of abutment wall
" Joint4 3" Joint4
" Joint4
1'-6"
5'-11 2"
2'-7" 3'-4"
1'-11"
2'-2" "2 12'-4 "8
32'-4
2'-0"
1'-6"
2'-0"4 Spacings at 5'-0"=20'4 Spacings at 5'-0"= 20'7'-0"
3' x 3'
3' x 3'
1' x 1.5' 2' x 5'
2' x 2
2' x 4' 1' x 2'
N
'4 14-3 '8
723 '4 14-3
3. See "Concrete Repair Details" sheets for additional information.
maintain structural integrity.
Remove substructure column concrete one column at a time to 2.
inch.8 1Maximum jacking height is to determine the need for structural support and jacking.
column concrete repair exceeds 4 inch depth from any surface
Stop work and notify the CO immediately when substructure 1.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
171525 DC NP-NAMA 12(3)212009
204832
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE
DRAWN BY
Chang Soo ParkRE/HS CSP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128417
Structure Number 3400-031P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EAST BASIN DRIVE OVER WASHINGTON CHANNEL
NATIONAL MALL AND MEMORIAL PARKS
REHABILITATION OF OUTLET BRIDGE
January 2021
-10
-5
R06
M
P R
O J E
C T
S n a m a (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
X '' = 1'-0''
'8
1' x 1'-6"
1' x 6'
1- J a n -2
1:
P
M
PLAN
ELEVATION
(Looking North)
PIER 1 PLAN AND ELEVATION - 1
CONCRETE REPAIR -
A C
T U
A L F I L E R N
A M
A
C
O N
C R
E T
E R
E P
A I R P I E
R P
L A
N E
L E
V A
T I O
N .D
G N
1' x 1'
C L o f b e a r in g
MHW Elev. +1.58
MLW Elev. -1.21
4 Spaces @ 5'-0" = 20'-0" 4 Spaces @ 5'-0" = 20'-0' "4
2'-1 1'-6"
2'-0" 7'-0" "8 36'-10
'-1"2 2'-1"
3/4" Joint
1'-6"
2'-0"
2'-10"
2'-3"
1'-6" x 6'
See Note 1.
and jacking.
structural support
Repair may require
1'-6" x 1'-6"
N
3. See "Concrete Repair Details" sheets for additional information.
structural integrity.
Remove pier column concrete one column at a time to maintain 2.
inch.8 1Maximum jacking height is determine the need for structural support and jacking.
concrete repair exceeds 4 inch depth from any surface to
Stop work and notify the CO immediately when pier column 1.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
171525 DC NP-NAMA 12(3)212009
204832
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE
DRAWN BY
Chang Soo ParkRE/HS CSP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128417
Structure Number 3400-031P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EAST BASIN DRIVE OVER WASHINGTON CHANNEL
NATIONAL MALL AND MEMORIAL PARKS
REHABILITATION OF OUTLET BRIDGE
January 2021
-10
-5
R07
M
P R
O J E
C T
S n a m a (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
X '' = 1'-0''
1.5' x 1'
1.5' x 2'
1- J a n -2
1:
P
M
PLAN
ELEVATION
(Looking South)
PIER 1 PLAN AND ELEVATION - 2
CONCRETE REPAIR -
A C
T U
A L F I L E R N
A M
A
C
O N
C R
E T
E R
E P
A I R P I E
R P
L A
N A
N D E
L E
V A
T I O
N .D
G N
1' x 6'
1' x 1'
C L o f b e a r in g
Footing
MHW Elev. +1.58
MLW Elev. -1.21
2'-0"4 Spaces @ 5'-0" = 20'-0"4 Spaces @ 5'-0" = 20'-0'"4
2'-1 "8 36'-10
1'-6"
2'-0"
'-1"22'-1"
3/4" Joint
7'-0"
1'-6" "4
2'-0
1' x 1'
11"
See Note 1.
and jacking.
structural support
Repair may require
N
3. See "Concrete Repair Details" sheets for additional information.
structural integrity.
Remove pier column concrete one column at a time to maintain 2.
inch.8 1Maximum jacking height is determine the need for structural support and jacking.
concrete repair exceeds 4 inch depth from any surface to
Stop work and notify the CO immediately when pier column 1.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
171525 DC NP-NAMA 12(3)212009
204832
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE
DRAWN BY
Chang Soo ParkRE/HS CSP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128417
Structure Number 3400-031P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EAST BASIN DRIVE OVER WASHINGTON CHANNEL
NATIONAL MALL AND MEMORIAL PARKS
REHABILITATION OF OUTLET BRIDGE
January 2021
-10
-5
R08
M
P R
O J E
C T
S n a m a (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
X '' = 1'-0''
1' x 1'
1' x 6'
1' x 1'-6"
1- J a n -2
1:
P
M
PIER 2 PLAN AND ELEVATION - 1
CONCRETE REPAIR -
PLAN
ELEVATION
(Looking North)
A C
T U
A L F I L E R N
A M
A
C
O N
C R
E T
E R
E P
A I R P I E
R P
L A
N A
N D E
L E
V A
T I O
N .D
G N
2'-6" x 1'
C L
MHW Elev. +1.58
MLW Elev. -1.21
4 Spaces @ 5'-0" = 20'-0" 4 Spaces @ 5'-0" = 20'-0' "4
2'-1 1'-6"
2'-0" 7'-0" "8 36'-10
1'-6"
2'-0" o f b e a r in g
'-1"2 2'-1"
3/4" Joint
C L
1'
1'-6" x 6' 1'-6" x 6' 1'-6" x 6'
1'-6" x 6"
"4
2'-0
See Note 1.
and jacking.
structural support
Repair may require
N
3. See "Concrete Repair Details" sheets for additional information.
structural integrity.
Remove pier column concrete one column at a time to maintain 2.
inch.8 1Maximum jacking height is determine the need for structural support and jacking.
concrete repair exceeds 4 inch depth from any surface to
Stop work and notify the CO immediately when pier column 1.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
171525 DC NP-NAMA 12(3)212009
204832
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE
DRAWN BY
Chang Soo ParkRE/HS CSP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128417
Structure Number 3400-031P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EAST BASIN DRIVE OVER WASHINGTON CHANNEL
NATIONAL MALL AND MEMORIAL PARKS
REHABILITATION OF OUTLET BRIDGE
January 2021
-10
-5
R09
M
P R
O J E
C T
S n a m a (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
X '' = 1'-0''
1' x 6'
1' x 1'
1' x 1'-6"1' x 1'-6"
1- J a n -2
1:
P
M
PLAN
ELEVATION
(Looking South)
PIER 2 PLAN AND ELEVATION - 2
CONCRETE REPAIR -
A C
T U
A L F I L E R N
A M
A
C
O N
C R
E T
E R
E P
A I R P I E
R P
L A
N A
N D E
L E
V A
T I O
N .D
G N
2.5' x 1'
C L b e a r in g 3
MHW Elev. +1.58
MLW Elev. -1.21
2'-0"4 Spaces @ 5'-0" = 20'-0"4 Spaces @ 5'-0" = 20'-0'"4
2'-1 "8 36'-10
1'-6"
2'-0" 7'-0"
1'-6" "4
2'-0
'-1"22'-1"
3/4" Joint
1'-6" x 6' 1'-6" x 6' 1'-6" x 6'
See Note 1.
and jacking.
structural support
Repair may require
N 3. See "Concrete Repair Details" sheets for additional information.
structural integrity.
Remove pier column concrete one column at a time to maintain 2.
inch.8 1Maximum jacking height is determine the need for structural support and jacking.
concrete repair exceeds 4 inch depth from any surface to
Stop work and notify the CO immediately when pier column 1.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
171525 DC NP-NAMA 12(3)212009
204832
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE
DRAWN BY
Chang Soo ParkRE/HS CSP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128417
Structure Number 3400-031P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EAST BASIN DRIVE OVER WASHINGTON CHANNEL
NATIONAL MALL AND MEMORIAL PARKS
REHABILITATION OF OUTLET BRIDGE
January 2021
-10
-5
R10
M
P R
O J E
C T
S n a m a (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
3/8'' = 1'-0''
A C
T U
A L F I L E R N
A M
A
T
Y P I C
A L S
E C
T I O
N .D
G N
TYPICAL SECTION
1- J a n -2
1:
P
M
W 27X145
4 spaces @ 5'- 0" = 20'-0"1'-6" 7'-0"
W 27X145
32'-
" 8 52'-7
Facia truss
8" Water line8" Water line conduits
Existing PEPCO
1'-6" conduit
Existing power
6" Gas Line
Varies
2'-0" to
Varies
2'-0" to
"8 52'-7 "4
33'-3"8 7" to 14'-04
3Varies 12'-0
"4
" Cover2
" Conc. Deck2
Diaphragm
W10x33
Beam
W27x91
"8 77'-0
C12x25
Diaphragm Beam (Typ.)
W 27x145
20'-0" - 2 Southbound Lanes 20'-0" - 2 Northbound Lanes
3% 2%
TYPICAL SECTION
(See Note 3.)
replace with PPC overlay surface and membrane, Remove asphalt wearing
Cores No. 1-3 (see Deck Corings) Asphalt Cores 4-6 (see Deck Corings)
2'-6" +/-
2'-6" +/-
Parapet
1'-6" bridge rail
Clean and paint
Parapet
1'-6" bridge deck all steel below Clean and paint
Utility Ducts
(all steel above stone parapet) (Typ.)
Clean and paint bridge rail
Lighting conduit
Existing 3"
8" Sewer line
Conduit
Lighting
Existing 3"
2'-0" 4 spaces @ 5'-0" = 20'-0" conduits
Existing Verizon
"8 761'-and place PPC overlay to same height as existing overlay.
6. Contractor to field measure existing curb reveal in all spans, to all existing utilities.
Contractor will be responsible for any damage that may occur
Take caution when working around or near these utilities.
5. Avoid any potential conflict/damage or impact to all utilities.
2 inches. See Deck Corings for actual thicknesses from corings.
4. As-built drawings show an asphalt wearing surface thickness of
Traffic" sheets.
Southbound deck work and vice versa. See "Maintenance of
Traffic to be open on Northbound lanes during closure for wearing surface replacement to be completed in two stages.
Wearing surface removal, top of deck concrete repair, and 3.
2. Clean and paint bridge rail with with hand tools.
Blast clean and paint all all exposed steel below bridge deck.1.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
171525 DC NP-NAMA 12(3)212009
204832
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE
DRAWN BY
Chang Soo ParkRE/HS CSP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128417
Structure Number 3400-031P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EAST BASIN DRIVE OVER WASHINGTON CHANNEL
NATIONAL MALL AND MEMORIAL PARKS
R11
M
P R
O J E
C T
S n a m a (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
1/8'' = 1'-0''
A C
T U
A L F I L E R N
A M
A
F
R A
M I N
G P
L A
N .D
G N
1- J a n -2
1:
P
M s p a c in g s p a c in g
W
X
W
X
CL
FRAMING PLAN
N
PLAN
PierCL W10x33
Diaphragm
CL
Diaphragm
CL W10x33 Diaphragm
CL Midspan
9" 9"
V a r ie s " t to
V a r ie s "
V a r ie s to to
CL BearingCL Bearing
9"
CL Bearing
9"
CL Bearing
9"
CL Bearing
9"
CL Bearing this line
Symmetric about CL Pier CL Diaphragm
CL W10x33
Diaphragm
42'-0" 42'-0"42'-0"
126'-0"
East Truss
West Truss
Face of backwall Face of backwall
C 10x25 C 10x25
Blast clean and paint all exposed steel below bridge deck.1.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
171525 DC NP-NAMA 12(3)212009
204832
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE
DRAWN BY
Chang Soo ParkRE/HS CSP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128417
Structure Number 3400-031P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EAST BASIN DRIVE OVER WASHINGTON CHANNEL
NATIONAL MALL AND MEMORIAL PARKS
R12
M
P R
O J E
C T
S n a m a (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
X '' = 1'-0''
A C
T U
A L F I L E R N
A M
A
S
E A
W A
L L R
E P
A I R .D
G N
/- S e a w a ll R e p a ir
PLAN
Scale: 14" = 1'-0"
LC
A b u tm e n t
Southwest wingwall
/- L im its o f C o ffe rd a m
8'
SEAWALL REPAIR - 1
extents of seawall repair in the presence of the CO.
Extents of seawall repair are estimated. Field verify exact 1.
N
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
171525 DC NP-NAMA 12(3)212009
204832
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE
DRAWN BY
Chang Soo ParkRE/HS CSP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128417
Structure Number 3400-031P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EAST BASIN DRIVE OVER WASHINGTON CHANNEL
NATIONAL MALL AND MEMORIAL PARKS
R13
M
P R
O J E
C T
S n a m a (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
X '' = 1'-0''
A C
T U
A L F I L E R N
A M
A
S
E A
W A
L L R
E P
A I R .D
G N
Scale: 12" = 1'-0"
SECTION A-A
A
A
Approximate limits of seawall repair
Remove stacked stone wall - repair riprap base as required
Rebuild stacked stone wall
Cast-in-place new concrete cap
Wall void area
8'
Cofferdam
SEAWALL REPAIR - 2
Saw cut cap at both ends of repair and remove cast-in-place concrete cap
T o p s o il Detail A
Detail B
DETAIL A
DETAIL B
Detail B spacing
@ 12"
#5 stirrup
(Typ.)
2" Cover
Scale: 2" = 1'-0"
20" +/-
V a r ie s
Scale: 2" = 1'-0"
E x is ti n g C a p
N e w C a p
3-#5 rebar epoxy anchor
Drill and
6"
E x is ti n g C a p
N e w C a p
3-#5 rebar epoxy anchor
Drill and
6" full length of repair
@ even spacing
3 - #5 rebar
R ip r a p b a s e
Scale: 12" = 1'-0"
ELEVATION
stacked stone to the CO for approval.
5. Submit samples of seawall cap repair concrete and seawall texture of existing concrete.
seawall cap. Match seawall cap repair concrete to color and
4. Furnish Class A(AE) concrete, f'c = 4000 psi at 28 days for dimensions as existing wall.
3. Provide new stones of a similar type, appearance, and
Provide new stones that are in-kind to existing stone.
2. Reuse existing stone in proposed wall to the extent possible.
and granular backfill behind the stacked stone walls.
The work also includes excavation and placement of geotextile resetting or replacing riprap, and constructing concrete caps.
caps, removing and resetting mortared stacked stone walls, The seawall repair includes sawcutting and removing concrete 1.
(#57 stone)
Structural backfill
24"
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
171525 DC NP-NAMA 12(3)212009
204832
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE
DRAWN BY
Chang Soo ParkRE/HS CSP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128417
Structure Number 3400-031P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EAST BASIN DRIVE OVER WASHINGTON CHANNEL
NATIONAL MALL AND MEMORIAL PARKS
R14
M
P R
O J E
C T
S n a m a (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
X '' = 1'-0''
A C
T U
A L F I L E R N
A M
A
C
O N
C R
E T
E R
E P
A I R D
E T
A I L S .D
G N
VERTICAL CONCRETE REPAIR
OVERHEAD CONCRETE REPAIR
concrete Face of existing depth of rebar allows.
Under cut all sides where
Depth of concrete repair
'' Saw cut2 concrete Face of existing
'' Saw cut2
Depth of concrete repair top cut
'' Under cut all sides except2
Existing reinforcement
Existing reinforcement depth of rebar allows.
Under cut all sides where
Depth of concrete repair
'' Saw cut2 concrete Face of existing
Existing reinforcement
HORIZONTAL CONCRETE REPAIR
1- J a n -2
1:
P
M
CONCRETE REPAIR DETAILS - 1
(f'c = 4000 psi min.)
HES concrete
(f'c = 4000 psi min.)
HES concrete
(f'c = 4000 psi min.)
HES concrete
3.
2.
1.
See Subsection 552.19 for concrete repair procedures.
for additional information.
is closed to traffic. See "TEMPORARY TRAFFIC CONTROL PLAN"
Perform underside of deck concrete repair when lane above determined in the field by the CO.
Depth of concrete rebars may vary. Removal areas will be
Location of concrete repair and cracking are approximate.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
171525 DC NP-NAMA 12(3)212009
204832
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE
DRAWN BY
Chang Soo ParkRE/HS CSP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128417
Structure Number 3400-031P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EAST BASIN DRIVE OVER WASHINGTON CHANNEL
NATIONAL MALL AND MEMORIAL PARKS
R15
1- J a n -2
1:
P
M M
P R
O J E
C T
S n a m a (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
Notes:Existing reinforcing bars
'' Under cut all sides2
2'' Min. clr. '' Saw cut4 concrete
Face of existing
Depth of concrete repair
Depth of concrete repair concrete
Face of existing
'' Saw cut4 top cut
'' Under cut all sides except2 reinforcing bar
" Min. clr. above4 reinforcing bar
" Min. clr. below4
Existing reinforcing bars
OVERHEAD DEEP CONCRETE REPAIR
VERTICAL DEEP CONCRETE REPAIR
reinforcing bar
" Min. clr. to4
'' Under cut all sides2 concrete
Face of existing
Existing reinforcing bars
Depth of concrete repair
HORIZONTAL DEEP CONCRETE REPAIR
No scale 15 concrete
Face of existing material
Concrete repair
Existing concrete
Zinc anode
Existing reinforcing bars
ZINC ANODE INSTALLATION DETAIL
Zinc anode
Zinc anode
Zinc anode
Class HES concrete
Class HES concrete
Class HES concrete when applicable)
(See note 2 for mortar pocket
Low-resistivity matches the existing concrete in texture, color and appearance.
Provide a surface finish to all concrete repair areas that 7.
Match existing reinforcing steel diameter and coating.
Replace reinforcing steel with section loss of 25% or more.6.
to Section 203.
abrasive blasting, or water jetting as required according
Clean existing steel and concrete by wire brush,5.
to existing steel reinforcement.
existing reinforcement, without incurring any damage concrete or to a depth of at least 1-inch clear of
Remove loose and deteriorated concrete to sound4.
perimeter around the designated repair area.
inch deep along a square or rectangular 4 3Saw cut 3.
inches beyond the anode on all sides.
which extends to the sound substrate concrete and 3 in a low resistivity (less than 15,000 ohm-cm) mortar bed permeability less than 2,000 coulombs, encase the anode
If a concrete repair material is used which has chloride according to Subsection 552.19, as approved by the CO.
Install Anodes for corrosion protection on repair areas2.
Removal areas will be determined in the field by the CO.
approximate. Depth of concrete rebars may vary.
Locations of concrete repair areas and cracking are1.
CONCRETE REPAIR DETAILS - 2
A C
T U
A L F I L E R N
A M
A
C
O N
C R
E T
E R
E P
A I R D
E T
A I L S .D
G
N NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
171525 DC NP-NAMA 12(3)212009
204832
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE
DRAWN BY
Chang Soo ParkRE/HS CSP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128417
Structure Number 3400-031P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EAST BASIN DRIVE OVER WASHINGTON CHANNEL
NATIONAL MALL AND MEMORIAL PARKS
R16
M
P R
O J E
C T
S n a m a (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
X '' = 1'-0''
A C
T U
A L F I L E R N
A M
A
J
O I N
T R
E P
A I R D
E T
A I L S .D
G N
1- J a n -2
1:
P
M
PLAN
Scale: 12" = 1'-0"
Scale: 12" = 1'-0"
TYPICAL
A
A
B
B
C L J o in t
Notes:
(Structure 5570-138P, 5570-476P)
EXISTING JOINT SECTION A-A
(Structure 5570-138P, 5570-476P)
HALF SECTION THRU CURB
FOR INFORMATION ONLY
AS-BUILT
Existing concrete Epoxy adhesive foam
Impregnated
CLJoint beads and silicone band.
Field-applied silicone corner
#5 Epoxy coated reinforcement
Existing anchor bolt.
Saw cutSaw cut
Factory-applied silicone coating
"8 14opening
Joint " 8
SECTION B-B
(PRE-COMPRESSED FOAM-SUPPORTED SILICONE JOINT SEAL)
SECTION A-A
Scale: 4" = 1'-0" and median (Typ.)
concrete on sidewalk
Wearing surface on deck
40 50 60 70 80
JOINT SETTING TABLE
Location
Abut. 1
Pier 1
Pier 2 opening
Joint
1''
1''
1''
1''
''D''
''D''
''D''
''D''Abut. 2
1''
1''
1''
1''
1''
1''
1''
1''
1''
1''
''16 11 ''8
11''16 15''8
''16 11''16
TEMPERATURE AT INSTALLATION (DEG. F)
joint seal
Pre-compressed joint seal
Pre-compressed joint seal
Pre-compressed
JOINT REPAIR DETAILS - 1
joint header (Typ.)
elastomeric concrete
Flexible, high-impact monolithic placement.
9. Cast each elastomeric concrete joint header in a single systems to the CO for approval before ordering.
8. Submit drawings and supporting documents for all joint to the manufacturer's recommendations.
7. Install new concrete blockout and expansion joint according to AASHTO M 31, Grade 60 deformed.
6. Furnish and place epoxy coated reinforcing steel conforming compressed air.
5. Clean joint opening of debris and remove laitance with oil-free anchor bolts or curb anchor block.
between curb anchor blocks. Do not remove cast-in-place
4. Remove steel angles and membrane including membrane based upon joint opening size and expected movement.
3. Design and provide pre-compressed seal joint dimension
2. Verify dimensions before fabrication of expansion joint.
1. See "PLAN" sheet for joint work location.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
171525 DC NP-NAMA 12(3)212009
204832
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE
DRAWN BY
Chang Soo ParkRE/HS CSP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128417
Structure Number 3400-031P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EAST BASIN DRIVE OVER WASHINGTON CHANNEL
NATIONAL MALL AND MEMORIAL PARKS
R17
M
P R
O J E
C T
S n a m a (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
X '' = 1'-0''
A C
T U
A L F I L E R N
A M
A
J
O I N
T R
E P
A I R D
E T
A I L S .D
G N
1- J a n -2
1:
P
M
Not to Scale
Not to Scale
WINGWALL ELEVATION
SECTION THRU MEDIAN
with pre-compressed joint seal
" vertical joint4 3Clean and reseal A
A with pre-compressed joint seal
" horizontal joint4 3Clean and reseal
B
B
SECTION A-A
Scale: 11 2" = 1'-0"
SECTION B-B
corner bead
Field-applied silicone silicone coating
Factory-applied corner bead
Field-applied silicone silicone coating
Factory-applied foam
Impregnated foam
Impregnated
PRE-COMPRESSED FOAM-SUPPORTED SILICONE JOINT SEAL
Notes:
systems to the CO for approval before ordering.
5. Submit drawings and supporting documents for all joint compressed air.
4. Clean joint opening of debris and remove laitance with oil-free upon joint opening size and expected movement.
3. Design and provide pre-compresed seal joint dimension based
2. Verify dimensions before fabrication of expansion joint.
sheets for joint work location.
1. See "PLAN" sheet and "EAST AND WEST FASCIA ELEVATION"
JOINT REPAIR DETAILS - 2
opening
Joint
STONE PARAPET ELEVATION
1" = 1'-0"
SECTION C-C
SILICONE JOINT SEAL
PRE-COMPRESSED FOAM-SUPPORTED
Scale: 4" = 1'-0"
CC
foam
Impregnated corner bead
Field-applied silicone silicone coating
Factory-applied
See Joint Opening Table pre-compressed joint seal roadway face of wall joint with
Clean and reseal top of wall and
Top of parapet height or curb
Sidewalk
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
171525 DC NP-NAMA 12(3)212009
204832
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE
DRAWN BY
Chang Soo ParkRE/HS CSP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128417
Structure Number 3400-031P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
EAST BASIN DRIVE OVER WASHINGTON CHANNEL
NATIONAL MALL AND MEMORIAL PARKS
File details come from the government source that posted it. Updated .