This solicitation is for the rehabilitation of Outlet Bridge and resurfacing of East Basin Drive located in the District of Columbia. The project consists of asphalt pavement milling, concrete removal and repair, PCC pavement, sidewalks, curbs, accessibility ramps, seawall repair, PCC overlay, cleaning and resealing joints, painting structural steel, repainting stone masonry, placing riprap and other miscellaneous work. Bids from certified Small Business Concerns only will be accepted, with bids expected to range from $1 million to $5 million. Bid documents will be issued on or about May 20, 2021, with the bid due date and location specified in Block 13a of the solicitation. The soliciting agency is the Department of Transportation Federal Highway Administration for this National Mall and Memorial Parks project. Annual Representations and Certifications must be completed online at SAM.gov, along with Vets-4212 at dol.gov/vets/vets4212.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 3400-031P

OUTLET BRIDGE INSPECTION DATE: 4/16/19

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... STEEL NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... STRINGER/MULTI-BEAM or GIRDER NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. N/A STRUCT. TOTAL LENGTH: .. 126.0 FT (38.4 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 42.0 FT (12.8 M)

WEARING SURFACE: .......... MODIFIED CONCRETE DECK WIDTH: ...................... 61.1 FT (18.6 M)

ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 40.0 FT (12.2 M)

PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... 32A1, 12(1) / NONE SKEW ANGLE: ..................... 0 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 1984-Redeck, paint, elastomeric brngs, conc patching. 1998-Membrane removed, wearing surf replaced, new appr slabs. 2007-Arch girder & substr repairs, ice fence, railings painted.

LOCATION

NATIONAL MALL AND MEMORIAL PARKS MILE POINT: ..................... 0.27 (KM PT 0.44)

STATE: ................................. DISTRICT OF COLUMBIA LOCATION: Adjacent to Structure No. 035T (Pedestrian Path over Washington Channel). FACILITY CARRIED: ............ EAST BASIN DRIVE

FEATURE INTERSECTED: .. WASHINGTON CHANNEL

STRUCTURE EVALUATION SUMMARY

This steel multi-beam bridge is in fair structural condition overall. The main problems include previously noted section loss on the steel beam bottom flanges and lower portions of the webs, and concrete deterioration with efflorescence and exposed rebar on the east fascia arch girder. The steel beams should be cleaned and spot painted to prevent further deterioration, and the exposed rebar on the east arch fascia girder should be cleaned and coated with an approved sealant.

Additional problems include moderate transverse cracking of the approach pavement and the bridge wearing surface, moderate delamination and spalling of the substructure concrete, and moderate cracking with efflorescence on the abutment backwalls.

It should be noted that the seawall adjacent to this structure and around the Tidal Basin continue to deteriorate, exhibiting extensive mortar loss throughout the masonry mortar joints, and numerous missing and displaced stones.

The seawall immediately to the southwest of structure is a safety hazard, the cap stone is undermined and could collapse under pedestrian load. The opening between the seawall and the west wingwalls has resulted in active erosion with significant soil loss from behind the seawall. Consideration should be given to a rehabilitating the seawall.

INSPECTION TEAM: Z. BAILEY, H. SALAD

CONDITION ASSESSMENT:

ZANE BAILEY, FIELD TEAM LEADER 703-404-6242

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 8/30/19

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 3400-031P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

C226 PRIORITY OF IMPROVEMENT

ITEM

NO.

ROUTINE MAINTENANCE QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

60.9, 223.4 PLACE EROSION CONTROL MEASURES AT JUNCTION OF WEST SIDE WINGWALLS

AND SEAWALL TO PREVENT ADDITIONAL EROSION.

30 CY

58.2 CLEAN AND RESEAL DECK EXPANSION JOINTS. 116 LF

60.8 CLEAN AND RESEAL VERTICAL JOINTS. 150 LF

58.3, 222.4 CLEAN AND SEAL CRACKS IN APPROACH PAVEMENT AND IN BRIDGE WEARING

SURFACE ALONG JOINTS.

500 LF

59.2, 60.4 CLEAN EXPOSED REBAR ON EAST ARCH GIRDER AND SUBSTRUCTURE

CONCRETE AND COAT WITH APPROVED SEALANT.

25 SF

58.8 REPAIR DISCONNECTED UTILITY CONDUITS AND BROKEN INSULATION COVERS

ON DECK UNDERSIDE. REPAIR LEAKING WATER LINE AT SOUTH ABUTMENT.

1 LS

222.5 REPAIR UNDERMINING OF WEST APPROACH SIDEWALK AT NORTH END. 4 CF

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST

ESTIMATES

REHAB. RECONSTR.

59.2,7 CLEAN AND PAINT STRUCTURAL STEEL. 1 LS

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: This structure was under rehabilitation at time of inspection under Project PRA-NACC-12(1).

Cost estimates assume that the recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 3400-031P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

F F N N N G F F G

N G

F G F G G F

N

P

G

F

58.1 MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE ON DECK

UNDERSIDE.

58.2 DECK EXPANSION JOINTS FILLED WITH DEBRIS THROUGHOUT;

COMPRESSION SEALS DEPRESSED UP TO 1-1/2". SEVERE

CRACKING OF COMPRESSION SEALS THROUGHOUT. NORTH

COMPRESSION SEAL AT WEST SIDEWALK TORN FOR 3' LENGTH.

COMPRESSION SEAL OVER SOUTH PIER HAS FAILED.

58.3 MINOR LONGITUDINAL, TRANSVERSE, AND RANDOM CRACKING OF

WEARING SURFACE THROUGHOUT; MODERATE NEAR JOINTS WITH

ASPHALT BREAKING UP (UP TO 3"W X 1"D). ASPHALT PATCHING IN

WEARING SURFACE IN SOUTHBOUND LANE OVER NORTH

ABUTMENT JOINT AND ALONG SOUTH PIER JOINT AT LOCATION OF

PREVIOUSLY MISSING JOINT HEADER.

58.5 MINOR CRACKING AND SPALLING OF CURBS AT ISOLATED

LOCATIONS.

MINOR TRANSVERSE AND DIAGONAL CRACKING OF WEST

SIDEWALK. MINOR SPALLING OF MORTAR MATERIAL WITH

ANCHORAGE PLATE EXPOSED IN WEST SIDEWALK IN NORTH SPAN

AT NORTH PIER JOINT AND IN EAST SIDEWALK IN SOUTH SPAN AT

SOUTH PIER JOINT.

MINOR MAP CRACKING OF CONCRETE MEDIAN; MINOR TO

MODERATE SPALLING AND DELAMINATION OF JOINT HEADER IN

CONCRETE MEDIAN ADJACENT TO DECK EXPANSION JOINTS WITH

ANCHORAGE BOLTS EXPOSED.

58.6 MINOR SURFACE RUST ON RAILINGS, PRIMARILY AT BASE PLATES.

MINOR TO MODERATE DETERIORATION OF PARAPET MASONRY

MORTAR JOINTS. MINOR DELAMINATION AND SPALLING OF EAST

PARAPET AT NORTH END. MINOR DELAMINATION OF PREVIOUS

CONCRETE PATCH REPAIR AT NORTH END OF EAST PARAPET;

SEVERAL LOOSE STONES IN THIS AREA. MINOR SPALL AT BASE OF

EAST PARAPET AT SOUTH END.

1. BREASTWALLS OR COLUMNS F

2. PILE BENTS N

3. CAPS AND/OR BEARING SEATS F

4. BACKWALLS AND/OR BULKHEADS F

5. FOUNDATIONS N

6. WINGWALLS F

7. WEEP HOLES N

8. EXPANSION JOINTS P

9. EROSION AND/OR SCOUR P

10. SETTLEMENT OR DEFLECTION F

11. SLOPE PROTECTION N

12. OTHER N

PIER(S)

F13. WALLS AND/OR COLUMNS

N14. PILE BENTS

F15. CAPS AND/OR BEARING SEATS

N16. FOUNDATIONS

G17. EROSION AND/OR SCOUR

G18. SETTLEMENT OR DEFLECTION

N19. OTHER

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

ALIGNMENT 1.

61. CHANNEL 7

G G N G

G(ICE FENCE)

MED

SUFF

18 FT.

SILT, SAND

222. APPROACHES 6

1. APPROACH SLABS

2. RELIEF JOINTS

3. APPROACH GUARDRAIL

4. SURFACING

5. EROSION

6. SETTLEMENT

7. SIGNS

8. ALIGNMENT

9. OTHER

N N N F F G N G N

223. RETAINING WALL 6

1. WALL

2. WEEP HOLES

3. FOUNDATION

4. EROSION AND/OR SCOUR

5. SETTLEMENT OR DEFLECTION

6. OTHER

F N N F G N

36. TRAFFIC AND SAFETY FEATURES

A. BRIDGE RAILINGS

B. TRANSITIONS

C. APPROACH GUARDRAILS

D. APPROACH GUARDRAIL ENDS

N N N

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

58.8 SEVERAL UTILITY CONDUITS MOUNTED ON UNDERSIDE OF

SUPERSTRUCTURE. CONDUITS DISCONNECTED AND INSULATION

COVERS BROKEN OR MISSING WITH WIRES EXPOSED AT SEVERAL

LOCATIONS. SEVERE DETERIORATION OF UTILITY CABLE TRAY ON

UNDERSIDE OF STRUCTURE IN BAY #10 AT ISOLATED LOCATIONS.

UTILITY HANGERS BROKEN AT ISOLATED LOCATIONS. LEAKING

WATER LINE AT SOUTH ABUTMENT.

59.1, 60.3 MODERATE DELAMINATION AND SPALLING OF BEAM #2 BEARING

SEAT AT SOUTH ABUTMENT.

59.2,7,8 MINOR SPOT RUSTING AND DETERIORATION OF PAINT ALONG

BOTTOM FLANGES AND WEBS THROUGHOUT STEEL BEAMS.

PREVIOUS NEGLIGIBLE SECTION LOSS NOTED ALONG BOTTOM

FLANGE AND BOTTOM OF WEB, MOST BEAMS; NO NEW SECTION

LOSS NOTED.

MODERATE RUSTING OF BOTTOM FLANGE AND LOWER PORTION

OF WEB OF BEAM #6 AT NORTH PIER, CENTER SPAN.

SEVERE EFFLORESCENCE FROM FASCIA ARCH GIRDER RING

STONES. MINOR RANDOM CRACKING WITH EFFLORESCENCE,

DELAMINATION, AND SPALLING OF EAST FASCIA ARCH GIRDER

INTERIOR SIDE AND UNDERSIDE WITH EXPOSED REBAR, ALL

SPANS. MINOR SPALLING WITH EXPOSED REBAR ON INSIDE FACE

OF EAST FASCIA ARCH GIRDER, CENTER SPAN AT MIDSPAN. SPALL

(20"W X UP TO 7"H X 5"D) ON SOUTH END OF WEST ARCH GIRDER AT

NORTH PIER. CORNER SPALL (8"W X 6"H X 4"D) ON WEST ARCH

GIRDER AT NORTH ABUTMENT.

MEDIUM-SIZED TREES GROWING AGAINST EAST ARCH FASCIA

GIRDER; SOUTH SPAN TREES HAVE BEEN CUT, BUT STARTING TO

REGROW.

60.1,13 ABUTMENT BREASTWALLS AND PIERS REHABILITATED IN 2007

(PARTIAL DEPTH CONCRETE REPAIRS); MINOR MAP CRACKING

WITH EFFLORESCENCE AT ISOLATED LOCATIONS. MINOR VERTICAL

AND MAP CRACKING OF COLUMNS AT ABUTMENTS AND PIERS.

MINOR HORIZONTAL CRACKING OF NORTH ABUTMENT

BREASTWALL, WEST HALF, WITH MOISTURE STAINS. MINOR TO

MODERATE SPALLING OF SOUTH ABUTMENT BREASTWALL COLUMN

BELOW BEAM #4. ACCUMULATION OF DEBRIS ALONG EAST SIDE OF

SOUTH ABUTMENT.

MINOR CRACKING OF MASONRY FASCIA STONES AND MORTAR AT

ENDS OF PIERS NOTED IN UNDERWATER INSPECTION PERFORMED

ON 8/2/13.

60.4 MODERATE HORIZONTAL AND VERTICAL CRACKING WITH

EFFLORESCENCE ON ABUTMENT BACKWALLS; MINOR TO

MODERATE SPALLING WITH EXPOSED REBAR ON NORTH

ABUTMENT BACKWALL IN BAYS #1, #3, AND #11. ISOLATED AREAS

OF HEAVY LEAKAGE ON BACKWALLS. MINOR TO MODERATE

SPALLING OF SOUTH ABUTMENT BACKWALL, EAST SIDE.

ADDITIONAL ITEM REFERENCE AND REMARKS

60.6,10, 223.5

SOUTHWEST AND NORTHWEST WINGWALLS REMAIN ROTATED AND DISPLACED FROM ABUTMENTS DUE TO SETTLEMENT (UP TO 5" OPENING ON TOP); WINGWALLS APPEAR TO HAVE STABILIZED, HOWEVER. MINOR

EFFLORESCENCE FROM WINGWALL MORTAR JOINTS THROUGHOUT.

60.8 JOINT FILLER MISSING AT TOP OF VERTICAL JOINTS. BACKFILL IS FALLING THROUGH SOUTHEAST VERTICAL

JOINT.

60.9, 223.4 SEAWALL HAS SEPARATED 6" FROM SOUTHWEST WINGWALL AND 9" FROM NORTHWEST WINGWALL; LARGE VOIDS ADJACENT TO WINGWALLS (9'-8"L X 4'-2"W X 3'D AT SOUTHWEST AND 5'L X 3'W X 5'D AT NORTHWEST) DUE TO EROSION OF FILL MATERIAL. CRACK ASSOCIATED WITH VOID AT SOUTHWEST SEAWALL INDICATES

DIFFERENTIAL MOVEMENT UP TO 1-1/4" VERTICALLY AND OUTWARD 1-1/2".

60.15 MODERATE SPALL (12"L X 10"H X 6"D) ON BEAM #5 BEARING SEAT AT SOUTH PIER, WEST SIDE. MINOR SPALL ON

BEAM #2 BEARING SEAT AT NORTH PIER, WEST SIDE.

60.19 MODERATE DETERIORATION AND ADHESION FAILURE OF SEALANT MATERIAL BETWEEN ICEBREAKERS AND

FASCIAE NOTED IN 2007 INSPECTION; UNABLE TO VERIFY DUE TO HIGH WATER.

61.2 MODERATE TO SEVERE EROSION (30'L X 15'W X 2'D) BEHIND SEAWALL ADJACENT TO SOUTHWEST WINGWALL.

EROSION AND SINKHOLE (20'L X 10'W X AVERAGE OF 1'D) IN NORTHWEST EMBANKMENT. WATER UP TO 29" DEEP

IN 18" DIAMETER HOLE ADJACENT TO NORTHWEST WINGWALL.

61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.

61.5 ICE FENCE RECONSTRUCTED IN 2007. PREVIOUSLY NOTED LOOSE BOLTS ON TIMBER ICE FENCE (THIRD

CONNECTION) IN SPAN #1 HAVE BEEN REPLACED/TIGHTENED.

222.4 MINOR TO MODERATE TRANSVERSE CRACKING AND BREAKING UP (UP TO 3"W) OF APPROACH PAVEMENT OVER

ABUTMENTS AND OVER FREE END OF APPROACH SLABS.

222.5 UNDERMINING OF WEST SIDEWALK AT NORTH END OF PARAPET (12'L X UP TO 10"H X UP TO 6' BACK UNDER IN

AREAS).

223.1 SEVERE DETERIORATION OF SEAWALL MASONRY MORTAR JOINTS; NUMEROUS STONES MISSING.

STRUCTURE LOAD RATING STRUCTURE NO. 3400-031P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 42 38 70 64

HS 56 51 93 84

TYPE 3 24 22 41 37

TYPE 3S2 38 34 65 59

TYPE 3-3 47 43 78 71

DESIGN LOADING: HS20 (MS18)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

X ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 7/15

LOAD RATING CONTROLLED BY: GIRDER #3 MOMENT

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3400-031P

STRUCTURE IDENTIFICATION

(201) PARK: NATIONAL MALL AND MEMORIAL PARKS (1) STATE: ....................................... 113 - DISTRICT OF COLUMBIA

(202) STRUCTURE NAME: .......... OUTLET BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 001 - DISTRICT OF COLUMBI

(204) STRUCTURE NUMBER: ..... 3400-031P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 2 - NATIONAL CAPITAL (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 12 (6) FEATURES INTERSECTED:....... WASHINGTON CHANNEL

(207) ROAD SECTION NO: ..........031P (7) FACILITY CARRIED: .................. EAST BASIN DRIVE

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 3400031P0000000

(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ Adjacent to Structure No.

(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................32A1, 12(1) (11) MILE POINT: .............................0.27 (KM PT 0.44)

(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

3 - STEEL

02 - STRINGER/MULTI-BEAM or GIRDER

42.0 FT (12.8 M)

126.0 FT (38.4 M)

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 3 - MODIFIED CONCRETE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... YES

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 56.0 TONS (50.8 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 93.0 TONS (84.4 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 4/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. YES

(221) SPECIAL STUDY DATE: INSP. EVERY: 60 MONTHS - LAST INSP. : 7/18

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3400-031P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 38°52'55.70"

(17) LONGITUDE: ......................... 77°02'01.10"

(19) DETOUR LENGTH: ............... 1 MI (2 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 00

(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN

(42B) SERVICE UNDER: .............. 5 - WATERWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... 0

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(51) CURB TO CURB WIDTH:

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

40.0 FT (12.2 M)

61.1 FT (18.6 M)

42.0 FT (12.8 M)

42.0 FT (12.8 M)

0.0 FT (0.0 M)

0.0 FT (0.0 M)

2 - CLOSED MEDIAN (no barrie

0 °

NO

40.0 FT (12.2 M)

2.0 FT (0.6 M)

14.1 FT (4.3 M)

2 - MOUNTED ON PARAPET

9 - OTHER

1 - CONTINUOUS RAIL

3.67 FT (1.12 M)

99.99 FT (99.99 M)

0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ...........................N

(222) APPROACHES:

(223) RETAINING WALL:

(36) TRAFFIC SAFETY FEAT: ... 1NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

5 - Stable; scour within limits of

2 - REHAB/RECONSTRUCTION

C - MODERATE

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1984-Redeck, paint, elastomeric brngs, conc patching. 1998-Membrane removed, wearing surf replaced, new appr slabs. 2007-Arch girder & substr repairs, ice fence, railings painted.

(231) ADDITIONAL CONSIDERATIONS:

KEY FROM NPS NEEDED TO OPEN FENCE GATE FOR BOAT ACCESS. BOAT ACCESS LIMITED TO OUTGOING TIDE (HIGH TO LOW)

DUE TO TIDE GATES AT ADJACENT STRUCTURE #3400-035T.

(330) ADDITIONAL CONFIG. INFO.:

APPENDIX STRUCTURE NO. 3400-031P

PHOTOGRAPHS STRUCTURE NO. 3400-031P

PHOTO #1 - LOOKING NORTH TOWARD MAINE AVENUE

PHOTO #2 - GENERAL TOPSIDE VIEW LOOKING NORTH

PHOTO #3 - TYPICAL TRANSVERSE CRACKING OF WEARING SURFACE

ALONG NORTHBOUND LANE NEAR NORTH END

PHOTO #4 - TYPICAL ASPHALT PATCH AT APPROACH PAVEMENT,

SOUTH APPROACH SHOWN

PHOTO #5 - MAP CRACKING OF WEARING

SURFACE AT SOUTH END

PHOTO #6 - TYPICAL DEBRIS ACCUMULATION

IN EXPANSION JOINTS OVER PIERS, SOUTH

PIER SHOWN

PHOTO #7 - TYPICAL JOINT OVER ABUTMENT,

NORTH END SHOWN

PHOTO #8 - SPALLING OF JOINT HEADER IN

CONCRETE MEDIAN ADJACENT TO DECK

EXPANSION JOINTS WITH ANCHORAGE BOLTS

EXPOSED; SOUTH PIER SHOWN

PHOTO #9 - TYPICAL DETERIORATION OF PARAPET MASONRY MORTAR

JOINTS; NORTHEAST CORNER SHOWN

PHOTO #10 - DELAMINATION ON EAST PARAPET NEAR NORTH END

PHOTO #11 - MISSING TOP RAIL RETURN AT

NORTHWEST CORNER OF STRUCTURE

PHOTO #12 - TYPICAL GAP BETWEEN BRIDGE

PARAPET AND APPROACH PARAPET;

NORTHWEST CORNER SHOWN

PHOTO #13 - TYPICAL JOINT FILLER MATERIAL

MISSING AT VERTICAL JOINTS, SOUTHEAST

VERTICAL JOINT SHOWN

PHOTO #14 - SPALL WITH DELAMINATION OF

EAST PARAPET

PHOTO #15 - DIFFERENTIAL SETTLEMENT OF APPROACH AT WEST

SIDEWALK NEAR SOUTH END

PHOTO #16 - UNDERMINING OF WEST SIDEWALK AT NORTH END OF

PARAPET

PHOTO #17 - 15" DEEP SINK HOLE AT SOUTHEAST CORNER

PHOTO #18 - GENERAL UNDERSIDE VIEW OF CENTER SPAN LOOKING

TOWARD BASIN; NOTE CRACKING OF UNDERSIDE OF ARCH

PHOTO #19 - TYPICAL TRANSVERSE CRACKING WITH

EFFLORESCENCE ON DECK UNDERSIDE, BAY #3, SOUTH SPAN SHOWN

PHOTO #20 - VIEW OF NEW UTILITY CONDUIT AND HANGERS RUNNING

THROUGH IN SPANS, SPAN #3 SHOWN

PHOTO #21 - TYPICAL RUSTING AND PAINT FAILURE OF GIRDERS

ALONG CENTERLINE OF STRUCTURE, SOUTH SPAN SHOWN

PHOTO #22 - DETERIORATION AND SPALLING OF CONCRETE AND

STAY-IN-PLACE FORM AT WEST SIDE IN CENTER SPAN

PHOTO #23 - TYPICAL EFFLORESCENCE FROM FASCIA ARCH GIRDER

RING STONES; EAST FASCIA GIRDER IN SOUTH SPAN SHOWN

PHOTO #24 - TYPICAL DELAMINATION, RANDOM CRACKING WITH

EFFLORESCENCE OF FACIA ARCH INTERIOR, EAST ARCH, SOUTH SPAN

SHOWN

PHOTO #25 - GENERAL VIEW OF NORTH ABUTMENT

PHOTO #26 - SPALLING WITH EXPOSED REBAR ON NORTH ABUTMENT

BACKWALL EAST SIDE OF BAY #1

PHOTO #27 - TYPICAL DELAMINATION AND CRACKING WITH

EFFLORESCENCE OF ARCH UNDERSIDE, EAST ARCH IN NORTH SPAN

SHOWN

PHOTO #28 - LEAKING SEWER LINE AT EAST SIDE OF NORTH SPAN

PHOTO #29 - SPALLING AND DELAMINATION OF EAST FACE OF WEST

COLUMN IN NORTH PIER

PHOTO #30 - GENERAL VIEW OF NORTH FACE OF NORTH PIER

PHOTO #31 - VERTICAL CRACK WITH EFFLORESCENCE ON NORTH

FACE OF NORTH PIER AT EAST END

PHOTO #32 - GENERAL VIEW OF SOUTH ABUTMENT

PHOTO #33 - SPALLING OF COLUMNS AT SOUTH ABUTMENT

PHOTO #34 - TYPICAL DETERIORATION OF BEARING SEAT AREA OVER

ABUTMENTS, BEARING #4 AT SOUTH ABUTMENT SHOWN

PHOTO #35 - SPALL AND DETERIORATION OF CONCRETE COLUMN AT

EAST END OF SOUTH ABUTMENT

PHOTO #36 - CLOSE UP OF DETERIORATION OF BEARING SEAT AREA

AT EAST END OF SOUTH ABUTMENT

PHOTO #37 - ACCUMULATION OF DEBRIS ALONG EAST SIDE OF SOUTH

ABUTMENT

PHOTO #38 - CRACKING AND STAINING ON SOUTH PIER COLUMNS,

SOUTH FACE NEAR WEST END

PHOTO #39 - CRACKING WITH

EFFLORESCENCE AND DETERIORATION OF

COLUMNS ON SOUTH PIER, BENTS #4 - #7,

SOUTH SIDE SHOWN

PHOTO #40 - SPALLING AND DELAMINATION

WITH EFFLORESCENCE UNDERNEATH BEAM

IN SOUTH PIER BENT #4

PHOTO #41 - CLOSE-UP OF SOUTH PIER, BENT #4

PHOTO #42 - VERTICAL CRACKING THROUGH MASONRY STONES OF

SOUTH PIER, SOUTHEAST FACE SHOWN

PHOTO #43 - EROSION BEHIND SOUTHWEST SEAWALL ADJACENT TO

WINGWALL; NOTE SEPARATION OF SEAWALL FROM WINGWALL

PHOTO #44 - EROSION OF EMBANKMENT BEHIND SEAWALL AT

NORTHWEST SIDE OF STRUCTURE

PHOTO #45 - CLOSE-UP VIEW OF EROSION OF EMBANKMENT BEHIND

SEAWALL AT NORTHWEST END

PHOTO #46 - EROSION AND SINKHOLE IN NORTHWEST EMBANKMENT

AT SEAWALL; NOTE SEPARATION OF SEAWALL FROM WINGWALL

PHOTO #47 - LOSS OF MASONRY STONE FOR SOUTHWEST SEAWALL

PHOTO #48 - GENERAL VIEW OF ICE FENCE, CENTER SPAN

PHOTO #49 - LOOKING WEST INTO TIDAL BASIN THROUGH

STRUCTURE, CENTER SPAN

PHOTO #50 - LOOKING EAST AT STRUCTURE NO. 3400-035T THROUGH

STRUCTURE, CENTER SPAN

File details come from the government source that posted it. Updated .