Results of Bid Opening - NP-NAMA 12(3).pdf
PDF 111 KB Posted
- Attached to
- National Mall and Memorial Parks - Rehabilitation of Outlet Bridge and Resurfacing of East Basin Drive
- Solicitation number
- 693C73-21-B-000015
About this file
This document summarizes the results of a bid opening for a federal contract solicitation to rehabilitate an outlet bridge and resurface a roadway within the National Mall and Memorial Parks. Highway and Safety Services submitted the lowest bid of $3,569,170.13 for Schedule A work and $434,420.50 for Option 1 work. The total estimated price range for the contract is between $1,000,000 to $5,000,000. The solicitation number is 693C73-21-B-000015 and was issued by the Eastern Federal Lands Highway Division of the Federal Highway Administration. The project work includes asphalt milling and paving, concrete removal and repair, granite curbing, painting, and other miscellaneous construction activities. The period of performance for Schedule A is 320 calendar days.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration Eastern Federal Lands Highway Division
Bid Opening for
National Mall and Memorial Parks
PROJECT: NP-NAMA 12(3)
SOLICITATION NO. 693C73-21-B-000015
July 8, 2021 at 2:00 p.m.
Ashburn, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-21-B-000015 Project: NP-NAMA 12(3)
July 8, 2021, 2:00 p.m. local time
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Highway and Safety Services SCHEDULE A
$3,569,170.13
OPTION 1
$434,420.50
SCHEDULE A + OPTION 1
$4,003,590.63
Milani Construction, LLC SCHEDULE A
$4,266,410.00
OPTION 1
$177,725.00
SCHEDULE A + OPTION 1
$4,444,135.00
Maverick Construction, LLC SCHEDULE A
$4,762,330.00
OPTION 1
$149,670.00
SCHEDULE A + OPTION 1
$4,912,000.00
If the Government awards the contract as Schedules A + C, the performance period will be 320 calendar days.
If separate: Schedule A will be 320 calendar days and Schedule C will be 10 calendar days.
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-21-B-000015 Project: NP-NAMA 12(3)
July 8, 2021, 2:00 p.m. local time
BIDDER’S BID TOTALS DAYS TOTAL PRICE
McDonnell Landscape, Inc. SCHEDULE A
$2,878,776.00
OPTION 1
$305,840.00
SCHEDULE A + OPTION 1
$3,184,616.00
Engineer’s Estimate SCHEDULE A
$3,300,000.00
OPTION 1
$275,000.00
SCHEDULE A + OPTION 1
$3,575,000.00
If the Government awards the contract as Schedules A + C, the performance period will be 320 calendar days.
If separate: Schedule A will be 320 calendar days and Schedule C will be 10 calendar days.
| Slide Number 1 |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-21-B-000015� Project: NP-NAMA 12(3)�July 8, 2021, 2:00 p.m. local time � |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-21-B-000015� Project: NP-NAMA 12(3)�July 8, 2021, 2:00 p.m. local time � |