This document is a Solicitation for the Chickamauga and Chattanooga National Military Park Project GA NP CHCH MULTI (1) in Walker and Catoosa Counties, Georgia, Solicitation Number 693C73-24-B-000013. The project consists of the rehabilitation of approximately 1.96 miles of Brotherton Road and 0.78 miles of Glenn-Viniard Road, including parking areas and pull-offs, within the Chickamauga and Chattanooga National Military Park. The work includes asphalt pavement removal, grading, subgrade stabilization, aggregate base, asphalt concrete pavement, riprap, removing and resetting stone masonry headwalls, aggregate-topsoil, signing, pavement markings, and other miscellaneous work. The project will be split into multiple work schedules/contract options, with the cost of the entire project expected to fall within the price range of $5,000,000 to $10,000,000. Sealed bids from certified Small Business Concerns only will be accepted, with the bid due date and location to be specified in the Solicitation. Bid documents will be issued on or about May 31, 2024, and can be downloaded from www.sam.gov. Prospective contractors must be registered in the System for Award Management (SAM) database prior to submitting an offer.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLANS FOR PROPOSED
PLANS PREPARED BY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH:
ADT (2023)
ADT (2043)
DHV
%Truck
D
V (MPH)
SPECIFICATIONS:
BRIDGE:
DESIGN DESIGNATION:
e(max)
C/A miscellaneous work.
aggregate-topsoil, signing, pavement markings, and other riprap, removing and resetting stone masonry headwalls, with cement, aggregate base, asphalt concrete pavement, Asphalt pavement removal, grading, subgrade stabilization
CATOOSA AND WALKER COUNTIES, GEORGIA
AND GLENN-VINIARD ROAD
REHABILITATION OF BROTHERTON ROAD
Administration
Federal Highway
U.S. Department of Transportation
U.S. DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
NATIONAL MILITARY PARK
CHICKAMAUGA AND CHATTANOOGA
GA NP CHCH Multi (1)
PROJECT
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
ROAD: SURFACE BASE SUBGRADEROAD: WIDTH SURFACE BASE SUBGRADE
N/A
APRIL 2024
Project Manager
S. HAILEGIORGIS
Lead Designer
J. JOHNSON
Highway Design Manager
C. DORVIL
INTERSTATE
Scale in Miles
0 1 21 ½
Catoosa Co.Walker Co.
Hamilton Co.
Georgia
Tennessee
CHATTANOOGA
CHICKAMAUGA
ROSSVILLE
146146
W a lk e r C o
C a to o s a C o
South
B u s h R d
B u rn in g
EAST RIDGE
V a ll e y R d
H a p p y
D ie tz id g e R d
M is s io n
G a p l n d
Boynton
BridgeRd
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
Airport
Chattanooga
District
Archeological
Bend National Moccasin
Ruby Falls
Aquarium
Tennesse
L a k e
GA NP CHCH Multi (1)
PROJECT
57' & var.
17' & var.
41' & var.
15' & var.
0.75" GACP
1.5" GACP
1.5" GACP
1.5" GACP
N/A
6" GAB
1.5" GACP,
N/A
6" GAB
1.5" GACP,
N/A
(Cement)
12" Stabilization
N/A
(Cement)
12" Stabilization
Total project length = 2.72 Miles
LANE MILES:
Brotherton Rd Glenn-Viniard Rd
50/50
1%
6%
None
100/00
1%
6%
None
Parking Tour Stop 6 (rte. 936)
Glenn-Viniard Road (rte. 503)
(rte. 924)
Brotherton Picnic Area Parking
Brotherton Road (rte. 102) Know what'sbelow.
before you dig.Call
R
GA NP CHCH Multi (1)
PROJECT
Total project lane miles = 5.17 Miles
KEY MAP
STATE OF GEORGIA
SCALE IN MILES
800 40
ATLANTA
MACONCOLUMBUS
SAVANNAH
NORTH CAROLINA
S O
U T H C
A R
O L
IN
A
AUGUSTA
A L
A B
A M
A
TENNESSEE
ATLANTIC
OCEAN
FLORIDA
INTERSTATE
INTERSTATE
INTERSTATE
20 INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
95N
N
Title Sheet
Symbols And Abbreviations
Location Map
Typical Sections
Construction Plan Brotherton Road
Erosion And Sediment Control Plan - Brotherton Road
Signing And Pavement Marking Plan
Standards And Details
DESCRIPTION
INDEX TO SHEETS
SHEET
NO
A01
A02-A03
A05
B01-B08
D01-D08
M01
N01
S01-S27
Traffic Control Plan
K01-K05 Drainage Profiles
C01-C02 Tabulation of Quantities
Survey InformationA06-A07
N02-N04
Traffic Control Narrative
P01-P13
C03-C10 Summaries And Schedules
Horizontal Alignment InformationA08-A09
A04 Mileage Tabulation
D09-D12 Construction Plan Glenn-Viniard Road
D13 Construction Plan Parking Tour Stop 6
M02-M09
M10-M13
M14
Erosion And Sediment Control Plan - Glenn-Viniard Road
Erosion And Sediment Control Plan - Parking Tour Stop 6
Erosion And Sediment Control Narrative
D14
Traffic Counter System
Br ot he rto n
M c F a r v ie w D r
Rd Dr
Chickamauga Creek a m a
C re ek
Chick u g a
D15
Construction Plan Brotherton Picnic Area Parking
Cycle #6(miles)
Station to Station Length RIP Milepost/Schedule Description
Brotherton Road (Route 102)/Traffic Counters
Parking Tour Stop 6/Wilder Tower (Route 936)
Glenn-Viniard Road (Route 503)
Brotherton Road (Route 102)
Brotherton Road (Route 102)
D
C
C
B
A
153+25.00
400+20.00 to 406+26.32
300+40.00 to 340+83.42
151+09.26 to 204+35.12
100+85.00 to 150+52.31
0.00
0.38
0.77
1.01
0.94
F e b r u a r y
:1
A M
B a s e .B
.U S
C
E n g in e e r in g
S o f tw a r e \O p e n
R o a d s D e s ig n e r C
E
.1
\C o n f ig u r a ti o n
\O r g a n iz a ti o n
C iv il
\F L
H
S td s W
S
.1
.2
.0
V
\C e ll
\F L
H C e ll s .c e l
PROJECT
NUMBER
SHEET
A01
NPS Drwg No. 301/192265NPS PMIS No. 246003
0.00EL.
BH TP
sidewalk symmetrical solid white point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent stopping sight distance point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south
S/W sym.
SW or SDW
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SSD
SS
SRS
sqyd sqft spa.
shldr.
sec.
SC
SADT
S typ.
Ts
TS
traf.
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral traffic thread temporary bench mark township tangent distance
VPI
vph var.
V vertical point of intersection vehicles per hour varies design speed
W west mon.
min.
max.
MP
MOD
ML
monument minimum maximum mile post modification main line
No.
NMSA
NC
N number nominal maximum size aggregate normal crown north
OG
OD
o. to o.
ohwm
o. c.
original ground outside diameter out to out ordinary high water mark on center pvmt.
PT
PST
PSC
PS
prop.
POT
POS
POE
POC
POB
pl.
PI
PGL
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral proposed point on tangent point on spiral point of ending point on curve point of beginning plate point of intersection profile grade line point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius sidewalk symmetrical solid white point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent stopping sight distance point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south
S/W sym.
SW or SDW
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SSD
SS
SRS
sqyd sqft spa.
shldr.
sec.
SC
SADT
S
1 6
1 6
SEC.
SEC.
E
N 0
00000
JH
RBAR
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION CHICKAMAUGA AND CHATTANOOGA NATIONAL MILITARY PARK
HW
hex.
hdwl.
inv.
ID
jt.
high water hexagon headwall invert inside diameter joint ftg.
flg.
fin.
footing flange finish θs Ø ∆c
DY or DTY DW or DTW
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
CL
cc or c. to c.
BW
brg.
br.
BP
BM
bldg.
BL
BK
Asph
ASC
appr.
AMD
AH
Agg
ADT
ACP
abut.
spiral central angle diameter curve central angle total central angle dotted yellow dotted white double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume diameter centers curve to spiral continuous construction joint connection concrete column corrugated metal pipe centerline center to center broken white bearing bridge balance point bench mark building baseline back asphalt aggregate surface course approach amendment ahead aggregate average daily traffic asphalt concrete pavement abutment expansion joint excavation existing edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation electric superelevation rate east exp. jt.
exc.
ex. or exist.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elec.
e E
LW
lt. or LT Ls
LPSM
long.
LOD
lat.
lam.
L low water left length of spiral lump sum longitudinal Limits of Disturbance latitude lamination length of curve gnd or grnd galv.
GAB
ga.
HW
hex.
hdwl.
ground galvanized graded aggregate base gage (gauge) high water hexagon headwall
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir
Spring or Seep
Treeline; Individual Trees
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
Sheet 1 of 2
:4
P
M
M a rc h
S H
E E
T
P
R O
J E
C T
S \c h c h \m u lt i(
H W
Y D
E S
\C A
D D
\A -0
C
H C
H
(1
(1
O
R D s y m
.d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A02
NPS Drwg No. 301/173809 NPS PMIS No. 246003
N
AREA PATTERN
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
U.S. DEPARTMENT OF TRANSPORTATION CHICKAMAUGA AND CHATTANOOGA NATIONAL MILITARY PARK
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
DI
Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
GACPGyratory mix asphalt concrete pavement sidewalk (proposed)
Exposed aggregate concrete
(exposed aggregate)
Accessibility ramp, concrete
Pavement Overlay
Thin Lift Asphalt Concrete
PCC slabsPortland Cement Concrete slabs
GAB Graded aggregate base var.Varies
Sheet 2 of 2
:0
A
M a r c h
S
H E
E
P R
O J E
C T
S \c h c h
\m u lt i(
H W
Y
D E
S \C
A D
D \A
-0
C
H C
H
(1
(1
O
R D s y m .d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A03
U.S. DEPARTMENT OF TRANSPORTATION CHICKAMAUGA AND CHATTANOOGA NATIONAL MILITARY PARK
:5
M a r c h
M il e a g e T b
P R
O J E
C T
S \c h c h
\m u lt i(
H W
Y
D E
S \C
A D
D \A
-0
C
H C
H
(1
(1
L o c
S u rv .d g n
MILEAGE TABULATION
PROJECT
NUMBER
SHEET
GA NP CHCH Multi (1) A04
INTERSTATE
C h a tt o o g a C h ic k a m a u g a R
R
C h ic k a m a u g a R
R
C h a tt o o g a
Catoosa Co.Walker Co.Georgia
CHATTANOOGA
OGLETHORPE
FORT
CHICKAMAUGA
ROSSVILLE
W a lk e r C o
C a to o s a C o
W e st
Ch ic ka m au ga
C re ek
South
C h ick a m a u g a Cr ee k
B u s h R d
EAST RIDGE
La ke v ie w D r.
H a p p y V a ll e y R d
D ie tz R d
Lytle R d.M is s io n id g
L a F a y e tt e
R d
G a p R d
M c F a rl a n d
Boynton Dr.
J a y 's
M il l R d
Br oth ert on
R d.
Rd.
Vi ni ar d-
R d
Chick
V itte to e a m a u g a
R d
B rid g eRd.Dyer
McFarland Rd.Gap
A le xa n de r
A lexan der' s
Reeds
Bridge
Rd.
NATIONAL MILITARY PARK
CHICKAMAUGA AND CHATTANOOGA
Rd
P o e
B a tt le li n e
R d
G le n n
K e ll y
R d
N
G le n n
Rd.
Viniard
100+85.00 to 150+52.31
Schedule A:
Schedule C: 300+40.00 to 340+83.42
153+25
Schedule D
151+09.26 to 204+35.12
Schedule B:
Tennessee
Schedule C: 400+20.00 to 406+26.32
SCALE IN MILES
0 0.5 1.0
U.S. DEPARTMENT OF TRANSPORTATION CHICKAMAUGA AND CHATTANOOGA NATIONAL MILITARY PARK
:0
M a r c h
A
P R
O J E
C T
S \c h c h
\m u lt i(
H W
Y
D E
S \C
A D
D \A
-0
C
H C
H
(1
(1
L o c
S u rv .d g n
LOCATION MAP
PROJECT
NUMBER
SHEET
GA NP CHCH Multi (1) A05
REBAR w/CAP691.0611977934.3591794825.9982201
REBAR w/CAP691.4871977916.5251794637.5172111
REBAR w/CAP696.0201977557.2911794576.6952110
REBAR w/CAP704.8781977344.2151794383.3422109
REBAR w/CAP717.5701976947.9631794208.8302108
REBAR w/CAP728.7811976528.1831794205.4472107
REBAR w/CAP737.0211976262.9341794117.1592106
REBAR w/CAP733.8641975968.7801794072.0332105
REBAR w/CAP732.8361975459.3211794019.0292104
REBAR w/CAP723.0551975198.2871793878.1122103
REBAR w/CAP724.0131974832.0521793800.2702102
REBAR w/CAP738.3851974475.1231793395.3492101
REBAR w/CAP728.0911974179.5451793212.4962016
REBAR w/CAP736.4231973839.4681793060.4322015
REBAR w/CAP755.9471973488.4381792654.3352014
REBAR w/CAP762.7831973062.0761792300.1132013
REBAR w/CAP745.6351972628.8861791935.4372012
REBAR w/CAP753.6761972335.0061791787.1752011
REBAR w/CAP751.9991971998.2091791812.9622010
REBAR w/CAP742.7541971668.2301791642.6702009
REBAR w/CAP736.3021971287.5781791453.7582008
REBAR w/CAP751.5181970701.8651791283.7142007
REBAR w/CAP742.2991970447.9311791076.2002006
REBAR w/CAP753.3851969829.7031791117.8402005
REBAR w/CAP761.5671969465.0771791028.9552004
REBAR w/CAP755.8161969081.3761790981.5982003
REBAR w/CAP756.9651968601.5181790756.1332002
REBAR w/CAP749.4751968553.9841790357.3922001
TYPEELEV.EASTINGNORTHINGNAME
Project Control Points
Project Site : GA NP CHCH Multi (1)
Geoid Model : GEIOD12B (Conus)
Vert. Datum : NAVD 1988 (Conus)
Hor. Datum : NAD 1983 (Conus)
Zone : Georgia West 1002
Coordinate System : US State Plane 1983
Project Coordinate System x .8 ' C
M P
Ston e
EOP
HW
HW
HW
CB
8"Ø
Info
HW
Monument
EOP
HW
HW
03CAP
8"Ø 210
CAP
30" Ø
PLACARD
CAP
CAP
CAP
8"Ø
28"Ø
CAP 15"
Ø
18"Ø
C A P
CAP
SL2
NAI
L
"Ø
CAP
CAP
20"Ø
15"Ø
12C
A P
24"Ø
12"Ø12 "Ø
"Ø
3C
A P
"Ø
In fo rm at io n
SP
SPEED LIMIT
SP
CAP
S L
T B
A R
"Ø
15C
A P
16CAP
"Ø
"Ø
C A P
"Ø
"Ø
SL210
NAIL
C A P
6"Ø 8"Ø
6"Ø
10"Ø
6"Ø
CAP
28"Ø
Monument I nfo.
SLA20
02TBAR
SL210
NAIL
6"Ø 8"Ø
CAP
NTS
SL2002
NAIL
I N
V
.6 x .8 ' C
M P
NTS
CAP
10"Ø
SL2005
TBAR
18"Ø
SL2006
NAIL
"Ø
"Ø I
N V
.5
3CAP
"Ø
"Ø
NTS NTS NTS
EOP
12"Ø 20
CAP
22"Ø
12"Ø
In fo rm at io n
CAP
CAP
"Ø
CAP
"Ø
"Ø
"Ø
INFO
CAP
20"Ø
ROAD
BROTHERTON
CAP
STOP
NTS NTS NTS NTS NTS
NTS NTS NTS NTS NTS
NTSNTSNTSNTSNTS
NTS NTS NTS NTS NTS
NTS NTSNTSNTSNTS
NTS NTS NTS
NTS
AZ
5.
°39
.6
6' AZ 7
2.7 5°26.
42'
A Z
.7
.4
"Ø
W /R
EF
8" Ø
TW
IN
24" Ø
CEDAR
36" Ø
WHIT
E O
AK
12"Ø
CEDAR
24"Ø
CEDAR
JAY'S MILL
15"Ø
CEDAR
BROTHERTON
ROAD
JAY'S MILL
BROTHERTON
ROAD
A Z
.4
.1
A Z
.0
.3
A Z
.5
.3
AZ 79
.36°
56.3 5'
AZ 288.84°
39.49'
AZ 103.01°
55.19'
A Z
.5
.2
AZ
.2
.8 7'
A Z .0
.9
SP
EED
LI
MI
T
AZ 269.5°
49.55'
.9
.3
.4
.3
'A
Z
.8
.3
A Z .0
.4
A Z
.9
.0
A Z
.9
.9
AZ 93.15°
17.68'
24" Ø
PIN
E
AZ 7
1.8
6°109 .77
A Z
.9
.1
AZ 76
.21°28.1 7'
AZ 80.
09°
40.81
"Ø
PI
N E
A Z .3
.0
AZ 79
.46°
19.5 4'
A Z .7
.2
A Z
.9
.5
AZ 107.86°
20.81'
AZ 6
9.3
7°12 .53
A Z
.5
.5
.82'
.72
8.
A Z
.9
.7
A Z 3.
.8 4'
A Z
.3
.2
AZ 87.36°
61.76' A
Z .6
.6
A Z
.1
.6
"Ø
PI
N E
AZ 7
0.8
°96 .96
A Z .3
.7
A Z
.7
.0
AZ 7
3.4
7°86.
11'A
Z .9
.8
A Z
.2
.4
AZ 2
52.
31°27.
7'
A Z
.1
.8
A Z
.3
.5
A Z
.7
.2
AZ 114.97°
89.34'
A Z
.6
.4
AZ
.5 6°13
.7 9'
A Z .9
.3
AZ 121.85°
71.06'
"Ø
P
IN
E
AZ
.5
.8 6'
A Z
.9
.8
AZ 6
8.1
7°16 .22
A Z
.9
.2
AZ 90.69°
69.23'
AZ 263.6
48.51'
AZ 301.7°
21.02' AZ
0.
.6
A Z
.3
.1
AZ
.6 1°
.2
3' AZ 97.42°
41.79'
A Z
.0
.6
AZ 105.72°
18.59'
AZ 86.83°
10.17'
AZ 7
0.6
9°26 .06
A Z
.4
.9
A Z
.7
.7
' AZ 78
.8° 30.0
6'
AZ 113.24°
35.02'
"Ø
CEDAR
"Ø
W/
REF
8"Ø
TWIN
15"Ø
W/REF
18"Ø
CEDAR
TWIN
18"Ø
CEDAR
"Ø
CEDAR
W/
REF
15" Ø
CEDAR
24"Ø
W/REF
15"Ø
W/REF
"Ø
W H
IT
E O
A K
"Ø
H
IC
K
28"Ø
W/REF
"Ø
W /R
E F
"Ø
C E D
A R
A
LE
X A N
D E R B
R
ID
G E
R O
A D
S T O P
B R
O T H E R T O
N
R O
A D
W e e p H o le s
"Ø
C E D
A R
W
R E F
"Ø
TW
IN
"Ø
W/
REF
BALDWIN
MONUMENT
15"Ø
W/R
EF
36"Ø
SYC TWIN
28"Ø
RED OAK
20"Ø
WHITE OAK
STOP
AZ 114.06°
63.29'
A Z .3
.1
22"Ø
W/REF
"Ø
DEAD
"Ø
CEDAR
W/
REF
AZ 261
.13°
33.7'
A Z
.5
.1
AZ 300.72°
16.13'
A Z
.8
.1
A Z
.3
.0
A Z
.7
.9
AZ 301.7°
12.42'
AZ
.7 1°
.4 7'
12"Ø
TWIN
"Ø
CEDAR
8"Ø
W/REF
BRAGG'S
HEADQUARTERS -
AZ 7
5.0
1°
79.
89'
AZ 82.97
21.56'A Z .3
.7
A Z .2
.1
70.89'AZ 104.27°
.2
A Z
.4
.0 5'
A Z .7
.2
A Z
.3
AZ
.3 3°
.9 7'
A Z 1.
1°
.8
A Z .9
AZ 6
9.7
5°
.3
A Z
.5
AZ 76
.21°
5.
AZ
9.
138.66'
AZ 268.56°14
9.
AZ
3.
.6
A Z .4
.2
A Z .2
Azimuth shown is based on north axis at clockwise rotation.
NOTE:
U.S. DEPARTMENT OF TRANSPORTATION
BROTHERTON ROAD AND
BROTHERTON PICNIC AREA PARKING
CHICKAMAUGA AND CHATTANOOGA NATIONAL MILITARY PARK
:0
M a r c h
A
P R
O J E
C T
S \c h c h
\m u lt i(
H W
Y
D E
S \C
A D
D \A
-0
C
H C
H
(1
(1
L o c
S u rv .d g n
SURVEY INFORMATION
PROJECT
A06
BOR BOR
CAP
20"Ø
24"Ø
SL1001
NAIL
x A
R P x
.7
.8 'S x .0 'R
ONE WAY
REFLECTOR
CAP
36"Ø
V
C P x
.8
SPEED
LIMIT
PLACARD
BRIGADE
DICK'S
CAP
36"Ø
36"Ø
6"Ø 6"Ø 5"Ø
W/REF
10"Ø
6"Ø
CAP
15"Ø
24"Ø
GLENN VINIARD ROAD
P x
.0
.2
'H
S I D
E
.2 'S x .6 'R x
CAP
STOP
W
IL
D E
R R
O A
D
CAP
18"Ø
D O
N
O T
E N T E R
18"Ø
SL1102
NAIL
A Z
.0
.8
A Z
.9
.6
T o C
P S
L
T o C o u n ty M
O N
NTS NTS NTS NTS
NTSNTSNTSNTS
NTS NTS NTS NTS
NTSNTS
17.59'
AZ 97.64°
.4
A Z
.5
.6
A Z
.6
49.12'
AZ 265.06°
.5
A Z
.0
°3
.9
A Z
.1
.5
A Z
.2
.3
A Z
.1
47.69'
AZ 99.38°
16.8'
A Z 128.54°
A Z
.8
.2
A Z
.0
.8
AZ 279.42°
19.34'
AZ 301.04°
12.05'
A Z
.5
.8
.8
A Z
.3
.4
A Z .4
.6 4'
AZ
.1 7°
A Z 2.
1°
.6 7'
.6
.4
AZ 305.69°12.21'
AZ 280.81°
10.31'
AZ 265.66°
13.72'
A Z
.8
.5
AZ 6
8.8
°35 .7'
.4
A Z
.9
.7 1'
AZ
.6 5°
A Z 306.62° 11.31'
A Z
.1
.0
AZ 112.61°
30.09'
AZ 76
.47°
13.2 9'
34.17'
AZ 301.07°
AZ 121.82°
16.92'AZ 267.56°
6.75'
A Z
.2
.9
STOP
52.01'
AZ 120.67°
.6
A Z .1
A Z .1
.5
.57
AZ 6
8.2
9°
.0
A Z
.2
.2
A Z
.2
.5
.2
.8
.0
.7
.2
42"Ø
12"Ø
6"Ø
8"Ø
8"DIP x 29.7'
CAP
15"Ø
W/REF
10"Ø
6"Ø
8"Ø
CAP
15"Ø
28"Ø
18"Ø 6"Ø
CEDAR
8"Ø
CEDAR
5"Ø
W/REF
28"Ø
CEDAR
12"Ø
CAP
"Ø24"Ø
10"Ø
TRIPLE
5"Ø 8"Ø
CEDAR
8"Ø
CEDAR
8"Ø
W/REF
10"Ø
5"Ø
8"Ø
CAP
18"Ø
20"Ø 24"Ø
24"Ø
15"Ø
15"Ø
18"Ø
12"Ø
48"Ø
CEDAR
15"Ø
8"Ø
5"Ø
5"Ø
CAP
20"Ø
15"Ø
24"Ø
12"Ø
5"Ø 5"Ø
19.45'
266.4°
CAP 28"Ø
10"Ø
NAIL736.1791965307.8331786565.067SL1102
NAIL711.1251968295.1871784764.743SL1001
REBAR;CAP736.4131965393.1311786627.5131102
REBAR;CAP735.8321965285.1211786289.9591101
REBAR;CAP735.2281965715.6691786186.0911010
REBAR;CAP737.2261966194.3331786091.6651009
REBAR;CAP734.7441966296.5931785744.6601008
REBAR;CAP730.2091966457.3291785334.3021007
REBAR;CAP729.1811966412.4001784957.6321006
REBAR;CAP731.5061966611.7701784800.1041005
REBAR;CAP732.1551966896.5811784821.2421004
REBAR;CAP722.1341967229.5371784746.4321003
REBAR;CAP713.6141967928.5771784750.2731002
REBAR;CAP713.5571968355.5821784950.0051001
REMARKSELEVATIONEASTINGNORTHINGPOINT
GEOID MODEL: GEOID12B (CONUS)
VERTICAL DATUM: NAVD 1988
HORIZ. DATUM: NAD 1983 (CONUS)
ZONE: GEORGIA WEST 1002
COORDINATE SYSTEM: US STATE PLANE 1983
PROJECT COORDINATE SYSTEM
Azimuth shown is based on north axis at clockwise rotation.
NOTE:
U.S. DEPARTMENT OF TRANSPORTATION
GLENN-VINIARD ROAD AND
PARKING TOUR STOP 6 (WILDER TOWER)
CHICKAMAUGA AND CHATTANOOGA NATIONAL MILITARY PARK
:0
M a r c h
A
P R
O J E
C T
S \c h c h
\m u lt i(
H W
Y
D E
S \C
A D
D \A
-0
C
H C
H
(1
(1
L o c
S u rv .d g n
SURVEY INFORMATION
PROJECT
A07
U.S. DEPARTMENT OF TRANSPORTATION
BROTHERTON ROAD
CHICKAMAUGA AND CHATTANOOGA NATIONAL MILITARY PARK
:0
M a r c h
A
P R
O J E
C T
S \c h c h
\m u lt i(
H W
Y
D E
S \C
A D
D \A
-0
C
H C
H
(1
(1
L o c
S u rv .d g n
INFORMATION
HORIZONTAL ALIGNMENT
PROJECT
A08
INFORMATION
HORIZONTAL ALIGNMENT
PARKING TOUR STOP 6 (WILDER TOWER)
GLENN VINIARD ROAD AND
:0
M a r c h
A
P R
O J E
C T
S \c h c h \m u lt i(
H W
Y D
E S
\C A
D D
\A -0
C
H C
H
(1
(1
L o c S u rv
.d
A09
Shldr.
1' existing
Match existing
Match
Limits of disturbance
SUPERELEVATED SECTION
Limits of disturbance
1.5" - 6.5" Asphalt pavement and
Existing:Proposed:
1.5" - 6.5" Asphalt pavement and
Aggregate base (unknown depth)
CROWN SECTION
BROTHERTON ROAD
166+10.13 to 204+35.12, Schedule B
151+09.26 to 164+50.59, Schedule B
149+82.03 to 150+52.31, Schedule A
119+43.00 to 148+32.33, Schedule A
100+85.00 to 117+80.00, Schedule A existing
Match
LC
Travel lane
7.5'±
Aggregate base (unknown depth) existing
Match
Travel lane
7.5'±
Travel lane
7.5'±
Travel lane
7.5'±
Shldr.
NO SCALE
LC
Proposed:
Existing:
LCLC
Existing ground
166+10.13 to 204+35.12, Schedule B
151+09.26 to 164+50.59, Schedule B
149+82.03 to 150+52.31, Schedule A
119+43.00 to 148+32.33, Schedule A
100+85.00 to 117+80.00, Schedule A
TYPICAL SECTIONS
BROTHERTON ROAD AND
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION CHICKAMAUGA AND CHATTANOOGA NATIONAL MILITARY PARK
Existing ground
PULL-OFF AREAS 1, 3, 4, 5, AND 6
NOTES:
with prior approval by the CO.
clearing for fiber roll installation and other work may be permitted
Do not remove any trees without prior approval of the CO. Minor according to Section 625.
Establish turf on all disturbed areas, except paved or rock surfaces, inch below the top edge of asphalt pavement.2 aggregate-topsoil course. Place top of aggregate-topsoil course
Grade shoulders to reestablish positive drainage prior to placing
1.
2.
4.
5.
Match the existing pavement grades and cross slopes.3.
Detail A
See Pavement Structure Details, Detail A
See Pavement Structure Details, are within 30 feet of the work area. See Subsection 107.02.
Place protective fencing around all monuments and markers that
Do not disturb existing markers and monuments.
Shldr.
1'
Pull-offs 1, 3, 4, 5, and 6 (Lt./Rt.)
10' and var.
Detail B or Detail D
See Pavement Structure Details, PULL-OFF AREA
BROTHERTON ROAD
188+51.43 to 189+78.90 RT, Schedule B
167+81.23 to 169+26.06 RT, Schedule B
164+50.59 to 166+10.13 LT, Schedule B
156+55.05 to 157+69.47 LT, Schedule B
117+80.00 to 119+40.00 LT, Schedule A
Shldr.
1'
Limits of disturbance
E d g e o f P a v e m e n t existing
Match
:5
A p r il
D e f a u lt
U s e r s \k a s h if .k h a n
\D e s k to p
\0
P r o je c ts
\3
C
O L
O
B
\C
\C A
D D
\B
B
C H
C H
M u lt i( ty p
.d g n B01
PROJECT
NOTES:
TYPICAL SECTIONS
BROTHERTON ROAD WITH STONE-LINED DITCH
CHICKAMAUGA AND CHATTANOOGA NATIONAL MILITARY PARKNO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SUPERELEVATED SECTION
BROTHERTON ROAD
Limits of disturbance
1.5" - 6.5" Asphalt pavement and existing
Match
LC Aggregate base (unknown depth)
Travel lane
7.5'±
Travel lane
7.5'±
Shldr.
1'
LC
Proposed:
Existing:
Existing ground
164+50.59 to 166+10.13, Schedule B
117+80.00 to 119+43.00, Schedule A
Limits of disturbance
Existing:
1.5" - 6.5" Asphalt pavement and
Aggregate base (unknown depth)
CROWN SECTION
BROTHERTON ROAD
151+09.26 to 204+35.12, Schedule B
100+85.00 to 150+52.31, Schedule A
Travel lane
7.5'±
Travel lane
7.5'±
LCLC
Existing
LCLC
Proposed
Note 4
See
0 to 1'
Var.
Existing ground with prior approval by the CO.
clearing for fiber roll installation and other work may be permitted
Do not remove any trees without prior approval of the CO. Minor according to Section 625.
Establish turf on all disturbed areas, except paved or rock surfaces, inch below the top edge of asphalt pavement.2 aggregate-topsoil course. Place top of aggregate-topsoil course
Grade shoulders to reestablish positive drainage prior to placing
1.
2.
Buffer
2' (min.)Shift
0-1' edge of pavement and the stone ditches.
Section 668 to maintain a minimum 2-foot buffer between the ditches are encountered, adjust the centerline according to before beginning ground disturbing activities. When stone-lined the presence of stone-lined ditches according to Section 623
The location of the stone-lined ditches are approximate. Check for 4.
5.
hand according to Subsection 303.03.
the CO. Perform the reconditioning work in stone-lined ditches by
Recondition ditches where shown in the plans or as directed by
6.
7.
(See Notes 4 and 5)
Stone-lined ditch existing
Match existing
Match
Match the existing pavement grades and cross slopes.3.
existing
Match
Shldr.
1'
Detail A
See Pavement Structure Details, Detail A
See Pavement Structure Details, feet of the work area. See Subsection 107.02.
fencing around all monuments and markers that are within 30
Do not disturb existing markers and monuments. Place protective LCLC
Existing
Note 4
See
0 to 1'
Var.
Proposed existing
Match existing
Match (See Notes 4 and 5)
Stone-lined ditch
Buffer
(min.)2'
:5
A p r il
D e f a
U s e r s \k a s h if
.k h a n \D e s k to p \0
P r o je c ts
\3 C
O L
O
B \C
\C A
D D
\B B
C
H C
H M u lt i( ty p .d g n
B02
PROJECT
1.5" Asphalt pavement and
Existing:Proposed:
Aggregate base (unknown depth)
Existing: Proposed:
1.5" - 6.5" Asphalt pavement
Aggregate base (unknown depth) existing
Match
BROTHERTON PICNIC AREA PARKING
148+32.33 to 149+82.03, Schedule A
Limits of disturbance
Median
48' and var.
Picnic area parking
40' and var.
Travel lane
15' and var.
existing
Match
Match
Shldr.
1' existing
Match
LCLC
Existing ground
BROTHERTON ROAD AND
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
BROTHERTON PICNIC AREA PARKING
Detail A
See Pavement Structure Details, with prior approval by the CO.
clearing for fiber roll installation and other work may be permitted
Do not remove any trees without prior approval of the CO. Minor according to Section 625.
Establish turf on all disturbed areas, except pavedor rock surfaces, NOTES:
inch below the top edge of asphalt pavement.2 aggregate-topsoil course. Place top of aggregate-topsoil course
Grade shoulders to reestablish positive drainage prior to placing
1.
2.
4.
5.
ditches by hand according to Subsection 303.03.
by the CO. Perform the reconditioning work in stone-lined
Recondition ditches where shown in the plans or as directed
6.
Match the existing pavement grades and cross slopes.3.
Detail C
See Pavement Structure Details, are within 30 feet of the work area. See Subsection 107.02.
Place protective fencing around all monuments and markers that
Do not disturb existing markers and monuments.
:5
A p r il
D e f a
U s e r s \k a s h if .k h a n
\D e s k to p
\0
P r o je c ts
\3
C
O L
O
B
\C
\C A
D D
\B
B
C H
C H
M u lt i( ty p
.d g n
B03
PROJECT
GLENN-VINIARD ROAD
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CROWN SECTION
GLENN-VINIARD ROAD
300+40.00 to 340+83.42, Schedule C
Limits of disturbance
4.75" to 8" Asphalt pavement and
SUPERELEVATED SECTION
GLENN-VINIARD ROAD
existing
Match
Existing:Proposed:
Travel lane
17'±
Shldr.
1'
Aggregate base (unknown depth) existing
Match
LCLC
Existing ground
Aggregate base (unknown depth)
Travel lane
8.5'±
8.5'±
LCLC
Proposed
2%
Buffer
(min.)2'Shift
0-1'
4.75" to 8" Asphalt pavement and
Match (See Notes 4 and 5) stone-lined ditch
Shldr.
1'
Existing ground
Detail D
See Pavement Structure Details, Detail D
See Pavement Structure Details, 300+40.00 to 340+83.42, Schedule C
Pull-off area #7
10' and var.
Shldr.
1'
Existing
Match
Detail D
See Pavement Structure Details, Limits of disturbance
PULL-OFF AREA
GLENN-VINIARD ROAD
with prior approval by the CO.
clearing for fiber roll installation and other work may be permitted
Do not remove any trees without prior approval of the CO. Minor according to Section 625.
Establish turf on all disturbed areas, except paved or rock surfaces, NOTES:
inch below the top edge of asphalt pavement.2 aggregate-topsoil course. Place top of aggregate-topsoil course
Grade shoulders to reestablish positive drainage prior to placing
1.
2.
edge of pavement and the stone ditches.
Section 668 to maintain a minimum 2-foot buffer between the ditches are encountered, adjust the centerline according to before beginning ground disturbing activities. When stone-lined the presence of stone-lined ditches according to Section 623
Check for The location of the stone-lined ditches are approximate. 4.
5.
6.
hand according to Subsection 303.03.
the CO. Perform the reconditioning work in stone-lined ditches by
Recondition ditches where shown in the plans or as directed by
7.
Match the existing pavement grades and cross slopes, unless 3.
are within 30 feet of the work area. See Subsection 107.02.
Place protective fencing around all monuments and markers that
Do not disturb existing markers and monuments.
302+79 to 303+95 LT, Schedule C
Note 4
See
0 to 1'
Var.
E d g e o f P a v e m e n t
2% otherwise noted in the plans or as directed by the CO.
:5
A p r il
D e f a
U s e r s \k a s h if
.k h a n \D e s k to p \0
P r o je c ts
\3 C
O L
O
B \C
\C A
D D
\B B
C
H C
H M u lt i( ty p .d g n
B04
PROJECT
PARKING TOUR STOP 6 (WILDER TOWER)
400+20.00 to 401+20.00 Schedule C existing
Match existing
Match
Limits of disturbance and 6" aggregate base
Approx. 4" asphalt pavement
Existing ground
Proposed: Existing:
Travel lane
9'±
9'±
Shldr.
1'
Shldr.
1'
PARKING TOUR STOP 6 (WILDER TOWER)
401+20.00 to 403+18.35 Schedule C existing
Match existing
Match
Limits of disturbance and 6" aggregate base
Approx. 4" asphalt pavement
Existing ground
Proposed: Existing:
Travel lane
9'±
9'±
Shldr.
1'
Shldr.
1'
Notes:
where directed by the CO (see Note 4)
Asphalt concrete pavement patch, type 2, NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PARKING TOUR STOP 6 (WILDER TOWER)
CHICKAMAUGA AND CHATTANOOGA NATIONAL MILITARY PARK
NO SCALE
Type I or Type II, brown aggregate, PG 64-22)
Thin lift asphalt concrete pavement (¾-inch depth, SHEET 1 OF 2 with prior approval by the CO.
clearing for fiber roll installation and other work may be permitted
Do not remove any trees without prior approval of the CO. Minor
1.
2.
Match the existing pavement grades and cross slopes.3.
4.
encountered at time of construction.
asphalt concrete pavement patching limits based on conditions
Tour Stop 6 (Wilder Tower) Sheet 2 of 2. The CO will determine
See Asphalt Concrete Pavement Patch, Type 2 Detail on Parking
5.
fill cracks wider than ½-inch prior to placing overlay.
-inch to ½-inch in width. Clean and 4
Clean and seal cracks that are
6. Remove existing pavement markings prior to placing overlay.
7.
tar, asphalt overspray, and surface treatment.
Protect all curbs, sidewalks, walls, and other appurtenances from are within 30 feet of the work area. See Subsection 107.02.
Place protective fencing around all monuments and markers that
Do not disturb existing markers and monuments.
according to Section 625.
Establish turf on all disturbed areas, except paved or rock surfaces, 8.
Type I or Type II, brown aggregate, PG 64-22)
Thin lift asphalt concrete pavement (¾-inch depth, Non-tracking hot applied polymer asphalt tack coat
Non-tracking hot applied polymer asphalt tack coat
:0
A p r il
D e f a
U s e r s \k a s h if
.k h a n \D e s k to p \0
P r o je c ts
\3 C
O L
O
B \C
\C A
D D
\B C
H C
H M u lt i( ty p .d g n
TYPICAL SECTIONS
PROJECT
NUMBER
SHEET
B05 ground
PARKING TOUR STOP 6 (WILDER TOWER)
Parking area
26.5' and var.
403+18.35 to 406+26.32, Schedule C
11'±
Shldr.
2'
Parking area
26.5' and var.
existing
Match
Limits of disturbance
Proposed: Existing:
Median
6' and var.
existing
Match
LCLC
Milling (var. depth)
4'
Taper
4' and varies 1.5%
403+18.35 to 406+26.32, Schedule C protect in place
Existing curb, " (see Note 7)4 depth varies 0" to
Mill existing ACP, and Thin Lift ACP Overlay Detail
See Variable Asphalt Pavement Milling
AND THIN LIFT ASPHALT CONCRETE PAVEMENT OVERLAY
ASPHALT PAVEMENT MILLING (VARIABLE DEPTH)
Approx. 4" asphalt pavement and 6" aggregate base and 6" aggregate base
Approx. 4" asphalt pavement pavement asphalt
Existing course base aggregate
Existing
Pay limits
Varies (See Note 4)
4" Asphalt pavement milling
Asphalt tack coat (typ.)
NMSA, 0.3 to <3 million ESAL"8
2" GACP,
Match existing
<3 million ESAL NMSA, 0.3 to "8
2" GACP,
Notes:
curb, protect in place
Existing sidewalk and
Milling (var. depth)
4' Milling (var. depth)
4' polymer asphalt tack coat
Non-tracking hot applied
Non-tracking hot applied polymer asphalt tack coat
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PARKING TOUR STOP 6 (WILDER TOWER)
CHICKAMAUGA AND CHATTANOOGA NATIONAL MILITARY PARK
NO SCALE SHEET 2 OF 2
with prior approval by the CO.
clearing for fiber roll installation and other work may be permitted
Do not remove any trees without prior approval of the CO. Minor
1.
2.
are within 30 feet of the work area. See Subsection 107.02.
Place protective fencing around all monuments and markers that
Do not disturb existing markers and monuments.
Match the existing pavement cross slopes.3.
4.
conditions encountered at time of construction.
determine asphalt concrete pavement patching limits based on
See Asphalt Concrete Pavement Patch, Type 2 Detail. The CO will
5.
fill cracks wider than ½-inch prior to placing overlay.
-inch to ½-inch in width. Clean and 4
Clean and seal cracks that are
6.
tar, asphalt overspray, and surface treatment.
Protect all curbs, sidewalks, walls, and other appurtenances from
7.
existing curb reveal.
Match the existing pavement grade at curbs in order to maintain the according to Section 625.
Establish turf on all disturbed areas, except paved or rock surfaces, 8.
where directed by the CO (see Note 4)
Asphalt concrete pavement patch, type 2, where directed by the CO (see Note 4)
Asphalt concrete pavement patch, type 2, Type I or Type II, brown aggregate, PG 64-22)
Thin lift asphalt concrete pavement (¾-inch depth, Type I or Type II, brown aggregate, PG 64-22)
Thin lift asphalt concrete pavement (¾-inch depth, Type I or Type II, brown aggregate, PG 64-22)
Thin lift asphalt concrete pavement (¾-inch depth, cross slope
Match existing
Non-tracking hot applied polymer asphalt tack coat
:0
A p r il
D e f a
U s e r s \k a s h if
.k h a n \D e s k to p \0
P r o je c ts
\3 C
O L
O
B \C
\C A
D D
\B C
H C
H M u lt i( ty p .d g n
:0
A p r il
D e f a
U s e r s \k a s h if
.k h a n \D e s k to p \0
P r o je c ts
\3 C
O L
O
B \C
\C A
D D
\B C
H C
H M u lt i( ty p .d g n
:0
A p r il
D e f a
U s e r s \k a s h if
.k h a n \D e s k to p \0
P r o je c ts
\3 C
O L
O
B \C
\C A
D D
\B C
H C
H M u lt i( ty p .d g n
TYPICAL SECTIONS
PROJECT
NUMBER
SHEET
B06
NPS Drwg No. 301/173809 NPS PMIS No. 246003
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2 DETAIL
or pull-off (Lt./Rt.)
existing
Match
3" Aggregate-topsoil
Shoulder reconditioning
STABILIZATION (CEMENT)
RECONSTRUCTION WITH SUBGRADE
FULL DEPTH ASPHALT PAVEMENT
DETAIL A
AGGREGATE SURFACE COURSE, 4-INCH DEPTH
DETAIL B
Shldr.
1'
4" Roadway excavation asphalt, 1.5-inch depth
Removal of pavement, existing
Match
ASPHALT PAVEMENT RECONSTRUCTION, 1.5-INCH DEPTH
DETAIL C
protect in place
Existing curb and gutter, protect in place
Existing concrete sidewalk, Picnic area parking
40' and var.
geotextile, Class 2, Type E Separation-stabilization
Shldr.
1'
Existing ground
Existing ground
Existing ground
0" - 6.5" depth
Removal of pavement, asphalt, 2.5" - 9" depth
Roadway excavation, 6" Aggregate base, grading C or D
(brown aggregate) 4" Aggregate surface course
12" Subgrade stabilization (cement)
Asphalt tack coat
(Lt./Rt.)
Travel lane
Existing ground
Removal of pavement, asphalt, 0" to 8" depth
Roadway excavation, 1" to 9" depth
6" Aggregate base, grading C or D
2% existing
Match
STABILIZATION (CEMENT)
RECONSTRUCTION WITH SUBGRADE
FULL DEPTH ASPHALT PAVEMENT
DETAIL D
3" Aggregate-topsoil
Shoulder reconditioning
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NO SCALE
PAVEMENT STRUCTURE DETAILS
3" Aggregate-topsoil Shoulder reconditioning
(type IV roughness, brown aggregate, PG 64-22) " NMSA, 0.3 to <3 million ESAL8
1.5" GACP,
pull-off (Lt.)
10' and var.
12" Subgrade stabilization (cement)
Asphalt tack coat
(type IV roughness, brown aggregate, PG 64-22)
" NMSA, 0.3 to <3 million ESAL8
1.5" GACP,
(type IV roughness, brown aggregate, PG 64-22)
" NMSA, 0.3 to <3 million ESAL8
1.5" GACP,
(PG 64-22)
, 0.3 to <3 million ESAL NMSA"8
, 1.5" GACP
(PG 64-22)
, 0.3 to <3 million ESAL NMSA"8
, 1.5" GACP
:1
M a r c h
D e f a
P R
O J E
C T
S \c h c h
\m u lt i(
H W
Y
D E
S \C
A D
D \B
-0
B
-0
C
H C
H M u lt i( ty p .d g n
PROJECT
GA NP CHCH Multi (1) B07
FEDERAL HIGHWAY ADMINISTRATION
NO SCALE WITH EXISTING CEMENT TREATED BASE
BROTHERTON ROAD AND GLENN-VINIARD ROAD
Shldr.
1' existing
Match existing
Match
Limits of disturbance
Existing:Proposed:
1.5" - 8.5" Asphalt pavement and
Aggregate base (unknown depth)
BROTHERTON ROAD & GLENN-VINIARD ROAD
Travel lane
.5'±7.5'± - 8
.5'±7.5'± - 8
Details E and F
See Pavement Structure Details, 300+40.00 to 340+83.42, Schedule C
151+09.26 to 204+35.12, Schedule B
100+85.00 to 150+52.31, Schedule A with prior approval by the CO.
clearing for fiber roll installation and other work may be permitted
Do not remove any trees without prior approval of the CO. Minor and according to Section 625.
Establish turf on all disturbed areas, except paved or rock surfaces, inch below the top edge of asphalt pavement.2 aggregate-topsoil course. Place top of aggregate-topsoil course
Grade shoulders to reestablish positive drainage prior to placing
Match the existing pavement grades and cross slopes.
are within 30 feet of the work area. See Subsection 107.02.
Place protective fencing around all monuments and markers that
Do not disturb existing markers and monuments.
NOTES:
2.
1.
5.
7.
4.
Cement treated base
(unknown depth)
(Lt./Rt.)
Travel lane
Existing ground
Removal of pavement, asphalt, 1.5" depth
2%
CEMENT TREATED BASE
RECONSTRUCTION WITH EXISTING
FULL DEPTH ASPHALT PAVEMENT
DETAIL E (BROTHERTON ROAD)
3" Aggregate-topsoil
Shoulder reconditioning
CEMENT TREATED BASE
RECONSTRUCTION WITH EXISTING
FULL DEPTH ASPHALT PAVEMENT
DETAIL F (GLENN-VINIARD ROAD)
(type IV roughness, brown aggregate, PG 64-22)
" NMSA, 0.3 to <3 million ESAL8
1.5" GACP,
Asphalt tack coat
3.
encountered.
Remove existing cement treated base or PCC slabs when
Removal of pavement, concrete
12" Subgrade stabilization (cement)
(cement treated base or PCC slabs)
6" Aggregate base, grading C or D
(PG 64-22)
, 0.3 to <3 million ESAL NMSA"8
, 1.5" GACP
(Lt./Rt.)
Travel lane
Existing ground
Removal of pavement, asphalt, 8.5" depth
2%
3" Aggregate-topsoil
Shoulder reconditioning
Asphalt tack coat
12" Subgrade stabilization (cement)
6" Aggregate base, grading C or D
6.
of 9 inches, as approved by the CO.
excavate below cement treated base or PCC slabs to a total depth
Prior to application of 12-inch subgrade stabilization with cement, Removal of pavement, concrete
(cement treated base or PCC slabs)
(type IV roughness, brown aggregate, PG 64-22)
" NMSA, 0.3 to <3 million ESAL8
1.5" GACP,
(PG 64-22)
, 0.3 to <3 million ESAL NMSA"8
, 1.5" GACP
:1
M a r c h
D e f a
P R
O J E
C T
S \c h c h
\m u lt i(
H W
Y
D E
S \C
A D
D \B
-0
B
-0
C
H C
H M u lt i( ty p .d g n
PROJECT
GA NP CHCH Multi (1) B08
SCHEDULE BSCHEDULE A SCHEDULE BSCHEDULE A
OFFICE OF FEDERAL LANDS HIGHWAY
:2
M a r c h
C
T A
B O
F Q
P R
O J E
C T
S \c h c h
\m u lt i(
H W
Y
D E
S \C
A D
D \C
-0
C
H C
H
(1
(1 ta b .d g n
TABULATION OF QUANTITIES
PROJECT
C01
SCHEDULES A AND B
SCHEDULE C SCHEDULE DSCHEDULE C SCHEDULE D
OFFICE OF FEDERAL LANDS HIGHWAY
:0 p r il
C
T A
B O
F Q
P R
O J E
C T
S \c h c h
\m u lt i(
H W
Y
D E
S \C
A D
D \C
-0
C
H C
H
(1
(1 ta b .d g n
TABULATION OF QUANTITIES
PROJECT
C02
SCHEDULES C AND D
:5
N o v e m b e r
B a s e .B
E n g in e e r in g
S o f tw a r e \O p e n
R o a d s D e s ig n e r C
E
.1
\C o n f ig u r a ti o n
\O r g a n iz a ti o n
C iv il
\F L
H
S td s W
S
.1
.2
.0
V
\C e ll
\F L
H C e ll s .c e l
SUMMARIES AND SCHEDULES
PROJECT
NUMBER
SHEET
GA NP CHCH Multi (1) C03
NPS PMIS No. 246003 NPS Drwg No. 301/173809
SCHEDULES A, B AND C
EARTHWORK SUMMARY - SCHEDULE A
EARTHWORK SUMMARY - SCHEDULE B
EARTHWORK SUMMARY - SCHEDULE C
N o v e m b e r
B a s e .B
E n g in e e r in g
S o f tw a r e \O p e n
R o a d s D e s ig n e r C
E
.1
\C o n f ig u r a ti o n
\O r g a n iz a ti o n
C iv il
\F L
H
S td s W
S
.1
.2
.0
V
\C e ll
\F L
H C e ll s .c e l
SUMMARIES AND SCHEDULES
PROJECT
C04
SCHEDULES A AND B
NPS PMIS No. 246003 NPS Drwg No. 301/173809
PAVEMENT SUMMARY - SCHEDULE A
PAVEMENT SUMMARY - SCHEDULE B
N o v e m b e r
B a s e .B
E n g in e e r in g
S o f tw a r e \O p e n
R o a d s D e s ig n e r C
E
.1
\C o n f ig u r a ti o n
\O r g a n iz a ti o n
C iv il
\F L
H
S td s W
S
.1
.2
.0
V
\C e ll
\F L
H C e ll s .c e
SUMMARIES AND SCHEDULES
SHEET
GA NP CHCH Multi (1) C05
SCHEDULE C
PAVEMENT SUMMARY - SCHEDULE C
N o v e m b e r
B a s e .B
E n g in e e r in g
S o f tw a r e \O p e n
R o a d s D e s ig n e r C
E
.1
\C o n f ig u r a ti o n
\O r g a n iz a ti o n
C iv il
\F L
H
S td s W
S
.1
.2
.0
V
\C e ll
\F L
H C e ll s .c e
C06
N o v e m b e r
B a s e .B
E n g in e e r in g
S o f tw a r e \O p e n
R o a d s D e s ig n e r C
E
.1
\C o n f ig u r a ti o n
\O r g a n iz a ti o n
C iv il
\F L
H
S td s W
S
.1
.2
.0
V
\C e ll
\F L
H C e ll s .c e l
SUMMARIES AND SCHEDULES
PROJECT
NUMBER
GA NP CHCH Multi (1) C07
SCHEDULE C
N o v e m b e r
B a s e .B
E n g in e e r in g S o f tw a r e \O p e n R o a d s D e s ig n e r C
E
.1
\C o n f ig u r a ti o n \O r g a n iz a ti o n C iv il
\F L
H S td s W
S .1
.2
.0
V
\C e ll
\F L
H C e ll s .c e l
SUMMARIES AND SCHEDULES
PROJECT
C08
N o v e m b e r
B a s e .B
E n g in e e r in g
S o f tw a r e \O p e n
R o a d s D e s ig n e r C
E
.1
\C o n f ig u r a ti o n
\O r g a n iz a ti o n
C iv il
\F L
H
S td s W
S
.1
.2
.0
V
\C e ll
\F L
H C e ll s .c e
GA NP CHCH Multi (1) C09
SCHEDULES A, B, AND C
N o v e m b e r
B a s e .B
E n g in e e r in g
S o f tw a r e \O p e n
R o a d s D e s ig n e r C
E
.1
\C o n f ig u r a ti o n
\O r g a n iz a ti o n
C iv il
\F L
H
S td s W
S
.1
.2
.0
V
\C e ll
\F L
H C e ll s .c e
C10
IN
V 685.67'
IN
V 685.73'
IN
V 685.72'
S
TO
N E B
O X
30"W x36"H x20.8'
IN
V 685.85'
S
TO
N E B
O X
30"W x36"H x20.7'
IN
V 685.87'
IN
V 686.07'
S
TO
N E B
O X
28"W x34"H x21.3'
IN
V.
.0 1'
IN
V.
.5 4'
STO
NE
BO
X
3' W x?
Hx2 9.
7'
C A P
SL2110
NAIL
CAP
N77°30'19"W
N77°30'19"W
S89°54'49"W
S65°52' 16"W
S4 7°
'41
"W
.7
.6
.1
.0
.4
.0
P O
B
4 1
21+ 74.55
PC
PT
N
M A T
C H L
IN
E
BR-curve 1 BR-curve 2 BR-curve 3JR-curve
Brotherto n Road
BEGIN CONSTRUCTION
BROTHERTON ROAD
100+85.00
N 1977895.7526
E 1794632.5948
Ja y 's M il l R o a d
BR-curve 3
Note:
BR-curve 2
Existing EOP
Recondition ditches where directed or approved by the CO. Prior to reconditioning ditches, locate historic stone-lined ditches according to Section 623. Preserve stone-lined ditches according to Section 303.
headwall
Repoint stone masonry
BR-curve 1 headwalls
Repoint stone masonry
Proposed EOP
Construction centerline
CAP
A B
A N
D O
N
B O
X C
U L V
E R
T
CAP
S68°48'54"W
.3
.5
8 1
N
M A
T C
H L I N
E
M A T C
H L
IN
E
Brotherton R oad
Recondition ditches where directed or approved by the CO. Prior to reconditioning ditches, locate historic stone-lined ditches according to Section 623.
Preserve stone-lined ditches according to Section 303.
Note:
Existing EOP
Proposed EOP
BR-curve 4
BR-curve 4
Construction centerline
BR-curve 5
BR-curve 5
SCALE IN FEET
0 25 50
SCHEDULE A
100+00 TO 114+00
U.S. DEPARTMENT OF TRANSPORTATION CHICKAMAUGA AND CHATTANOOGA NATIONAL MILITARY PARK
BROTHERTON ROAD
CONSTRUCTION PLAN
:1
M a r c h
P la n
S h e t]
P R
O J E
C T
S \c h c h \m u lt i(
H W
Y D
E S
\C A
D D
\D -0
C
H C
H
(1
(1
P
L N
.d
D01
CAP
C
P O
U T
C
L A
Y x
.6
I N
V .4
I N
V .3
CAP
5 1
S87°25'55"W
S69° 08'5
0"W
7 1
N
M A
T C
H L I N
E
M A
T C
H L I N
E
Brotherton Road
2. Recondition ditches where directed or approved by the CO. Prior to reconditioning ditches, locate historic stone-lined ditches according to Section 623. Preserve stone-lined ditches according to Section 303.
1. Furnish stone masonry caps to replace missing headwall stone (6' long x 2' deep x 9" high)
Notes:
Existing EOP
Proposed EOP
BR-curve 6
BR-curve 6
Note 1). Clean culvert.
masonry headwall (See
Remove and reset stone
BR-curve 7
Construction centerline
(See typical sections)
Pull-off area #1
BR-curve 7
CAP
CAP
BOR
BOR
BOR
BOR
S81°55'33"W
7 1
N
M A
T C
H L I N
E
M A
T C
H L
IN
E
Brotherton Road
Recondition ditches where directed or approved by the CO. Prior to reconditioning ditches, locate historic stone-lined ditches according to Section 623. Preserve stone-lined ditches according to Section 303.
Note:
Existing EOP
Proposed EOP
Construction centerline
BR-curve 8
BR-curve 8
SCALE IN FEET
0 25 50
114+00 TO 128+00
BROTHERTON ROAD
CONSTRUCTION PLAN1
:1
M a r c h
P la n
S h e
P R
O J E
C T
S \c h c h \m u lt i(
H W
Y D
E S
\C A
D D
\D -0
C
H C
H
(1
(1
P
L N
.d
D02
O N
E B
O X
W x H x .4
IN
V .0
IN
V .2
SL2102
NAIL
CAP
CAP
S63°30'27"W
S83°58'12"W
C 1
PC
N
M A
T C
H L
IN
E
M A T
C H L
IN
E
Brotherton Road
Existing EOP
Recondition ditches where directed or approved by the CO. Prior to reconditioning ditches, locate historic stone-lined ditches according to Section 623.
Preserve stone-lined ditches according to Section 303.
Note:
masonry headwall
Remove and reset stone masonry headwall
Remove and reset stone
Proposed EOP
BR-curve 9
BR-curve 10
BR-curve 10BR-curve 9
Construction centerline
CAP
BOR
CAP
BOR
S45°42'02"W
N
M A
T C
H L I N
E
M A
T C
H L
IN
E
Brotherton R oad
Existing EOP
BR-curve 11
Construction centerline
Proposed EOP
BR-curve 11
(Do not disturb)
Pull-off area #2
128+00 TO 142+00
CONSTRUCTION PLAN
:1
M a r c h
P la n
S h e
P R
O J E
C T
S \c h c h
\m u lt i(
H W
Y
D E
S \C
A D
D \D
-0
C
H C
H
(1
(1
P
L N
.d
D03
I
V . 7
.4
I N
V .0
CAP
CAP
O N
E B
O X
W x H x .5
S67°46'03"W
.8
N
M A
T C
H L I N
E
M A
T C
H L I N
E
Brotherton Road
Recondition ditches where directed or approved by the CO. Prior to reconditioning ditches, locate historic stone-lined ditches according to Section 623. Preserve stone-lined ditches according to Section 303.
Note:
backfill voids using lean conc.
headwalls and repair
Repoint stone masonry
BR-curve 12
BR-curve 11
BR-curve 12BR-curve 11
Existing EOP
Proposed EOP
Construction centerline
I N
V . 7
.0
Weep H oles
2 - 4"
INV. 74
8.26
SL2014
TBAR
INV. 75
0.31'
I N
V . 7
.5
I N
V . 7
.5
BOR
CAP
BOR
R
C P x
.3
18" R CP x 45
.0'
C
M P x
.6
BOR
N '4
W
S43°52'58"W
S44°39'01"W
N
M A
T C
H L I N
E
M A
T C
H L I N
E
A le x a n d e r 's B r id g e R o a d
Note:
Recondition ditches where directed or approved by the CO. Prior to reconditioning ditches, locate historic stone-lined ditches according to Section 623. Preserve stone-lined ditches according to Section 303.
Proposed EOP BR-curve 13
BR-curve 13ABR-curve 1
Brotherton Picnic Area Parking
See Construction Plan to remain
Existing culvert reset gate
Remove and
Construction centerline reset gate
Remove and
END SCHEDULE A
BROTHERTON ROAD
150+52.31
BROTHERTON ROAD
151+09.26
BEGIN SCHEDULE B
Brotherton Road
Plan 8
1"=50'
142+00 TO 154+00
:1
M a r c h
P la n
S h e
P R
O J E
C T
S \c h c h \m u lt i(
H W
Y D
E S
\C A
D D
\D -0
C
H C
H
(1
(1
P
L N
.d
D04
CAP
S51°43'41"W S48°34'56"W
.9
N
M A
T C
H L I N
E
M A
T C
H L I N
E
Brotherton Road
Pull-off area #3
Construction centerline
Recondition ditches where directed or approved by the CO. Prior to reconditioning ditches, locate historic stone-lined ditches according to Section 623. Preserve stone-lined ditches according to Section 303.
Note:
Existing EOP
Proposed EOP
BR-curve 14
BR-curve 14
I N
V . 7
.9
I N
V . 7
.7
CAP
BOR
CAP
S T
O N
E B
O X
.5 'W x 'H x .6
BOR
S5 0°
'16
"W
S54 °51 '30
"W
S88°06'44"W
C 1
3 1
N
M A T
C H L
IN
E
M A T
C H L
IN
E
Brotherton Road
Recondition ditches where directed or approved by the CO. Prior to reconditioning ditches, locate historic stone-lined ditches according to Section 623.
Preserve stone-lined ditches according to Section 303.
Note:
Proposed EOP stump (26" diameter)
Remove individual
Construction centerline
Existing EOP
BR-curve 15
BR-curve 15 masonry headwalls
Remove and reset stone channel (20' x 6' x 8") to grade of upstream rock and gravel down
Remove berm of loose channel (20' x 6' x 8") gravel down to grade of downstream
Remove berm of loose rock and tree to remain
Existing 19" diameter
Pull-off area #4
Detail E157-08, and Detail E157-09 culvert. See Drainage Cross Sections, Remove and install 24" concrete pipe
SCHEDULE B
154+00 TO 168+00
:1
M a r c h
P la n
S h e
P R
O J E
C T
S \c h c h \m u lt i(
H W
Y D
E S
\C A
D D
\D -0
C
H C
H
(1
(1
P
L N
.d
D05
CAP
CAP
S89°23'34"W
S59°51 '02"W
1 1 2 1 3 1
N
M A T
C H L
IN
E
M A
T C
H L I N
E
Brothe rton Ro ad
Existing EOP
Recondition ditches where directed or approved by the CO. Prior to reconditioning ditches, locate historic stone-lined ditches according to Section 623. Preserve stone-lined ditches according to Section 303.
Note:
Pull-off area #5
BR-curve 16
Proposed EOP
BR-curve 16
BR-curve 17
Construction centerline
I N
V . 7
.7
I N
V . 7
.1
CAP
S T
O N
E B
O X
'W x 'H x
BOR
BOR
S70°25'11"W S71°17'13"W S71°43'09"W S72°06'52"W
N
M A
T C
H L I N
E
M A
T C
H L I N
E
Brotherton Road
Existing EOP
1. Recondition ditches where directed or approved by the CO. Prior to reconditioning ditches, locate historic stone-lined ditches according to Section 623.
Preserve stone-lined ditches according to Section 303.
2. Remove and reset historic stone masonry headwalls.
Notes:
BR-curve 17
BR-curve 17 with lean conc. backfill.
backfill headwall pads masonry headwalls and
Remove and reset stone
Proposed EOP channel (30' x 12' x 8").
gravel down to grade of downstream
Remove berm of loose rock and
Construction centerline
168+00 TO 182+00
:1
M a r c h
P la n
S h e
P R
O J E
C T
S \c h c h \m u lt i(
H W
Y D
E S
\C A
D D
\D -0
C
H C
H
(1
(1
P
L N
.d
D06
IN
V . 7
.2
IN
V . 7
.8
CAP
SL2006
NAIL
CAP
S T
O N
E B
O X
W x H x .4
S72°06'52"W
S5 3°0
2'0 6"W
N89°33'07"W
N87°59'39"W
3 1
5 1
N
M A
T C
H L I N
E
M A T
C H L
IN
E
Bro the rto n R oa d
Recondition ditches where directed or approved by the CO. Prior to reconditioning ditches, locate historic stone-lined ditches according to Section 623.
Preserve stone-lined ditches according to Section 303.
Note:
masonry headwalls
Remove and reset stone
Existing EOP
BR-curve 18
BR-curve 19
Construction centerline
BR-curve 18 BR-curve 19
(60' x 6' x 8") down to grade of downstream channel
Remove berm of loose rock and gravel
Proposed EOP
I N
V . 7
.8
I N
V . 7
.9
BOR
SL2005
TBAR
CAP
CAP
S T
O N
E B
O X x x .4
BOR
N87°35'46"W S78°35 '50"W
S79°00 '02"W
N
M A
T C
H L I N
E
M A
T C
H L I N
E
Brotherton Road
Pull-off area #6
Recondition ditches where directed or approved by the CO. Prior to reconditioning ditches, locate historic stone-lined ditches according to Section 623.
Preserve stone-lined ditches according to Section 303.
Note:
Proposed EOP
Existing EOP
BR-curve 20 and clean culvert
Repoint headwalls
BR-curve 20 concrete backfill (4' x 4' x 8")
Fill voids and corners with lean
Construction centerline
(60' x6' x8") down to grade of downstream channel
Remove berm of loose rock and gravel
(100' x 6' x 8") down to grade of downstream channel
Remove berm of loose rock and gravel
182+00 TO 196+00
:4
M a r c h
P la n
S h e
P R
O J E
C T
S \c h c h \m u lt i(
H W
Y D
E S
\C A
D D
\D -0
C
H C
H
(1
(1
P
L N
.d
D07
I
V
.5
I N
V
.1
O
N E B
O X
'W x 'H x
.4
SLA2002
TBAR
BOR755
CAP
BOR
S79°00'02"W
S78°46'50"W
S78°58'10"W
S61° 30'1
3"W
1 2
N
M A
T C
H L I N
E
M A
T C
H L I N
E
Broth erton
Road
Existing EOP
1. Recondition ditches where directed or approved by the CO. Prior to reconditioning ditches, locate historic stone-lined ditches according to Section 623.
Preserve stone-lined ditches according to Section 303.
Notes:
BR-curve 21
Proposed EOP
BR-curve 22
Construction centerline
BR-curve 21 BR-curve 22
See Note 2
See Note 3
2. Do not disturb existing culvert and headwall.
3. Fill voids underneath headwall with lean concrete backfill. Repoint headwall. Place riprap, class 3
(10' x 8' x 2') and geotextile, class 1, type C.
I N
V
.2
CAP
S78°20'36"W e = ___
'154.30L =
'77.71T =
'525.00R =
(RT)16°50'23"Δ =
202+64.19PI
.3
P
O E
N
M A T
C H L
IN
E
L a fa y e tt e R o a d
Existing EOP
Proposed EOP
END CONSTRUCTION
BROTHERTON ROAD
204+35.12 N 1968648.6687 E 1790803.5516
Lafayette Road
POC 62+00.21
Brotherton Road =
POC 204+47.77
to remain Existing gate
LR-curve 1
LR-curve 1
Construction centerline
Brotherton Road
196+00 TO 204+35.12
See Detail E251-01A.
:4
M a rc h
P la n
S h e
P R
O J E
C T
S \c h c h
\m u lt i(
H
W Y
D
E S
\C A
D D
\D
-0
C H
C H
(1
(1
P L
N .d
D08
40391
COMON
SL1001
NAIL
CAP
BOR
GLENN-VINIARD ROAD
300+40.00
N 1784783.0565
E 1968354.7815
Glenn-Viniard Road
Existing EOP
Proposed EOP Construction centerline headwalls
Repoint stone masonry in place
Clean culvert headwalls
Repoint stone masonry
Pull-off area #7
BEGIN CONSTRUCTION
L a F a y e tt e R o a d
L a F a y e tt e R o a d
S87°13'07"W e = ___
'135.12L =
'67.56T =
'4,000.00R =
(RT)01°56'07"Δ =
PI 304+99.11
P C
.5
P T
.6
P O
B
.0
40880
PRC
CAP
Proposed EOP
Existing EOP Construction centerline
Glenn-Viniar d Road
M A
T C
H L
IN
E
M A
T C
H L
IN
E
M A
T C
H L
IN
E
N
N
SCALE IN FEET
0 25 50 ditches according to Section 303.
to Section 623. Preserve stone-lined historic stone-lined ditches according reconditioning ditches, locate or approved by the CO. Prior to
Recondition ditches where directed
Note:
U.S. DEPARTMENT OF TRANSPORTATION CHICKAMAUGA AND CHATTANOOGA NATIONAL MILITARY PARK
300+00 TO 312+00
SCHEDULE C
GLENN-VINIARD ROAD
CONSTRUCTION PLAN
ditches according to Section 303.
to Section 623. Preserve stone-lined historic stone-lined ditches according reconditioning ditches, locate or approved by the CO. Prior to
Recondition ditches where directed
S89°09'14"W
S89°30'34"W
S89°14'37"W e = ___ '49.65L = '24.82T = '8,000.00R =
(RT)00°21'20"Δ =
PI 306+97.27
e = ___ '182.93L = '91.87T = '800.00R =
(RT)13°06'06"Δ =
PI 311+46.64
P C
.4
P T
.0
P C
.7
:2
M a rc h
D
P
R O
J E
C T
S \c h c h \m u lt i(
H W
Y D
E S
\C A
D D
\D -D
C
H C
H
(1
(1
P
L N
.d g n
PROJECT
D09
BOR
CAP
CAP
Construction centerline
Existing EOP Proposed EOP
Gle nn-
Vin iard Ro ad
N
N77°39'17"W
S88 °59 '45"
W e = ___
'174.14L =
'88.81T =
'360.00R =
(RT)27°42'54"Δ =
PI 317+82.55
e = ___ '186.39L = '93.62T = '800.00R =
(LT)13°20'58"Δ =
PI 313+98.21
P C
.5
P T
.9
P T
.7
P C
.7
4 3
6 3 7 3
CAP
Construction centerline
Existing EOP
Proposed EOP
Glenn-Viniard Road
Clean culvert in…