This document is a Pavement Report related to the Chickamauga and Chattanooga National Military Park project, Solicitation Number 693C73-24-B-000013.
The solicitation is seeking sealed bids from certified Small Business Concerns only for the rehabilitation of approximately 1.96 miles of Brotherton Road and 0.78 miles of Glenn-Viniard Road, including parking areas and pull-offs, within the Chickamauga and Chattanooga National Military Park. The work includes pavement removal, grading, subgrade stabilization, aggregate base, asphalt concrete pavement, riprap, removing and resetting stone masonry headwalls, aggregate-topsoil, signing, pavement markings, and other miscellaneous work. The project is expected to fall within the price range of $5,000,000 to $10,000,000 and will be split into multiple work schedules/contract options. Bid documents are expected to be issued on or about May 31, 2024, with the bid due date and location to be specified in the solicitation. Bidders are encouraged to submit bids electronically.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAVEMENT REPORT NUMBER FY24-03
Project GA NP CHCH MULTI (1)
Chickamauga and Chattanooga National Military Park Catoosa and Walker Counties, Georgia
Pavement Design Recommendations for Brotherton Road and Glen Viniard Road
February 2024
U.S. Department of Transportation Federal Highway Administration
Eastern Federal Lands Highway Division 22001 Loudoun County Parkway
Ashburn, VA 20147
GA NP CHCH MULTI (1) Pavement Report No. FY24-03
TABLE OF CONTENTS
1 INTRODUCTION
1.1 GENERAL
1.2 PROJECT DESCRIPTION
1.3 PROJECT BACKGROUND
1.4 PROJECT PURPOSE-AND-NEED
2 PROCEDURES AND RESULTS
2.1 PAVEMENT CONDITION ASSESSMENT PROCEDURES
2.2 SUBSURFACE EVALUATION PROCEDURE
2.3 FINDINGS
2.3.1 Existing Pavement Conditions
2.3.2 Laboratory Testing Results
2.3.3 Subsurface Conditions
2.3.4 Compaction and CBR Test Results
2.3.5 Groundwater
3 PAVEMENT DESIGN ANALYSIS
3.1 Traffic Loading
3.3 Vehicle Class Distribution Percentages, Truck Factors and Design ESALs
3.4 Flexible Pavement Design Variables
4 PAVEMENT RECOMMENDATIONS
4.1 BROTHERTON ROAD AND GLEN VINIARD ROAD
4.2 BROTHERTON PICNIC AREA PARKING
4.3 PARKING TOUR STOP 6 (WILDER TOWER)
4.4 PRE-OVERLAY REPAIRS – PARKING TOUR STOP 6
APPENDICES
Appendix A - Project Location Map Appendix B - Roadway Condition Summary Report Appendix C - Pavement Conditions Photos Appendix D - Pavement Coring Log Appendix E - Soil Boring Logs Appendix F - Laboratory Testing Results Appendix G - Pavement Design Analysis
Note: Design changes, made subsequent to distribution of this report and prior to project advertisement, will be documented by a memo inserted after the title page
PAVEMENT REPORT NUMBER FY24-03
Project GA NP CHCH MULTI (1)
Waler and Catoosa Counties, Georgia
Pavement Design Recommendations for Brotherton Road, Glen Viniard Road, Brotherton Picnic Area Parking, and Parking Tour Stop 6 (Wilder Tower)
1 INTRODUCTION
1.1 General
This report discusses the findings and recommendations for Project GA NP CHCH MULTI (1), located in Chickamauga and Chattanooga National Military Park (CHCH) in Walker and Catoosa Counties, Georgia. A Project Location Map is presented in Appendix A.
1.2 Project Description
Project NP CHCH MULTI (1) consists of preservation, rehabilitation, and reconstruction of the following routes:
Brotherton Road (CHCH-0102) is a 2-lane, 2-way, 1.96-mile asphalt concrete (AC) roadway.
Glen Viniard Road (CHCH-0503) is a 1-lane, 1-way, 0.78-mile AC roadway.
Brotherton Picnic Area Parking (CHCH-0924) is a 7,884 square foot, AC parking area.
Parking Tour Stop 6 (Wilder Tower) (CHCH-0936) is a 23,972 square foot, AC parking area.
1.3 Project Background
Brotherton and Glen Viniard Roads were originally part of CHCH 102(1), 503(1) until work was stopped during the design phase. The reason for the stoppage was a change in funding source from the Federal Lands Transportation Program (FLTP) to the Great American Outdoors Act (GAOA). During the delay of project CHCH 102(1), 503(1), historic stone lined ditches were uncovered during the construction of project NP CHCH 500(1), 501(1), ETC in March 2022 between the intersection of Glen-Kelly Road and Dyer Road. This discovery resulted in a stop-work order, leading to the National Park Service (NPS), Eastern Federal Lands Highway Division (EFLHD) and the Georgia State Historic Preservation Office (GA SHPO) entering into a Memorandum of Agreement (MOA). The MOA stipulates that any future road rehabilitation work in CHCH will operate under a mitigation plan, which requires an archaeological survey to be conducted to identify the presence and extent of historic roadway features.
In April and July 2023, the NPS Southeast Archeological Center (SEAC) conducted archaeological investigations in the form of subsurface and geophysical surveys to identify and document the presence of historic roadway features. As a result of the stoppage due to funding and the discovery of the historic, stone lined ditches, work for project NP CHCH 102(1), 503(1) was delayed until August of 2023, where the project was commenced under a new project name NP CHCH MULTI (2).
1.4 Project Purpose-and-Need
The Purpose-and-Need for this project is to rehabilitate roadways and parking areas within the Chickamauga and Chattanooga National Military Park.
2 PROCEDURES AND RESULTS
2.1 Pavement Condition Assessment Procedures
The existing pavement conditions of the roadways and parking areas included within the scope of work has been assessed through different methods.
In July 2021, the EFLHD Road Inventory Program (RIP) collected the road condition data for the NPS using the automatic Data Collection Vehicle (DCV) as part of Cycle 6 (C6) collection.
The RIP roadway condition information was used to determine the Pavement Condition Rating (PCR) which is the overall indicator of pavement performance and surface condition.
Cracking, rutting and ride quality data are the surface characteristics that most contribute to PCR. Pavement conditions are categorized based on the PCR into “Good” (PCR ≥ 85), “Fair” (60 < PCR < 85), and “Poor” (PCR ≤ 60). A PCR below 30 is indicative of the end of pavement service life.
An EFLHD Pavement Engineer conducted a pavement condition survey in November 2019 to assess the existing pavement conditions based on visual observation of surface distresses.
2.2 Subsurface Evaluation Procedure
In February and June 2019, EFLHD’s Subsurface Exploration Team drilled a total of 3 pavement borings and extracted a total of 12 pavement cores to determine the existing pavement type and thickness. The roadway borings were drilled to a depth of 5 feet below the existing grade along selected routes within Cosby Campground.
Standard Penetration Tests (SPT) were performed using a 2 -inch (outer diameter) split spoon sampler in accordance with AASHTO T-206. SPT soil samples were recovered by driving the split spoon sampler a distance of 24 inches, or until refusal, into the undisturbed soil under the action of a 140-pound automatic hammer free-falling 30 inches. The number of hammer blows required to advance the split-spoon sampler the middle 12 inches of the 24-inch sample interval is designated as the “Standard Penetration Resistance” or N-value. The N-values and the number of blows required to advance the sampler through each 6-inch interval was recorded on field boring logs. Representative portions of the SPT soil samples were placed into glass jars, labeled, and transported to the EFLHD Materials Testing Laboratory in Sevierville, TN for testing and storage.
Laboratory testing on samples collected included approximately:
Three Natural Moisture Contents (AASTHO T-265) Three Gradation Analyses by Sieve (AASHTO T-27 and T-11)
Three Plastic Limit, Liquid Limit, and Plasticity Indices of soils (AASHTO T-89 and
AASHTO T-90)
One Standard Proctor Compaction (AASTHO T-99) One California Bearing Ratio (AASTHO T-193)
2.3 Findings
The findings of the pavement condition assessment and subsurface investigation are summarized below.
2.3.1 Existing Pavement Conditions
A summary of the PCRs based on the RIP data for Cycle 6 in June 2021 and the pavement condition from the November 2019 survey are included in Table 1. Appendix B summarizes the 2021 RIP Data for routes within CHCH. Photographs showing detailing pavement conditions from 2019 are included in Appendix C.
Table 1. Pavement Conditions
Roadway Name
PCR
(2021) Pavement Condition
(condition survey – November 2019) Brotherton Road
(CHCH-0102)
(Poor)
Low to high severity fatigue cracking, high severity edge cracking, low to high severity block cracking, high severity longitudinal cracking, high severity patching, raveling, moderate to high severity transverse cracking.
Glen Viniard Road (CHCH- 0503)
(Poor)
Low to high severity fatigue cracking, low to high severity longitudinal cracking, low to high severity block cracking, Brotherton Picnic Area Parking (CHCH-0924)
(Poor)
Moderate severity longitudinal and transverse cracking in addition to raveling.
Parking Tour Stop 6/ Wilder Tower Parking (CHCH-0936)
(Fair)
Low severity longitudinal cracking, low to moderate severity transverse cracking, raveling.
In February and June 2019, EFLHD’s subsurface exploration team extracted a total of 12 pavement cores from Brotherton Road, Glen Viniard Road, and Brotherton Picnic Parking Area to determine the existing pavement thickness and condition. Table 2 summarizes the existing AC thickness and condition and information from the cores. The Pavement Coring Logs are included in Appendix D.
Table 2. Pavement Core Data
Roadway Name
Number of
Pavement Cores
ACP
Thickness
Range (inches)
ACP
Thickness Average (inches)
Pavement Cores Conditions
Brotherton Road
7 2.75-6.5 3.7
Brown aggregate was observed in the first lift of all core samples. Loss of bond as a result of stripping was observed at depths ranging from 1.0 to 3.0 inches.
Brotherton Picnic Parking Area
1 1.5 1.5
Brown aggregate was observed in the entire core sample. The presence of a possible cement treated base was observed during coring.
Glen Viniard Road
4 4.75-8.0 2.75
Brown aggregate observed in the first lift of all core samples. Loss of bonding observed depths ranging from 3 to 5.5 inches.
2.3.2 Laboratory Testing Results
Table 3 summarizes the laboratory testing results for the subgrade soil based on the borings drilled. Soil boring logs and full laboratory testing results can be found in Appendix E and F, respectively.
Table 3. Laboratory Testing Results Route
Boring
ID
Depth (ft)
Moisture content %
Liquid Limit
PI
Fines
AASHTO
Classification
Description
Brotherton Road P2 1.0-3.0 20.3 34 9 47.0 A-4(2) Silty Sand
Brotherton Road P2 3.0-5.0 27.0 48 15 52.8 A-7-5(6) Sandy Silt
Glenn Viniard P3 3.0-5.0 26.5 46 14 59.8 A-7-5(8) Sandy Silt
2.3.3 Subsurface Conditions
Fill soils were encountered in all borings immediately beneath the pavement and extending to the boring termination depth of 5 ft. The fill was classified as Sandy Silt or Silty Sand for Brotherton Road and Sandy Silt for Glen Viniard Road.
On Brotherton, the N values for coarse grained soil was 6 blows per foot (bpf) and 4 bpf for indicating a very loose apparent density for the coarse-grained soil and a firm consistency for the fine-grained soil. For Glen Viniard Road, N values ranged from 3 to 5 bpf, indicating a soft to firm consistency.
Laboratory tests performed on fill soils measured liquid limits of 34 to 48 percent and plasticity indices of non-plastic to 9 to 15 percent. Natural moisture contents ranged from 20.3 to 27.0 percent.
2.3.4 Compaction and CBR Test Results
One bulk sample was collected from Brotherton Road to evaluate the compaction criteria and pavement support characteristics. The sample had a plasticity index of 19 percent and a maximum dry density of 107.6 pounds per cubic foot (pcf). The California Bearing Ratio was
1.5 percent, which corresponds to a Resilient Modulus of 2,250 psi. The Swell was recorded at 3 percent. Results from the CBR and compaction testing are shown in Table 4.
Table 4. Proctor Compaction and CBR Test Results
Boring
ID
Depth (ft) Liquid Limit
PI
Soil Description
Fines
Max. Dry Density pcf
Optimum Moisture Content
CBR %
Swell
B-5 1.0-5.0 58 19 Sandy Silt 27.8 120.6 8.3 1.5 3
2.3.5 Groundwater
No groundwater was encountered in any borings during drilling. It should be noted that fluctuations in groundwater level may occur due to in-situ soil types, seasonal variations, evaporation, surface run-off, and other site-specific factors not present at the time of drilling.
3 PAVEMENT DESIGN ANALYSIS
3.1 Traffic Loading
Traffic loading for the project considers the traffic count and growth data provided by NPS.
We considered the following traffic data for our analysis: An AADT of 146 vehicles per day, with a 60/40 distribution, 1 percent trucks, an annual growth rate of 2.0 percent, and a 25-year service life.
3.3 Vehicle Class Distribution Percentages, Truck Factors and Design ESALs Table 5 details the estimated 18,000-pound equivalent single axle load (ESALs) for design analysis for each vehicle class.
Table 5. Calculated ESALs FHWA Vehicle
Class Percentage of
AADT
Design Truck
Factor ESALs
Class 1-3 99.0 0.0008 786 Class 4 1.0 1.25 9,349
Total ESALs 10,135
For pavement design purposes, 50,000 ESALs will be used as per Section 11.2.1.2 of the FHWA Project Development and Design Manual (PDDM). Pavement design analyses were performed in accordance with the 1993 AASHTO Pavement Design procedure using the DARWin (version 3.01) Pavement Design System to determine the required structural number (SN) necessary for the proposed roadways.
3.4 Flexible Pavement Design Variables
To represent the strength of the subgrade with cement stabilization, a resilient modulus of 7,500 psi was used for pavement design. Other parameters specified in the analysis included a reliability of 75 percent, an overall standard deviation of 0.49, and initial serviceability of 4.2, and a terminal serviceability of 2.0 The results of the pavement design analysis are presented in Appendix G.
4 PAVEMENT RECOMMENDATIONS
Based on the pavement conditions observed during the field view and the subsurface investigation, we recommend the following pavement rehabilitation strategies. The recommendations included here reference the FP-14, “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.”
4.1 Brotherton Road and Glen Viniard Road
Both Brotherton and Glen Viniard Road exhibit severe pavement distress that require reconstruction. As part of the CHCH 102(1), 503(1) Final Pavement Report dated August 8, 2021, Full Depth Reclamation with Cement (FDR) was the recommend treatment. However, reclaimer operation will impact the historic stone lined ditches present on both routes. To resolve the poor pavement conditions and minimize the impact to the stone lined ditches, we recommend Full Depth Reconstruction. While FDR is less invasive vertically, reconstruction allows the contractor to come in with backhoes, skid steers, and use hand work to remove the existing pavement, offering greater control to avoid impacting the stone lined ditches.
We recommend removal of the entire existing pavement structure and the existing aggregate base. Afterwards, the existing subgrade (12 inches) will be treated with cement to increase its structural capacity prior to the placement of a 6.0-inch aggregate base, and 3.0- inch AC. The minimum requirements for the pavement structure are presented in Table 6.
Table 6. Full Depth Reconstruction
Layer Minimum Thickness
(in)
Comments
AC Surface Course 1.5
Gyratory Asphalt Concrete Pavement (GACP), as per Section 401, 0.3 to <
3 Million ESALs, 3/8” Nominal Maximum Size Aggregate (NMSA), Type IV Roughness, Brown Aggregate
Asphalt Tack Coat --- AC Tack Coat as per Section 412
AC Base Course 1.5 GACP, as per Section 401, 0.3 to < 3
Million ESALs, 3/8” NMSA
Aggregate Base 6.0 Aggregate Base, Grading C or D as per Section 301
Subgrade (Existing) 12.0 Subgrade Stabilization (Cement) as per Section 213
4.2 Brotherton Picnic Area Parking
The pavement on Brotherton Picnic Area Parking was observed to be in poor condition.
Because the distresses (longitudinal and transverse cracking) are predominantly thermal related, we recommend removal and replacement of the existing AC. Table 7 presents the minimum pavement structure requirements.
Table 7. AC Removal
Minimum Thickness
Existing AC 1.5 AC Removal as per Section 203
AC Surface Course 1.5 GACP, as per Section 401, 0.3 to < 3 Million ESALs, 3/8” NMSA, Type IV
Roughness, Brown Aggregate
4.3 Parking Tour Stop 6 (Wilder Tower)
The pavement on Wilder Tower was observed to be in fair to good condition, thus a thin AC overlay (with brown aggregate) is recommended. Table 8 presents the minimum pavement structure requirements.
Table 8. ¾” AC Overlay
Minimum Thickness
AC Surface Course 0.75
GACP, as per Section 401, 0.3 to < 3 Million ESALs, 4.75 mm (No. 4
Sieve) NMSA, Type IV Roughness, Brown Aggregate
Asphalt Tack Coat --- AC Tack Coat as per Section 412
4.4 Pre-Overlay Repairs – Parking Tour Stop 6
The following repairs must be performed as required prior to placing the ACP overlay:
Perform Full Depth Patching (Type 2) as necessary (in areas exhibiting fatigue cracking, settlement, rooting and/or potholes. Such areas should be identified by the CO. Patch areas should be performed in accordance with Section 418.
Perform Crack Sealing and Filling. Crack sealing (crack width ¼-inch to less than 1-inch) and filling (crack width greater than 1-inch) should be performed in accordance with Section 414.
Table 9 details the approximate quantities for crack sealing and patching in Wilder Tower Parking. Table 10 presents the minimum requirements for Type 2 patching.
Table 9. Full Depth Patching and Crack Sealing Quantities
Route Full Depth
Patch Type 2 (Square Yards)
Crack Sealing and Filling (Linear Feet)
Parking Tour Stop 6
(Wilder Tower Parking)
CHCH-0936
3 380
Table 10. Full Depth Patching, Type 2
Minimum Thickness
AC Surface Course 2.0 Asphalt Concrete Pavement (ACP)
Type 1, as per Section 403 AC Tack Coat --- AC Tack Coat as per Section 412
AC Base Course 2.0 ACP, Type 1, as per Section 403
DISCLAIMER/LIMITATIONS CLAUSE
The subsurface explorations and tests described in the section on Procedures and Results have been conducted in accordance with standard practices and procedures (except as specifically noted). The results of these explorations and tests represent conditions at the specific locations indicated. Subsurface and conditions between these locations may vary. The Analysis and Conclusions section and the Recommendations section in this report include interpretations and recommendations developed by the Government in the process of preparing the design.
These interpretations are not intended as a substitute for the personal investigation, independent interpretation, and judgment of the Contractor.
Prepared by:
Kenneth Nguyen Pavement Engineer
Reviewed by:
Mohammed Elias Pavement Team Leader
APPENDIX A – Project Location Map
Project Location Map APPENDIX A CHCH MULTI (1)
APPENDIX B – Roadway Condition Summary Report
Surface Type:
Inspection Date:
Paved Length (Miles):
Number of Lanes Lane & Width Inform ation
Pavement Condition Rating (PCR) Roadway Condition Inform ation
Longitudinal Crack Index
Distress Index Values
Route Sum m ary Section Length (MI) Beginning Section MP
Surface Condition Rating (SCR)
Transverse Cracking Index Patching Index Rutting Index International Roughness Index (IRI)
Paved Width (ft) Lane Width (ft)
Roughness Condition Index (RCI)
Alligator Crack Index Structural Crack Index
Rte. 0102
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
Chickam auga and Chattanooga National Military Park
ROU TE 0102: BROTHERTON ROAD
2 2
0.96
7/23/2021 1.96
ASPHALT
7.5
15.3 7.7
14.7 7.3
929493
Data Collection Vehicle (DCV) Rating
Route Condition Legend – Pavem ent Condition Rating (PCR)
Colors on map represent condition scores at 0.10-mile intervals. See Appendix for definitions and formulas.
Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
5-9
Surface Type:
In spection Date:
Paved Len gth (Miles):
Number of Lanes Lane & Width In formation
Pavement Condition Rating (PCR) Roadway Condition In formation
Longitudinal Crack Index
Distress Index V alues
Route Summary Section Length (MI) Begin n in g Section MP
Surface Condition Rating (SCR)
Transverse Cracking Index Patching Index Rutting Index International Roughness Index (IRI)
Paved Width (ft) Lane Width (ft)
Roughness Condition Index (RCI)
Alligator Crack Index Structural Crack Index
0Rte. 0503
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
Ch ickamauga and Chattanooga National Military Park
ROUTE 0503: GLEN V INIARD ROAD
1 1
0.78
7/23/2021 0.78
ASPHALT
17.6 16.9
17.6 16.9
Data Collection Vehicle (DCV) Rating
Route Condition Legen d – Pavement Condition Ratin g (PCR)
Colors on map represent condition scores at 0.10-mile intervals. See Appendix for definitions and formulas.
Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
5-25
User AccessInspection Date FMSS Num b er Surface Type
Curb Reveal (Inc h es)Area (Sq. Ft.) Lane Miles (11' Wid th s) Curb Recom m end ation
Curb & Gutter TypeCurb Type
Cond ition Rating / P CRP avem ent Recom m end ation
NOT APPLICABLE
FROM ROUTE 0102 (BROTHERTON ROAD) ON RIGHT
TO ROUTE 0102 (BROTHERTON ROAD)
5/17/2021
7,884
NO CURB
HEAVY 3R TREATMENTS POOR / 53
CONCRETE
0.136
75283 PUBLIC ASPHALT
LIGHT REPAIR
6-24
ROUTE 0924: P ARKING BROTHERTON P ICNIC AREA
Manual Rating
Ch ic k am auga and Ch attanooga National Military P ark
Route Cond ition Legend – P avem ent Cond ition Rating (P CR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)P oor (0 - 60) Excellent (95 - 100) Not Rated
Rte. 0
Rte. 0924
± 0 60 120 Feet
User AccessInspection Date FMS S Num ber S urface Type
Curb Reveal (Inches)Area (S q. Ft.) Lane Miles (11' Wid ths) Curb Recom m end ation
Curb & Gutter TypeCurb Type
Cond ition Rating / PCRPavem ent Recom m end ation
FROM ROUTE 0503 (GLEN VINIARD ROAD) AT WILDER BRIGADE MONUMENT
TO PARKING
5/17/2021
23,972
CONCRETE
LIGHT 3R TREATMENTS FAIR / 73
NO CURB AND GUTTER
0.413
75313 PUBLIC ASPHALT
LIGHT REPAIR
6-36
ROUTE 0936: PARKING TOUR S TOP 6 (WILDER TOWER)
Manual Rating
Chickam auga and Chattanooga National Military Park
Route Cond ition Legend – Pavem ent Cond ition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excelle nt (95 - 100) Not Rated
Rte. 0503
Rte. 0105
Rte. 0936
± 0 240 480 Feet
APPENDIX C – Photographs
GA NP CHCH MULTI (1) APPENDIX C Photographs
Figure 1. Brotherton Road - Fatigue Cracking
Figure 2. Brotherton Picnic Area Parking – Transverse and Longitudinal Cracking
GA NP CHCH MULTI (1) APPENDIX C Photographs
Figure 3. Glen Viniard Road - Longitudinal and Fatigue Cracking
Figure 4. Wilder Tower Parking (Tour Stop 6) – Transverse, Longitudinal and Block Cracking
APPENDIX D – Pavement Coring Log
Pavement Coring Log APPENDIX D Project: CHCH MULTI (1)
Report Date: 02/15/2024
Notes:
1. Photographed cores show top of core on left-hand side, unless otherwise noted.
Core No. Core Photograph / Side View Location Key
PV19-25
2/9/19
Core Description Location / GPS
3.5” Asphalt Concrete (intact) Brown aggregate observed in top 1.0-inch.
Location: Brotherton Road, Chickamauga and Chattanooga National Military Park in Walker and Catoosa Counties (GA)
GPS: 34.92823°; -85.23105°
Core No.
Core Photograph / Side View Location Key
PV19-26
6.5” Asphalt Concrete (intact) Brown aggregate observed in top 1.5-inch.
GPS: 34.92729 °; -85.23397 °
Report Date: 02/15/2024
Notes:
1. Photographed cores show top of core on left-hand side, unless otherwise noted.
Core No. Core Photograph / Side View Location Key
PV19-27
3.25” Asphalt concrete (intact)
GPS: 34.92683°, --85.23671 °
PV19-29
1.5” Asphalt concrete (intact) Brown aggregate observed in the asphalt layer.
Possible cement treated base
Location: Brotherton Picnic Parking Area, Chickamauga and Chattanooga National Military Park in Walker and Catoosa Counties (GA)
GPS: 34.92325°, -85.24397 °
Report Date: 02/15/2024
Notes:
1. Photographed cores show top of core on left-hand side, unless otherwise noted.
Core No. Core Photograph / Side View Location Key
PV19-30
3.0” Asphalt concrete (intact) Brown aggregate observed in the top 1.5-inch.
Location: Brotherton Road, Chickamauga and Chattanooga National Military Park in Walker and Catoosa Counties (GA)
GPS: 34.92223; -85.24546
PV19-32
3.75” Asphalt concrete (intact)
GPS: 34.91856; -85.25453
Report Date: 02/15/2024
Notes:
1. Photographed cores show top of core on left-hand side, unless otherwise noted.
Core No. Core Photograph / Side View Location Key
PV19-33
3.0” Asphalt concrete (intact) Brown aggregate observed in top 1.0-inch.
Location: Brotherton Road, Chickamauga and Chattanooga National Military Park in Walker and Catoosa Counties (GA)
GPS: 34.91845; -85.25702
PV19-34
2.75” Asphalt concrete (unbonded)
Loss of bonding between asphalt layers at 1.0-inch depth.
GPS: 34.91803; -85.25962
Report Date: 02/15/2024
Notes:
1. Photographed cores show top of core on left-hand side, unless otherwise noted.
Core No. Core Photograph / Side View Location Key
PV19-21
5.5” Asphalt Concrete (unbonded) Brown aggregate observed in top 1.0-inch and at depth 2 to 3 inches.
Macadam observed at depth 2 to 5.5 inches. Loss of bonding in macadam lift.
Location: Glen Viniard Road, Chickamauga and Chattanooga National Military Park in Walker and Catoosa Counties (GA)
GPS: 34.90108; -85.26273
PV19-22
4.75” Asphalt concrete (intact) Brown aggregate observed in top 0.25-inch (chip seal, possibly) and at depth 2 to 3 inches.
Macadam observed at depth 3 to 4.75 inches.
Location: Glen Viniard Road, Chickamauga and Chattanooga
GPS: 34.90107; -85.26529
Report Date: 02/15/2024
Notes:
1. Photographed cores show top of core on left-hand side, unless otherwise noted.
Core No. Core Photograph / Side View Location Key
PV19-23
8.0” Asphalt concrete (unbonded) Brown aggregate observed in top 1.0-inch and at depth 2 to 3 inches.
Macadam observed at depth 3 to 8.5 inches. Loss of aggregate bonding in macadam lift.
Cement treated base (possible)
GPS: 34.90406; -85.26842
PV19-24
6.0” Asphalt concrete (unbonded) Brown aggregate observed in top 1.0-inch and at depth 3 to 4 inches.
Macadam observed at depth 4 to 6 inches.
Loss of bonding between asphalt layers at depth 3 inches.
GPS: 34.90496; -85.2701
APPENDIX E – Soil Boring Logs
1.4
1.0
Asphalt Pavement
Base course, sand and gravel, tan, moist, Fill.
Silty SAND (SM), loose, red-tan, moist, Fill.
Sandy SILT (ML), soft, tan, moist.
Boring terminated at 5.0 ft.
1.25
3-3-3-6
1-2-2-5
J-1
J-2
0.3
1.0
3.0
5.0
Project Location:
Encountered at:
After
Northing: 3866337.91 Easting: 660980.4
Caved at:
Hammer Drop:
Rock Core (RQD in %)
Standard Penetration Test Data
Project Datum:
(Blows / ft)
Undisturbed (UD)
6/11/19
Project Name:
MATERIAL DESCRIPTION
Boring No.:
Groundwater Depth:
Sample Types:
BORING LOG
6/11/19 Doug Hutchins Jason FarleyOperator:
T yp e
Weather:
SAMPLE
Plastic Limit
No groundwater was encountered during our drilling operation.
Boring was backfilled with auger cuttings.
hrs
Remarks:
Auger Cuttings
G ra ph ic
L og
Chickamauga & Chattanooga National Military Park
Density, Color, Plasticity, Size, Proportions, Moisture
Surface Elevation:
Boring Location:
La ye r
D ep th ft
Boring Began:
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Liquid Limit
SPT
U. S. DEPARTMENT OF TRANSPORTATION
At Completion:
Completed:
S P
T B lo w s pe r in
D ep th S ca le ft)
N o.
Walker and Catoosa Counties, GA
E le va tio n (f ee t)
3 3/4" Boring Method:
Rock Core Diam:
Vane Shear
30 in.
140 lbs/Automatic
Penetrometer (PP in tsf)
Water Content %
Hole Diameter:
NAD83
SFA
P-2
Hammer Wt. & Type:
Partially cloudy, 58°F
Brotherton Rd.
Inspector:
R ec ft
P P
R
Q D
B O
R
IN
G L
O G
2/
/2
:3
\F H
F L
F
IL
E S
E R
V E
.F L
H D
.F H
W A
.D O
T .G
O V
\D A
T A
\P R
O
JE
C T
S \C
H C
H \1
(1
(1
T
E C
H S
E R
V \P
A V
E M
E N
T \B
O R
IN
G
L
O G
S \G
IN
T
\N P
C H
C H
(1
(1
P A
V E
M E
N T
B O
R
IN
G S
.G P
J
Sheet: 1 of 1
1.3
1.4
Asphalt pavement
Subbase course
Elastic SILT with sand (MH), stiff, tan, moist, Fill.
Elastic SILT with sand (MH), stiff, tan, moist, trace gravel.
Boring terminated at 5.0 ft.
2.5
2.5
6-4-5-5
1-4-5-8
J-1
J-2
0.4
1.0
3.0
5.0
Project Location:
Encountered at:
After
Northing: 3865639.25 Easting: 660025.33
Caved at:
Hammer Drop:
Rock Core (RQD in %)
Standard Penetration Test Data
Project Datum:
(Blows / ft)
Undisturbed (UD)
2/13/19
Project Name:
MATERIAL DESCRIPTION
Boring No.:
Groundwater Depth:
Sample Types:
BORING LOG
2/13/19 Doug Hutchins Glenn MoodyOperator:
T yp e
Weather:
SAMPLE
Plastic Limit
No groundwater was encountered during our drilling operation.
Boring was backfilled with auger cuttings.
hrs
Remarks:
Auger Cuttings
G ra ph ic
L og
Chickamauga & Chattanooga National Military Park
Density, Color, Plasticity, Size, Proportions, Moisture
Surface Elevation:
Boring Location:
La ye r
D ep th ft
Boring Began:
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Liquid Limit
SPT
U. S. DEPARTMENT OF TRANSPORTATION
At Completion:
Completed:
S P
T B lo w s pe r in
D ep th S ca le ft)
N o.
Lookout Mountain, TN
E le va tio n (f ee t)
3 3/4" Boring Method:
Rock Core Diam:
Vane Shear
30 in.
140 lbs/Automatic
Penetrometer (PP in tsf)
Water Content %
Hole Diameter:
NAD83
SFA
Hammer Wt. & Type:
Sunny, 55°F
Brotherton Rd.
Inspector:
R ec ft
P P
R
Q D
B O
R
IN
G L
O G
/2
4/
5:
F
H F
L1 5F
IL
E
S E
R V
E .F
LH
D
.F H
W A
.D O
T .G
O V
\D A
T A
\P R
O
JE
C T
S \C
H C
H \5
(1
1( 1)
_E T
C \T
E C
H S
E R
V \G
E O
T E
C H
\S U
B S
U R
F A
C E
IN
V
E S
T
IG
A T
IO
N
\B O
R
IN
G L
O G
S \G
IN
T
\P A
V E
M E
N T
S \N
P C
H C
H
(1
(1
P
A V
E M
E N
T B
O R
IN
G
S .G
P J
1.0
1.1
Asphalt Pavement
Base course
Sandy SILT (ML), soft, tan, moist, trace gravel, Fill.
Sandy SILT (ML), soft, tan, moist, Fill.
Sandy SILT (ML), firm, tan, moist.
Boring termintaed at 5.0 ft.
1.25
1.5
2-1-2-2
1-2-3-3
J-1
J-2
0.6
1.0
2.0
3.0
5.0
Project Location:
Encountered at:
After
Northing: 3863679.55 Easting: 658240.93
Caved at:
Hammer Drop:
Rock Core (RQD in %)
Standard Penetration Test Data
Project Datum:
(Blows / ft)
Undisturbed (UD)
6/11/19
Project Name:
MATERIAL DESCRIPTION
Boring No.:
Groundwater Depth:
Sample Types:
BORING LOG
6/11/19 Doug Hutchins Jason FarleyOperator:
T yp e
Weather:
SAMPLE
Plastic Limit
No groundwater was encountered during our drilling operation.
Boring was backfilled with auger cuttings.
hrs
Remarks:
Auger Cuttings
G ra ph ic
L og
Chickamauga & Chattanooga National Military Park
Density, Color, Plasticity, Size, Proportions, Moisture
Surface Elevation:
Boring Location:
La ye r
D ep th ft
Boring Began:
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Liquid Limit
SPT
U. S. DEPARTMENT OF TRANSPORTATION
At Completion:
Completed:
S P
T B lo w s pe r in
D ep th S ca le ft)
N o.
Walker and Catoosa Counties, GA
E le va tio n (f ee t)
3 3/4" Boring Method:
Rock Core Diam:
Vane Shear
30 in.
140 lbs/Automatic
Penetrometer (PP in tsf)
Water Content %
Hole Diameter:
NAD83
SFA
P-3
Hammer Wt. & Type:
Partially cloudy, 58°F
Glen Vinyard Rd.
Inspector:
R ec ft
P P
R
Q D
B O
R
IN
G L
O G
/2
4/
5:
F
H F
L1 5F
IL
E
S E
R V
E .F
LH
D
.F H
W A
.D O
T .G
O V
\D A
T A
\P R
O
JE
C T
S \C
H C
H \1
(1
3( 1)
\T E
C H
S E
R V
\P A
V E
M E
N T
\B O
R
IN
G _L
O G
S \G
IN
T
\N P
C H
C H
(1
(1
P A
V E
M E
N T
B O
R
IN
G S
.G P
J
APPENDIX F – Laboratory Testing Results
Test specification:
Project:
Remarks:Client:Project No.
MATERIAL DESCRIPTION
No.200Moist.AASHTOUSCSDepth
PILLSp.G.
Nat.ClassificationElev/
COMPACTION TEST REPORT
D ry d en si ty , p cf
Water content, %
3 5 7 9 11 13 15
T-193(CBR)- 1.5 Swell% = 3.0
FHWA/EFLHDNP-CHCH
Sandy elastic silt
61.90.01958N/AA-7-5(12)MH
AASHTO T 99 Method D Standard
Chickamauga NBF
COMPACTION TEST REPORT
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Location: E-19-0093
TEST RESULTS
3/4 in.
Optimum moisture = 8.3 %
Maximum dry density = 107.6 pcf
Brotherton Road
(X=NO)PERCENTFINERSIZE
PASS?SPEC.*PERCENTSIEVE
Project No:
Project:
Client:
Elev./Depth:Location:
Date:Source of Sample:Sample No.:
Remarks
Classification
Coefficients
Atterberg Limits
Soil Description
AASHTO=USCS=
Cc=Cu= D10=D15=D30= D50=D60=D85=
PI=LL=PL=
Particle Size Distribution Report
P E
R C
E N
T F
IN
E
R
100 10 1 0.1 0.01 0.001500 GRAIN SIZE - mm
% COBBLES
% GRAVEL
CRS. FINE
% SAND
CRS. MEDIUM FINE
% FINES
SILT CLAY
in in in
1- 1/ in in
3/ in
1/ in
3/ in
#4 #1
#2
#3
#4
#6
#1
#1
#2
0.0 0.0 0.0 0.0 9.3 28.8 61.9
NP-CHCH 500(1),
Chickamauga NBF
FHWA/EFLHD
E-19-0093 Brotherton RdB-5/Bucket
A-7-5(12)MH
0.274
195839
Sandy elastic silt
(no specification provided)
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
100.0 90.7 61.9
# 10 # 40
# 200
SOIL DATA
INDEXLIMITLIMITCONTENTNO.
PLASTICITYLIQUIDPLASTICWATERDEPTHSAMPLE
NATURAL
SOURCESYMBOL
Project No.:
Project:
Client:
LIQUID AND PLASTIC LIMITS TEST REPORT
(ft.)
AASHTO
NP-CHCH 500(1),501(1),ETC
Chickamauga NBF
FHWA/EFLHD
A-4(4)93829N/AB-1/BucketGlenn Kelly
LIQUID AND PLASTIC LIMITS TEST REPORT
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
A-4(0)103020N/AB-2/BucketGlenn Kelly
A-6(6)123523N/AB-3/BucketBattlelane Rd
A-7-5(14)185032N/AB-4/BucketPoe Rd
A-7-5(12)195839N/AB-5/BucketBrotherton Rd
10 30 50 70 90 110
LIQUID LIMIT
P
LA
S T
IC
IT
Y
IN
D E
X
PI
=L
L-
A-4 or A-2-4 A-5 or A-2-5
A-7-6
A-6 or A-2-6
A-7-5 or A-2-7
Federal Lands Highway Office
Eastern Federal Lands Highway Division
Materials Testing Laboratory
1827 Jack Delozier Drive, Sevierville, TN 37876
Chickamauga & Chattanooga
NP-CHCH 500(1), 501(1)_ETC
GA
Doug Hutchins
6/18/2019
Boring#P2
J. Farley
6/11/2019
D. Hutchins
1 Jar
Brotherton Road
Project Name: State:
Submitted By:
Date Sample Received:
Field Sample No:
Sampled By:
Date Sampled:
Witnessed By:
Source Name: Source No:
Boring No: Sample No:
Project Number:
Type of Containers:No of Containers:
Boring #P2
J-1 Depth: 1-3'P2
*Disclaimer: EFLHD Materials Laboratory is responsible for the quality of the tests upon receipt of the sampled materials. However, EFHLD Materials Laboratory has no control over field material sampling and therefore has no responsibility for any sampling error, the sample integrity, and shipping methods prior to receipt in the laboratory.
Report of Subsurface Soil Tests
Soil Classification (AASHTO M 145 is not an AAP accredited test)
Classification A-4 (2)
Moisture Content (AASHTO T 265)
Moisture Content, % 20.3
Sieve - in. (mm) % Passing
Sieve Analysis (AASHTO T 27)
3/8 (9.5) 100
#4 (4.75) 99
#10 (2.00) 79
#40 (0.425) 67
No. 200 (0.075) 47.0
Liquid Limit (AASHTO T 89)
LL 34
Plastic Limit and Plasticity Index (AASHTO T 90)
PL 25
PI 9
Page 1 of 1 6/27/2019 06:52 AM
Jason A. Moore. - Laboratory Team Leader Date
Lab Control No: E-19-0352
Uncontrolled Copy
Federal Lands Highway Office
Eastern Federal Lands Highway Division
Materials Testing Laboratory
1827 Jack Delozier Drive, Sevierville, TN 37876
Chickamauga & Chattanooga
NP-CHCH 500(1), 501(1)_ETC
GA
Doug Hutchins
6/18/2019
Boring#P2
J. Farley
6/11/2019
D. Hutchins
1 Jar
Brotherton Road
Project Name: State:
Submitted By:
Date Sample Received:
Field Sample No:
Sampled By:
Date Sampled:
Witnessed By:
Source Name: Source No:
Boring No: Sample No:
Project Number:
Type of Containers:No of Containers:
Boring #P2
J-2 Depth: 3-5'P2
*Disclaimer: EFLHD Materials Laboratory is responsible for the quality of the tests upon receipt of the sampled materials. However, EFHLD Materials Laboratory has no control over field material sampling and therefore has no responsibility for any sampling error, the sample integrity, and shipping methods prior to receipt in the laboratory.
Report of Subsurface Soil Tests
Soil Classification (AASHTO M 145 is not an AAP accredited test)
Classification A-7-5 (6)
Moisture Content (AASHTO T 265)
Moisture Content, % 27.0
Sieve - in. (mm) % Passing
Sieve Analysis (AASHTO T 27)
3/8 (9.5) 100
#4 (4.75) 99
#10 (2.00) 69
#40 (0.425) 66
No. 200 (0.075) 52.8
Liquid Limit (AASHTO T 89)
LL 48
Plastic Limit and Plasticity Index (AASHTO T 90)
PL 33
PI 15
Page 1 of 1 6/27/2019 06:52 AM
Jason A. Moore. - Laboratory Team Leader Date
Lab Control No: E-19-0353
Federal Lands Highway Office
Eastern Federal Lands Highway Division
Materials Testing Laboratory
1827 Jack Delozier Drive, Sevierville, TN 37876
Chickamauga & Chattanooga
NP-CHCH 500(1), 501(1)_ETC
GA
Doug Hutchins
6/18/2019
Boring#P3
J. Farley
6/11/2019
D. Hutchins
1 Jar
Glenn Viniard Rd.
Project Name: State:
Submitted By:
Date Sample Received:
Field Sample No:
Sampled By:
Date Sampled:
Witnessed By:
Source Name: Source No:
Boring No: Sample No:
Project Number:
Type of Containers:No of Containers:
Boring #P3
J-2 Depth: 3-5'P3
*Disclaimer: EFLHD Materials Laboratory is responsible for the quality of the tests upon receipt of the sampled materials. However, EFHLD Materials Laboratory has no control over field material sampling and therefore has no responsibility for any sampling error, the sample integrity, and shipping methods prior to receipt in the laboratory.
Report of Subsurface Soil Tests
Soil Classification (AASHTO M 145 is not an AAP accredited test)
Classification A-7-5 (8)
Moisture Content (AASHTO T 265)
Moisture Content, % 26.5
Sieve - in. (mm) % Passing
Sieve Analysis (AASHTO T 27)
3/8 (9.5) 100
#4 (4.75) 98
#10 (2.00) 78
#40 (0.425) 65
No. 200 (0.075) 59.8
Liquid Limit (AASHTO T 89)
LL 46
Plastic Limit and Plasticity Index (AASHTO T 90)
PL 32
PI 14
Page 1 of 1 6/27/2019 06:53 AM
Jason A. Moore. - Laboratory Team Leader Date
Lab Control No: E-19-0354
APPENDIX G – Pavement Design Analysis
1993 AASHTO Pavement Design
DARWin Pavement Design and Analysis System
A Proprietary AASHTOWare Computer Software Product
Flexible Structural Design Module
Flexible Structural Design
18-kip ESALs Over Initial Performance Period 50,000 Initial Serviceability 4.2 Terminal Serviceability 2 Reliability Level 75 % Overall Standard Deviation 0.49 Roadbed Soil Resilient Modulus 7,500 psi Stage Construction 1
Calculated Design Structural Number 1.90 in
Rigorous ESAL Calculation
Performance Period (years) 25 Two-Way Traffic (ADT) 146 Number of Lanes in Design Direction 1 Percent of All Trucks in Design Lane 100 % Percent Trucks in Design Direction 60 %
Vehicle Class
Percent of
ADT
Annual
Growth
Average Initial Truck Factor
(ESALs/ Truck)
Annual % Growth in
Truck Factor
Accumulated 18-kip ESALs over Performance Period
2 99 2 0.0008 0 786 4 1 2 0.75 2 9,349
Total 100 - - - 10,135
Growth Simple
Total Calculated Cumulative ESALs 10,135
Specified Layer Design
Material Description
Struct Coef.
(Ai)
Drain Coef.
(Mi)
Thickness (Di)(in)
Width
(ft)
Calculated
SN (in) 1 AC Surface Course 0.44 1 1.5 12 0.66 2 AC Base Course 0.44 1 1.5 12 0.66 3 Aggregate Base 0.12 1 6 12 0.72
Total - - - 9.00 - 2.04
*Note: This value is not represented by the inputs or an error occurred in calculation.
| fdgdfg.pdf |
| GA NP CHCH Multi (1) Pavement Report Appendices.pdf |
| Appendix Covers.pdf |
| dddd.pdf |
| Appendix A - Location Map.pdf |
| Appendix B - C6 RIP Data.pdf |
| Appendix C - Photographs.pdf |
| Appendix D - Pavement Core Log.pdf |
| Appendix E - Boring Logs_updated.pdf |
| Appendix F - Lab Tests.pdf |
| Appendix G - Pavement Design Analysis.pdf |
/ASCII85EncodePages false /AllowTransparency false /AutoPositionEPSFiles true /AutoRotatePages /All /Binding /Left /CalGrayProfile (Dot Gain 20%) /CalRGBProfile (sRGB IEC61966-2.1) /CalCMYKProfile (U.S. Web Coated \050SWOP\051 v2) /sRGBProfile (sRGB IEC61966-2.1) /CannotEmbedFontPolicy /Warning /CompatibilityLevel 1.4 /CompressObjects /Tags /CompressPages true /ConvertImagesToIndexed true /PassThroughJPEGImages true /CreateJDFFile false /CreateJobTicket false /DefaultRenderingIntent /Default /DetectBlends true /ColorConversionStrategy /LeaveColorUnchanged /DoThumbnails false /EmbedAllFonts true /EmbedJobOptions true /DSCReportingLevel 0 /EmitDSCWarnings false /EndPage -1 /ImageMemory 1048576 /LockDistillerParams false /MaxSubsetPct 100 /Optimize true
/OPM 1
/ParseDSCComments true /ParseDSCCommentsForDocInfo true /PreserveCopyPage true /PreserveEPSInfo true /PreserveHalftoneInfo false /PreserveOPIComments false /PreserveOverprintSettings true /StartPage 1 /SubsetFonts true /TransferFunctionInfo /Apply /UCRandBGInfo /Preserve /UsePrologue false /ColorSettingsFile () /AlwaysEmbed [ true /NeverEmbed [ true /AntiAliasColorImages false /DownsampleColorImages true /ColorImageDownsampleType /Bicubic /ColorImageResolution 300 /ColorImageDepth -1 /ColorImageDownsampleThreshold 1.50000 /EncodeColorImages true /ColorImageFilter /DCTEncode /AutoFilterColorImages true /ColorImageAutoFilterStrategy /JPEG /ColorACSImageDict << /QFactor 0.15 /HSamples [1 1 1 1] /VSamples [1 1 1 1] /ColorImageDict << /QFactor 0.15 /HSamples [1 1 1 1] /VSamples [1 1 1 1] /JPEG2000ColorACSImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 /JPEG2000ColorImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 /AntiAliasGrayImages false /DownsampleGrayImages true /GrayImageDownsampleType /Bicubic /GrayImageResolution 300 /GrayImageDepth -1 /GrayImageDownsampleThreshold 1.50000 /EncodeGrayImages true /GrayImageFilter /DCTEncode /AutoFilterGrayImages true /GrayImageAutoFilterStrategy /JPEG /GrayACSImageDict << /QFactor 0.15 /HSamples [1 1 1 1] /VSamples [1 1 1 1] /GrayImageDict << /QFactor 0.15 /HSamples [1 1 1 1] /VSamples [1 1 1 1] /JPEG2000GrayACSImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 /JPEG2000GrayImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 /AntiAliasMonoImages false /DownsampleMonoImages true /MonoImageDownsampleType /Bicubic /MonoImageResolution 1200 /MonoImageDepth -1 /MonoImageDownsampleThreshold 1.50000 /EncodeMonoImages true /MonoImageFilter /CCITTFaxEncode /MonoImageDict << /K -1 /AllowPSXObjects false /PDFX1aCheck false /PDFX3Check false /PDFXCompliantPDFOnly false /PDFXNoTrimBoxError true /PDFXTrimBoxToMediaBoxOffset [ 0.00000 0.00000 0.00000 0.00000 /PDFXSetBleedBoxToMediaBox true /PDFXBleedBoxToTrimBoxOffset [ 0.00000 0.00000 0.00000 0.00000 /PDFXOutputIntentProfile () /PDFXOutputCondition () /PDFXRegistryName (http://www.color.org) /PDFXTrapped /Unknown
/Description << /FRA <FEFF004f007000740069006f006e00730020007000650072006d0065007400740061006e007400200064006500200063007200e900650072002000640065007300200064006f00630075006d0065006e00740073002000500044004600200064006f007400e900730020006400270075006e00650020007200e90073006f006c007500740069006f006e002000e9006c0065007600e9006500200070006f0075007200200075006e00650020007100750061006c0069007400e90020006400270069006d007000720065007300730069006f006e00200061006d00e9006c0069006f007200e90065002e00200049006c002000650073007400200070006f0073007300690062006c0065002000640027006f00750076007200690072002000630065007300200064006f00630075006d0065006e007400730020005000440046002000640061006e00730020004100630072006f0062006100740020006500740020005200650061006400650072002c002000760065007200730069006f006e002000200035002e00300020006f007500200075006c007400e9007200690065007500720065002e> /ENU (Use these settings to create PDF documents with higher image resolution for improved printing quality. The PDF documents can be opened with Acrobat and Reader 5.0 and later.)
/JPN <FEFF3053306e8a2d5b9a306f30019ad889e350cf5ea6753b50cf3092542b308000200050004400460020658766f830924f5c62103059308b3068304d306b4f7f75283057307e30593002537052376642306e753b8cea3092670059279650306b4fdd306430533068304c3067304d307e305930023053306e8a2d5b9a30674f5c62103057305f00200050004400460020658766f8306f0020004100630072006f0062006100740020304a30883073002000520065006100640065007200200035002e003000204ee5964d30678868793a3067304d307e30593002> /DEU <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> /PTB <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> /DAN <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> /NLD <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> /ESP <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> /SUO <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> /ITA <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> /NOR <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> /SVE <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> >> setdistillerparams /HWResolution [2400 2400] /PageSize [612.000 792.000] >> setpagedevice
/AllowTransparency false /AutoPositionEPSFiles true /AutoRotatePages /All /Binding /Left /CalGrayProfile (Dot Gain 20%) /CalRGBProfile (sRGB IEC61966-2.1) /CalCMYKProfile (U.S. Web Coated \050SWOP\051 v2) /sRGBProfile (sRGB IEC61966-2.1) /CannotEmbedFontPolicy /Warning /CompatibilityLevel 1.4 /CompressObjects /Tags /CompressPages true /ConvertImagesToIndexed true /PassThroughJPEGImages true /CreateJDFFile false /CreateJobTicket false /DefaultRenderingIntent /Default /DetectBlends true /ColorConversionStrategy /LeaveColorUnchanged /DoThumbnails false /EmbedAllFonts true /EmbedJobOptions true /DSCReportingLevel 0 /EmitDSCWarnings…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .