Plans-006777A-signed.pdf
PDF 31 MB Posted
- Solicitation number
- 25-0669-ITB-C STEP 2
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This document is a detailed engineering plan set for the Pinellas County FY2025 Countywide Pavement Preservation Program, specifically focusing on 49th Street North from 5th Avenue North to 38th Avenue North. The project involves comprehensive road rehabilitation, including milling existing asphalt pavement to a depth of 2 inches and resurfacing with Type SP 12.5 Structural Course (Traffic C) across multiple station segments. The project covers approximately 60,300 linear feet and is documented across 19 technical sheets detailing road typical sections, station-specific layouts, and engineering specifications. The project is professionally certified by Professional Engineer Jeffrey S. Thompson and is scheduled for implementation in Fiscal Year 2025.
The project is part of Pinellas County's broader infrastructure improvement initiative, which aims to enhance traffic safety and roadway efficiency. The pavement preservation package includes four paving locations totaling approximately 34.98 lane miles, comprising two arterial roads and two neighborhood projects. While specific funding sources are not explicitly detailed in the provided documentation, the project appears to be a planned municipal infrastructure investment aimed at maintaining and upgrading county roadways. The engineering plans provide comprehensive technical details about milling depths, resurfacing techniques, and road cross-sections, indicating a structured and methodical approach to road rehabilitation.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PID 25-0669-006777A
FY2025 COUNTYWIDE
PAVEMENT PRESERVATION PROGRAM
49TH ST N (5TH AVE N - 38TH AVE N)
FINANCIAL PID 004192A
STATE OF
No.
PR
O
FESSIONAL ENGIN
EE
R
JE
FFR
EY S. THOMPSON
FLORI'A
93254
49TH ST N (5TH AVE N - 38TH AVE N)
STA. 20+87.72 TO STA. 72+01.34
TYPICAL SECTION
* 2% (OR AS DIRECTED BY THE ENGINEER) * 2% (OR AS DETERMINED BY THE ENGINEER)
* 2% (OR AS DETERMINED BY THE ENGINEER)
49TH ST N (5TH AVE N - 38TH AVE N)
STA. 74+01.60 TO STA. 101+48.38
TYPICAL SECTION
49TH ST N (5TH AVE N - 38TH AVE N)
STA. 103+54.47 TO STA. 127+10.15
TYPICAL SECTION
MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (2")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (2")
MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (2")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (2")
MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (2")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (2")
Feet
60300 15
| Sheets and Views |
| 1 Eng_Cover_SSM |
| 2 GENERAL NOTES-(2) |
| 3 ROAD TYPICAL SECTION |
| 4 SH (20+00.00-29+40.00) |
| 5 SH (29+40.00-38+80.00) |
| 6 SH (38+80.00-48+20.00) |
| 7 SH (48+20.00-57+60.00) |
| 8 SH (57+60.00-67+00.00) |
| 9 SH (67+00.00-76+40.00) |
| 10 SH (76+40.00-85+80.00) |
| 11 SH (85+80.00-95+20.00) |
| 12 SH (95+20.00-104+60.00) |
| 13 SH (104+60.00-114+00.00) |
| 14 SH (114+00.00-123+40.00) |
| 15 SH (123+40.00-129+00.00) |
| 16 SH (130+00.00-139+40.07) |
| 17 Typical Sections A_B-SHEET-(40) |
| 18 Typical Section C-SHEET-(41) |
| 19 LOOP DETAIL-(42) |
| 2025-05-19T14:33:55-0400 | |
| Jeffrey S Thompson |
File details come from the government source that posted it. Updated .