Plans-006775A-_signed.pdf

PDF 32 MB Posted

Attached to
FY 2025 - Pavement Preservation - Package 4 STEP 2
Solicitation number
25-0669-ITB-C STEP 2
Issued by
Pinellas County, Clewiston City, Florida

About this file

This document is a pavement preservation program plan for a local government project (PID 25-0669-006775A) for Fiscal Year 2025, signed by Professional Engineer Jeffrey S. Thompson. The project involves roadway resurfacing and milling on multiple streets including 40th Avenue N, 41st Avenue N, 42nd Avenue N, 25th Street N, 47th Avenue N, 48th Avenue N, 49th Avenue N, 46th Avenue N, 46th Terrace N, 50th Avenue N, 26th Street N, Xenia Street N, and 24th Street N. The plan specifies milling existing asphalt pavement to a depth of 1.5 inches and resurfacing with Type SP 12.5 Structural Course (Traffic C), with a consistent 2% grade (or up to 4% as directed by the engineer).

The document contains 22 sheets and views, including cover pages, general notes, typical sections, and detailed roadway plans. While specific pricing details are not explicitly stated, the project appears to be a comprehensive county-level infrastructure improvement initiative focused on pavement rehabilitation. The plan was documented and signed on May 19, 2025, suggesting this is a future infrastructure maintenance project designed to preserve and improve local roadway conditions through systematic milling and resurfacing techniques.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PID 25-0669-006775A

FY2025 COUNTYWIDE

PAVEMENT PRESERVATION PROGRAM

LOCAL GROUP 210

FINANCIAL PID 004192A

STATE OF

No.

PR

O

FESSIONAL ENGIN

EE

R

JE

FFR

EY S. THOMPSON

FLORI'A

93254

40TH AVE N

* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)

MILLING

MILL EXISTING ASPHALT

PAVEMENT FOR DEPTH (1.5")

RESURFACING

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")MILLING

MILL EXISTING ASPHALT

PAVEMENT FOR DEPTH (1.5")

RESURFACING

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5)

41ST AVE N

TYPICAL SECTION

TYPICAL SECTION

MILLING

MILL EXISTING ASPHALT

PAVEMENT FOR DEPTH (1.5")

RESURFACING

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5)

42ND AVE N, 25TH ST N, 47TH AVE N, 48TH AVE N, 49TH AVE N,

TYPICAL SECTION

46TH AVE N, 46TH TERR N,

* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)

MILLING

MILL EXISTING ASPHALT

PAVEMENT FOR DEPTH (1.5")

RESURFACING

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")

TYPICAL SECTION

50TH AVE N, 26TH ST N, 46TH AVE N

(STA. 108+08.57 - STA. 114+46.89), 25TH ST N, XENIA ST N & 24TH ST N

Feet 60300 15

Sheets and Views
1 Eng_Cover_SSM
2 GENERAL NOTES-(2)
3 TYPICAL SECTION_1-(3)
4 ROADWAY PLAN (04)
5 ROADWAY PLAN (05_)
6 ROADWAY PLAN (6_)
7 ROADWAY PLAN (7_)
8 ROADWAY PLAN (8_)
9 ROADWAY PLAN (9_)
10 ROADWAY PLAN (10_)
11 ROADWAY PLAN (11_)
12 ROADWAY PLAN (12_)
13 ROADWAY PLAN (13_)
14 ROADWAY PLAN (14_)
15 ROADWAY PLAN (15_)
16 ROADWAY PLAN (16_)
17 ROADWAY PLAN (17_)
18 ROADWAY PLAN (18_)
19 ROADWAY PLAN (19_)
20 Typical Sections A_B-SHEET-(40)
21 Typical Section C-SHEET-(41)
22 LOOP DETAIL-(42)
2025-05-19T14:26:17-0400
Jeffrey S Thompson

File details come from the government source that posted it. Updated .