Planholder Agmt DRDC Fire Protection Repl.pdf

PDF 112 KB Posted

Attached to
CTF DRDC Fire Protection System Repl IFB1 TBD CMS211157
Solicitation number
IFB1 CBAA 2027000036 2
Issued by
Denver County, Colorado

About this file

This is a Planholder Agreement from the State of Colorado Department of Corrections for Project Number 2026-012P25, the Fire Protection System Replacement at Denver Reception and Diagnostic Center (DRDC). The agreement establishes conditions for parties who have formally requested or received bid documents through the Invitation for Bids or attendance at the mandatory Pre-Bid Meeting. Planholders are permitted to request additional hard-copy or electronic media bid document sets through the Point of Contact listed in the Advertisement for Bids, provided that document sets are maintained in their original bound or electronic format and a formal distribution log is maintained documenting the names and addresses of all parties receiving such documents.

The agreement prohibits planholders from reproducing hard-copy or electronic bid documents in any form due to the sensitive nature of the project. All parties receiving documents from a planholder must comply with the requirement that all hard-copy bid document sets be returned and all electronic media format document data be deleted or destroyed no later than seven calendar days after bid opening. By executing the agreement, planholders commit to prohibiting unauthorized copying of any portion of the documents and assure that no third-party organization receiving documents will make unauthorized copies.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Colorado Department of Corrections

Denver Reception and Diagnostic Center Project Number: 2026-012P25

Project Title: Fire Protection System Replacement, Denver Reception and Diagnostic Center (DRDC)

Planholder Agreement Prohibiting Reproduction of Documents

The Architect/Engineer of Record for the above referenced project has prepared drawings and a project manual describing the scope of work to be performed for purposes of soliciting construction bids for the above referenced project. These documents have been issued to those parties formally requesting documents pursuant to the Invitation for Bids, or by attendance at the mandatory Pre-Bid Meeting (herein referred to as “planholders”).

Due to the sensitive nature of the project, the Colorado Department of Corrections has required that all planholders be prohibited from reproducing the hard-copy bid document sets issued them in any form, including hard copies and electronic files.

ONLY Planholders may request additional hard-copy bid document sets, or electronic media bid document sets, through the Point of Contact in the Advertisement for Bids, provided:

1) document sets are maintained in their original bound or electronic media format, and

2) a formal distribution log shall be maintained to include the names and addresses of all other parties receiving such documents from the Planholder, to include direction that “All hard-copy bid document sets shall be returned to the Planholder and all electronic media format document data be deleted or destroyed (no later than seven (7) calendar days after the bid opening).”

By executing this Agreement, the Planholder agrees it will not make any unauthorized copies of any part of the documents, and assures that no third party organization to whom the Planholder may issue documents will likewise make unauthorized copies.

Representative for

Name/Title Date

END OF PLANHOLDER AGREEMENT PROHIBITING REPRODUCTION OF DOCUMENTS

FMS 10/2014

State of Colorado Department of Corrections

File details come from the government source that posted it. Updated .