Appendix B1 - Bid Alternates DRDC Fire Protection Repl.pdf
PDF 317 KB Posted
- Solicitation number
- IFB1 CBAA 2027000036 2
- Issued by
- Denver County, Colorado
About this file
This is a Bid Alternates form from the State of Colorado Office of the State Architect, State Buildings Program, for the Department of Corrections Facility Management Services related to project 2026-012P25, the DRDC Fire Protection System Replacement. The form provides instructions for bidders to submit pricing for additive and deductive alternates associated with the fire protection system replacement project. The specific alternates listed include: Additive Alternate 1 (A.A.1) for adding a fire alarm graphics workstation at specification section 2.13.B with a pricing of $275,129.17; Additive Alternate 2 (A.A.2) for adding air aspirating smoke detection in lieu of spot detection at specification section 2.9; and Additive Alternate 3 (A.A.3) for adding ERCES to provide additional radio coverage. The form structure accommodates up to ten additive and ten deductive alternates, though only the first three additive alternates are populated with descriptions in this document.
The form establishes that additive and deductive alternates are mutually exclusive—if additive alternates are accepted, deductive alternates will not be used, and vice versa. Bidders are instructed to refer to Item #8 in the Instructions to Bidders (form SBP-6.12) and the contract documents for thorough descriptions of each alternate. The base bid will be modified by the amounts entered for any accepted alternates. The form requires bidder signature, company name, and date to complete the submission.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBP-6.131
Rev 7/2025 R1
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
BID ALTERNATES
Institution or Agency:
Project No./Project Name:
INSTRUCTIONS:
1. Refer to Item #8 in the Instructions to Bidders (SBP-6.12) for additional alternate information.
2. Additive alternates will not be used if deductible alternates are used. Deductible alternates will not be used if additive alternates are used.
3. Refer to the contract documents for thorough description(s) of the alternates.
4. If alternates are accepted, the base bid will be modified by the amount entered below.
ADDITIVE ALTERNATES
Alt. # Description of Additive Alternate Spec. Section Pricing
A.A.1 $
A.A.2 $
A.A.3 $
A.A.4 $
A.A.5 $
A.A.6 $
A.A.7 $
A.A.8 $
A.A.9 $
A.A.10 $ lanexxTX Line lanexxTX Line
SBP-6.131
Rev 7/2025 R1
DEDUCTIVE ALTERNATES
Alt. # Description of Deductive Alternate Spec. Section Pricing
D.A.1
D.A.2 $
D.A.3 $
D.A.4 $
D.A.5 $
D.A.6 $
D.A.7 $
D.A.8 $
D.A.9 $
D.A.10 $
THE BIDDER
BY_________________________________________________________________
Company Name
BY__________________________________________________________________
Signature Date
| BID ALTERNATES |
| INSTRUCTIONS: |
| ADDITIVE ALTERNATES |
| DEDUCTIVE ALTERNATES |
| THE BIDDER |
| TextInput.127: Department of Corrections / Facility Managment Services |
| TextInput.173: 2026-012P25 / DRDC Fire Protection System Replacement |
| TextInput: |
| AA1: |
| 0: |
| 2: Add air aspirating smoke detection in lieu of spot |
| 3: Add ERCES to provide additional radio coverage |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: Add fire alarm graphics workstation |
| AA1S: |
| 0: |
| 2: 2.9 |
| 3: 275129.17 |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: 2.13.B |
| AA1P: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: |
| DA1: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| DA1S: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| DA1P: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
Company Name:
File details come from the government source that posted it. Updated .