This is a project plan document prepared by the State of Michigan's Department of Technology, Management and Budget, Design and Construction Division, for the Lakeland Correctional Facility located in Coldwater, Branch County, Michigan. The project involves the design and construction of a water meter building, with the technical drawings and specifications detailed across multiple plan sheets. The project is identified as 472/17466 CDP and includes architectural elevations, building sections, wall sections, floor plans, piping plans, electrical plans, and detailed specifications for water flow measurement and control systems. The design phases progressed from a conceptual plan dated July 26, 2018, through Phase 500 at 50% completion on March 15, 2019, Phase 500 at 90% completion on December 11, 2019, permit approval on December 19, 2019, and bid documents finalized on January 21, 2020. The water meter building incorporates a magnetic flowmeter installation with a flow control panel, air release valves, pipe supports, and integrated input/output systems for monitoring water flow, totalization, and utility power status.
The project specifications include detailed piping plans with multiple signal types (4-20mA analog signals and 24VDC/120VAC digital signals), conduit sizing (3/4" and 2" conduits), and a control system configuration with multiple failure detection systems. The system components include a water flow meter (FE-100), flow totalization equipment (FIT-100), and a control panel (FLOW-CP) with UPS backup power provisions. The documentation indicates coordination with civil engineers and adherence to state facility administration standards. No pricing information, contract terms, set-asides, or funding sources are detailed in this technical plan document, which serves primarily as the design and construction specification package for the water meter building infrastructure at the correctional facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plan Part A 17466.pdf | ||
| Addendum 1 17466.pdf | ||
| Addendum 2 17466.pdf | ||
| Advertisement 17466.pdf | ||
| LEIN Request From 17466.pdf | ||
| Specifications A 17466.pdf | ||
| Plan Part B 17466.pdf | ||
| Specifications B 17466.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J C
/E N
G B
Y
P R
O J E
C T
N O
IN
D
E X
P C
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
P R
O J E
C T
D E
S C
R
IP
T
IO
N
C
IV
IL
E
N G
IN
E
E R
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L
L R
A
N C
A R
B D
IR
E
C T
O R
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
-0
D J S
K J M
C O
L D
W A
T E
R
B R
A N
C H
C O
U N
T Y
M
IC
H
IG
A
N
L A
K E
L A
N D
C O
R R
E C
T
IO
N A
L
F A
C
IL
IT
Y
/1
C
D P
D J S
W A
T E
R M
E T
E R
B U
IL
D
IN
G
E L
E V
A T
IO
N
S
B U
IL
D
IN
G
S E
C T
IO
N
W A
L L
S E
C T
IO
N
F L
O O
R
P L
A N
A .1
R E
V
IE
W D
A T
E
C o n c e p tu a l P la n
/2
/2
P h a s e
/1
/2
P h a s e
/1
/2
P e rm it s
/1
/2
B id
D o c u m e n ts
/2
/2
J C
/E N
G B
Y
P R
O J E
C T
N O
IN
D
E X
P C
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
P R
O J E
C T
D E
S C
R
IP
T
IO
N
C
IV
IL
E
N G
IN
E
E R
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L
L R
A
N C
A R
B D
IR
E
C T
O R
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
-0
D J S
K J M
C O
L D
W A
T E
R
B R
A N
C H
C O
U N
T Y
M
IC
H
IG
A
N
L A
K E
L A
N D
C O
R R
E C
T
IO
N A
L
F A
C
IL
IT
Y
/1
C
D P
D J S
W A
T E
R M
E T
E R
B U
IL
D
IN
G
D E
T A
IL
S
A .2
R E
V
IE
W D
A T
E
C o n c e p tu a l P la n
/2
/2
P h a s e
/1
/2
P h a s e
/1
/2
P e rm it s
/1
/2
B id
D o c u m e n ts
/2
/2
M
FLOW-CP
M
P L O
T I N
F O
Z
\1
\C
A D
\C D
\P .D
W G
A
Y O
U T
P
D
T
E /1
/2
T
IM
E
:4
:5
U
S E
R
R S
E C
O R
D
J C
/E N
G B
Y
P R
O J E
C T
N O
IN
D
E X
P C
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
R E
V
IE
W D
A T
E
P R
O J E
C T
D E
S C
R
IP
T
IO
N
C
IV
IL
E
N G
IN
E
E R
P L
U R
I B
U E
S U
N U
M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L
L
R A
N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
-0
C O
L D
W A
T E
R
B R
A N
C H
C O
U N
T Y
M
IC
H
IG
A
N
L A
K E
L A
N D
C O
R R
E C
T
IO
N A
L
F A
C
IL
IT
Y
/1
C
D P
C o n c e p tu a l P la n
/2
/2
P h a s e
/1
/2
P h a s e
/1
/2
P e rm it s
/1
/2
B id
D o c u m e n ts
/2
/2
PIPING PLAN
SECTION
SECTION NOTES
KEY NOTES
P L O
T I N
F O
Z
\1
\C
A D
\C D
\P .D
Y O
U T
P
T
E /1
/2
E
:4
:5
E
R
R S
E C
O R
D
J C
/E N
G B
Y
P R
O J E
C T
N O
IN
D
E X
P C
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
R E
V
IE
W D
A T
E
P R
O J E
C T
D E
S C
R
IP
T
IO
N
C
IV
IL
E
N G
IN
E
E R
P L
U R
I B
U E
S U
N U
M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L
L
R A
N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
-0
C O
L D
W A
T E
R
B R
A N
C H
C O
U N
T Y
M
IC
H
IG
A
N
L A
K E
L A
N D
C O
R R
E C
T
IO
N A
L
F A
C
IL
IT
Y
/1
C
D P
C o n c e p tu a l P la n
/2
/2
P h a s e
/1
/2
P h a s e
/1
/2
P e rm it s
/1
/2
B id
D o c u m e n ts
/2
/2
P L O
T I N
F O
Z
\1
\C
A D
\C D
\P .D
Y O
U T
P
T
E /1
/2
E
:4
:5
E
R
R S
E C
O R
D
J C
/E N
G B
Y
P R
O J E
C T
N O
IN
D
E X
P C
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
R E
V
IE
W D
A T
E
P R
O J E
C T
D E
S C
R
IP
T
IO
N
C
IV
IL
E
N G
IN
E
E R
P L
U R
I B
U E
S U
N U
M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L
L
R A
N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
-0
C O
L D
W A
T E
R
B R
A N
C H
C O
U N
T Y
M
IC
H
IG
A
N
L A
K E
L A
N D
C O
R R
E C
T
IO
N A
L
F A
C
IL
IT
Y
/1
C
D P
C o n c e p tu a l P la n
/2
/2
P h a s e
/1
/2
P h a s e
/1
/2
P e rm it s
/1
/2
B id
D o c u m e n ts
/2
/2
P
IP
IN
A
N A
N D
S E
C T
IO
N
S
P
ELECTRICAL NOTES
R S
C G M
JB
O
T I N
F O
Z
\1
\C
A D
\C D
\P .D
Y O
U T
P
T
E /1
/2
E
:4
:4
E
R
R S
E C
O R
D
J C
/E N
G B
Y
P R
O J E
C T
N O
IN
D
E X
P C
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
R E
V
IE
W D
A T
E
P R
O J E
C T
D E
S C
R
IP
T
IO
N
C
IV
IL
E
N G
IN
E
E R
P L
U R
I B
U E
S U
N U
M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L
L
R A
N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
-0
C O
L D
W A
T E
R
B R
A N
C H
C O
U N
T Y
M
IC
H
IG
A
N
L A
K E
L A
N D
C O
R R
E C
T
IO
N A
L
F A
C
IL
IT
Y
/1
C
D P
C o n c e p tu a l P la n
/2
/2
P h a s e
/1
/2
P h a s e
/1
/2
P e rm it s
/1
/2
B id
D o c u m e n ts
/2
/2
COMBINATION AIR RELEASE VALVE DETAIL
PIPE SUPPORT
FLOOR STAND w/SADDLE
FS-1
FLOOR SLEEVE DETAIL
INPUT/OUTPUT LIST AND WIRING SCHEDULE
DESCRIPTION I/O TYPE TAG DESTINATION WIRING
CONDUIT
SIZE
SIGNAL
TYPE
REMARKS
FROM TO 16 TSP 14 AWG
WATER FLOW - FE-100 FE-100 FIT-100 - - - - FE-100 IS INTEGRAL TO FIT-100
WATER FLOW
AI FIT-100 FIT-100 FLOW-CP 1 - 3/4" 4-20mA
120VAC POWER FROM CONTROL PANEL,
PROIVIDE SEPARATE CONDUIT AND WIRING
AS INDICATED ON PLANS
WATER FLOW TOTALIZATION PULSE DI FIT-100 FIT-100 FLOW-CP - 2 3/4" 24VDC
ON UTILITY POWER DI YA-100A FLOW-CP FLOW-CP - 2 - 120VAC SIGNAL INTERNAL TO PANEL
ON UPS POWER
DI
YA-100B
FLOW-CP FLOW-CP - 2 - 120VAC
SIGNAL INTERNAL TO PANEL
UPS FAILURE
DI
YA-100C
FLOW-CP FLOW-CP - 2 - 24VDC
SIGNAL INTERNAL TO PANEL, VERIFY
VOLTAGE REQUIRED
SPD FAILURE
DI YA-100D FLOW-CP FLOW-CP - 2 - 24VDC
SIGNAL INTERNAL TO PANEL, VERIFY
VOLTAGE REQUIRED
CONTROL SYSTEM CONFIGURATION DIAGRAM
SAMPLE TAP DETAIL
PIPE SUPPORT - DOUBLE FLOOR STAND
R S
C G
M
D
JB
MAGNETIC FLOWMETER INSTALLATION DETAIL
D E
T A
IL
S
P
File details come from the government source that posted it. Updated .