Plan Part C 17466.pdf

PDF 4 MB Posted

Attached to
472/17466. CDP; Lakeland CF - Water & Sewer Improvements
Solicitation number
RFQ 171 200000000124 3
Issued by
Benzie County, Michigan

About this file

This is a project plan document prepared by the State of Michigan's Department of Technology, Management and Budget, Design and Construction Division, for the Lakeland Correctional Facility located in Coldwater, Branch County, Michigan. The project involves the design and construction of a water meter building, with the technical drawings and specifications detailed across multiple plan sheets. The project is identified as 472/17466 CDP and includes architectural elevations, building sections, wall sections, floor plans, piping plans, electrical plans, and detailed specifications for water flow measurement and control systems. The design phases progressed from a conceptual plan dated July 26, 2018, through Phase 500 at 50% completion on March 15, 2019, Phase 500 at 90% completion on December 11, 2019, permit approval on December 19, 2019, and bid documents finalized on January 21, 2020. The water meter building incorporates a magnetic flowmeter installation with a flow control panel, air release valves, pipe supports, and integrated input/output systems for monitoring water flow, totalization, and utility power status.

The project specifications include detailed piping plans with multiple signal types (4-20mA analog signals and 24VDC/120VAC digital signals), conduit sizing (3/4" and 2" conduits), and a control system configuration with multiple failure detection systems. The system components include a water flow meter (FE-100), flow totalization equipment (FIT-100), and a control panel (FLOW-CP) with UPS backup power provisions. The documentation indicates coordination with civil engineers and adherence to state facility administration standards. No pricing information, contract terms, set-asides, or funding sources are detailed in this technical plan document, which serves primarily as the design and construction specification package for the water meter building infrastructure at the correctional facility.

View the file

Other files

File Type Posted
Plan Part A 17466.pdf PDF
Addendum 1 17466.pdf PDF
Addendum 2 17466.pdf PDF
Advertisement 17466.pdf PDF
LEIN Request From 17466.pdf PDF
Specifications A 17466.pdf PDF
Plan Part B 17466.pdf PDF
Specifications B 17466.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J C

/E N

G B

Y

P R

O J E

C T

N O

IN

D

E X

P C

A

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

P R

O J E

C T

D E

S C

R

IP

T

IO

N

C

IV

IL

E

N G

IN

E

E R

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L

L R

A

N C

A R

B D

IR

E

C T

O R

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

-0

D J S

K J M

C O

L D

W A

T E

R

B R

A N

C H

C O

U N

T Y

M

IC

H

IG

A

N

L A

K E

L A

N D

C O

R R

E C

T

IO

N A

L

F A

C

IL

IT

Y

/1

C

D P

D J S

W A

T E

R M

E T

E R

B U

IL

D

IN

G

E L

E V

A T

IO

N

S

B U

IL

D

IN

G

S E

C T

IO

N

W A

L L

S E

C T

IO

N

F L

O O

R

P L

A N

A .1

R E

V

IE

W D

A T

E

C o n c e p tu a l P la n

/2

/2

P h a s e

/1

/2

P h a s e

/1

/2

P e rm it s

/1

/2

B id

D o c u m e n ts

/2

/2

J C

/E N

G B

Y

P R

O J E

C T

N O

IN

D

E X

P C

A

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

P R

O J E

C T

D E

S C

R

IP

T

IO

N

C

IV

IL

E

N G

IN

E

E R

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L

L R

A

N C

A R

B D

IR

E

C T

O R

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

-0

D J S

K J M

C O

L D

W A

T E

R

B R

A N

C H

C O

U N

T Y

M

IC

H

IG

A

N

L A

K E

L A

N D

C O

R R

E C

T

IO

N A

L

F A

C

IL

IT

Y

/1

C

D P

D J S

W A

T E

R M

E T

E R

B U

IL

D

IN

G

D E

T A

IL

S

A .2

R E

V

IE

W D

A T

E

C o n c e p tu a l P la n

/2

/2

P h a s e

/1

/2

P h a s e

/1

/2

P e rm it s

/1

/2

B id

D o c u m e n ts

/2

/2

M

FLOW-CP

M

P L O

T I N

F O

Z

\1

\C

A D

\C D

\P .D

W G

A

Y O

U T

P

D

T

E /1

/2

T

IM

E

:4

:5

U

S E

R

R S

E C

O R

D

J C

/E N

G B

Y

P R

O J E

C T

N O

IN

D

E X

P C

A

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

R E

V

IE

W D

A T

E

P R

O J E

C T

D E

S C

R

IP

T

IO

N

C

IV

IL

E

N G

IN

E

E R

P L

U R

I B

U E

S U

N U

M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M O E

N A

M

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L

L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

-0

C O

L D

W A

T E

R

B R

A N

C H

C O

U N

T Y

M

IC

H

IG

A

N

L A

K E

L A

N D

C O

R R

E C

T

IO

N A

L

F A

C

IL

IT

Y

/1

C

D P

C o n c e p tu a l P la n

/2

/2

P h a s e

/1

/2

P h a s e

/1

/2

P e rm it s

/1

/2

B id

D o c u m e n ts

/2

/2

PIPING PLAN

SECTION

SECTION NOTES

KEY NOTES

P L O

T I N

F O

Z

\1

\C

A D

\C D

\P .D

Y O

U T

P

T

E /1

/2

E

:4

:5

E

R

R S

E C

O R

D

J C

/E N

G B

Y

P R

O J E

C T

N O

IN

D

E X

P C

A

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

R E

V

IE

W D

A T

E

P R

O J E

C T

D E

S C

R

IP

T

IO

N

C

IV

IL

E

N G

IN

E

E R

P L

U R

I B

U E

S U

N U

M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M O E

N A

M

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L

L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

-0

C O

L D

W A

T E

R

B R

A N

C H

C O

U N

T Y

M

IC

H

IG

A

N

L A

K E

L A

N D

C O

R R

E C

T

IO

N A

L

F A

C

IL

IT

Y

/1

C

D P

C o n c e p tu a l P la n

/2

/2

P h a s e

/1

/2

P h a s e

/1

/2

P e rm it s

/1

/2

B id

D o c u m e n ts

/2

/2

P L O

T I N

F O

Z

\1

\C

A D

\C D

\P .D

Y O

U T

P

T

E /1

/2

E

:4

:5

E

R

R S

E C

O R

D

J C

/E N

G B

Y

P R

O J E

C T

N O

IN

D

E X

P C

A

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

R E

V

IE

W D

A T

E

P R

O J E

C T

D E

S C

R

IP

T

IO

N

C

IV

IL

E

N G

IN

E

E R

P L

U R

I B

U E

S U

N U

M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M O E

N A

M

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L

L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

-0

C O

L D

W A

T E

R

B R

A N

C H

C O

U N

T Y

M

IC

H

IG

A

N

L A

K E

L A

N D

C O

R R

E C

T

IO

N A

L

F A

C

IL

IT

Y

/1

C

D P

C o n c e p tu a l P la n

/2

/2

P h a s e

/1

/2

P h a s e

/1

/2

P e rm it s

/1

/2

B id

D o c u m e n ts

/2

/2

P

IP

IN

A

N A

N D

S E

C T

IO

N

S

P

ELECTRICAL NOTES

R S

C G M

JB

O

T I N

F O

Z

\1

\C

A D

\C D

\P .D

Y O

U T

P

T

E /1

/2

E

:4

:4

E

R

R S

E C

O R

D

J C

/E N

G B

Y

P R

O J E

C T

N O

IN

D

E X

P C

A

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

R E

V

IE

W D

A T

E

P R

O J E

C T

D E

S C

R

IP

T

IO

N

C

IV

IL

E

N G

IN

E

E R

P L

U R

I B

U E

S U

N U

M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M O E

N A

M

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L

L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

-0

C O

L D

W A

T E

R

B R

A N

C H

C O

U N

T Y

M

IC

H

IG

A

N

L A

K E

L A

N D

C O

R R

E C

T

IO

N A

L

F A

C

IL

IT

Y

/1

C

D P

C o n c e p tu a l P la n

/2

/2

P h a s e

/1

/2

P h a s e

/1

/2

P e rm it s

/1

/2

B id

D o c u m e n ts

/2

/2

COMBINATION AIR RELEASE VALVE DETAIL

PIPE SUPPORT

FLOOR STAND w/SADDLE

FS-1

FLOOR SLEEVE DETAIL

INPUT/OUTPUT LIST AND WIRING SCHEDULE

DESCRIPTION I/O TYPE TAG DESTINATION WIRING

CONDUIT

SIZE

SIGNAL

TYPE

REMARKS

FROM TO 16 TSP 14 AWG

WATER FLOW - FE-100 FE-100 FIT-100 - - - - FE-100 IS INTEGRAL TO FIT-100

WATER FLOW

AI FIT-100 FIT-100 FLOW-CP 1 - 3/4" 4-20mA

120VAC POWER FROM CONTROL PANEL,

PROIVIDE SEPARATE CONDUIT AND WIRING

AS INDICATED ON PLANS

WATER FLOW TOTALIZATION PULSE DI FIT-100 FIT-100 FLOW-CP - 2 3/4" 24VDC

ON UTILITY POWER DI YA-100A FLOW-CP FLOW-CP - 2 - 120VAC SIGNAL INTERNAL TO PANEL

ON UPS POWER

DI

YA-100B

FLOW-CP FLOW-CP - 2 - 120VAC

SIGNAL INTERNAL TO PANEL

UPS FAILURE

DI

YA-100C

FLOW-CP FLOW-CP - 2 - 24VDC

SIGNAL INTERNAL TO PANEL, VERIFY

VOLTAGE REQUIRED

SPD FAILURE

DI YA-100D FLOW-CP FLOW-CP - 2 - 24VDC

SIGNAL INTERNAL TO PANEL, VERIFY

VOLTAGE REQUIRED

CONTROL SYSTEM CONFIGURATION DIAGRAM

SAMPLE TAP DETAIL

PIPE SUPPORT - DOUBLE FLOOR STAND

R S

C G

M

D

JB

MAGNETIC FLOWMETER INSTALLATION DETAIL

D E

T A

IL

S

P

File details come from the government source that posted it. Updated .