Pipestem SP Visitor Center Septic Systems - Construction Plans.pdf

PDF 4 MB Posted

Attached to
Pipestem SP Visitor Center Septic Construction
Solicitation number
CRFQ 0310 DNR2100000007 2
Issued by
Ritchie County, West Virginia

About this file

This is a construction plans document for septic system improvements at Pipestem Resort State Park in Summers County, West Virginia, prepared by the West Virginia Department of Natural Resources (WVDNR). The project involves the design and installation of new septic systems for the Visitors Center and related facilities at the state park. The scope of work includes construction of multiple septic tank and soil absorption field systems: a 1,000-gallon tank with 1,500 square feet of drainfield for the Recreation Center; dual tanks (1,000 gallons and 1,200 gallons) with 2,750 square feet of dual drainfields for the Canyon Rim Center; and a 1,000-gallon tank with 1,250 square feet of drainfield for the Park Headquarters. The plans indicate that all existing treatment units and subgrade equipment are to be removed by others after the new septic tanks are operational. The drawings were prepared in November 2020 as a 90% submittal and include site plans, standard details, and a sheet index for the complete construction document set.

The document serves as a technical reference prepared by MOT MAC engineering firm (Charleston, West Virginia) and provides detailed specifications for materials, equipment, submittals, quality control, temporary facilities, and measurement and payment provisions. The construction plans include standard sections addressing project meetings, special conditions, and material and equipment requirements. Utility information is noted as preliminary and based on available survey evidence at the time of preparation, with all utility locations requiring field verification with appropriate authorities prior to construction. No specific contract pricing, award dates, or bid submission deadlines are indicated within this technical planning document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET

INDEX TO DRAWINGS

NAME

LOCATION MAP

NO SCALE

Title Sheet

N O

V E

M B

E R

Site Plan

Septic System Standard Details

S U

M M

E R

S

C

O U

N T

Y

W

E S

T

V

I R

G I N

I A

RevStatus

Drawing Number

Scale at ARCH D

Eng check

Approved

Coordination

Dwg check

Drawn

Designed

Title

Security

Client

App’dCh’k’dDescriptionDrawnDateRev

Project Number

TotalB/O

P:\WVDNR\403765 WVDNR Pipestem Wastewater\Pipestem Resort SP\DWG\C2-01 VISITORS CENTER PLAN LAYOUT.dwg Nov 12, 2020 - 9:48AM

GAR69416

201 Pennsylvania Avenue, 4th Floor

Charleston, West Virginia 25302

U.S.A.

T 304.356.3010

F 304.357.9222

W www.motmac.com/americas

Pipestem Resort State Park

SUMMERS COUNTY, WEST VIRGINIA

507403765

As Noted PRE 1 STD

KDG

KDG

JJM

THS

THS

GDF

Visitors Center Septic Systems

1 Nov. 2020 KDG 90% Submittal THSGDF

GRAPHIC SCALE

0' 100'

VISITORS CENTER MAP

T o

M c

K e e v e r

L o d g e

EXISTING TREATMENT UNIT AND ALL APPURTENANCES

INCLUSIVE OF SUBGRADE EQUIPMENT TO BE REMOVED

BY OTHERS AFTER NEW SEPTIC TANKS HAVE BEEN

INSTALLED AND ARE IN OPERATION.

C o m f o r t

S t a t i o n

NOTE:

UTILITY INFORMATION IS SHOWN HEREON FOR

INFORMATION ONLY AND IS INTENDED ONLY TO

INDICATE THE EXISTENCE THEREOF. IT IS BASED

ON EVIDENCE AVAILABLE AT THE TIME OF THE

SURVEY. THE UTILITY LOCATIONS AND INFORMATION

SHOWN MAY NOT BE ACCURATE OR COMPLETE

AND SHOULD NOT BE RELIED ON. ALL UTILITY

INFORMATION MUST BE VERIFIED IN THE FIELD

WITH THE APPROPRIATE AUTHORITIES PRIOR TO

ANY CONSTRUCTION OR OTHER USE.

RECREATION CENTER SEPTIC TANK

& SOIL ABSORPTION FIELD

1,000 GAL. TANK, 1,500 S.F. DRAINFIELD

CANYON RIM CENTER SEPTIC TANK

& SOIL ABSORPTION FIELD

1,000 GAL. & 1,200 GAL. TANKS (2 TANKS),

2,750 S.F. DRAINFIELD (2 FIELDS)

PARK HEADQUARTERS SEPTIC TANK

& SOIL ABSORPTION FIELD

1,000 GAL. TANK, 1,250 S.F. DRAINFIELD

RevStatus

Drawing Number

Scale at ARCH D

Eng check

Approved

Coordination

Dwg check

Drawn

Designed

Title

Security

Client

App’dCh’k’dDescriptionDrawnDateRev

Project Number

TotalB/O

P:\WVDNR\403765 WVDNR Pipestem Wastewater\Pipestem Resort SP\DWG\C2-01 VISITORS CENTER PLAN LAYOUT.dwg Nov 12, 2020 - 9:49AM

GAR69416

201 Pennsylvania Avenue, 4th Floor

Charleston, West Virginia 25302

U.S.A.

T 304.356.3010

F 304.357.9222

W www.motmac.com/americas

Pipestem Resort State Park

SUMMERS COUNTY, WEST VIRGINIA

507403765

As Noted PRE 1 STD

KDG

KDG

JJM

THS

THS

GDF

Visitors Center Septic Systems

1 Nov. 2020 KDG 90% Submittal THSGDF

Pipestem Resort SP Septic Improvements 00 01 10 Table of Contents_0
TABLE OF CONTENTS
Pipestem Resort SP Septic Improvements 01 10 00 SUMMARY OF WORK 111120_0
SECTION 01 10 00
END OF SECTION
Pipestem Resort SP Septic Improvements 01 12 00 MATERIAL AND EQUIPMENT_0
PART 1 – GENERAL
PART 3 – EXECUTION
3.3 MATERIALS AND EQUIPMENT TO SUIT DESIGN
Pipestem Resort SP Septic Improvements 01 13 00 SPECIAL CONDITIONS_0
PART 1 – GENERAL
PART 2 – PRODUCTS (Not Used)
PART 3 – EXECUTION (Not Used)
Pipestem Resort SP Septic Improvements 01 29 00 MEASUREMENT AND PAYMENT_0
PART 1 – GENERAL
Pipestem Resort SP Septic Improvements 01 31 19 PROJECT MEETINGS_0
PROJECT MEETINGS
Pipestem Resort SP Septic Improvements 01 33 00 SUBMITTALS_0
Pipestem Resort SP Septic Improvements 01 45 00 QUALITY CONTROL_0
PART 2 – PRODUCTS (Not Used)
Pipestem Resort SP Septic Improvements 01 50 00 TEMPORARY FACILITIES_0
SEPTIC FRONT COVER - Pipestem_0
PAGE BLANK
C2 - VISITORS CENTER SEPTIC SYSTEMS 11-12-20
Pipestem Resort SP Septic Improvements 00 01 10 Table of Contents_0
TABLE OF CONTENTS
Pipestem Resort SP Septic Improvements 01 10 00 SUMMARY OF WORK 111120_0
SECTION 01 10 00
END OF SECTION
Pipestem Resort SP Septic Improvements 01 12 00 MATERIAL AND EQUIPMENT_0
PART 1 – GENERAL
PART 3 – EXECUTION
3.3 MATERIALS AND EQUIPMENT TO SUIT DESIGN
Pipestem Resort SP Septic Improvements 01 13 00 SPECIAL CONDITIONS_0
PART 1 – GENERAL
PART 2 – PRODUCTS (Not Used)
PART 3 – EXECUTION (Not Used)
Pipestem Resort SP Septic Improvements 01 29 00 MEASUREMENT AND PAYMENT_0
PART 1 – GENERAL
Pipestem Resort SP Septic Improvements 01 31 19 PROJECT MEETINGS_0
PROJECT MEETINGS
Pipestem Resort SP Septic Improvements 01 33 00 SUBMITTALS_0
Pipestem Resort SP Septic Improvements 01 45 00 QUALITY CONTROL_0
PART 2 – PRODUCTS (Not Used)
Pipestem Resort SP Septic Improvements 01 50 00 TEMPORARY FACILITIES_0
SEPTIC FRONT COVER - Pipestem_0
PAGE BLANK
C2 - VISITORS CENTER SEPTIC SYSTEMS 11-12-20

File details come from the government source that posted it. Updated .