Pipestem SP Visitor Center Septic Systems - Construction Plans.pdf
PDF 4 MB Posted
- Attached to
- Pipestem SP Visitor Center Septic Construction
- Solicitation number
- CRFQ 0310 DNR2100000007 2
- Issued by
- Ritchie County, West Virginia
About this file
This is a construction plans document for septic system improvements at Pipestem Resort State Park in Summers County, West Virginia, prepared by the West Virginia Department of Natural Resources (WVDNR). The project involves the design and installation of new septic systems for the Visitors Center and related facilities at the state park. The scope of work includes construction of multiple septic tank and soil absorption field systems: a 1,000-gallon tank with 1,500 square feet of drainfield for the Recreation Center; dual tanks (1,000 gallons and 1,200 gallons) with 2,750 square feet of dual drainfields for the Canyon Rim Center; and a 1,000-gallon tank with 1,250 square feet of drainfield for the Park Headquarters. The plans indicate that all existing treatment units and subgrade equipment are to be removed by others after the new septic tanks are operational. The drawings were prepared in November 2020 as a 90% submittal and include site plans, standard details, and a sheet index for the complete construction document set.
The document serves as a technical reference prepared by MOT MAC engineering firm (Charleston, West Virginia) and provides detailed specifications for materials, equipment, submittals, quality control, temporary facilities, and measurement and payment provisions. The construction plans include standard sections addressing project meetings, special conditions, and material and equipment requirements. Utility information is noted as preliminary and based on available survey evidence at the time of preparation, with all utility locations requiring field verification with appropriate authorities prior to construction. No specific contract pricing, award dates, or bid submission deadlines are indicated within this technical planning document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET
INDEX TO DRAWINGS
NAME
LOCATION MAP
NO SCALE
Title Sheet
N O
V E
M B
E R
Site Plan
Septic System Standard Details
S U
M M
E R
S
C
O U
N T
Y
W
E S
T
V
I R
G I N
I A
RevStatus
Drawing Number
Scale at ARCH D
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Security
Client
App’dCh’k’dDescriptionDrawnDateRev
Project Number
TotalB/O
P:\WVDNR\403765 WVDNR Pipestem Wastewater\Pipestem Resort SP\DWG\C2-01 VISITORS CENTER PLAN LAYOUT.dwg Nov 12, 2020 - 9:48AM
GAR69416
201 Pennsylvania Avenue, 4th Floor
Charleston, West Virginia 25302
U.S.A.
T 304.356.3010
F 304.357.9222
W www.motmac.com/americas
Pipestem Resort State Park
SUMMERS COUNTY, WEST VIRGINIA
507403765
As Noted PRE 1 STD
KDG
KDG
JJM
THS
THS
GDF
Visitors Center Septic Systems
1 Nov. 2020 KDG 90% Submittal THSGDF
GRAPHIC SCALE
0' 100'
VISITORS CENTER MAP
T o
M c
K e e v e r
L o d g e
EXISTING TREATMENT UNIT AND ALL APPURTENANCES
INCLUSIVE OF SUBGRADE EQUIPMENT TO BE REMOVED
BY OTHERS AFTER NEW SEPTIC TANKS HAVE BEEN
INSTALLED AND ARE IN OPERATION.
C o m f o r t
S t a t i o n
NOTE:
UTILITY INFORMATION IS SHOWN HEREON FOR
INFORMATION ONLY AND IS INTENDED ONLY TO
INDICATE THE EXISTENCE THEREOF. IT IS BASED
ON EVIDENCE AVAILABLE AT THE TIME OF THE
SURVEY. THE UTILITY LOCATIONS AND INFORMATION
SHOWN MAY NOT BE ACCURATE OR COMPLETE
AND SHOULD NOT BE RELIED ON. ALL UTILITY
INFORMATION MUST BE VERIFIED IN THE FIELD
WITH THE APPROPRIATE AUTHORITIES PRIOR TO
ANY CONSTRUCTION OR OTHER USE.
RECREATION CENTER SEPTIC TANK
& SOIL ABSORPTION FIELD
1,000 GAL. TANK, 1,500 S.F. DRAINFIELD
CANYON RIM CENTER SEPTIC TANK
& SOIL ABSORPTION FIELD
1,000 GAL. & 1,200 GAL. TANKS (2 TANKS),
2,750 S.F. DRAINFIELD (2 FIELDS)
PARK HEADQUARTERS SEPTIC TANK
& SOIL ABSORPTION FIELD
1,000 GAL. TANK, 1,250 S.F. DRAINFIELD
RevStatus
Drawing Number
Scale at ARCH D
Eng check
Approved
Coordination
Dwg check
Drawn
Designed
Title
Security
Client
App’dCh’k’dDescriptionDrawnDateRev
Project Number
TotalB/O
P:\WVDNR\403765 WVDNR Pipestem Wastewater\Pipestem Resort SP\DWG\C2-01 VISITORS CENTER PLAN LAYOUT.dwg Nov 12, 2020 - 9:49AM
GAR69416
201 Pennsylvania Avenue, 4th Floor
Charleston, West Virginia 25302
U.S.A.
T 304.356.3010
F 304.357.9222
W www.motmac.com/americas
Pipestem Resort State Park
SUMMERS COUNTY, WEST VIRGINIA
507403765
As Noted PRE 1 STD
KDG
KDG
JJM
THS
THS
GDF
Visitors Center Septic Systems
1 Nov. 2020 KDG 90% Submittal THSGDF
| Pipestem Resort SP Septic Improvements 00 01 10 Table of Contents_0 |
| TABLE OF CONTENTS |
| Pipestem Resort SP Septic Improvements 01 10 00 SUMMARY OF WORK 111120_0 |
| SECTION 01 10 00 |
| END OF SECTION |
| Pipestem Resort SP Septic Improvements 01 12 00 MATERIAL AND EQUIPMENT_0 |
| PART 1 – GENERAL |
| PART 3 – EXECUTION |
| 3.3 MATERIALS AND EQUIPMENT TO SUIT DESIGN |
| Pipestem Resort SP Septic Improvements 01 13 00 SPECIAL CONDITIONS_0 |
| PART 1 – GENERAL |
| PART 2 – PRODUCTS (Not Used) |
| PART 3 – EXECUTION (Not Used) |
| Pipestem Resort SP Septic Improvements 01 29 00 MEASUREMENT AND PAYMENT_0 |
| PART 1 – GENERAL |
| Pipestem Resort SP Septic Improvements 01 31 19 PROJECT MEETINGS_0 |
| PROJECT MEETINGS |
| Pipestem Resort SP Septic Improvements 01 33 00 SUBMITTALS_0 |
| Pipestem Resort SP Septic Improvements 01 45 00 QUALITY CONTROL_0 |
| PART 2 – PRODUCTS (Not Used) |
| Pipestem Resort SP Septic Improvements 01 50 00 TEMPORARY FACILITIES_0 |
| SEPTIC FRONT COVER - Pipestem_0 |
| PAGE BLANK |
| C2 - VISITORS CENTER SEPTIC SYSTEMS 11-12-20 |
| Pipestem Resort SP Septic Improvements 00 01 10 Table of Contents_0 |
| TABLE OF CONTENTS |
| Pipestem Resort SP Septic Improvements 01 10 00 SUMMARY OF WORK 111120_0 |
| SECTION 01 10 00 |
| END OF SECTION |
| Pipestem Resort SP Septic Improvements 01 12 00 MATERIAL AND EQUIPMENT_0 |
| PART 1 – GENERAL |
| PART 3 – EXECUTION |
| 3.3 MATERIALS AND EQUIPMENT TO SUIT DESIGN |
| Pipestem Resort SP Septic Improvements 01 13 00 SPECIAL CONDITIONS_0 |
| PART 1 – GENERAL |
| PART 2 – PRODUCTS (Not Used) |
| PART 3 – EXECUTION (Not Used) |
| Pipestem Resort SP Septic Improvements 01 29 00 MEASUREMENT AND PAYMENT_0 |
| PART 1 – GENERAL |
| Pipestem Resort SP Septic Improvements 01 31 19 PROJECT MEETINGS_0 |
| PROJECT MEETINGS |
| Pipestem Resort SP Septic Improvements 01 33 00 SUBMITTALS_0 |
| Pipestem Resort SP Septic Improvements 01 45 00 QUALITY CONTROL_0 |
| PART 2 – PRODUCTS (Not Used) |
| Pipestem Resort SP Septic Improvements 01 50 00 TEMPORARY FACILITIES_0 |
| SEPTIC FRONT COVER - Pipestem_0 |
| PAGE BLANK |
| C2 - VISITORS CENTER SEPTIC SYSTEMS 11-12-20 |