This document contains electrical demolition and installation notes for the Bruin Lake Campground project, part of a larger contract opportunity issued by the state of Michigan involving Jackson County, Livingston County, and Pentwater Village.

The electrical work includes abandoning existing site pedestals and feeders, identifying and marking underground feeders to remain, installing an empty conduit for a relocated toilet building, and providing new electrical service pedestals per the landscape drawings. The feeder schedule details the specific cable sizes, conduit sizes, and electrical loads for each new circuit. The feeders are to be direct-buried between pedestals, with conduit only from the distribution panel to the first junction box. This electrical scope is part of the base bid for the overall Bruin Lake Campground project.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEMOLITION ELECTRICAL NOTES (Sheet 7.1)

1. ALL EXISTING FEEDERS TO SITE PEDESTALS IN THE AFFECTED AREA

SHALL BE ABANDONED. ANY SITE DAMAGE CAUSED BY THIS WORK

SHALL BE REPLACED &/OR REPAIRED TO ITS ORIGINAL CONDITION.

2. ALL EXISTING PEDESTALS IN THE AFFECTED AREA SHALL BE REMOVED

AND STACKED ON PALLETS FOR THE OWNER TO CONSIDER FOR SPARE

PARTS. UPON RELEASE BY THE OWNER, THE BALANCE OF THE UNITS

SHALL BE REMOVED FROM THE SITE BY THE CONTRACTOR.

3. UNDERGROUND FEEDERS TO REMAIN IN THE EXISTING AREA (PRIMARY,

PANELS DP1, DP2, TOILET BUILDINGS AND GRINDER PUMPS), SHALL BE

IDENTIFIED AND MARKED WITH FLAGS BY THE EC.

4. AN EMPTY 2” CONDUIT, FOR THE RELOCATED TOILET BUILDING, SHALL

BE LOCATED PER THE LANDSCAPE ARCHITECT, CAPPED AND MARKED

FOR LATER USE.

5. THIS EXISTING PEDESTAL TO REMAIN AND BE RE-FED FROM A NEW

CIRCUIT (SEE SHEET 7.3).

6. ABANDON UNDERGROUND (UG) CABLES AFTER RECONNECTING

PEDESTAL (SEE NOTE 5 ABOVE).

7. EXISTING OVERHEAD TO REMAIN WHERE STILL FEEDING THE

DISTRIBUTION PANELS “DP-1” AND “DP-2”.

GENERAL ELECTRICAL NOTES (SHEETS 7.2 & 7.3)

1. THE EC SHALL COORDINATE ALL WORK WITH OTHER TRADES,

INCLUDING THE FINAL ROUTE FOR UNDERGROUND FEEDERS.

2. FEEDERS SHALL BE ROUTED SO AS TO AVOID BEING UNDER SITE

IMPROVEMENTS (i.e. CONCRETE SLABS, ROADS AND BUILDINGS), WHERE PRACTICAL.

3. UNDERGROUND CONDUITS CROSSING UNDER ROADS AND SIDEWALKS

SHALL BE INSTALLED IN SLEEVES AT A DEPTH PER NEC. SLEEVES

SHALL EXTEND 5’ BEYOND THE SURFACE CONDITION. PROVIDE

SURFACE MARKER AT ENDS OF SLEEVE.

4. ROUTE UNDERGROUND FEEDERS AROUND TREES, AT THE RESPECTIVE

DRIP LINE, OR AT LEAST OUT FROM THE TRUNK A DISTANCE OF 6 (SIX)

TIMES THE DIAMETER OF THE TREE. VERIFY ROUTE IS CLEAR OF ANY

ROOTS 2” OR LARGER IN DIAMETER - ALTER ROUTE ACCORDINGLY.

5. SEE FEEDER SCHEDULE FOR SPECIFIC MOTES ON EACH FEEDER.

6. EXISTING SERVICE ENTRANCE PANEL DP-1 TO REMAIN.

7. PEDESTALS SHALL BE TYPE AND LOCATION AS INDICATED ON THE

DRAWINGS. CONCRETE BASE LOCATION PER LANDSCAPE DRAWINGS.

FEEDER FEEDER CONDUIT FEEDER TOTAL DEMAND TOTAL BREAKER NOTES

I.D. SIZE SIZE FOR LOAD (A) FACTOR DEMAND (A) (A)

CIRC #1 3#3/0 + #6 GD 3"C CIRC #1 322 0.45 145 175 1

CIRC #2 3#1/0 + #6 GD 3"C CIRC #2 270 0.45 122 150 2

CIRC #3 3#3/0 + #6 GD 3"C Circ #3 190 0.50 95 125 3

CIRC #4 3#3/0 + #6 GD 3"C CIRC #4 230 0.50 95 150 4

5 3#1/0 & 3#3/0 3"C CIRC #3 -- -- -- -- 5

& #6 GD & #4

6 3#3/0 + #6 GD 2"C SITE -- -- -- -- 6

FEEDERS

7 3#1/0 + #6 GD 2"C SITE -- -- -- -- 7

FEEDERS

8 3#4 + #6 GD 1"C SITE -- -- -- -- 8

FEEDERS

9 3#10 + #6 GD 1"C SITE -- -- -- -- 9

FEEDERS

CIRC #10 3#3 + #8 GD 2"C TOILET 75 -- 75 100 10

PANEL "C1"

CIRC #11 3#3/0 2"C GRINDER 64 -- 64 200 11

PUMP

12 CONDUIT STUB 2"C FUTURE -- -- -- -- 12

GRADE BOX 8"X8"X8" -- -- -- -- -- 13

GRAND TOTAL 11 0 0 0.41 0

FEEDER SCHEDULE NOTES:

1 FEEDER FOR CIRCUIT #1, REUSE 175/2 BREAKER IN EXISTING DISTRIBUTION PANEL DP1

2 FEEDER FOR CIRCUIT #2, REUSE 150/2 BREAKER IN EXISTING DISTRIBUTION PANEL DP1

3 FEEDER FOR CIRCUIT #3, REUSE 125/2 BREAKER IN EXISTING DISTRIBUTION PANEL DP-1

4 FEEDER FOR CIRCUIT #4, REUSE 150/2 BREAKER IN EXISTING DISTRIBUTION PANEL DP-1.

5 COMBINE CIRCUITS 3 & 4 IN COMMON CONDUIT FROM GRADE BOX TO PANEL DP-1 (SEE NOTE 14).

6 3/0 FEEDER FOR SITES, SIZED FOR 2% VOLTAGE DROP (SEE NOTE 14).

7 1/0 FEEDER FOR SITES, SIZED FOR 2% VOLTAGE DROP (SEE NOTE 14).

8 #1 FEEDER FOR SITES, SIZED FOR 2% VOLTAGE DROP (SEE NOTE 14).

9 #10 FEEDER FOR SITES, SIZED FOR 2% VOLTAGE DROP (SEE NOTE 14).

10 2"C INSTALLED NOW FOR #3 FEEDER INSTALLED LATER FOR RELOCATED TOILET BUILDING

11 EXISTING 2"C FOR GRINDER PUMP (PROTECT OR REPLACE WHEN TOILET BUILDING IS RELOCATED)..

12 2" CONDUIT STUBS FOR FUTURE RESTROOM AND CABINS OR CAMP SITES - 3' TO 5' LONG AND CAP END.

13 8" X 8" X 8" WATER TIGHT GRADE BOX FOR EASE OF FEEDER INSTALATION AND FUTURE

SITES ELECTRICAL REQUIREMENTS.

14. NOTE THAT FEEDERS BETWEEN PEDESTALS ARE DIRECT BURIED. FEEDERS FROM PANEL DP-1

TO THE FIRST JUNCTION BOX SHALL BE IN SCHEDULE 40 PVC CONDUIT. BEYOND THE JUNCTION

BOX FEEDERS SHALL BE DIRECT BURIED.

BRUIN LAKE CAMPGROUND

FEEDERS SCHEDULE

(BASE BID)

5_Grading Plan 5.1
5_Grading Plan 5.2
5_Grading Plan 5.3
Pinckney_BruinLkCG_Plans 2 of 3_22318.pdf
5_Grading Plan 5.4
6_Landscape Plans 6.1
6_Landscape Plans 6.2

File details come from the government source that posted it. Updated .