APPENDIX A _Pinckney_Waterloo_22318.pdf
PDF 57 KB Posted
- Solicitation number
- RFP - 171 - 220000002968
- Issued by
- Jackson County, Livingston County, Pentwater Village, Michigan
About this file
This document is an appendix that provides additional scope and general information for a state and local contract opportunity related to the Pinckney and Waterloo Recreation Areas in Michigan. The proposal shall separate billable and reimbursable work for each Recreation Area, as two separate contracts will be issued. Maps of the current PASER Ratings for road improvements are provided, and the contractor's experience working with a Construction Manager should be included. The proposal should also include expected hours for coordination with the Construction Manager through the design and bidding process for each location. Phase 600 & 700 will not be requested as part of this RFP.
The related state and local contract opportunity is for 751/22318.BDW, which covers multiple projects at the Pinckney and Waterloo Recreation Areas. The jurisdictions involved are Jackson County, Livingston County, and Pentwater Village. Pricing and other salient details are not provided in this document.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX A – Additional Scope and General Information
1. The proposal shall be provided such that billable and reimbursable work will be separated by each Recreation Area. Two separate contracts will be issued (Pinckney RA under File No. 751/22318.BDW) and (Waterloo RA under File No.
751/22320.BDW). Break down cost proposals separately for each location/File No.
2. For Road improvements, maps of the current PASER Ratings are provided.
3. Phase 600 & 700 will not be requested as part of this RFP. Please include in your proposal, your experience working with a Construction Manager (CM).
Please note, DTMB will retain the contract for Professional Services throughout the work.
4. The proposal should include expected hours for coordination with the CM through the design/bidding process for each location. The CM will be expected to be involved through the design process (meetings, plan reviews, etc.) upon their entry into the project team.