PIN 6755.56 Phase 1 Add-04 2022-12-06[6352].pdf
PDF 687 KB Posted
- Attached to
- E. Hughes St. / County Road 26 Bridge over Genesee River, BIN 3330740 Phase 1, Bridge Removal
- Solicitation number
- 2092059
- Issued by
- Allegany County, New York
About this file
This document is an Addendum related to a state and local government contract opportunity for the removal of the E. Hughes St./CR 26 Bridge over the Genesee River in the Town and Village of Belfast, Allegany County, New York. The addendum revises plan sheets and itemized proposal pages to change the removal of structural concrete to removal of the concrete approach slab. It specifies that the heavy stone fill used for the temporary causeway will become the property of Allegany County. The addendum also notes that no equipment or personnel will be permitted on the unsafe bridge deck, and a superstructure removal plan sealed by a professional engineer must be submitted prior to demolition. Bids are due on December 8, 2022 at 3:00 PM, and bidders must acknowledge receipt of all addenda.
The contract will compensate the contractor through various bid items such as removing existing superstructures, removing substructures, unclassified excavation and disposal, and temporary causeways. The contractor will also be responsible for tasks related to environmental protection, tree removal, invasive species control, and providing an engineer's field office. Funding and administration of this project appears to be through Allegany County's Department of Public Works.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PIN 6755.56 Phase 1 Add-04 2022-12-06.docx Page 1 of 1
ADDENDUM #4
PIN 675556, D040494
E. HUGHES ST./CR 26 BRIDGE OVER GENESEE RIVER
PHASE 1 – BRIDGE REMOVAL
BIN 3330740
TOWN & VILLAGE OF BELFAST, ALLEGANY COUNTY, NEW YORK
BIDS DUE ON DECEMBER 8, 2022, AT 3:00 P.M. (UNCHANGED)
1. REPLACE Contract Plan Sheets 2, 14, 15 and 26, WITH the revised Contract Plan Sheets
2R1, 14R1, 15R1 and 26R1.
This change revises item 580.01 – Removal of Structural Concrete to item 580.04 – Removal of Concrete Approach Slab.
2. REPLACE Itemized Base Proposal pages 17 through 20 of the Contract Proposal Book WITH pages 17-A4 through 20-A4.
This change revises item 580.01 – Removal of Structural Concrete to item 580.04 – Removal of Concrete Approach Slab.
This addendum and associated files are available for download from the DropBox link below:
https://www.dropbox.com/scl/fo/oidk77yol3wx5uuvdesxx/h?dl=0&rlkey=eyc3bjz2ihkt7vaygukd2dn3q
NOTE TO ALL BIDDERS: Be sure to include page 22 of the Contract Proposal to acknowledge receipt of all addendums (Addendums 1 thru 4) when submitting your bid.
Please contact Stephen Gauthier, PE if you have any questions.
Issued By: Stephen L. Gauthier, PE, Project Manager LaBella Associates, DPC ph: 585-295-6657 | email: sgauthier@labellapc.com
Date Issued: December 6, 2022
END OF ADDENDUM #4
Department of Public Works
County Office Building
7 Court Street
Belmont, New York 14813
Phone: 585-268-9230 https://www.dropbox.com/scl/fo/oidk77yol3wx5uuvdesxx/h?dl=0&rlkey=eyc3bjz2ihkt7vaygukd2dn3q mailto:sgauthier@labellapc.com
BRIDGES CULVERTSPIN
J O
B
M A
N A
G E
R D
E S I G
N
S U
P E
R V I S
O R
COUNTY:
P R
O J
E C
T
N A
G E
R D
E S I G
N D
R A
F T I N
G C
H E
C K
C H
E C
K
ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
F I L
E
N
I
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, CONTRACT NUMBER
DRAWING NO.
SHEET NO.
REGION:
D040494
I:
A ll e g a n y
C o u n t y
D
P
IN
.5
C R
B r id g e
D r a w in g s
T r a n s p o c p h in d .d g n
:2
:4
A
M
D A
3330740
Powered by partnership.
LaBella
6755.56
CR 26, HUGHES STREET
OVER GENESEE RIVER
ALLEGANY COUNTY
TOWN OF BELFAST
BRIDGE REMOVAL
OF PUBLIC WORKS
ALLEGANY COUNTY DEPARTMENT
TOTAL NUMBER OF SHEETS INDEX
DESCRIPTION DRAWING NUMBER
NUMBER
SHEET
ITEM NO. DESCRIPTION UNIT ESTIMATED FINAL
ESTIMATE OF QUANTITIES
GENERAL NOTES
HYDRAULIC NOTES
REMOVAL NOTES
REMOVAL NOTES
AND GENERAL NOTES
INDEX, ESTIMATE OF QUANTITIES
1974 CR 26 RECORD PLANS - MODIFIED TO OUTLINE BRIDGE REMOVAL
PROJECT ROW PLAN
CAUSEWAY ELEVATION AND SECTIONS
CONCEPTUAL CAUSEWAY GENERAL PLAN
INDEX, ESTIMATE OF QUANTITIES AND GENERAL NOTES
TITLE SHEET
6 TO 29
THEIR AGENT.
SHALL BE STOCKPILED IN THE SOUTHEAST QUADRANT OF THE BRIDGE IN THE GRAVEL PARKING AREA AS DIRECTED BY THE COUNTY OR
HEAVY STONE FILL USED IN THE CONSTRUCTION OF THE TEMPORARY CAUSEWAY SHALL BECOME THE PROPERTY OF ALLEGANY COUNTY AND 2.
ALL EXCAVATED AREAS TO PREVENT EROSION AND LOSS OF SOILS UNTIL THE CONSTRUCTION OF THE REPLACEMENT BRIDGE COMMENCES.
TO ITS PRE-CONSTRUCTION CONDITIONS, TO THE GREATEST EXTENT PRACTICABLE. EROSION CONTROL PRODUCTS SHALL BE INSTALLED AT
UPON COMPLETION OF THE BRIDGE REMOVAL OPERATIONS, THE CONTRACTOR SHALL RESTORE THE SITE, RIVERBED, AND AFFECTED AREAS 1.
PROTECTIVE DEVICES SHALL BE INCLUDED IN THE UNIT PRICE BID USING THE APPROPRIATE ITEMS IN THE CONTRACT.
THE COST OF FURNISHING, INSTALLING, MAINTAINING, REMOVING AND DISPOSING OF ALL PLATFORMS, NETS, SCREENS OR OTHER 9.
AT NO COST TO THE STATE.
ALL MATERIAL FALLING ON THE AREA BELOW AND ADJACENT TO THE BRIDGE SHALL BE REMOVED AND DISPOSED OF BY THE CONTRACTOR 8.
SHALL BE STOPPED UNTIL ADEQUATE PROTECTION IS PROVIDED.
PROTECTIVE DEVICES SHALL BE USED TO CATCH THE MATERIAL. IF ADEQUATE PROTECTIVE DEVICES ARE NOT BEING EMPLOYED, THE WORK
THE BRIDGE EXCEPT WHERE THE PLANS SPECIFICALLY PERMIT THE DROPPING OF MATERIAL. PLATFORMS, NETS, SCREENS OR OTHER
DURING REMOVAL OPERATIONS, THE CONTRACTOR SHALL NOT DROP WASTE CONCRETE, DEBRIS, AND OTHER MATERIAL TO THE AREA BELOW 7.
ENGINEER FOURTEEN (14) DAYS PRIOR TO BEGINNING THE DEMOLITION.
MATERIALS. A REMOVAL PLAN, SEALED BY A REGISTERED NEW YORK STATE PROFESSIONAL ENGINEER, SHALL BE SUBMITTED TO THE
202-3.01 - GENERAL AND SAFETY REQUIREMENTS, OF THE NYSDOT STANDARD SPECIFICATIONS - CONSTRUCTION AND yPROVISIONS OF
CONTRACTOR SHALL PREPARE A SUPERSTRUCTURE REMOVAL PLAN ON THIS BASIS. THE SUPERSTRUCTURE REMOVAL PLAN SHALL MEET THE
CONTRACTOR IS HEREBY GIVEN NOTICE THAT NO EQUIPMENT OR PERSONNEL IS PERMITTED ON THE BRIDGE DECK AT ANY TIME. THE
DUE TO THE UNSAFE EXISTING CONDITION OF THE BRIDGE SUPERSTRUCTURE SPECIFICALLY THE INSTABILITY OF THE WEST ABUTMENT, THE 6.
BARRIERS AND FENCING SHALL BE INCLUDED IN THE VARIOUS BID ITEMS.
BARIERS AND FENCING ARRANGE FOR THE COUNTY TO RETRIEVE THESE ITEMS. THE COSTS ASSOCIATED WITH REMOVING AND STORING
BARRIERS AND FENCING SHALL REMAIN THE PROTERTY OF ALLEGANY COUNTY AND THE CONTRACTOR SHALL REMOVE AND STORE THE
THE ALLEGANY COUNTY DPW HAS INSTALLED BARRIERS AND FENCING TO PREVENT THE PUBLIC FROM ACCESSING THE BRIDGE. THE 5.
EXISTING SUPERSTRUCTURE SHALL BE REMOVED UNDER ITEM 202.120001 - REMOVING EXISTING SUPERSTRUCTURES.4.
SUBSTRUCTURES.
EXISTING SUBSTRUCTURES SHALL BE REMOVED WITHIN THE PAY LIMITS SHOWN IN THE PLANS UNDER ITEM 202.19 - REMOVAL OF 3.
RECORD PLANS FOR THIS STRUCTURE ARE AVAILABLE AT THE ALLEGANY COUNTY DEPARTMENT OF PUBLIC WORKS OFFICE.2.
ITS AGENT.
BRIDGE REMOVAL ACTIVITIES, THE CONTRACTOR SHALL CAREFULLY REMOVE THE BIN PLATE AND TURN IT OVER TO ALLEGANY COUNTY OR
THE STRUCTURE HAS A BRIDGE IDENTIFICATION NUMBER (B.I.N.) PLATE ATTACHED TO THE SOUTHWEST ABUTMENT WINGWALL. PRIOR TO 1.
CONSTRUCTION SEASON FOR MORE THAN 25% OF THE TIME. IT IS AN OBSERVED ELEVATION RATHER THAN A COMPUTED ONE.
LOW WATER IS ESTIMATED TO BE 1,250.0. LOW WATER IS DEFINED AS THE NORMAL LOW WATER ELEVATION PREVALENT DURING ONE 3.
ELEVATION AND IT IS USUALLY AN OBSERVED ELEVATION RATHER THAN A COMPUTED ONE.
ENCOUNTERED DURING ONE CONSTRUCTION SEASON (EXCLUDING MAJOR FLOODS). IT IS ALWAYS LESS THAN THE ORDINARY HIGH-WATER
ORDINARY WATER IS ESTIMATED TO BE 1,251.4. ORDINARY WATER IS DEFINED AS THE HIGHEST SURFACE WATER ELEVATION LIKELY TO BE 2.
MEAN ANNUAL FLOOD, WHICH IS THE FLOOD THAT HAS A RECURRENCE INTERVAL OF 2.33 YEARS.
ORDINARY HIGH- WATER IS ESTIMATED TO BE 1,262.0. ORDINARY HIGH-WATER IS DEFINED AS THE WATER SURFACE ELEVATION FOR THE 1.
HIGH VOLTAGE ELECTRICAL LINES ARE IN PROXIMITY TO THIS BRIDGE.5.
PERMISSION FROM THE ENGINEER BEFORE PROCEEDING.
MATERIALS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK AND NOTIFY THE ENGINEER. THE CONTRACTOR SHALL OBTAIN WRITTEN
CONTRACT THAT THESE MATERIALS ARE NOT TO BE DISTURBED IN ANY WAY. SHOULD THE CONTRACTOR DISTURB OR ENCOUNTER ANY SUCH
NOT REQUIRE THE DISTURBANCE, DESTRUCTION OR REMOVAL OF ANY OF THESE MATERIALS. IT IS THE EXPRESS INTENT OF THIS
NO KNOWN ASBESTOS CONTAINING MATERIALS ARE BELIEVED TO EXIST AND/OR THE WORK TO BE PERFORMED UNDER THIS CONTRACT DOES 4.
ALL SHOP DRAWINGS FOR THIS PROJECT SHALL BE PREPARED IN U.S. CUSTOMARY UNITS.3.
DETAILS FOR WHICH NO SCALE IS SHOWN ARE DRAWN PROPORTIONALLY AND ARE FULLY DIMENSIONED.
DETAILS ON THE DRAWINGS LABELED AS "NOT TO SCALE" ARE INTENTIONALLY DRAWN NOT TO SCALE FOR VISUAL CLARITY. ALL OTHER 2.
OF SEPTEMBER 1, 2022.
CONSTRUCTION SPECIFICATIONS: NYSDOT STANDARD SPECIFICATIONS - CONSTRUCTION AND MATERIALS WITH ALL PROVISIONS IN EFFECT AS 1.
RP-1 THRU RP-24
ROW-1
ST-2
ST-1
IND-1
COVER
699.040001
698.05
697.03
637.34
637.11
625.01
620.05
620.03
619.17010009
619.01
617.11000024
617.10000024
617.01020024
614.060502
614.060401
614.060301
614.060201
614.060101
603.051410
580.04
570.100001
570.090001
553.04010109
209.190301
209.13
206.01
203.03
203.02
202.19
202.120001
201.06
LS
DC
DC
DC
MNTH
LS
CY
CY
LF
LS
LS
CY
SF
EA
EA
EA
EA
EA
LF
SF
LS
LS
LS
SY
LF
CY
CY
CY
CY
LS
LS
MOBILIZATION (4% MAX.)
FUEL PRICE ADJUSTMENT
FIELD CHANGE PAYMENT (FCP)
OFFICE TECHNOLOGY AND SUPPLIES
ENGINEER'S FIELD OFFICE - TYPE 1
SURVEY OPERATIONS
STONE FILLING (HEAVY) - COST INCLUDED IN ITEM 553.04010109
STONE FILLING (LIGHT) - COST INCLUDED IN ITEM 553.04010109
TEMPORARY CONCRETE BARRIER (UNPINNED) TO REMAIN IN PLACE
BASIC WORK ZONE TRAFFIC CONTROL
EQUIPMENT CLEANING FOR INVASIVE PLANT SPECIES
DISPOSAL OF MATERIAL CONTAINING INVASIVE PLANT SPECIES
CONTROLLING INVASIVE PLANT SPECIES BY PULLING
TREE REMOVAL OVER 24" TO 36" AT BREAST HEIGHT - STUMPS CUT FLUSH
TREE REMOVAL OVER 18" TO 24" AT BREAST HEIGHT - STUMPS CUT FLUSH
TREE REMOVAL OVER 12" TO 18" AT BREAST HEIGHT - STUMPS CUT FLUSH
TREE REMOVAL OVER 6" TO 12" AT BREAST HEIGHT - STUMPS CUT FLUSH
TREE REMOVAL OVER 4" TO 6" DIAM. BREAST HEIGHT - STUMPS CUT FLUSH
CORRUGATED STEEL PIPE (2-2/3"X1/2" CORRUGATIONS) 24 INCH, 10 GAUGE
REMOVAL OF CONCRETE APPROACH SLAB
ENVIRONMENTAL WATERWAY PROTECTION
ENVIRONMENTAL GROUND PROTECTION
TEMPORARY CAUSEWAYS
ROLLED EROSION CONTROL PRODUCT, CLASS II TYPE C, INTERMEDIATE
SILT FENCE - TEMPORARY
STRUCTURE EXCAVATION
EMBANKMENT IN PLACE
UNCLASSIFIED EXCAVATION AND DISPOSAL
REMOVAL OF SUBSTRUCTURES
REMOVING EXISTING SUPERSTRUCTURES
CLEARING AND GRUBBING
NEC
1,000
90,700
2,000
NEC
1,700
NEC
NEC
2,000
2,240
NEC
NEC
NEC
1,040
1,050
1,040
NEC
NEC
IND-1 R1
ADDENDUM 4
SHEET 2 IN ITS ENTIRETY.
THIS SHEET SUPERSEDES
ITEM 553.04010109 - TEMPORARY
CAUSEWAYS. SEE DETAIL
EL. 1270.0 +/-
ITEM 202.19 - REMOVAL OF
SUBSTRUCTURES
ITEM 202.120001 - REMOVAL OF
EXISTING SUPERSTRUCTURES
ITEM 202.120001 - REMOVAL OF
EXISTING SUPERSTRUCTURES
ITEM 580.01 - REMOVAL OF
STRUCTURAL CONCRETE
ITEM 553.04010109 - TEMPORARY
CAUSEWAYS. REFER TO CONCEPTUAL
CAUSEWAY GENERAL PLAN, DWG. ST-1
PREPARED BY LABELLA ASSOCIATES.
OHW EL. 1251.92+/-
ITEM 202.120001 - REMOVAL OF
EXISTING SUPERSTRUCTURES
ITEM 202.19 - REMOVAL OF
SUBSTRUCTURES
AREA ANTICIPATED FOR
CONTRACTOR STAGING YARD
NOTES:
1. GIVEN THE WEST ABUTMENT EXHIBITS EVIDENCE OF DISPLACEMENT AND
INSTABILITY, THE CONTRACTOR IS HEREBY GIVEN NOTICE THAT HE WILL NOT BE
PERMITTED ON THE BRIDGE WITH DECK REMOVAL EQUIPMENT OF ANY KIND.
2. THESE CONCEPTUAL BRIDGE REMOVAL PLANS HAVE BEEN ADVANCED ASSUMING
THAT THE BRIDGE WILL BE FELLED BY DROPPING THE BRIDGE ON TO A CAUSEWAY,
AND THEN REMOVED OFF-SITE.
3. UPON COMPLETION OF THE BRIDGE REMOVAL OPERATIONS, THE CONTRACTOR
SHALL RESTORE THE SITE, RIVER BED, AND AFFECTED AREAS TO ITS
PRE-CONSTRUCTION CONDITIONS, TO THE GREATEST EXTENT PRACTICABLE.
EROSION CONTROL PRODUCTS SHALL BE INSTALLED AT ALL EXCAVATED AREAS TO
PREVENT EROSION AND LOSS OF SOILS UNTIL THE CONSTRUCTION OF THE
REPLACEMENT BRIDGE COMMENCES.
4. HEAVY STONE FILL USED IN THE CONSTRUCTION OF THE TEMPORARY CAUSEWAY
SHALL BECOME THE PROPERTY OF ALLEGANY COUNTY AND SHALL BE STOCK-PILED
IN A LOCATION(S) AS DIRECTED BY THE COUNTY OR THEIR AGENT.
TOP OF CAUSEWAY
EL. 1252.92+/-
DRAWING NO. RP-9
SHEET NO. 14
ITEM 580.04 - REMOVAL OF
CONCRETE APPROACH SLAB
ADDENDUM 4
THIS SHEET SUPERCEDES
SHEET 14 IN ITS ENTIRETY
14R1
ITEM 580.01 - REMOVAL OF
STRUCTURAL CONCRETE
DRAWING NO. RP-10
SHEET NO. 15
ITEM 580.04 - REMOVAL OF
CONCRETE APPROACH SLAB
ADDENDUM 4
THIS SHEET SUPERCEDES
SHEET 15 IN ITS ENTIRETY
15R1
ITEM 202.120001 - REMOVAL OF SUPERSTRUCTURES
ITEM 580.01 - REMOVAL OF STRUCTURAL CONCRETE
ITEM 202.19 - REMOVAL OF SUBSTRUCTURES
ITEM 202.120001 - REMOVAL OF SUPERSTRUCTURES
DRAWING NO. RP-21
SHEET NO. 26
ITEM 580.04 - REMOVAL OF CONCRETE APPROACH SLAB
ADDENDUM 4
THIS SHEET SUPERCEDES
SHEET 26 IN ITS ENTIRETY
26R1
E. HUGHES ST. / CR 26 BRIDGE OVER GENESEE RIVER ITEMIZED PROPOSAL
TOWN & VILLAGE OF BELFAST, ALLEGANY COUNTY, NY
BIN 3330740; PIN 6755.56 | D040494
UNIT QTY. DOLLARS . CTS DOLLARS . CTS
201.06 CLEARING AND GRUBBING LS 1 . .
202.120001 REMOVING EXISTING SUPERSTRUCTURES LS 1 . .
202.19 REMOVAL OF SUBSTRUCTURES CY 310 . .
203.02 UNCLASSIFIED EXCAVATION AND DISPOSAL CY 1,040 . .
203.03 EMBANKMENT IN PLACE CY 1,050 . .
206.01 STRUCTURE EXCAVATION CY 1,040 . .
209.13 SILT FENCE - TEMPORARY LF 500 . .
209.190301 ROLLED EROSION CONTROL PRODUCT, CLASS II
TYPE C, INTERMEDIATE SY 400 . .
553.04010109 TEMPORARY CAUSEWAYS LS 1 . .
570.090001 ENVIRONMENTAL GROUND PROTECTION LS 1 . .
BIDDER'S NAME: _________________________________________________________________ BALANCE TO CARRY FORWARD:
UNIT BID PRICE BID AMOUNT
ITEMIZED BASE PROPOSAL
ESTIMATED
QUANTITYITEM
NUMBER ITEM DESCRIPTION UNIT BID PRICE
(IN WORDS)
The itemized proposal shall be completed by the bidder with the unit prices written in words, and the extensions written in numerals. Sheet 1 of 4
17-A4
BIN 3330740; PIN 6755.56 | D040494
ITEMIZED BASE PROPOSAL
BALANCE BROUGHT FROWARD:
UNIT QTY. DOLLARS . CTS DOLLARS . CTS
570.100001 ENVIRONMENTAL WATERWAY PROTECTION LS 1 . .
580.04 REMOVAL OF CONCRETE APPROACH SLAB SF 2,240 . .
603.051410 CORRUGATED STEEL PIPE (2-2/3"X1/2"
CORRUGATIONS) 24 INCH, 10 GAUGE LF 65 . .
614.060102 TREE REMOVAL OVER 4 INCHES TO 6 INCHES DIAM.
BREAST HEIGHT - STUMPS CUT FLUSH EA 14 . .
614.060202 TREE REMOVAL OVER 6 INCHES TO 12 INCHES AT
BREAST HEIGHT - STUMPS CUT FLUSH EA 28 . .
614.060302 TREE REMOVAL OVER 12 INCHES TO 18 INCHES AT
BREAST HEIGHT - STUMPS CUT FLUSH EA 4 . .
614.060402 TREE REMOVAL OVER 18 INCHES TO 24 INCHES AT
BREAST HEIGHT - STUMPS CUT FLUSH EA 12 . .
614.060502 TREE REMOVAL OVER 24 INCHES TO 36 INCHES AT
BREAST HEIGHT - STUMPS CUT FLUSH EA 12 . .
617.01020024 CONTROLLING INVASIVE PLANT SPECIES BY
PULLING SF 2,000 . .
617.10000024 DISPOSAL OF MATERIAL CONTAINING INVASIVE
PLANT SPECIES CY 36 . .
BIDDER'S NAME: _________________________________________________________________ BALANCE TO CARRY FORWARD: $_____________________________.______
BID AMOUNT
ITEM
NUMBER ITEM DESCRIPTION
ESTIMATED
QUANTITY UNIT BID PRICE
(IN WORDS)
UNIT BID PRICE
The itemized proposal shall be completed by the bidder with the unit prices written in words, and the extensions written in numerals. Sheet 2 of 4
18-A4
BIN 3330740; PIN 6755.56 | D040494
ITEMIZED BASE PROPOSAL
BALANCE BROUGHT FROWARD:
UNIT QTY. DOLLARS . CTS DOLLARS . CTS
617.11000024 EQUIPMENT CLEANING FOR INVASIVE PLANT
SPECIES LS 1
619.01 BASIC WORK ZONE TRAFFIC CONTROL LS 1 . .
619.17010009 TEMPORARY CONCRETE BARRIER (UNPINNED) TO
REMAIN IN PLACE LF 135 . .
620.03 STONE FILLING (LIGHT) - COST INCLUDED IN ITEM
553.04010109 CY 500 ZERO DOLLARS & ZERO CENTS . .
620.05 STONE FILLING (HEAVY) - COST INCLUDED IN ITEM
553.04010109 CY 1,700 ZERO DOLLARS & ZERO CENTS . .
625.01 SURVEY OPERATIONS LS 1 . .
637.11 ENGINEER'S FIELD OFFICE - TYPE 1 MNTH 4 . .
637.34 OFFICE TECHNOLOGY AND SUPPLIES DC 2,000 ONE DOLLAR & ZERO CENTS . .
697.03 FIELD CHANGE PAYMENT (FCP) DC 91,400 ONE DOLLAR & ZERO CENTS . .
698.05 FUEL PRICE ADJUSTMENT DC 1,000 ONE DOLLAR & ZERO CENTS . .
BIDDER'S NAME: _________________________________________________________________ BALANCE TO CARRY FORWARD:
SUBTOTAL ________________________________________________________ DOLLARS $_____________________________.______
AND ____________________________________ CENTS
BID AMOUNT
ITEM
NUMBER ITEM DESCRIPTION
ESTIMATED
QUANTITY UNIT BID PRICE
(IN WORDS)
UNIT BID PRICE
The itemized proposal shall be completed by the bidder with the unit prices written in words, and the extensions written in numerals. Sheet 3 of 4
19-A4
BIN 3330740; PIN 6755.56 | D040494
ITEMIZED BASE PROPOSAL
BALANCE BROUGHT FROWARD:
UNIT QTY. DOLLARS . CTS DOLLARS . CTS
699.040001 MOBILIZATION (4% MAX.) LS 1 . .
BIDDER'S NAME: _________________________________________________________________
TOTAL BID ________________________________________________________ DOLLARS $_____________________________.______
AND ____________________________________ CENTS
ITEM
NUMBER ITEM DESCRIPTION
ESTIMATED
QUANTITY UNIT BID PRICE
(IN WORDS)
UNIT BID PRICE BID AMOUNT
The itemized proposal shall be completed by the bidder with the unit prices written in words, and the extensions written in numerals. Sheet 4 of 4
20-A4