PIN 6755.56 Phase 1 Add-02 2022-11-15[5451].pdf

PDF 149 KB Posted

Attached to
E. Hughes St. / County Road 26 Bridge over Genesee River, BIN 3330740 Phase 1, Bridge Removal
Solicitation number
2092059
Issued by
Allegany County, New York

About this file

This document is an Addendum for a state and local contract opportunity for the removal of the E. Hughes St./CR 26 Bridge over the Genesee River in the Town and Village of Belfast, Allegany County, New York. The contract has a final completion date of April 21, 2023, with all construction and bridge removal activities, as well as removal of the causeway and restoration of the river and bank, required to be completed by March 31, 2023. The addendum provides information and presentation materials from the Pre-Bid Meeting held on November 14, 2022, and states that all future questions regarding the project must be submitted in writing by December 2, 2022, with responses provided via addendum by December 5, 2022. The addendum also includes a Dropbox link to access the pre-bid meeting materials.

The document does not provide any details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient information beyond the project scope and timeline.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PIN 6755.56 Phase 1 Add-02 2022-11-15.docx Page 1 of 1

ADDENDUM #2

PIN 675556, D040494

E. HUGHES ST./CR 26 BRIDGE OVER GENESEE RIVER

PHASE 1 – BRIDGE REMOVAL

BIN 3330740

TOWN & VILLAGE OF BELFAST, ALLEGANY COUNTY, NEW YORK

BIDS DUE ON DECEMBER 8, 2022, AT 3:00 P.M. (UNCHANGED)

1. Information and presentation materials provided from Pre-Bid Meeting held on November

14, 2022.

- Meeting Minutes

- PDF of presentation.

- All future questions regarding this project shall be submitted in writing and must be received by the close of business on Friday, December 2, 2022, so that responses can be provided, via addendum, by the close of business on Monday, December 5, 2022.

- All information will be posted in a folder called “Pre-Bid Meeting” and can be downloaded from the DropBox link below:

https://www.dropbox.com/scl/fo/oidk77yol3wx5uuvdesxx/h?dl=0&rlkey=eyc3bjz2ihkt7vaygukd2dn3q

2. Final Completion Date:

- The Project Final Completion Date shall be April 21, 2023.

- All construction and bridge removal activities, as well as removal of the causeway and restoration of the river and bank at or below the OHWM elevation must be complete by March 31, 2023.

Please contact Stephen Gauthier, PE if you have any questions.

Issued By: Stephen L. Gauthier, PE, Project Manager LaBella Associated, DPC ph: 585-295-6657 | email: sgauthier@labellapc.com

Date Issued: November 15, 2022

END OF ADDENDUM #2

Department of Public Works

County Office Building

7 Court Street

Belmont, New York 14813

Phone: 585-268-9230 https://www.dropbox.com/scl/fo/oidk77yol3wx5uuvdesxx/h?dl=0&rlkey=eyc3bjz2ihkt7vaygukd2dn3q mailto:sgauthier@labellapc.com