About this file

The document is a comprehensive set of attachments for the Humboldt Mountain Road (NFSR 562) Maintenance project for the Federal Aviation Administration (FAA) NAS Defense Program, located in Maricopa County, Arizona. The project involves road maintenance activities including a hot applied chip seal with fog coat, roadway signage removal and installation, and culvert cleaning, with project coordinates spanning from 33°57'22.69"N, 111°50'10.35"W to 33°58'52.60"N, 111°47'52.60"W.

The attachments include detailed project documentation such as road signing plans, geometric layout, signing details, culvert repair photos, and supplemental Forest Service specifications. The Tonto National Forest has provided an authorization letter with specific mitigation requirements, including Sonoran Desert Tortoise awareness, compliance with the Industrial Fire Precautions Plan, equipment cleaning to prevent weed spread, archaeological notification, and use of Forest Service-approved staging areas. The project will be conducted under Forest Service guidelines with environmental and safety considerations paramount to the maintenance work.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENTS

ATTACHMENT 1

EXHIBIT 1 – Project Limits

EXHIBIT 1

PROJECT LIMITS

End Project Lattitude: 33°58'52.60"N Longitude: 111°47'52.60"W

General Notes:

1. Coordinates shown are approximate.

Refer to Attachment 2 for additional location information and coordinated with FAA Contracting Officer’s Representative (COR) prior to construction for exact project limits and limitations. Perform work along this road in accordance with the Project Statement of Work FAA-B710-PHX-SOW. Work items include:

1. Hot Applied Chip Seal with Fog Coat.

2. Roadway Signage removal and installation of new signage.

3. Culvert Cleaning.

Start Project Lattitude: 33°57'22.69"N Longitude: 111°50'10.35"W

ATTACHMENT 2

Humboldt Mountain Road Signing Project

Civil & Environmental Engineering Consultants, Inc.

© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 TomTom

© 2025 Microsoft Corporation © 2025 TomTom

SITE MAP

SITE

8 34567 12

8 34567 12

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

REFERENCE

NOTE

FEDERAL AVIATION ADMINISTRATION

NAS DEFENSE PROGRAM

HUMBOLDT MOUNTAIN ROAD SIGNING PLAN

E STATE HWY 562

MARICOPA COUNTY, ARIZONA

VICINITY MAP

C001

C O

V E

R S

H E

E T

Sheet List Table Sheet

Number Sheet Title

C001 COVER SHEET

C002 SIGNING SCHEDULE

C003 GEOMETRIC LAYOUT PLAN

C004 GEOMETRIC LAYOUT TABLES

C005 SIGNING PLAN STA. 10+00 TO STA. 68+00

C006 SIGNING PLAN STA. 68+00 TO STA. 125+00

C007 SIGNING PLAN STA. 125+00 TO STA. 153+50

C008 SIGNING PLAN STA. 153+50 TO STA. 213+50

C009 GENERAL SIGNING DETAILS

C010 GENERAL SIGNING DETAILS

8 34567 12

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

REFERENCE

NOTE

C002

S

IG

N

IN

G S

C H

E D

U

LE

SIGNING NOTES:

GENERAL

LOCATION

PANEL

SHEETING

POSTS

SHOP DRAWINGS

REMOVALS

NORTH

8 34567 12

8 34567 12

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

C003

M

AT

C H

L

IN

E

SE

E

M

ID

D

LE

L

EF

T

G E

O M

E

TR

IC

L

A Y

O U

T P

LA

N

SE

E

TO

P

R

IG

H T

M

AT

C H

L

IN

E

M A

TC

H

L

IN

E S

E E

B O

TT

O

M L

E

FT

NORTH

S E

E M

ID

D

LE

R

IG

H

T M

A

TC

H L

IN

E

REFERENCE

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

C004

G E

O M

E

TR

IC

L

A Y

O U

T

TA

B

LE

S

C

ATTLE

G U

AR

D

R O

AD

C

LO

SED

R O

AD

C

LO

SE

D

C

AT

TL

E

G U

AR

D

NORTH

NORTH

8 34567 12

8 34567 12

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

REFERENCE

NOTE

C005

M A

TC

H

LIN

E

S E

E A

B O

V E

R

IG

H T

M A

TC

H

L

IN

E

S

EE

B

EL

O W

L

EF

T

M A

TC

H

L

IN

E S

E E

S H

E E

T C

S

IG

N

IN

G P

LA

N

S

TA

. 1 0+

T

O S

TA

. 6

8+

8 34567 12

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

REFERENCE

NOTE

C006

S E

E S

H E

E T

C

M

A

TC

H L

IN

E

M A

TC

H

L

IN

E S

E E

S H

E E

T C

M

ATC

H

LIN

E

SEE AB

O

VE R

IG

H T

SEE B

ELO

W

LEFT

M A

TC

H

LIN

E

S

IG

N

IN

G P

LA

N

S

TA

. 6 8+

T

O S

TA

. 1

8 34567 12

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

REFERENCE

NOTE

C007

S E

E S

H E

E T

C

M

A

TC

H L

IN

E

SEE SHEET C008

MATCH LINE

S

IG

N

IN

G P

LA

N

S

TA

. 1

T O

S

TA

. 1

8 34567 12

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

REFERENCE

NOTE

C008

MATCH LINE

SEE SHEET C007

S

IG

N

IN

G P

LA

N

S

TA

. 1

T O

S

TA

. 2

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

C009

G E

N E

R A

L S

IG

N

IN

G

D E

TA

IL

S

DETAIL 1

RETROREFLECTIVE TAPING ON GATE ARM

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

C010

G E

N E

R A

L S

IG

N

IN

G

D E

TA

IL

S

ATTACHMENT 3

Photos of roadway edge repair around culvert

Photo 1: Repair Area Example on Culvert (1 of 3) Photo around area C58, See Attachment 2 for location estimation

Photo 2: Repair Area Example on Culvert (2 of 3)

Photo 3: Repair Area Example on Culvert (3 of 3)

ATTACHMENT 4

Forest Services Supplemental Specifications to FP-14 –

Humboldt Mountain road (NSFR 562) Maintenance

Forest Service Supplemental Specifications to FP-14

Humboldt Mountain Road (NFSR 562) Maintenance

Table of Contents Preface

101 - Terms¸ Format¸ and Definitions

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid¸ Award¸ and Execution of Contract

Delete Section 102

103 - Scope of Work

Delete Subsections 103.02, 103.03, 103.04, 103.05

104 - Control of Work

Delete Subsections 104.01, 104.02, 104.04

104.03 Specifications and Drawings

104.06 Use of Roads by Contractor

105 - Control of Material

105.02(c) Contractor-located sources

106 - Acceptance of Work

106.01 Conformity with Contract Requirements

106.02 Visual Inspection

106.07 Partial and Final Acceptance

107 - Legal Relations and Responsibility to the Public

107.02 Protection and Restoration of Property and Landscape

Delete Subsection 107.05

107.08 Sanitation, Health, and Safety

108 - Prosecution and Progress

Delete Section 108

109 - Measurement and Payment

Delete Subsections 109.06, 109.07, 109.08, 109.09

109.01 Measurement of Work

109.02 Measurement Terms and Definitions

109.03 Weighing Procedures and Devices

152 - Construction Survey and Staking

152.04 General

152.05 Survey and Staking Requirements

Table 152-1 Construction Survey and Staking Tolerances

153 - Contractor Quality Control

153.02 Qualifications

153.03 Quality Control Plan

153.07 Records and control charts

155 - Schedules for Construction Contracts

Delete Section 155

156 - Public Traffic

Section 156. – PUBLIC TRAFFIC

157 - Soil Erosion and Sediment Control

157.04 General

302 - Minor Crushed Aggregate

302.04 Placing Crushed Aggregate

302.05 Compacting and Finishing Crushed Aggregate

303 - Road Reconditioning

303.07 Roadway Reconditioning

407 - Chip Seal

407.01 Description

407.07 Weather Limitations

407.08 Production Start-Up Procedures

407.09 Asphalt Application

407.11 Placing and Finishing. Table 407-1

407.12 Double and Triple Course Chip Seal

407.12 Double and Triple Course Chip Seal. Table 407-2

407.12 Double and Triple Course Chip Seal. Table 407-2a

407.15 Payment

409 - Micro Surfacing

409.07 Weather Limitations

412 - Asphalt Tack Coat

412.05 Weather Limitations

Preface Preface_wo_08_26_2025

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.

101 - Terms¸ Format¸ and Definitions 101.01_National_3_15_2017

Add the following paragraph to Subsection 101.01:

101.01 Meaning of Terms.

Delete all references to the FAR (Federal Acquisition Regulations) in the specifications when incorporating into 2400-6(T) Timber Sale or 2400-13(T) Stewardship contracts.

101.03_National_11_9_2016

Add the following to Subsection 101.03:

101.03 Abbreviations.

(a) Acronyms.

AGAR — Agriculture Acquisition Regulations

AFPA — American Forest and Paper Association

FSAR — Forest Service Acquisition Regulations

MSHA — Mine Safety and Health Administration

NESC — National Electrical Safety Code

WCLIB — West Coast Lumber Inspection Bureau

(f) Miscellaneous unit abbreviations.

MP — milepost location ppm — parts per million volume

STA station location

101.04_National_1_22_2020

Make the following changes to Subsection 101.04:

101.04 Definitions.

Delete these definitions and replace the following:

Bid Schedule — The Schedule of Items.

Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.

Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.

Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Add the following definitions:

Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Forest Service — The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line — A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road — Temporary construction access built along the route of the project.

Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.

Utilization Standards —

The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid¸ Award¸ and Execution of Contract 102.00_National_11_9_2016

Delete Section 102 in its entirety.

Delete Section 102.

103 - Scope of Work 103.00_National_11_9_2016

Delete all of Section 103 except Subsection 103.01 Intent of Contract.

Delete Subsections 103.02, 103.03, 103.04, 103.05.

104 - Control of Work 104.00_National_11_9_2016

Delete Subsections 104.01, 104.02, and 104.04.

Delete Subsections 104.01, 104.02, 104.04.

104.03_National_3_3_2021

Delete Subsection 104.03 and replace with the following:

104.03 Specifications and Drawings.

Refer to B(T) 5.211 in the 2400-6(T)) or the 2400-13(T) contracts for requirements under this subsection.

104.06_National_11_9_2016

Add the following to Subsection 104.06:

104.06 Use of Roads by Contractor.

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material

105.05_National_6_29_2020

105.02(c) Contractor-located sources.

All material (e.g., soil, gravel, sand, borrow, aggregate, etc.) transported onto National Forest System land or incorporated into the work shall be weed-free. All equipment shall be cleaned and inspected prior to use on NFS lands. Equipment will be considered clean when visual inspection does not reveal soil, seeds, plant material or other such debris. Cleaning shall occur at a vehicle washing station or cleaning facility before the equipment and vehicles enter Forest Service land. Cleaning of equipment and vehicles shall also occur when equipment leaves Forest Service land to prevent the spread of weeds to other areas.

106 - Acceptance of Work 106.01_National_7_18_2017

Delete Subsection 106.01 and replace with the following:

106.01 Conformity with Contract Requirements.

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site.

If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price.

Four methods of determining conformity and accepting work are described in Subsections

106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work; providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request.

Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

Sampling method;

Number of samples;

Sample transport;

Test procedures;

Testing laboratories;

Reporting;

Estimated time and costs; and Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program.

Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

Have the work accepted at a reduced price; or Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.02_National_11_9_2016

Delete Subsection 106.02 and replace with the following:

106.02 Visual Inspection.

Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.

106.07_National_11_1_2016

Delete Subsection 106.07.

106.07 Partial and Final Acceptance.

107 - Legal Relations and Responsibility to the Public

107.02_National_11_1_2016

Add the following to Subsection 107.02:

107.02 Protection and Restoration of Property and Landscape.

Adhere to Best Management Practices within these specifications and in the supplemental information for this project.

107.05_National_7_18_2017

Delete Subsection 107.05.

Delete Subsection 107.05.

107.08_National_3_3_2021

Delete Subsection 107.08 and replace with the following:

107.08 Sanitation, Health, and Safety.

Refer to specific provisions under B(T) 6.0 in the 2400-6(T) or the 2400-13(T) contracts for requirements under this subsection.

108 - Prosecution and Progress 108.00_National_11_9_2016

Delete Section 108 in its entirety.

Delete Section 108.

109 - Measurement and Payment

109.00_National_11_9_2016

Delete Subsections 109.06, 109.07, 109.08, and 109.09:

Delete Subsections 109.06, 109.07, 109.08, 109.09.

109.01_National_2_22_2019

Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:

109.01 Measurement of Work.

Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.

Table 109-1

Decimal Accuracy of Quantities for Final Payment

Pay Item Level of Precision Linear Foot 1

Exception--Timber, Steel, and concrete Piles 0.1 Station 0.1 Mile 0.01 Square Foot 0.1 Square Yard 0.1 Each 1 Acre 0.01 Gallon 1 M-Gals. 0.1 Cubic Yard 1

Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions;

0.1

Exception--Concrete; Masonry 0.01 Pound 1 Ton 0.1

Exception--Calcium Chloride;

Sodium Chloride; Hydrated Lime;

0.01

Bituminous Materials; Pavements;

Bed Course Materials

Hour 0.1

MFBM 0.01

Station Yard 1 Cubic Yard Mile 1 Ton Mile 1

109.02_National_11_9_2016

Add the following sentence to Subsection 109.02(b):

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

109.03_National_11_1_2016

Add the following to Subsection 109.03(c):

109.03 Weighing Procedures and Devices.

(c) Project weighing system.

For aggregates weighed for payment, adjust scale weights of material to deduct the daily average moisture content in excess of 2 percentage points over optimum moisture as determined by AASHTO T 99 or the designated compaction method. If moisture determination is necessary, determine the daily average moisture content in accordance with AASHTO T 255, from not less than three representative samples of aggregate taken at random intervals each day that aggregate is being weighed.

Manual scales may be used if approved in writing by the CO and if the method of weighing meets all other contract requirements.

152 - Construction Survey and Staking 152.00_National_12_12_2016

Add the following to Subsection 152.04(c):

152.04 General.

(c) Material.

Use required stake dimensions and materials. Pre-paint the top 2 inches of all stakes and lath, or mark them with plastic flagging. Use designated colors for paint or flagging.

Mark all stakes with a stake pencil that leaves a legible imprint, or with waterproof ink.

Do not use aerosol spray paints.

Use moisture-resistant paper for survey notes. Keep notes in books with covers that will protect the contents and retain the pages in numerical sequence.

Make the following changes to Subsection 152.05:

152.05 Survey and Staking Requirements.

Delete Subsection 152.05(d)(2) and replace with the following:

(d) Slope and reference stakes.

(2) Conventional survey methods. When required, locate slope stakes on designated portions of the road. Locate the slope stake catch points and use them to establish clearing limits and slope stake references.

Mark slope stakes with the station, the amount of cut or fill, the horizontal distance to centerline, and the slope ratios.

Place slope reference stakes at least 10 feet outside the clearing limit and mark with the offset distance to the slope stake. Place sight stakes when required.

Prior to clearing and grubbing operations, move the slope stake outside the clearing limit to the slope reference stake. After clearing and grubbing and before excavation, reset the slope stakes in their original position.

Use the designated method to establish the slope stake catchpoint.

Method I—Computed Method. Use the template information shown in the plans or other Government-provided data to calculate the actual location of the catchpoint. The slope stake “catchpoint distance” provided may be used as a trial location to initiate slope staking. Recatch slope stakes on any section that does not match the staking report within the tolerances established in Table 152-2.

Method II—Catchpoint Measurement Method. Determine the location of slope stake catchpoints by measuring the catchpoint distances shown in the plans or other Government-provided data.

Add the following to Subsection 152.05(e):

(e) Clearing and grubbing limits.

Mark the clearing limits with flagging or tags on trees to be left standing, or on lath. Make markings intervisible, and no more than 90 feet apart.

After establishing clearing limits, move the location line stake outside the clearing limits for station identification purposes, and mark it with horizontal distance to location line.

Replace Table 152-1 with the following:

Table 152-1 Construction Survey and Staking Tolerances Table 152-1

Construction Survey and Staking Tolerances (1)

Staking Phase Horizontal Vertical

Control points set from existing Government control points- Tolerance Class A

±0.03 feet (±10 millimeters)

±0.01 feet × N

(±3 millimeters × N )(2)

Mapping, topography, and cross-section Points- Tolerance Class A

±0.16 feet (±50 millimeters)

±0.16 feet (±50 millimeters)

Centerline points (3) including (PC), (PT), (POT),(POC), and references- Tolerance Class A

±0.06 feet (±20 millimeters)

±0.06 feet (±20 millimeters)

Slope-stake and slope-stake references- Tolerance Class A (4)

±0.16 feet (±50 millimeters)

±0.16 feet ±50 millimeters)

Culverts, ditches, and minor drainage structures stakes- Tolerance Class A

±0.16 feet (±50 millimeters)

±0.06 feet (±20 millimeters)

Retaining walls stakes ±0.06 feet (±20 millimeters)

±0.03 feet (±10 millimeters)

Curb and gutter stakes ±0.06 feet (±20 millimeters)

±0.03 feet (±10 millimeters)

Bridge substructures stakes ±0.03 feet (±10 millimeters)(5)

±0.03 feet (±10 millimeters)

Bridge superstructures stakes ±0.03 feet (±10 millimeters)(5)

±0.03 feet (±10 millimeters)

Clearing and grubbing limit stakes- Tolerance Class A

±1.00 feet (±300 millimeters)

Roadway subgrade finish stakes- Tolerance Class A (6)

±0.16 feet (±50 millimeters)

±0.03 feet (±10 millimeters)

Roadway finish grade stakes (6) ±0.16 feet (±50 millimeters)

±0.03 feet (±10 millimeters)

Table 152-1

Construction Survey and Staking Tolerances (continued) (1)

Staking Phase Horizontal Vertical

Control points set from existing Government control points –Tolerance Class B (7)

±0.16 feet (±20 millimeters)

±0.16 feet ×

(±20 millimeters × )(2)

Mapping, topography, and cross-section points–Tolerance Class B (7)

±1.00 feet (±300 millimeters)

±0.50 feet (±150 millimeters)

Centerline points including (PC), (PT), (POT),(POC), and references–Tolerance Class B (7)

±0.16 feet (±20 millimeters)

±0.16 feet (±20 millimeters)

Slope-stake and slope-stake references–Tolerance Class B (7)

±0.50 feet (±50 millimeters)

±0.16 feet ±50 millimeters)

Culverts, ditches, and minor drainage structures stakes–Tolerance Class B (7)

±0.50 feet (±150 millimeters)

±0.16 feet (±20 millimeters)

N

N

Clearing and grubbing limit stakes– Tolerance Class B (7)

±2.00 feet (±600 millimeters)

Roadway subgrade finish stakes– Tolerance Class B (7)

±0.50 feet (±50 millimeters)

±0.16 feet (±10 millimeters)

Roadway finish grade stakes–Tolerance Class B (7)

±0.50 feet (±50 millimeters)

±0.16 feet (±10 millimeters)

(1) At statistical 95 percent confidence level. Tolerances are relative to existing Government control points.

(2) N is the number of instrument setups.

(3) Centerline points: PC - point of curve, PT - point of tangent, POT - point on tangent, POC - point on curve.

(4) Take the cross-sections normal to the centerline ±1 degree.

(5) Bridge control is established as a local network and the tolerances are relative to that network.

(6) Includes paved ditches.

(7) Tolerance Class B for Very Low Volume Roads with an aggregate or native finished surface.

153 - Contractor Quality Control 153.02_National_11_1_2016

Delete Subsection 153.02 and replace with the following:

153.02 Qualifications.

Submit the following for approval with the quality control plan:

(a) Quality control manager (QCM). Furnish a QCM who has at least 2 years’ experience in construction, inspector, quality control and material testing on construction projects of similar type and scope.

(b) Testers. Provide testers with at least one year experience in the type of sampling and testing required, and with one of the following for the type of sampling and testing performed:

(1) NICET Level II certification in highway material or equivalent state or industry certification;

(2) Certification by a regional certification program (such as Western Alliance for Quality Transportation Construction (WAQTC), Northeast Transportation Technician Certification Program (NETTCP), Southeast Task Force for Technician Training and Qualification (STFTTQ), or Multi Regional Training and Certification (M-TRAC)); or

(3) At least one year employment by an AASHTO accredited laboratory performing equivalent sampling and testing.

153.03_National_11_1_2016

Add the following paragraph to the end of Subsection 153.03(b):

153.03 Quality Control Plan.

(b) Quality Control Procedures.

Submit written proposals for approval of alternate AASHTO or State approved test methods. Alternate methods may be allowed based on documented equivalence to the specified method.

153.07_National_11_1_2016

Delete Subsection 153.07 and replace with the following:

153.07 Records and control charts.

Maintain complete testing and inspection records by pay item number and make them accessible to the CO.

155 - Schedules for Construction Contracts 155.00_National_11_9_2016

Delete Section 155 in its entirety.

Delete Section 155.

156 - Public Traffic 156.00_National_2_5_2019

Delete Section 156 in its entirety and replace with the following:

Section 156. – PUBLIC TRAFFIC Description

156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.

Material

156.02 Conform to the MUTCD and the following Sections and Subsections:

Permanent Traffic Control 633

Traffic Signing and Marking Material 718

Concrete Barriers and Precast Guardwalls 618

Temporary plastic fence 710.11

Construction Requirements

156.03 General. Accommodate traffic according to MUTCD, approved traffic control plan and this section. Perform work in a manner that ensures safety and convenience of the public. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Accommodate public traffic on roads adjacent to and within the project until the project is accepted according to Subsection 106.07(b).

Submit traffic control plan at least 30 days prior to intended use. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved.

Post construction signs and traffic control devices in conformance with MUTCD and Forest Service EM 7100-15. All required signs will be in place and approved prior to beginning work on project.

If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.

156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:

(a) Furnish and install traffic control devices before the start of construction operations.

(b) All detours outside of clearing limits will be approved in writing by the District Ranger as part of the traffic control plan.

(c) Install only those traffic control devices needed for each stage or phase.

(d) Relocate temporary traffic control devices as necessary.

(e) Remove devices that no longer apply to the existing conditions.

(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.

(g) Keep temporary traffic control devices clean.

(h) Remove all temporary traffic control devices upon contract completion or when approved.

(i) When required, use flaggers certified by the American Traffic Safety Services Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.

156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.

Prior to closing roads during construction, give written notice to the District Ranger at least 10 days in advance.

Table 156-1 Temporary Road Closures

Road Number

From Terminus

To Terminus

Maximum Consecutive Days of Closure

Minimum Consecutive Days Open

Beginning of Road

End of Road

TBD – Coordinate with District closer to implementation

TBD – Coordinate with District closer to implementation

156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.

Measurement and Payment

156.07 Do not measure Public Traffic for payment. Payment for contract work is provided indirectly. See Subsection 109.05.

157 - Soil Erosion and Sediment Control 157.04_National_11_1_2016

Delete Subsection 157.04 and replace with the following:

157.04 General.

Thirty (30) days prior to the start of construction, submit a written plan according to subsection 104.03 with all necessary permits that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control without approval.

When erosion control measures are not functioning as intended, take corrective action to eliminate or minimize pollutants in storm water discharges from the project.

302 - Minor Crushed Aggregate 302.04_National_7_18_2017

Add the following to Subsection 302.04 and 302.04(a)

302.04 Placing Crushed Aggregate.

Written approval of the surface is required before placing aggregate.

(a) Roadway aggregate.

For pit run or grid-rolled material, furnish material smaller than the maximum size, no gradation will be required otherwise. After processing on the road, remove all oversize material from the road and dispose as directed by the CO.

302.05_National_6_11_2020

Replace the first paragraph of subsection 302.05(a) with the following:

302.05 Compacting and Finishing Crushed Aggregate

(a) Roadway aggregate. Unless otherwise specified compact according to method

2. Finish surface according to Subsection 301.06.

303 - Road Reconditioning 303.07_National_7_18_2017

Add the following to Subsection 303.07:

303.07 Roadway Reconditioning.

Remove cattleguard decks. Clean the deck and the area beneath the cattleguard of soil and other material to the bottom of the original foundation over the entire width of the installation. Dispose of waste at designated sites or according to Subsection 204.14.

Reinstall the cattleguard deck.

407 - Chip Seal 407.01_National_7_18_2017

Delete the first sentence of Subsection 407.01 and replace with the following:

407.01 Description.

407.01 This work consists of applying a single, double, or triple course chip seal with emulsified asphalt.

407.07_National_5_17_2017

Delete Subsection 407.07 (b) and (e) replace with the following:

407.07 Weather Limitations.

(b) Surface temperature in the shade is 60 °F (16 °C) and rising.

(e) Rain or temperatures below 40 °F (4 °C) are not forecast or anticipated for at least 24 hours after application;

407.08_National_5_17_2017

Delete the second paragraph of Subsection 407.08 and replace with the following:

407.08 Production Start-Up Procedures.

On the first day of placement of each surface treatment layer, or whenever there is a change in the surface texture or aggregate gradation, construct a 500-foot control strip that is one-lane wide.

Construct the control strip using material, lay-down, and compaction procedures intended for the remainder of the surface treatment according to subsection 407.09 and 407.10.

Cease production after construction of the control strip until the material and the control strip are evaluated and accepted.

407.09_National_5_17_2017

Add the following to Subsection 407.09:

407.09 Asphalt Application.

On existing aggregate surfaces, prime the surface according to Section 411. Allow the primed surface to cure at least 5 days for cutback asphalt or 24 hours for asphalt emulsions. Ensure that the primed surface is dry for surface treatments using asphalt binder or slightly damp for surface treatments using emulsified asphalt.

407.11_National_3_8_2021

Delete Table 407-1 and replace with the following:

407.11 Placing and Finishing. Table 407-1.

Table 407-1 Approximate Quantities of Material for

Single-Course Chip Seal

D es ig n at io n Nominal Maximum Size of Aggregate

Aggregate Gradation (1)

Estimated Quantity of Aggregate (2) pounds/yd2

Estimated Quantity of Emulsified Asphalt (3) gallons/yd2

Estimated Quantity of Asphalt Binder (3) gallons/yd2

1A 3/4 inch A 40 – 49 0.40 – 0.55 0.27 – 0.38

1B 1/2 inch B 26 – 29 0.31 – 0.44 0.20 – 0.31

1C 3/8 inch C 20 – 26 0.20 – 0.35 0.13 – 0.24

1D No. 4 D 15 – 20 0.15 – 0.22 0.11 – 0.18

(1) See Table 703-7 for aggregate gradations.

(2) Aggregate masses are for aggregates having a bulk specific gravity of 2.65, as determined by AASHTO T 84 and T 85. Make proportionate corrections when the aggregate furnished has a bulk specific gravity above 2.75 or below 2.55.

(3) Adjust the asphalt content for the condition of the road.

407.12_National_5_17_2017

Rename Subsection 407.12

407.12 Double and Triple Course Chip Seal.

Delete Table 407-2 in Subsection 407.12 and replace with the following:

407.12 Double and Triple Course Chip Seal. Table 407-2.

Table 407-2

Double Course Surface Treatments

Designation (Thickness)

Nominal Maximum

Size of Aggregate

Aggregate Gradation(1)

Estimated Quantity of Aggregate(2) pounds/yd2

Estimated Quantity of Emulsified Asphalt (3) gallons/yd2

Estimated Quantity of Asphalt Binder (3) gallons/yd2 2A (3/4 inch)

1st Application 3/4 inch A 40 – 49 0.35 – 0.51 0.22 – 0.33

2nd Application 3/8 inch C 20 – 26 0.51 – 0.60 0.33 – 0.42

2B (5/8 inch)

1st Application 1/2 inch B 29 – 40 0.31 – 0.40 0.18 – 0.29

2nd Application No. 4 D 14 – 20 0.40 – 0.51 0.24 – 0.33

2C (1/2 inch)

1st Application 3/8 inch C 26 – 35 0.20 – 0.31 0.11 – 0.22

2nd Application No. 4 B 9 – 15 0.31 – 0.40 0.18 – 0.29

(1) See Table 703-7 for aggregate gradations.

(2) Aggregate masses are for aggregates having a bulk specific gravity of 2.65, as determined by AASHTO T 84 and T 85. Make proportionate corrections when the aggregate furnished has a bulk specific gravity above 2.75 or below

(3) Adjust the asphalt content of the first application for the condition of the road.

Add Table 407-2a to Subsection 407.12.

407.12 Double and Triple Course Chip Seal. Table 407-2a.

Table 407-2a

Triple Course Chip Seal

Designation (Thickness)

Nominal Maximum

Size of Aggregate

Aggregate Gradation(1)

Estimated Quantity of Aggregate(2) pounds/yd2

Estimated Quantity of Emulsified Asphalt (3) gallons/yd2

Estimated Quantity of

Asphalt Binder(3) gallons/yd2 3A (3/4 inch)

1st Application 3/4 inch A 35 – 46 0.24 – 0.35 0.15 – 0.27

2nd Application 3/8 inch C 20 – 26 0.31 – 0.40 0.18 – 0.29

3rd Application No. 4 D 9 – 15 0.24 – 0.35 0.15 – 0.27

3B (5/8 inch)

1st Application 1/2 inch B 29 – 40 0.20 – 0.31 0.11 – 0.22

2nd Application 3/8 inch C 15 – 20 0.31 – 0.40 0.18 – 0.29

3rd Application No. 4 D 9 – 15 0.20 – 0.31 0.11 – 0.22

(1) See Table 703-7 for aggregate gradations.

(2) Aggregate masses are for aggregates having a bulk specific gravity of 2.65 as determined by AASHTO T 84 and T 85. Make proportionate corrections when the aggregate furnished has a bulk specific gravity above 2.75 or below

(3) Adjust the asphalt content of the first application for the condition of the road.

407.15_National_5_17_2017

Delete Subsection 407.15 and replace with the following:

407.15 Payment.

407.15 The accepted quantities will be paid at the contract price per unit of measurement for the Section 407 pay items listed in the bid schedule. See Subsection 109.05.

409 - Micro Surfacing 409.07_National_11_4_2016

Delete Subsection 409.07(b) and replace with the following:

409.07 Weather Limitations.

(b) Surface temperature in the shade is 45 °F (7 °C) and rising;

412 - Asphalt Tack Coat 412.05_National_11_4_2016

Delete Subsection 412.05(b) and replace with the following:

412.05 Weather Limitations.

(b) Ambient air temperature is above 40 °F (5 °C) and rising; and

ATTACHMENT 5

Tonto National Forest Authorization Letter to proceed with Humboldt Mountain Road Maintenance Project

Date: August 27, 2025 Tim Mach FAA NAS Defense Programs (NDP) CSA Liaison Management and Program Analyst NDP Infrastructure Team, AJW-B710

Dear Tim Mach:

This letter serves as formal authorization for the Federal Aviation Administration (FAA) to proceed with the Humboldt Mountain Road Maintenance project, as outlined in the FAA Statement of Work, contingent upon Forest Service approval and in compliance with the conditions specified herein. All activities shall be conducted in coordination with our designated representatives and in compliance with applicable regulations.

The Tonto National Forest (TNF) has evaluated this project for environmental impacts and has determined that this project will not adversely affect the surrounding environment. No further environmental evaluation is required.

If there is a change in project termini or work is to be added outside of the original project scope or limits, the TNF must be contacted to evaluate potential impacts.

The following mitigation measures shall be followed and will be included in the Contract Work:

Project Contractor Responsibilities:

1) Prior to construction, all personnel who will be on-site including, but not limited to, contractors, contractors’ employees, supervisors, inspectors, and subcontractors, will review the attached Tonto National Forest Sonoran Desert Tortoise Awareness Program Handout and become familiar with the identification of and avoidance of the Sonoran Desert Tortoises and follow the notification request as applicable.

2) The Contractor shall comply with the requirements as shown in the attached Tonto Industrial Fire Plan.

3) All material (e.g., soil, gravel, sand, borrow, aggregate, etc.) transported onto National Forest System land or incorporated into the work shall be weed-free. All equipment shall be cleaned and inspected prior to use on NFS lands. Equipment will be considered clean when visual inspection does not reveal soil, seeds, plant material or other such debris. Cleaning shall occur at a vehicle washing station or cleaning facility before the equipment and vehicles enter Forest Service land. Cleaning of equipment and vehicles shall also occur when equipment leaves Forest Service land to prevent the spread of weeds to other areas.

4) Notify the Cave Creek District Archaeologist at least two weeks prior to beginning construction activities.

5) Utilize Forest Service-approved staging areas that are deemed suitable for equipment storage and material laydown.

Attachment(s):

− Tonto National Forest Sonoran Desert Tortoise Awareness Program Handout

− Tonto National Forest Industrial Fire Plan

Please contact Michelle Tom, Engineering and Minerals Staff Officer, at the Tonto National Forest Supervisor’s Office, at michelle.tom@usda.gov if you have any questions or if you need more information.

Sincerely, MICAH GRONDIN

Cave Creek District Ranger mailto:michelle.tom@usda.gov

SONORAN DESERT TORTOISE AWARENESS PROGRAM

Tonto National Forest

Desert Tortoise Example of Desert Tortoise burrow

(But not all burrows/shelters will look like this)

State law prohibits take, possession, or harassment of wild Sonoran desert tortoises.

Be on the lookout for tortoises and tortoise scat.

Check under vehicles for tortoises before moving vehicles.

Drive slowly, especially on unpaved roads or off-road.

Cover any holes/pits/trenches at the end of each construction day.

Check under vegetation for tortoise and/or tortoise burrow.

Tortoise Scat (usually the size of a small egg)

If you see a tortoise or possible tortoise burrow, suspend any activity that may harm the tortoise or destroy the burrow, and immediately notify the Tonto National Forest Wildlife Biologist at 602-225-5322 or the Cave Creek District Ranger at 480-595-3301.

SOUTHWEST INTERAGENCY FIRE RESTRICTIONS & CLOSURE MASTER OPERATING PLAN

TONTO NATIONAL FOREST

INDUSTRIAL FIRE PRECAUTIONS PLAN GUIDELINES

For

AUTHORIZED USERS

PURPOSE

The purpose of fire restrictions and industrial fire precautions is to reduce the risk of human-caused fires.

The Industrial Fire Precautions Plan Guidelines and its associated fire precautionary measures must be followed year round. The intent of this guide is to provide authorized users with the information they need to ensure their operations conform to the standards and requirements outlined within this document.

For the purpose of this plan, authorized users include any permit holder, lease, contractor, subcontractor and other user, engaged in permitted operations on Tonto National Forest Lands.

When operating on Tonto National Forest Lands, it is incumbent on the permitted user to know the current Emergency Fire Precaution Schedule and to take the appropriate actions to meet the mitigation measures in these guidelines. In addition, it is also incumbent on the authorized user to inform any and all of their subordinates (contractors, sub-contractors, etc…) of these precautions and to ensure that all requirements are being met.

At all times, users shall have a plan of action which briefly states what preventative measures will be taken to mitigate fire occurrence. Users should clearly designate a fireguard and what actions will be taken should a fire occur, including the notification process.

GENERAL FIRE PRECAUTIONARY MEASURES

COMMUNICATIONS

Authorized users shall ensure a serviceable telephone, radio-telephone or radio communication system is available to provide prompt and reliable communications between the authorized user’s operations and the Tonto National Forest. In the event of a wildland fire ignition, users shall contact the USFS Phoenix Interagency Dispatch Center – (480) 457-1555

FIRE TOOLS

Authorized users shall furnish and maintain, in good working order, fires tools to be used only for suppressing wildland fires. Each operation shall be provided with one firefighting tool per person to equip all personnel engaged in authorized user’s operations. Approved firefighting tools may include the following: Pulaski; McLeod tool; long handled shovel. These tools are separate from those required to be mounted on equipment.

FIRE TOOLS ON EQUIPMENT

Passenger carrying vehicles, including light pickup trucks and all-terrain vehicles, shall be equipped with one (1) long-handled round pointed shovel and one (1) ABC dry chemical fire extinguisher not less than 2 1/2 pounds capacity. Each internal combustion fuel carrying piece of equipment (dump truck, dozer, excavator, backhoe, etc…) shall be equipped with one long-handled round-pointed shovel, and one 5-

INDUSTRIAL FIRE PRECAUTIONS PLAN GUIDELINES

For

AUTHORIZED USERS

pound capacity ABC dry chemical fire extinguisher. Shovels and fire extinguishers shall be so mounted as to be readily reached from the ground.

SPARK ARRESTERS AND MUFFLERS

Authorized user will ensure that each internal combustion engine shall be equipped with a spark arrester qualified and rated under USDA Forest Service Standard (Spark Arrester Guide) 5100-1a or the latest revision of Society of Automotive Engineers "medium size engine, SAE recommended practice J350" unless it is:

(a) Equipped with a turbine-driven exhaust supercharger such as the turbocharger. There shall be no exhaust bypass.

(b) A multi-position engine, such as on power saws purchased after 6/30/77 which must meet the performance levels set forth in the Society of Automotive Engineers "multi-positioned small engine exhaust fire ignition standard, SAE recommended practice J335B" as now or hereafter amended. Those purchased prior to the above date shall be equipped with an approved spark arrester/muffler containing a

0.023 inch mesh screen in good condition.

(c) A passenger carrying vehicle or light truck, or medium truck up to 40,000 GVW, used on roads and equipped with a factory designed muffler and an exhaust system in good working condition.

(d) A heavy duty truck, such as a dump truck, or other vehicle used for commercial hauling, used only on roads and equipped with a factory designed muffler and with a vertical stack exhaust system extending above the cab.

Exhaust equipment described in this Subsection, including spark arresters and mufflers, shall be properly installed and constantly maintained in serviceable condition and not modified in any manner.

POWERED HAND TOOLS

During periods of use, each powered handtool operator shall have readily available for use, one long-handled round-pointed shovel and one chemical-pressurized ABC dry chemical fire extinguisher of not less than 8-ounce capacity by weight. Muffler, extinguisher, and shovel shall be maintained in good working order at all times. Fueling or refueling of a powered handtool shall be done in an area which has been completely cleared of material which will carry fire.

Powered hand tools shall be moved at least 10 feet from the place of fueling or refueling before starting.

GAS OIL STORAGE AND SERVICE AREAS

The location of equipment service areas and gas and oil storage areas shall be approved in writing by the permit administrator. All areas shall be cleared of brush, litter, grass or other flammable debris for a radius of 50 feet.

INDUSTRIAL FIRE PRECAUTIONS PLAN GUIDELINES

For

AUTHORIZED USERS

BURNING OF REFUSE

No slash or other debris, such as that resulting from clearing on right-of-way, shall be burned without the written consent of the Tonto National Forest.

BLASTING

Use of fuses in blasting shall not be permitted. A long-handled round-pointed shovel and at least five gallons of water for fire fighting purposes shall be available at all times. A fire guard must remain on the blasting site for a minimum of one hour after blasting operations have concluded. Industrial mining operations as approved under a mining plan of operations in large areas devoid of vegetation such as pits, are exempted from blasting restrictions.

WELDING

An area of sufficient size but not less than a 10 foot radius shall be cleared down to mineral soil before welding operations are started. Prior to welding, authorized user shall have available a round-pointed long-handled shovel, at least 5-gallons of water, and a 5-pound fire ABC dry chemical extinguisher at each welding site. A fire guard must remain on the welding site for a minimum of one hour after welding operations have concluded. Industrial mining operations as approved under a mining plan of operations in large areas devoid of vegetation such as pits, are exempted from welding restrictions.

SPECIFIC FIRE PRECAUTIONARY MEASURES

EMERGENCY FIRE PRECAUTION SCHEDULE

FIRE RESTRICTION/CLOSURE “STAGE”

“STAGED” RESTRICTION LEVELS INDUSTRIAL FIRE PRECAUTION PLAN

NO RESTRICTIONS A

STAGE I B

STAGE II C

PARTIAL/FOREST CLOSURE ** D

RED FLAG WARNING

(Issued by National Weather Service)

D

** Partial Forest Closure:

Project areas which are outside the boundaries of the partial forest closure may continue to operate under Industrial Fire Precaution Plan “C” operating criteria as agreed upon between the Permit Administrator and Purchaser in writing.

Project areas within the boundaries of the proclaimed partial forest closure area are to operate under Industrial Fire Precaution Plan “D”.

INDUSTRIAL FIRE PRECAUTIONS PLAN GUIDELINES

For

AUTHORIZED USERS

Staged restriction levels are determined by the appropriate Forest Line Officer in consultation with the Forest Fire Management Officer and Permit Administrator. The appropriate Forest Line Officer may adjust the predicted Industrial Fire Precaution Plan for local weather conditions within a Project Area.

Changes in the predicted Industrial Fire Precaution Plan shall…