Photos_-_138_W._Addison_St..pdf
PDF 811 KB Posted
- Solicitation number
- 2025-COMMUNITY DEVELOPMENT-028
- Issued by
- Kalamazoo County, Michigan
About this file
This document is a project specification file for handrail and guardrail installation at 138 W. Addison St. in Jackson, Michigan, prepared by the City of Jackson. The specification details the installation of new spruce hand and guard railings at open edges of floor and stair systems, with specific requirements including 2" x 4" top and bottom rails, 2" x 2" balusters spaced 6" on center, and a top rail height of 36" above floor level. The project involves three specific railing installations: an upper section handrail, a lower section guard rail in the basement, and a wrought iron handrail on the front precast steps, with the homeowner selecting the final color of the stain or paint.
The document includes three photographs showing the existing stairways - two interior shots of wooden stairs in different stages of preparation and one exterior shot of concrete steps with fallen leaves. The specification does not include pricing details, but provides explicit technical requirements for the railing installation. The project appears to be part of a municipal home improvement or rehabilitation program, with the work to be completed according to building code requirements and manufacturer's instructions. The file was prepared on 12/13/2024 by sharrison@cityofjackson.org, suggesting this is a current or upcoming municipal contract opportunity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Location: Unassigned
Porches & Entrances Quantity Units
{ - INSTALL HANDRAILS
(Spec (i car ion I D : 40. 062 50 Est im ated Qty' 0)
LF
Install. per building code requirements, new spruce hand and guard railings at open edges of floor and stair system. Railing system to be constructed in similar style to railings removed. At a minimum, new rails to include 2" x 4" top and bottom rails with 2" x2" balusters 6" on center fastened between rails. Top rail to be
36" above floor level or higher when required by code. Bottom rail to be no more than 4" above floor and supported in mid span if span between posts more than 6'. Install 4" x 4" posts where necessary. Apply two coats of solid color stain or paint to railing system. Homeowner to select color.
Note: Upper section just a handrail.
Lower section. Guard rail on the right side standing in the basement looking up. install of a new handrail on the left. installed off brackets and extending pass the upper and lower step by a foot.
Install of a wrought iron handrail on the front steps. One side only. Rail shall fit the steps and landing.
Installation shall be done according to manufactures instructions. Note: These are precast steps so a iron rail will frt.
P re pa re d By : sh o r ri son @ cityofj o ckso n. org o n 1 2/1 3/20 24
Total l E
T
L't a t d $ t