This is Addendum 2 to the contract documents for the PHF—Newport News/Williamsburg International Airport Restroom Refurbishment Project, issued by BSQuare Design on behalf of the Peninsula Airport Commission on October 20, 2026. The addendum addresses 17 Requests for Information (RFI 012–028) submitted by bidders regarding scope clarifications, material specifications, signage requirements, phasing procedures, and administrative timelines. The project involves comprehensive renovation of men's and women's restrooms across eight phases, including demolition, new ceramic tile installation, gypsum board ceilings, LED lighting, plumbing fixture replacement, glass partitions, and ADA-compliant signage. The contract duration is structured as 15 administrative work days followed by 90 construction work days from the Notice to Proceed, totaling 105 work days. The addendum includes detailed specifications for painting (Section 09 91 00), accessible signage (Section 10 14 23), general signage (Section 10 14 00), and cleaning boundaries with phased turnover procedures. Bidders must submit all required administrative deliverables—including certificates of insurance, building permits, shop drawings, purchase orders, and a baseline construction schedule—within the first 15 work days before on-site construction may commence.
Key contractual requirements include one comprehensive Notice to Proceed issued at contract execution with no separate administrative NTP; construction work is limited to weekdays only (no weekend work) between 8:00 a.m. and 5:00 p.m., with sprinkler system shutdowns limited to 6 hours maximum per day on weekdays from 7:00 a.m. to 2:00 p.m. with 48 hours' notice. The contractor is responsible for all permit fees, testing, and inspection fees. Temporary wayfinding signage and daily progress cleaning are contractor-provided throughout all phases, with phase-end final cleaning required before bathroom areas reopen to the public (Phases 4, 6, and 8). The project involves coordination with Airport Operations, TSA badging requirements (SIDA badges for site access; two-week to one-month processing), and delivery route coordination. No pricing information, set-asides, or funding sources are provided in this addendum document. The architect reserves the right to withhold authorization to begin on-site work if administrative deliverables are materially incomplete at the end of work day 15, and any delay to on-site start beyond work day 16 remains the contractor's responsibility without extending the substantial completion date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BSQuare Design
A r c h i t e c t u r e · I n t e r i o r D e s i g n · P r o j e c t M a n a g e m e n t
ADENDUM 2
P R O J E C T
PHF — Newport News/Williamsburg International Airport
Restroom Refurbishment Project
Date: October 20, 2026
Prepared by: Fabio Bendana, Project Manager | BSQuare Design
Contact: fbendana@bsquare.design
Document No.: Adendum No. 2
Status: For Record and Distribution to All Bidding Parties
This document is confidential and intended solely for the use of the named recipient(s). | © 2026
BSQuare Design. All rights reserved.
BSQuare Design | Addendum 2 | PHF Restroom Refurbishment Project | October 20, 2026
Section 1 — Introduction / Transmittal Note
BSQuare Design submits the following Addendum in response to questions received from bidders (RFI’s) and other additional information in connection with the PHF — Newport
News/Williamsburg International Airport Restroom Refurbishment Project. These the RFI’s identify discrepancies, missing documents, and clarifications required for accurate bid preparation. Owner/Architect responses are incorporated herein for the record and for distribution to all bidding parties. All addenda become part of the contract documents.
Field Detail
Project PHF — Newport News/Williamsburg International Airport Restroom Refurbishment
Owner Peninsula Airport Commission
Architect / Submitter BSQuare Design | Fabio Bendana, fbendana@bsquare.design
Date of Submission October 20, 2026
RFI Numbers Covered RFI 012 through RFI 028
Distribution Owner, Project Manager, All Bidding Parties
Section 2 — RFI Log Summary
The table below provides a consolidated index of all Requests for Information submitted under this package. Reference individual RFI detail sheets in Section 3 for full question text and Owner/Architect responses.
RFI No. Subject Reference Status
RFI 012 Missing painting specification Ceiling specification on PDF page 27 references Section 09 91 00— Painting
✓ Answered
RFI 013 Painting scope: base bid and Alternate 1 AD-103, A-400 ✓ Answered
RFI 014 Permanent signage quantities and locations Section 10 14 00 (PDF pages 56–
59) and A-200/A-201, details 12–
✓ Answered
RFI 015 Entry-sign materials and governing detail Section 10 14 00 ✓ Answered
RFI 016 Glass-panel graphics and existing signs Section 10 14 00; Drawings A-200 and A-201
✓ Answered
RFI 017 Temporary wayfinding during construction Drawings; AP100 and AP101 ✓ Answered
RFI 018 Cleaning boundaries and phased turnover Drawings; AP100 and AP101 ✓ Answered
RFI 019 Existing fire-alarm system coordination General ✓ Answered
RFI 020 Current documents and formal responses General ✓ Answered
RFI 021 Projected Start Day for Construction General ✓ Answered
RFI 022 Administration Activities and Construction
NTP
General ✓ Answered
RFI 023 Shutdown During Phases General ✓ Answered
RFI 024 Calendar days vrs Workdays General ✓ Answered
RFI 025 Women's bathroom the electric paper towel circuit
E-202 ✓ Answered
RFI 026 New Lights Over the Sink E-101 E-101 ✓ Answered
RFI 027 New Lights Over the Sink E-201 E-201 ✓ Answered
RFI No. Subject Reference Status
RFI 028 Sprinkler/Insurance Fees Associate with Shutdown
General ✓ Answered
Additional Information Provided in this Addendum (Addendum 2)
1. Pre-bid Meeting Agenda
2. Sign-in Sheet (Plan holder list)
Section 3 — RFI Detail Sheets
The following pages contain the full text of each Request for Information, including the question as submitted and the Owner/Architect response as received. All responses are incorporated herein for the record.
RFI - 001 through 011 were responded in Addendum 1 dated on October 8, 2026
RFI 012 — Missing Painting Specification
Reference:
Ceiling specification on PDF page 27 references Section 09 91 00—Painting
QUESTION:
The ceiling specification on PDF page 27 references Section 09 91 00—Painting, but we could not locate that section in the supplied manual. Please provide the complete section, including approved manufacturers/product lines, substrate-specific primers, number of coats, dry-film thicknesses, colors, sheens, and coating systems.
OWNER RESPONSE:
See attached specification Section 09 91 00
RFI 013 — Painting Scope: Base Bid and Alternate 1
A-400, AD-103
Please identify the painting included in the base bid versus Alternate 1/basement work. In particular, confirm the required extent of restroom ceiling/soffit painting, coves behind glass panels on A-400, and repaired basement CMU walls on AD-103. For match-existing areas, please confirm whether full wall surfaces or only repaired areas must be repainted and how existing colors and sheens will be established.
1. Base Bid vs. Alternate 1 — Painting Scope Summary
All upper-level bathrooms scheduled on A-400 with a GWB/PNT ceiling finish receive new paint as part of the base bid renovation scope.
The basement Storage Room CMU wall: Contractor to partially demo the CMU wall to remove the embedded sanitary pipe, then rebuild the demolished portion and repaint the surface to match existing paint. This CMU repainting is a Base Bid item.
Alternate 1 painting work is limited to the basement Men's and Women's Bathrooms. Contractor to partially demo the front side of the chase to replace the sanitary riser, rebuild the demolished
CMU portion, and repaint the surface to match existing paint. The inside of the bathrooms are also painted in it entirety with matching color paint. Contractor to partially demo the chase CMU wall on the outside of the bathroom, demo and replace the sanitary riser, rebuild the demolished
CMU portion, and repaint the surface to match existing paint. Additionally, under Alt-1, the gypsum board ceilings in the basement Men's and Women's Bathrooms are demolished to access the sanitary piping. Contractor shall replace the demo gypsum ceiling in kind. The replacement gypsum ceiling is to receive paint finish consistent with the standard GWB/PNT ceiling finish called out in the Finish Schedule (A-400).
Restroom Ceiling / Soffit Painting
Per the Finish Schedule on Sheet A-400, the ceiling finish for all bathroom bays (Men's and
Women's, all MBW, MVW, WBW, WVW room tags) is designated GWB / PNT — Gypsum Wall
Board with a Paint finish. This applies to all ceiling surfaces within the renovated restroom areas as part of the base bid scope.
Coves Behind Glass Panels (A-400 / MVW 8)
The cove surfaces behind and adjacent to the tempered glass panels at vanity locations MVW 8
(Men's and Women's) shall be painted as part of the base bid scope. The painted cove is a GWB surface visible behind/through the glass panel. Painting is included in the base bid.
Base bid for CMU walls: The intent is to repaint only the repaired/rebuilt portions of the CMU wall surface, not the full wall. The scope is limited to the area of reconstruction. If blending of the repainted area with the adjacent existing painted CMU surface cannot be achieved without visible discontinuity, the Contractor shall notify the Architect for direction prior to proceeding.
Match-Existing — Color and Sheen Verification Protocol
Prior to painting any match-existing area, the Contractor shall:
Field-verify the existing paint color and sheen on the CMU surfaces in the presence of the
Owner's Representative.
Submit a paint sample (minimum 12" × 12" on the actual substrate in the actual location) for
Architect's and Owner's written approval before proceeding.
If the existing paint product is no longer available or cannot be matched within an acceptable tolerance, submit alternate color options to the Architect and Owner for selection. The Owner reserves the right to select a new color for the full wall surface if an acceptable match cannot be achieved, at no additional cost if the repainted area is within the scope noted above.
RFI 003 — Permanent Signage Quantities and Locations
Section 10 14 00 (PDF pages 56–59) and A-200/A-201, details 12–14
For Section 10 14 00 (PDF pages 56–59) and A-200/A-201, details 12–14, please provide or confirm a coordinated sign schedule listing quantities, dimensions, text, and mounting locations for tactile/Braille restroom signs, overhead identification signs, directional signs, and accessible-stall symbols. Please identify any signs furnished by the Owner versus the Contractor.
1. Directional signs are not part of this contract.
2. See attached signage schedule listing quantities, dimensions, text, and mounting locations for tactile/Braille restroom signs, overhead identification signs, and accessible-stall symbols.
RFI 015 — Entry-sign materials and governing detail
Specifications §10 14 00
Please clarify the differing entry-sign material descriptions in Section 10 14 00 and the drawing details, and identify the governing material, thickness, finish, and mounting requirements for pricing.
Contractor to refer to the new signage specification attached to the end of this Addendum.
RFI 016 — Glass-panel graphics and existing signs
Specifications; section 10 14 00 — signage; Drawings A-200 Detail 10, 13 & A201 Detail 10, 13
Please provide the final artwork, sizes, and quantities for the vinyl graphics on the glass feature panels, or confirm the pricing basis to use pending approved artwork. Please also confirm the quantity and final locations of existing tornado-shelter signs to be removed, protected, and reinstalled.
OWNER RESPONSE:
The Final Artwork for the glass panel graphics will be provided by the Architect, the approximate size and quantities are as per the drawings shown on A200 and A201 and material as per signage revised Signage specification SECTION 10 14 00; section 2.2 and 2.3
RFI 017 — Temporary wayfinding during construction
Drawings; AP100; AP101
Please confirm the number, sizes, wording, mounting requirements, and locations of temporary restroom-direction signs required for each phase, including whether the Contractor must relocate or replace them as phases change.
Each phase will have signs to meet code (ADA) and to identify the respective gender of the bathroom. Temporary signs can be simple as long as they meet the required code. The contractor is responsible for providing all these signs. Signs can be reused as long as they meet code once they are relocated from phase to phase.
RFI 018 — Cleaning Boundaries and Phased Turnover
Drawings: AP-100, AP-101
Please confirm whether final cleaning is required at the completion of each restroom/phase and again at overall project completion. Please identify the limits of cleaning, including adjacent public areas affected by construction, and clarify required progress/rough cleaning versus final cleaning. If available, please provide a restroom-by-restroom area schedule; otherwise, confirm the basis for field verification.
Please see document attached to this addendum titled CLEANING BOUNDARIES AND PHASED
TURNOVER
RFI 019 — Fire-Alarm System Coordination
N/A
Please identify the existing fire-alarm manufacturer and current servicing/original installing contractor, and confirm any requirement for that contractor to perform modifications, programming, testing, or system integration for this project.
The original contractor that installed the system is not known; There are two panels; a notifier and the main panel which is Siemens. The current contractor servicing the airport is Baltimore
Fire Protection BFPE
RFI 020 — Current Documents and Formal Responses
Please confirm all addenda issued to date and provide any revised drawings or specifications. Please issue responses affecting scope or pricing through a written addendum available to all.
Addendum 1 was issued on October 8, 2026; no drawings have been issued, and specification revision can be found in this addendum (Addendum 2). All final responses (RFI) have been responded in Addendum 1 and addendum 2.
RFI 021 — Projected Starting Day for Construction
What is the projected start date on site for Construction?
Construction shall follow the NTP (Notice to Proceed) from the Owner.
RFI 022 — Administration Activities and Construction NTP
Will you consider issuing a notice to proceed for administration activities(contracts, submittals, material procurement, etc..) and a second NTP to start work on site after material procurement?
One NTP will be issued at contract execution. The total contract duration is 105 work days from the NTP date, structured as follows:
Work Days 1–15 (3 calendar weeks): Administrative Period No on-site work, demolition, or material deliveries are permitted during this period. The Contractor shall use this time to complete all administrative obligations before construction begins.
Work Days 16–105 (90 work days): Period of Construction On-site work may commence on Work Day 16, provided all administrative deliverables below have been satisfactorily completed. Substantial Completion is due at the end of Work Day 105.
During the 3-week Administrative Period, the Contractor shall complete the following before any on-site work begins:
1. Execute all subcontracts
2. Submit Certificate of Insurance and Payment/Performance Bonds for Owner approval
3. Obtain building permit
4. Submit all required shop drawings, product data, and samples — tile, plumbing fixtures, tempered glass panels, ADA/Braille signage, and accessories
5. Place purchase orders for all long-lead materials — glass panels, acrylic art graphics
(pending Owner/Architect art approval per A-200/A-201), ceramic tile, fixtures, and signage
6. Complete PHF Airport Operations coordination meeting — confirm debris removal hours, access protocols, and dust control plan in writing
7. Submit baseline construction schedule incorporating all 8 phases (AP-100/AP-101) for
Architect review
8. Submit Contractor-prepared restroom area schedule for Architect confirmation
The Architect reserves the right to withhold written authorization to begin on-site work if administrative deliverables are materially incomplete at the end of Work Day 15. In that event, contract dates do not change — any delay to the on-site start beyond Work Day 16 falls within the Contractor's responsibility and does not extend Substantial Completion beyond Work Day
105.
RFI 023 — Shutdown During Phases
Will there be any down time between phases?
No, there should not be any down time between phases.
RFI 024 — Calendar days vrs Workdays
Addendum #1 states that the duration of the project is 90 calendar days, but the addenda also state that there will be no work on the weekends. Can you change the 90 calendar days to 90 workdays?
See response to RFI 022
RFI 025 — Women's Bathroom the Electric Paper Towel Circuit
E-202
On page E-202 in the women's bathroom the electric paper towel dispenser they show circuit L11-19. Is circuit L11-19 an existing circuit available for use?
Circuit L11-19 is an existing spare circuit. Refer to sheet E-403 for existing and modified panel schedule for panel L11.
RFI 026 — New Lights Over the Sink E-101
E-101
On page E-101 the new work plan shows two new lights over the sinks. Are these Type A1 lights?
Yes, these are to be Type A1 lights.
RFI 027 — New Lights Over the Sink E-201
E-101
On page E-201 the new work plan shows 5 new lights. Are we to assume four of them are Type A1 and one of them is Type A1 w/EM backup?
Yes, these are to be Type A1 lights with one connected to the emergency circuit EH1-39.
RFI 028 — Sprinkler/Insurance Fees Associate with Shutdown
Will there be any type of shut down fees associated with the sprinkler system or any time restraints on how long the system can be shut down for, due to insurance reasons?
Sprinkler shutdown can be scheduled as follows:
1. 48 hours’ notice
2. 6 hours max per day
3. Weekdays 7:00 am to 2:00 pm latest to ensure back up and running.
There are no PHF associated fees.
Note: Contractor to reach to the building department regarding all permit fees as the contractor is responsible for all permit fees and testing/inspection fees related to the works for this project.
Prepared by Firm
Fabio Bendana Project Manager fbendana@bsquare.design
BSQuare Design Architecture · Interior Design · Project Management Date: October 20, 2026
BSQuare Design Project Number
BSQ-200.100
DIVISION 09
BSQUARE DESIGN
Innovative Design Solutions
SECTION 09 91 00
PAINTING
CSI 3-Part Specification
Project Bathroom Refurbishment Project
Date October 2026
Document No. BSQ-09 91 00-01
Prepared By BSQuare Design
CSI MasterFormat Section 09 91 00 – Painting
Status For Construction – Addendum 2 10.20.2026
BSQuare Design Project Number
Section 09 91 00 – Painting
Part 1 – General
1.01 SUMMARY
A. Section Includes:
1. Surface preparation for all interior and exterior painted surfaces.
2. Application of primers, intermediate coats, and finish coats.
3. Painting of exposed interior surfaces unless otherwise indicated.
4. Painting of exposed exterior surfaces unless otherwise indicated.
5. Field painting of exposed bare and covered pipes, ducts, hangers, and insulation.
B. Related Sections:
1. Section 01 35 00 – Special Procedures
2. Section 09 06 00 – Schedule for Finishes
3. Section 09 21 16 – Gypsum Board Assemblies
1.02 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. ASTM D16 – Terminology for Paint, Related Coatings, Materials, and Applications
2. ASTM E84 – Surface Burning Characteristics of Building Materials
3. ASTM D4442 – Test Methods for Direct Moisture Content Measurement of Wood
B. Master Painters Institute (MPI):
1. MPI Architectural Painting Specification Manual – current edition
BSQuare Design Project Number
2. MPI Approved Products List – current edition
C. Steel Structures Painting Council (SSPC):
1. SSPC-SP1 – Solvent Cleaning
2. SSPC-SP2 – Hand Tool Cleaning
3. SSPC-SP3 – Power Tool Cleaning
D. South Coast Air Quality Management District (SCAQMD) Rule 1113 – Architectural Coatings
1.03 DEFINITIONS
A. Gloss Level: Degree of specular reflectance of a coating as measured per ASTM D523.
B. MPI Gloss Levels:
Gloss Level Description Measurement
Gloss Level 1 Flat 0–5 units at 60°
Gloss Level 2 Velvet 0–5 units at 85°
Gloss Level 3 Eggshell 10–25 units at 60°
Gloss Level 4 Satin 25–35 units at 60°
Gloss Level 5 Semi-Gloss 35–70 units at 60°
Gloss Level 6 Gloss 70–85 units at 60°
Gloss Level 7 High Gloss >85 units at 60°
C. DFT: Dry Film Thickness, measured in mils.
D. VOC: Volatile Organic Compound content expressed in grams per liter (g/L).
BSQuare Design Project Number
1.04 SUBMITTALS
A. Product Data: Submit manufacturer's product data sheets for each paint product to be used, including:
1. Product name and number
2. Application instructions
3. Coverage rates
4. VOC content
5. Dry film thickness per coat
B. Samples:
1. Submit color and sheen samples on 8½" × 11" substrate prior to purchase.
2. Submit full-size field samples (minimum 4 SF) on actual substrate in location directed by Architect.
3. Approved samples shall serve as standard for finished work.
C. Maintenance Data:
1. Submit maintenance data including product names, numbers, and color formulations for Owner's maintenance files.
D. Certificates:
1. Certification that products comply with VOC regulations of the authority having jurisdiction.
2. MPI Approved Products List certification for specified products.
1.05 QUALITY ASSURANCE
A. Applicator Qualifications:
1. Painting contractor shall have minimum 5 years experience on projects of similar size and complexity.
2. Applicator shall be familiar with MPI standards and application requirements.
BSQuare Design Project Number
B. Mock-Up:
1. Prior to full application, apply mock-up of each paint system on 100 SF minimum panel of actual substrate.
2. Obtain Architect's written approval before proceeding.
3. Approved mock-up may remain as part of finished work.
C. Pre-Installation Conference:
1. Conduct pre-installation conference with Contractor, painting subcontractor, and Architect before beginning painting operations.
2. Review surface preparation requirements, application methods, environmental conditions, and scheduling.
1.06 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials to site in original sealed containers bearing manufacturer's name, product name and number, color designation, and application instructions.
B. Store materials in a clean, dry, well-ventilated space protected from freezing. Maintain temperature between 45°F and 90°F.
C. Keep containers tightly closed when not in use.
D. Remove rags and waste materials from the building at the end of each work day. Dispose of in accordance with local regulations.
1.07 ENVIRONMENTAL CONDITIONS
A. Do not apply paint under the following conditions:
1. When ambient air temperature is below 50°F or above 95°F.
2. When surface temperature is below 50°F or above 100°F.
3. When relative humidity exceeds 85%.
4. When rain is imminent or has occurred within 24 hours (exterior).
BSQuare Design Project Number
5. In direct sunlight on hot surfaces.
6. When surfaces are wet or damp.
B. Provide lighting of minimum 30 foot-candles at surfaces being painted.
C. Provide adequate ventilation during and after application of solvent-borne paints.
1.08 WARRANTY
A. Provide manufacturer's standard warranty covering defects in materials.
B. Provide applicator's written warranty for a period of two (2) years from Date of Substantial
Completion, covering peeling, cracking, and premature failure of paint film under normal use conditions.
Part 2 – Products
2.01 MANUFACTURERS
A. Acceptable manufacturers (subject to compliance with requirements):
1. Sherwin-Williams Company
2. Benjamin Moore & Co.
3. PPG Architectural Finishes
4. Dunn-Edwards Corporation
B. Substitutions: Submit requests for substitution to the Architect. Substitutions must demonstrate equivalency to specified products including MPI approval, VOC compliance, and performance characteristics.
BSQuare Design Project Number
2.02 PAINTS AND COATINGS – GENERAL
A. All paints and coatings shall be:
1. Listed on the MPI Approved Products List.
2. Compliant with VOC regulations of the authority having jurisdiction.
3. Mixed and applied per manufacturer's written instructions.
4. Compatible with substrate and adjacent materials.
B. VOC Content Limits (per SCAQMD Rule 1113 and MPI standards):
Coating Type VOC Limit (g/L)
Flat coatings 50 g/L maximum
Non-flat coatings 150 g/L maximum
Primers 200 g/L maximum
Anti-corrosion coatings 250 g/L maximum
2.03 INTERIOR PAINT SYSTEMS
A. Interior Gypsum Board – Flat (MPI #53)
Primer: Interior latex primer-sealer, MPI #50
Finish: Interior latex, flat sheen (Gloss Level 1), MPI #53
Application: 2 finish coats minimum
DFT: 3.0–4.0 mils total
BSQuare Design Project Number
B. Interior Gypsum Board – Eggshell (MPI #52)
Finish: Interior latex, eggshell (Gloss Level 3), MPI #52
Application: 2 finish coats minimum
DFT: 3.0–4.0 mils total
C. Interior Gypsum Board – Semi-Gloss (MPI #54)
Finish: Interior latex, semi-gloss (Gloss Level 5), MPI #54
Application: 2 finish coats minimum
DFT: 3.5–4.5 mils total
Note: Use in bathrooms, utility areas, and corridors.
D. Interior Metal – Semi-Gloss
Prime: Interior/exterior rust-inhibitive primer, MPI #107
Finish: Interior latex, semi-gloss (Gloss Level 5), MPI #54 (2 coats)
DFT: 4.0–5.0 mils total
Applies to: Exposed steel framing, pipes, conduit, hangers, ductwork.
E. Interior Concrete Masonry Unit (CMU)
BSQuare Design Project Number
Filler: Block filler, latex, interior/exterior, MPI #4
Finish: Interior latex, semi-gloss (Gloss Level 5), MPI #54 (2 coats)
DFT: 6.0–8.0 mils total
2.04 EXTERIOR PAINT SYSTEMS
A. Exterior Metal – Semi-Gloss
Primer: Exterior rust-inhibitive primer, MPI #107 (2 coats)
Finish: Exterior latex, semi-gloss (Gloss Level 5), MPI #163 (2 coats)
DFT: 5.0–6.0 mils total
Applies to: Ferrous and non-ferrous metal surfaces, doors, frames, flashings.
B. Exterior Concrete and Masonry
Filler/Primer: Exterior block filler, MPI #4 (1 coat)
Finish: Exterior latex, flat (Gloss Level 1–2), MPI #10 (2 coats)
DFT: 6.0–8.0 mils total
2.05 ACCESSORY MATERIALS
A. Primers, sealers, fillers, and undercoats: As recommended by finish coat manufacturer and listed on
MPI Approved Products List. Must be compatible with finish coat.
BSQuare Design Project Number
B. Caulking and sealants: Specified in Section 07 92 00 – Joint Sealants. Painting contractor to coordinate prior to painting.
C. Patching compound: Premixed vinyl or latex-based patching compound compatible with substrate and paint system.
D. Thinners and solvents: As recommended by manufacturer. Do not use unless specifically directed by manufacturer's printed instructions.
Part 3 – Execution
3.01 EXAMINATION
A. Inspect surfaces to be painted prior to beginning work. Report defects, unsatisfactory conditions, and substrate issues to Contractor in writing before proceeding.
B. Do not begin painting until defects have been corrected and surfaces are approved.
C. Verify:
1. Gypsum board surfaces are taped, finished, and sanded smooth to Level 5 finish at areas receiving flat paint and to Level 5 at areas receiving higher sheen levels.
2. Plaster surfaces are fully cured (minimum 28 days), dry, and free of efflorescence.
3. Metal surfaces are clean, dry, and free of mill scale, rust, oil, grease, and other contamination.
4. Concrete and masonry surfaces are fully cured (minimum 28 days), dry, and free of efflorescence and form release agents.
BSQuare Design Project Number
3.02 PREPARATION
A. General:
1. Clean and prepare surfaces in accordance with SSPC standards and paint manufacturer's written recommendations.
2. Remove hardware, plates, lighting fixtures, and similar items prior to painting. Replace on completion.
3. Protect adjacent finished work, equipment, and surfaces not to be painted.
4. Cover floors and furniture with drop cloths.
B. Gypsum Board Surfaces:
1. Remove dust, dirt, grease, and fingerprints.
2. Repair cracks, holes, and surface defects with patching compound. Sand smooth after curing.
3. Prime bare areas after patching.
4. Sand between coats as required.
C. Metal Surfaces:
1. Clean per SSPC-SP1 (solvent cleaning) to remove oil and grease.
2. Remove loose rust and mill scale per SSPC-SP2 (hand tool) or SSPC-SP3 (power tool) as appropriate.
3. Feather and smooth edges of existing paint.
4. Spot prime bare metal immediately after cleaning.
D. Concrete and Masonry Surfaces:
1. Allow new concrete minimum 28 days cure before painting.
2. Remove efflorescence by wire brushing or acid washing per manufacturer's recommendations;
neutralize and rinse thoroughly.
3. Fill cracks and voids with appropriate patching material.
4. Apply block filler to masonry in accordance with manufacturer's recommendations; apply liberally, working into all surface voids.
E. Caulking: After primers are dry, caulk all joints, cracks, and voids at intersections of dissimilar materials per Section 07 92 00 requirements. Allow caulk to cure fully before applying finish coats.
BSQuare Design Project Number
3.03 APPLICATION
A. General:
1. Apply paint per manufacturer's written instructions.
2. Do not thin paint unless specifically directed by manufacturer's instructions.
3. Apply each coat at coverage rate established by manufacturer; do not spread beyond recommended coverage.
4. Apply successive coats only after preceding coat has fully dried or cured per manufacturer's requirements.
5. Lightly sand between coats where recommended by manufacturer or where required to achieve smooth finish.
B. Application Methods:
1. Brush: Use for trim, cut-in work, and areas inaccessible by roller or spray.
2. Roller: Use for large flat surfaces. Select roller nap appropriate for surface texture.
3. Spray: Acceptable where not prohibited. Mask adjacent surfaces thoroughly. Apply backroll immediately after spraying unless manufacturer specifically prohibits.
C. Minimum Number of Coats:
1. Primer: 1 coat (2 coats on new metal and porous masonry).
2. Finish: 2 coats minimum on all surfaces.
3. Additional coats: Apply as required to achieve complete, uniform coverage and specified DFT.
D. Color and Sheen:
1. Apply finish coats in colors. Colors to be chosen by the Architect and to match existing color and finish.
2. First and second finish coats may be of slightly different shade to ensure full coverage of preceding coat.
BSQuare Design Project Number
3.04 FIELD QUALITY CONTROL
A. Wet Film Thickness: Measure wet film thickness during application using appropriate wet film thickness gauge. Adjust application to achieve specified dry film thickness.
B. Dry Film Thickness: Measure DFT after each coat has dried using appropriate gauge. Minimum DFT per coat per manufacturer's published data.
C. Adhesion Testing: Perform adhesion testing per ASTM D3359 (Cross-Cut Method) on representative areas. Minimum acceptable rating: 4B.
D. Touch-Up and Repair:
1. Touch up damaged areas immediately after inspection.
2. Feather edges of repair to blend with surrounding areas.
3. Apply additional coats as required to match surrounding work.
3.05 CLEANING AND PROTECTION
A. At the end of each work day, collect and dispose of rags, waste, and debris. Remove from building and dispose in accordance with applicable regulations.
B. Clean spills, drips, and spatters immediately using appropriate solvent or cleaner.
C. Remove protective coverings after painting is complete and surfaces have dried.
D. Touch up damage to adjacent surfaces caused by painting operations.
E. At completion, remove all paint-related materials, equipment, and debris from the project site.
BSQuare Design Project Number
3.06 PAINT SCHEDULE – SUMMARY TABLE
A. The following table summarizes all paint systems specified herein.
Surface Type Location Primer /
Sealer (MPI
Intermediate Coat
Finish Coat
(MPI #)
Gloss Level Notes
Gypsum Board
Interior Latex Primer- Sealer, MPI #50
— Interior Latex Flat, MPI #53
To match existing
General areas, ceilings
Gypsum Board
Interior Latex Primer- Sealer, MPI #50
— Interior Latex Semi-Gloss, MPI #54
To match existing
Baths, corridors
Metal (Ferrous)
Interior Rust- Inhibitive Primer, MPI #107
— Interior Latex Semi-Gloss, MPI #54
To match existing
Pipes, conduit, hangers, ductwork
CMU /
Masonry
Interior Block Filler, MPI #4
— Interior Latex Semi-Gloss, MPI #54
To match existing
DFT 6.0–8.0
mils
Metal (Ferrous & Non-Ferrous)
Exterior Rust- Inhibitive Primer, MPI #107 (2 coats)
— Exterior Latex Semi-Gloss, MPI #163
To match existing
Doors, frames, flashings
Concrete & Masonry
Exterior Exterior Block Filler, MPI #4
— Exterior Latex Flat, MPI #10
To match existing
DFT 6.0–8.0
mils
Note: MPI # references are per the MPI Architectural Painting Specification Manual, current edition. All products shall appear on the current MPI Approved Products List. GL = MPI Gloss Level. DFT = Dry Film
Thickness. Consult Section 09 06 00 for complete room/area finish schedule and color designations.
END OF SECTION 09 91 00
BSQuare Design Project Number
Document No. BSQ-10 14 23
Prepared By BSQuare Design
CSI MasterFormat Section 10 14 23 – ACCESSIBLE SIGNAGE (ISA)
1.01 SUMMARY
A. Section Includes:
1. International Symbol of Accessibility (ISA) pictogram signs at accessible restroom entrances.
2. Tactile and Grade 2 Braille accessible restroom identification signs at Men's and
Women's restroom entry doors.
3. Accessible single-occupant toilet room signs (unisex/family restroom identification signs where applicable).
4. Accessible stall/compartment identification signs within multi-stall restrooms designating the accessible stall.
5. Mounting hardware, adhesive, and all associated accessories required for complete, code-compliant sign installation.
B. Related Sections:
3. Section 09 21 16 – Gypsum Board Assemblies (substrate behind signs)
4. Section 09 30 00 – Tiling (ceramic tile substrate adjacent to signs)
DIVISION 10 — SPECIALTIES
SECTION 10 14 23 — ACCESSIBLE SIGNAGE (ISA)
PART 1 — GENERAL
5. Section 10 14 00 – Signage (general identification devices, overhead, and directional signage)
6. Section 10 21 13 – Toilet Compartments (accessible stall assemblies)
C. Products Installed But Not Furnished Under This Section:
1. None — all ISA signs are Contractor-furnished and Contractor-installed under this section unless otherwise noted in the Sign Schedule.
D. Owner-Furnished Products Installed Under This Section:
1. Existing tornado shelter signs at Men's and Women's restrooms — Contractor to remove, protect, and reinstall per demolition drawings AD-200 and AD-201. Not ISA signs; coordinate with Section 10 14 00.
1.02 REFERENCES
A. Americans with Disabilities Act (ADA):
1. ADA 2010 Standards for Accessible Design — Chapter 7: Communication Elements and Features, specifically:
a. Section 703 – Signs
b. Section 703.1 – General
c. Section 703.2 – Raised Characters
d. Section 703.3 – Braille
e. Section 703.4 – Installation Height and Location
f. Section 703.5 – Visual Characters
g. Section 703.7 – Symbols of Accessibility
h. Section 703.7.2.1 – International Symbol of Accessibility (ISA)
i. Section 216 – Signs (scoping for when signs are required)
j. Section 216.8 – Toilet Rooms and Bathing Rooms
k. Section 216.2 – Designating Permanent Spaces
B. ICC/ANSI:
ICC/ANSI A117.1-2017 – Accessible and Usable Buildings and Facilities
a. Section 703 – Signs (mirrors ADA requirements with clarifications)
b. Section 703.1 through 703.7 – all applicable
C. International Building Code:
1. IBC 2018, Section 1110 – Accessible Route; Section 1111 – Signage
D. Virginia Uniform Statewide Building Code (VUSBC):
1. Current Edition — adopts IBC 2018 with Virginia amendments
2. All signage shall comply with VUSBC requirements as adopted by the Commonwealth of Virginia
E. International Organization for Standardization (ISO):
1. ISO 7001 – Public Information Symbols (reference for ISA graphic proportions)
2. ISO 21542 – Building Construction: Accessibility and Usability of the Built Environment
F. ASTM International:
1. ASTM D4541 – Pull-Off Strength of Coatings Using Portable Adhesion Testers (for adhesive-mounted signs)
2. ASTM E84 – Surface Burning Characteristics of Building Materials
● G. United States Access Board:
1. ABA Accessibility Standards — current edition
2. Technical Bulletin: Accessible Signage (current edition)
1.03 DEFINITIONS
A. ISA (International Symbol of Accessibility): The standard wheelchair-and-person pictogram symbol adopted per ADA 2010 §703.7.2.1, designating spaces and routes accessible to persons with disabilities.
B. Tactile Sign: A sign with characters or symbols raised a minimum of 1/32 inch (0.8 mm) above the sign surface, complying with ADA 2010 §703.2.
C. Grade 2 Braille: A contracted form of Braille, per the Braille Authority of North America
(BANA) standards, required below all raised tactile characters on accessible signs per ADA 2010
§703.3.
D. Pictogram: A pictorial symbol used on a sign to convey information, surrounded by a minimum 6" × 6" clear field.
E. Non-Glare Finish: A sign surface finish that diffusely reflects light, with a matte or satin sheen that does not produce specular reflections, as required by ADA 2010 §703.5.1.
F. Character Height: The height of the uppercase letter "I" measured from the baseline to the top of the character.
G. Finish 1 (Accessible Sign Finish Standard): Manufacturer's standard non-glare photopolymer or raster-engraved acrylic sign face with contrasting background and character colors as specified herein.
H. Mounting Adhesive: Manufacturer-recommended permanent pressure-sensitive adhesive tape (PSA tape) or two-part epoxy adhesive for flush-wall-mounted signs.
1.04 SUBMITTALS
A. Product Data: Submit manufacturer's full product data sheets for each sign type specified, including:
1. Material description and composition
2. ADA compliance certification
3. Available sizes and configurations
4. Standard finish and color options
5. Mounting methods and hardware
6. Fire rating (ASTM E84 Class A)
7. Photopolymer or engraving process description
B. Shop Drawings: Submit dimensioned shop drawings for each sign type, including:
1. Overall sign dimensions (height × width)
2. Character height, spacing, and font identification
3. Pictogram field dimensions and ISA graphic proportions
4. Braille cell spacing and position below tactile characters
5. Color designations for face, character, and background
6. Mounting method detail (adhesive tape locations, screw locations if applicable)
7. Sign location elevation drawings keyed to floor plan
C. Sign Schedule: Prior to fabrication, submit a complete coordinated Sign Schedule in tabular format for Architect's and Owner's written approval, including:
1. Unique sign mark number
2. Sign type (tactile/Braille ID, ISA symbol, stall marker)
3. Room or location designation
4. Quantity
5. Sign face dimensions
6. Text content (including Braille text confirmation)
7. Finish and color designation
8. Mounting height (AFF)
9. Substrate type
10. Furnished by and installed by
D. Samples:
1. Submit one (1) full-size sample of each sign type for Architect's and Owner's written approval prior to fabrication of production run.
2. Approved samples shall serve as the standard for the finished work.
3. Samples may be incorporated into the work if undamaged.
E. Certificates:
1. Manufacturer's written certification that all signs comply with ADA 2010 Standards for Accessible Design, ICC/ANSI A117.1-2017, and IBC 2018/VUSBC.
2. Manufacturer's certification that sign face materials achieve ASTM E84 Class A flame spread rating.
F. Maintenance Data:
1. Cleaning instructions for each sign type
2. Touch-up or replacement ordering information with manufacturer's product codes
1.05 QUALITY ASSURANCE
A. Manufacturer Qualifications:
1. Sign manufacturer shall have a minimum of five (5) years of continuous experience in fabricating ADA-compliant tactile, Braille, and ISA pictogram signs for institutional or commercial projects.
2. Manufacturer shall be a current member of the Society for Environmental Graphic
Design (SEGD) or an ADA-recognized accessible signage fabricator.
B. Installer Qualifications:
1. Installer shall have a minimum of three (3) years of experience installing ADA-compliant accessible signage on projects of comparable scope.
2. Installer shall be trained and certified (or authorized) by the sign manufacturer.
C. Pre-Installation Meeting:
1. Prior to sign installation, conduct a pre-installation meeting with the Contractor, sign installer, and Architect.
2. Review mounting heights, door swing direction, latch-side location requirements, substrate conditions, and sequencing with adjacent finishes.
D. Mock-Up:
1. Install one (1) mock-up set (one tactile/Braille restroom ID sign and one ISA accessible stall sign) at locations directed by Architect.
2. Obtain Architect's written approval of mock-up before proceeding with full installation.
3. Approved mock-up may remain as part of the finished work.
E. Regulatory Requirements:
1. All signage shall comply with the Virginia Uniform Statewide Building Code (VUSBC), ADA 2010, ICC/ANSI A117.1-2017, and all other regulations of authorities having jurisdiction (AHJ).
2. Where conflicts exist between codes and standards, the more stringent requirement governs.
1.06 DELIVERY, STORAGE, AND HANDLING
A. Deliver signs in manufacturer's original protective packaging, clearly labeled with sign mark number, text, and location.
B. Store signs in a clean, dry space, protected from direct sunlight, extreme temperatures, moisture, and physical damage.
C. Do not stack signs without protective interleaving; prevent scratching or marring of sign faces.
D. Inspect each sign upon delivery for defects, damage, and conformance with approved shop drawings. Reject and replace non-conforming signs before installation.
1.07 PROJECT CONDITIONS
A. Substrate Conditions: Verify that mounting surfaces are flat, plumb, clean, dry, and free of contaminants before installing signs.
B. Install signs only after all adjacent finish work (tile, paint, wallcovering) is complete and cured.
C. Do not install signs before doors are hung and swing direction is confirmed.
D. Coordinate installation sequence with general contractor to avoid damage to completed finishes.
1.08 COORDINATION
A. Coordinate sign locations with door schedule, hardware schedule, and restroom floor plans
(A-100/A-101).
B. Signs shall be mounted on the latch side of all restroom entry doors. Where the latch side is within 8 inches of a perpendicular wall or obstruction, the sign shall be mounted on the nearest adjacent wall.
C. Coordinate accessible stall sign location with toilet compartment installer (Section 10 21 13)
— sign shall be mounted on the stall door or wall adjacent to the stall door on the approach side, at the required ADA height.
D. Coordinate substrate with gypsum board installer to ensure backing is provided at all pin-mount or screw-mount sign locations.
1.09 WARRANTY
A. Provide manufacturer's standard written warranty in the name of the Owner, covering defects in materials and workmanship for a period of not less than five (5) years from Date of
Substantial Completion.
B. Warranty shall cover: delamination, fading, peeling, loss of Braille dots, loss of tactile character relief, and adhesive failure.
2.01 MANUFACTURERS
A. Acceptable manufacturers (subject to compliance with specified requirements):
1. Best Sign Systems
2. ASI Sign Systems
3. Apco Industries
4. Braille International, Inc.
5. Vista System
6. Greenbacker Sign Systems
B. Substitutions: Substitutions must demonstrate full compliance with ADA 2010, ICC/ANSI
A117.1-2017, and specified dimensional and finish requirements.
2.02 SIGN MATERIALS – GENERAL REQUIREMENTS
A. All signs shall be fabricated from rigid, durable materials suitable for interior use in high-humidity environments (restrooms).
B. Sign face material: One of the following, as scheduled:
○ 1. Photopolymer (preferred): ADA-compliant photopolymer resin face bonded to a rigid aluminum or PVC substrate; tactile characters and pictogram fields integrally molded with uniform raised relief; Grade 2 Braille dots integrally molded. UV-stable, non-glare matte finish.
PART 2 — PRODUCTS
C. Sign substrate: Rigid, minimum 0.080" aluminum backing or 3mm PVC backing for photopolymer signs; 1/8" acrylic for engraved signs.
D. Surface finish: Non-glare matte finish on all sign faces. Specular (glossy) finishes are not permitted.
E. Fire rating: ASTM E84 Class A flame spread (FSI ≤ 25, SDI ≤ 450) for all sign materials.
F. Humidity resistance: All signs and adhesives shall be rated for continuous use in high-humidity environments (relative humidity up to 95%, non-condensing).
2.03 TACTILE CHARACTERS AND BRAILLE REQUIREMENTS
A. Raised Characters (ADA 2010 §703.2):
1. Characters shall be raised minimum 1/32 inch (0.8 mm) above sign surface.
2. Characters shall be uppercase; sans-serif typeface only (Arial, Helvetica, or equivalent sans-serif). Decorative, italic, or serif fonts are not permitted for tactile characters.
3. Character height: minimum 5/8 inch (16 mm), maximum 2 inches (50 mm) for characters read by touch at mounting heights specified herein.
4. Character spacing: minimum 1/8 inch (3.2 mm) between characters (edge to edge).
5. Word spacing: minimum 3/16 inch (4.8 mm).
6. Line spacing: minimum 1/8 inch, maximum 1/2 inch between baselines of successive lines.
7. Character width: between 55% and 110% of character height.
8. Character stroke width: between 10% and 30% of character height.
9. Characters shall have rounded or eased (not sharp) edges.
B. Grade 2 Braille (ADA 2010 §703.3):
1. Braille shall be contracted Grade 2 Braille (Unified English Braille, per BANA current standards).
2. Braille shall be positioned below the corresponding text: minimum 3/8 inch (9.5 mm) below the bottom of the lowest tactile character, measured from the baseline.
3. Braille dot base diameter: 0.059 inch (1.5 mm) minimum, 0.063 inch (1.6 mm) maximum.
4. Braille dot height: 0.025 inch (0.6 mm) minimum, 0.037 inch (0.9 mm) maximum (domed shape).
5. Braille cell spacing: dot-to-dot, 0.1 inch (2.5 mm) within a cell; cell-to-cell, 0.241 inch (6.1
mm) minimum; line spacing: 0.395 inch (10 mm) minimum.
2.04 PICTOGRAM FIELD – INTERNATIONAL SYMBOL OF ACCESSIBILITY (ISA)
A. ISA Pictogram (ADA 2010 §703.7.2.1 and §216.8):
1. The International Symbol of Accessibility (ISA) — the standard wheelchair-and-seated-figure symbol — shall be provided on all accessible restroom identification signs and all accessible stall door signs.
2. ISA shall be white on a blue background field, or as accepted by Architect per approved color schedule submitted for this project.
3. The ISA pictogram field shall be a minimum 6 inches × 6 inches (152 mm × 152 mm) clear field surrounding the ISA symbol graphic.
4. ISA symbol proportions shall conform to ADA 2010 §703.7.2.1 and the ISO 7001 reference standard.
5. The ISA pictogram shall not include raised tactile elements in the pictogram field — it is a visual character only, per ADA 2010 §703.6.1.
B. Tactile text providing equivalent designation of the ISA (e.g., "ACCESSIBLE" or room designation with ISA) shall appear adjacent to, not within, the pictogram field, per ADA 2010
§703.6.2.
2.05 COLOR AND CONTRAST REQUIREMENTS
A. All signs shall provide a minimum 70% contrast between characters and background, measured using the following formula:
1. Contrast % = [(B1 – B2) / B1] × 100
2. Where B1 = light reflectance value of lighter area, B2 = light reflectance value of darker area.
B. Standard color scheme (subject to Owner/Architect approval via submitted Sign Schedule and samples):
1. Background: Dark charcoal or black (LRV ≤ 10%) or Airport Authority standard color.
2. Raised characters: Light gray or white (LRV ≥ 70%).
3. ISA pictogram: White symbol on blue field (Pantone 294 C or equivalent), or per Airport
Authority standard.
C. Final color designations to be confirmed by Owner and Architect on approved Sign Schedule submittals and confirmed samples prior to fabrication.
2.06 SIGN TYPES AND SCHEDULES
Provide the following sign types as shown on drawings, as detailed on Sheets A-200 and A-201, and as confirmed in the approved Sign Schedule:
Type S-1: Women's Restroom Identification Sign — ADA Tactile/Braille with ISA
Sign Face Size: 8-1/2" wide × 8-1/2" high (nominal — confirm on shop drawing)
Pictogram: ISA symbol, minimum 6" × 6" field, centered in upper portion of sign
Tactile Text: "WOMEN" (uppercase, raised, sans-serif, min. 5/8" character height)
Braille: Grade 2, "Women," below tactile text per ADA §703.3
Background: Per approved color schedule
Finish: Non-glare matte photopolymer
Quantity: Per approved Sign Schedule (1 per Women's restroom entrance, all phases)
Mounting: See Article 3.03
Type S-2: Men's Restroom Identification Sign — ADA Tactile/Braille with ISA
Sign Face Size: 8-1/2" wide × 8-1/2" high (nominal — confirm on shop drawing)
Pictogram: ISA symbol, minimum 6" × 6" field, centered in upper portion of sign
Tactile Text: "MEN" (uppercase, raised, sans-serif, min. 5/8" character height)
Braille: Grade 2, "Men," below tactile text per ADA §703.3
Background: Per approved color schedule
Finish: Non-glare matte photopolymer
Quantity: Per approved Sign Schedule (1 per Men's restroom entrance, all phases)
Type S-8: Accessible Stall Identification Sign — ADA Tactile/Braille with ISA
Sign Face Size: 6" wide × 9" high (nominal — confirm on shop drawing), or as required to contain all required elements within ADA §703 dimensional compliance
Pictogram: ISA symbol, minimum 6" × 6" field
Tactile Text: "ACCESSIBLE" (uppercase, raised, sans-serif, min. 5/8" character height)
Braille: Grade 2, "Accessible," below tactile text per ADA §703.3
Background: Per approved color schedule
Finish: Non-glare matte photopolymer
Quantity: Per approved Sign Schedule (1 per accessible stall, all phases, Men's and Women's)
2.07 MOUNTING HARDWARE AND ADHESIVES
A. Adhesive Mounting (standard, flush wall):
1. Manufacturer's standard heavy-duty double-sided permanent pressure-sensitive adhesive
(PSA) tape — VHB foam tape (3M 4950 or equal) or equivalent manufacturer's standard;
rated for high-humidity interior use.
2. Minimum tape coverage: 75% of sign back surface area.
3. Adhesive bonding strength: minimum 50 oz./in. peel strength per PSTC-1 test.
4. VHB tape thickness: 0.040 inch minimum.
B. Concealed Screw Mounting (on tile or any other surface where substrates where PSA adhesive is not reliable):
1. Stainless steel screws, #6 × 3/4" flat head, with stainless steel toggle anchors for hollow wall applications; or concrete anchors for CMU/concrete substrates.
2. Sign shall include concealed mounting holes factory-prepared; screw heads shall not be visible on sign face.
3. Screw mounting to be coordinated with backing plates in gypsum board substrate
(Section 09 21 16).
C. Ceramic Tile Substrates:
1. On ceramic tile substrates: use manufacturer's recommended high-bond epoxy adhesive rated for tile; verify with tile manufacturer that adhesive is compatible. No drilling into tile face.
3.01 EXAMINATION
A. Before installing signs, examine substrate surfaces for:
1. Plumb and flat condition — maximum 1/8" in 10 ft. deviation.
2. Cleanliness — free of dust, grease, mold, silicone, tile grout residue, and paint overspray.
3. Dryness — surface moisture content compliant with adhesive manufacturer's requirements.
4. Completion of adjacent finishes — all tile, paint, and wallcovering must be fully cured before sign installation.
B. Examine doors for: (including temporary doors)
1. Swing direction (confirm latch side for all restroom entry doors).
2. Clearance: verify no obstruction on latch side (within 8 inches of perpendicular wall) that would prevent standard latch-side mounting — if obstruction exists, relocate sign per ADA
§703.4.2.
C. Report deficiencies in writing to the Contractor before proceeding. Proceeding with installation constitutes acceptance of existing conditions.
3.02 PREPARATION
PART 3 — EXECUTION
A. Clean substrate surface with isopropyl alcohol (70% minimum concentration) and allow to dry fully before applying adhesive tape or epoxy.
B. Mark sign centerline location at 60 inches AFF (above finished floor) on substrate before installing.
C. Verify door hardware and door frame are fully installed before marking final sign position.
D. Confirm sign text and Braille content against approved Shop Drawings and Sign Schedule before installing each sign — do not install signs with incorrect text, typos, or non-compliant Braille.
3.03 INSTALLATION – MOUNTING HEIGHTS AND LOCATIONS
A. Restroom Entry Door Signs (Types S-1 and S-2):
1. Mount on the wall adjacent to the latch side of the entry door.
2. Sign centerline height: 60 inches (1525 mm) AFF to centerline of ISA pictogram field, per
ADA 2010 §703.4.1.
3. Horizontal position: Sign must be…