Pest Control SOW with service location FY26 RST7 North.pdf
PDF 107 KB Posted
- Attached to
- USCG Pest Services
- Solicitation number
- 70Z036-26-Q-PESTCONTROL083
About this file
This is a Performance Work Statement for monthly pest control services at U.S. Coast Guard facilities located in Florida, Georgia, and South Carolina. The contractor must provide all personnel, management, licenses, laboratory testing, tools, supplies, equipment, transportation, and labor necessary to develop and implement a comprehensive Integrated Pest Management (IPM) plan. Services must be delivered monthly and as needed during normal business hours (Monday through Friday, 8 A.M. to 4 P.M.) and shall address all insect and rodent issues at USCG installations in a manner that ensures the health and wellbeing of personnel.
The contractor's scope of work includes developing an EPA and OSHA-compliant IPM plan for Facility Manager approval that utilizes targeted, environmentally sound methods such as habitat/facility modification, biological/genetic/cultural control, and mechanical/physical control, with judicious use of hazardous pesticides only when necessary. Key requirements include: all pesticide applicators must hold state pesticide application certificates/licenses; the contractor is responsible for maintaining current licenses and training; all pesticide mixing and storage must occur off-installation; the contractor must establish a quality control program with systematic facility inspections, a customer service call/emergency response system, and continuous pest prevention education for facility managers, food handling managers, and housing occupants; and the contractor bears all costs associated with mitigating any spills or releases of hazardous substances and must immediately notify the facility representative of such incidents. The USCG will evaluate contractor performance periodically in accordance with the Quality Assurance Surveillance Plan. The primary point of contact is Julia S. Kline (MS Teams # 206-827-1234, Email: Julia.S.Kline2@uscg.mil). Specific service locations are identified in an attached spreadsheet to the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pest Unit Table REV. 6-17-2026.xlsx | XLSX spreadsheet | |
| SF-30 70Z036-26-Q-PESTCONTROL083A00003.pdf | ||
| Question and Answers 17JUN2026 70Z036-26-Q-PESTCONTROL083 02.docx | DOCX document | |
| SF-1449 70Z036-26-Q-PESTCONTROL083.pdf | ||
| SF-30 SOLICITATION EXTENSION 70Z036-26-Q-PESTCONTROL083A00002.pdf | ||
| Question and Answers 10JUN2026 70Z036-26-Q-PESTCONTROL083.pdf | ||
| SF-30 70Z036-26-Q-PESTCONTROL083A00001.pdf | ||
| Pest Unit Table REV. 6-9-2026.xlsx | XLSX spreadsheet | |
| GA Wage Determination.txt | TXT text file | |
| SC Wage Determination.txt | TXT text file | |
| FL Wage Determination.txt | TXT text file | |
| Provisions and Clauses Services.pdf | ||
| SF-1449.pdf | ||
| Pest Unit Table.xlsx | XLSX spreadsheet | |
| 15-4427.txt | TXT text file |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTION/SPECIFICATION/WORK STATEMENT
FOR PEST CONTROL
PART I
SECTION A
Work Statement
In the performance of this contract, the contractor shall provide the services of monthly-
Pest Control at U.S. Coast Guard units, with locations in Florida, Georgia and South
Carolina. The contractor shall provide all management, licenses, laboratory testing, tools, supplies, equipment, transportation and labor to develop and implement an Integrated Pest
Management (IPM) plan at USCG facilities in a manner that will ensure the health and general wellbeing of installation personnel.
The contact person for this contract is Julia S. Kline, MS Teams # 206-827-1234, Email:
Julia.S.Kline2@uscg.mil
Scope of Services
The contractor shall furnish trained, qualified personnel and any required special tools or equipment necessary to complete any work task, which may be issued. The contractor shall develop an IPM plan, for approval by Facility Managers, to address all insect and rodent issues. The contractor’s IPM plan shall establish the strategy and methods for conducting a safe, effective, and environmentally sound pest management program.
Contractor may review the installation’s historical records of pest activity and abatement actions (if available), survey facilities and grounds. The IPM approach should use targeted
(effective, environmentally sound) methods including habitat/facility modification, biological/genetic/cultural control, mechanical/physical control, and where necessary, the judicious use of hazardous pesticides to the needs at each site. The IPM plan shall comply with all applicable Environmental Protection Agency (EPA), Occupational Safety and
Health Administration (OSHA), state/local regulatory guidance on pesticide storage, disposal and applications.
Contractor Performance Requirements
Services must be provided monthly and as needed, during normal business days and hours of operations Monday through Friday from 8 A.M through 4 P.M. The contractor shall develop and maintain a quality control program to ensure systematic inspection of facilities and grounds for pests, a customer service call/ emergency response system for pest removal, and a continuous pest prevention education program for facility managers, food handling managers, and housing occupants. The contractor shall develop and implement procedures to identify and prevent defective services from reoccurring. As a minimum, the contractor shall develop quality control procedures that address the areas identified.
USCG will periodically evaluate the contractor’s performance in accordance with the
Quality Assurance Surveillance Plan.
(1) All contract employees that apply pesticides must have a state pesticide application certificate/license.
(2) The contractor will be responsible for ensuring that the licenses/certificates and training of contractor personnel are kept current.
(3) All mixing and storage of pesticides shall be performed off the installation.
(4) If the contractor spills or releases any hazardous substances, the contractor should immediately notify the facility representative.
(5) Contractor is responsible for all costs associated with mitigating any spills or releases of hazardous substances.
Service locations:
See attached spreadsheet to solicitation.
File details come from the government source that posted it. Updated .