Performance Work Statement Locksmith Services 2026_02_26.pdf
PDF 845 KB Posted
- Attached to
- Locksmith Services
- Solicitation number
- W50S7826RA003
- Issued by
-
Department of the Army National Guard
About this file
This is a Performance Work Statement (PWS) for locksmith services at the 149th Fighter Wing, Joint Base San Antonio-Lackland, located in San Antonio, Texas. The contractor must provide GSA-certified safe and vault technicians trained and certified through GSA-approved training institutions to repair and replace access control hardware and locks on Government property. The contractor shall troubleshoot and diagnose failures in security containers and access control hardware (including Kaba Mas X-10 and X-9 series devices and Sargent & Greenleaf 2890 series access control hardware) and determine whether repair or full replacement is needed. Repair and replacement work must meet Federal Specification FF-L-2890C. The Period of Performance is 15 days for Test and Evaluation and 15 days for Repair and Replacement. Performance occurs at the 149th Fighter Wing facility in multiple buildings, and the Advanced Programs Office will inspect safes and lock sets upon work completion.
The PWS establishes mandatory requirements including physical security safeguarding of Government property, combating trafficking in persons with a zero-tolerance policy, utilities conservation, and telework prohibition. Attachment 1 specifies extensive security requirements applicable to on-base work, including execution of a Security Agreement, personnel security clearance requirements (with Government-funded investigations for facility clearances), DoD Common Access Card (CAC) procurement for contracts exceeding six months, personnel suitability investigations (Tier 1 minimum for those without classified access), maintenance of current employee lists with security clearance levels, appointment of a security monitor, and compliance with Department of Defense and Air Force security directives regarding classified information handling, Freedom of Information Act procedures, physical security standards, operating instructions for controlled areas, and lock combination protocols.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
1.0 General:
1.1 Scope:
The contractor shall troubleshoot/diagnose to determine where the failure of the and also determine if the need a repair or a full
1.1.1 Objectives to repair
1.2 Background: The
1.3 Period of Performance (PoP): The Period of Performance shall be days for Test and Evaluation, 5 days for epai .
1.4 General Information:
1.4.1 Place and Performance of Services:
1.4. Quality Assurance: The will inspect the
upon .
1.4. Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4 Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract.
The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.7 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.8 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
AEI Army Enterprise Infostructure Army Regulation Antiterrorism/Operational Security Background Investigation Contract Manager Contracting Officer Representative Department of the Army Department of Defense Contract Security Classification Specification Defense Federal Acquisition Regulation Supplement Department of Defense
Defense Counterintelligence and Security Agency Federal Acquisition Regulation Government Furnished Property/Material/Equipment/Services Headquarters, Department of the Army Homeland Security Presidential Directive Information Assurance Information System(s) Contracting Officer National Guard Bureau Organizational Conflict of Interest Personally Identifiable Information Phase In/Phase Out Point of Contact Performance Requirements Summary Performance Work Statement Quality Assurance Quality Assurance Surveillance Plan Quality Control Quality Control Program Service Contract Reporting Social Security Number Technical Exhibit
AR
AT/OPSEC BI
CM
COR
DA
DD254
DFARS DoD
DSCA
FAR
GFP/M/E/S
HQDA HSPD
IA
IS
KO
NGB
OCI
PII
PIPO
POC
PRS
PWS
QA
QASP
QC
QCP
SCR
SSN
TE
USD(I)
Under Secretary of Defense for Intelligence
3. Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
Publication (Chapter/Page)
Date of Publication
Mandatory or Advisory
Website
Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition
Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/in dex.html or https://www.acquisition.gov/dfars Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/travelreg.cfm
DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)
01/23/2014 (Change 1:
07/28/2020) http://www.esd.whs.mil/Directives/issuances/dodm
Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors
(paragraph 9)
August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201 -2.pdf
DoDM 5200.2 Procedures for the DoD Personnel Security Program
(PSP)
04/03/2017 https://www.esd.whs.mil/Directives/issuances/dodm/
DoDI 5200.46 DoD Investigative and Adjudicative Guidance for Issuing the Common
Access Card (CAC)
09/09/14 (Change 1:
05/04/2018) https://www.esd.whs.mil/Directives/issuances/dodi/
Homeland Security Presidential Directive (HSPD)-12
Policy for a Common Identification Standard for Federal Employees and
Contractors
08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12
DoDI 5400.11 Department of Defense Privacy and
Civil Liberties Programs
01/29/2019 https://www.esd.whs.mil/Directives/issuances/dodi/
DoD 5400.11-R Department of Defense Privacy
Program
05/14/2007 https://www.esd.whs.mil/Directives/issuances/dodm/
DoDD 8140.01 Cyberspace Workforce Management 10/05/2020 https://www.esd.whs.mil/Directives/issuances/dodd/
DoD 8570.01-M Information Assurance Workforce
Improvement Program
12/19/2005 (Change 4:
11/10/2015) https://www.esd.whs.mil/Directives/issuances/dodm/
DoD 5220.22-M National Industrial Security Program
Operating Manual (NISPOM)
02/28/2006 (Change 2:
05/18/2016) https://www.esd.whs.mil/Directives/issuances/dodm/
Army Directive 2014-05 Policy and Implementation
Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors
03/07/2014 https://armypubs.army.mil/ProductMaps/PubForm/A rmyDir.aspx
AR 25-2
Information Assurance
04/04/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
AR 530-1
Operations Security
09/26/2014 http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
AR 525-13
Antiterrorism
12/09/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
AR 381-12
Threat Awareness and Reporting
Program (TARP) (Section II, ¶ 2-4.b)
06/01/2016 http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
AFI 10-245
Antiterrorism
03/28/2013 (Certified current
03/30/2017) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
AFI 31-101
Security Forces Standards and
Procedures
08/18/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
AFMAN 31-113
Security Forces Standards and Procedures
03/05/2013 Change 1:
12/02/2015 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
AFPD 17-1
Information Dominance Governance and Management
04/12/2016 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
AFMAN 17-1301
Computer Security (COMPUSEC) 02/12/2020 https://www.e-publishing.af.mil/Product-
Index/#/?view=pubs&orgID=10141&catID=1&series =-1&modID=449&tabID=131
AFI 10-701
Operations Security
7/24/2019 (Change 1:
06/09/2020) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
Attachment 1 to Performance Work Statement
1. Security Agreement (SA). The contractor shall enter into a security agreement if service performance is on base. This agreement shall outline how the contractor integrates security requirements for service operations with the Air Force to ensure effective and economical operation on the installation. The agreement shall include:
a. Security support provided by the Air Force to the contractor shall include storage containers for classified information/material, use of base destruction facilities, classified reproduction facilities, use of base classified mail services, investigation of security incidents, and the use of security forms and conducting inspections required by DoDM 5220.32 Vol 1, National Industrial Security Program:
Industrial Security Procedures for Government Activities, Air Force Policy Directive 16-14, Security Enterprise Governance, and Air Force Manual 16-1406, National Industrial Security Program: Industrial Security Procedures for Government Activities.
b. Security support requiring joint Air Force and contractor coordination includes packaging classified information, mailing and receiving classified materials, implementing emergency procedures for protection of classified information, security checks and internal security controls for protection of classified material and high-value pilferable property.
c. On base, the long-term installation security agreement may take the place of a Standard Practice Procedure (SPP).
2. Obtaining and Retrieving Identification Media.
a. DoD Common Access Card (CAC), (AFI 36-3026 Vol 2, Common Access Card), used for contracts for more than six months and requirement exists for access to the government computer systems and software. CAC applications are accomplished by Mission Partner Identity, Credential and Access Management (MP ICAM)
3. Security Clearance Requirements. The contractor must possess or obtain an appropriate facility security clearance prior to performing work on a classified government contract. If the contractor does not possess a facility clearance the government will request one. The government assumes costs and conducts investigations for Top Secret, Secret, and Confidential facility security clearances. The contractor shall request personnel security clearances, at the company’s expense, for employees requiring access to classified information within 15 days after receiving a facility clearance or, if the contractor is already cleared, within 15 days after service award. Due to costs involved with security investigations, requests for personnel security clearances shall be kept to the minimum amount employees required to fulfil contract requirements.
4. List of Employees. The contractor shall maintain a current list of employees. The list shall include employees’ names, social security number, and level of security clearance. The list shall be validated and signed by the company Facility Security Officer (FSO) and provided to the contracting officer and Information Protection Office (IP Office) at each performance site 30 days prior to the service start date.
Updated listings shall be provided when an employee's status or information changes. A Visit Request for all employees with a security clearance is required to be sent through the Defense Information System for Security (DISS) or successor system and must be updated at least annually. The contractor shall notify the Information Protection Office at each operating location 30 days before on-base performance of the service.
The notification shall include:
a. Name, address, and telephone number of company key management representatives.
b. The contract number and contracting agency.
c. The highest level of classified information to which employees require access.
d. The location(s) of service performance and future performance, if known.
e. The date service performance begins.
f. Any change to information previously provided under this paragraph.
5. Suitability Investigations. Contractor personnel not requiring access to classified shall successfully complete, as a minimum, a Tier 1 (T1) investigation, before operating government furnished workstations. The contractor shall comply with the DoDM 5200.02, Procedures for the Department of Defense Personnel Security Program and AFI 17-130, Cybersecurity Program Management, requirements. T1 investigation requests are initiated using the Standard Form (SF) 85 and are submitted to the installation Information Protection Office through the using agency’s Security Assistant (SA). T1 investigations are different from the Wants and Warrants checks, and are provided by the government at no additional cost to the contractor.
For contracts requiring IT-Level I and II access with no access to classified material, the contractor shall complete Tier 5 (T5) formerly called an SSBI or Tier 3 (T3) investigations, respectively. These investigations are submitted using the SF 86, and are submitted to the Information Protection Office through the using agency Unit Security Assistant within five calendar days after contract start. These investigations are provided by the government at no additional cost to the contractor.
6. Security Monitor Appointment. The contractor shall appoint a security representative for the on base long term visitor group. The security representative may be a full-time position or an additional duty position. The security representative shall work with the host organization to provide employees with training required by DoDM 5200.01, Information Security Program, AFPD 16-14, Security Enterprise Governance, and AFI 16-1404, Air Force Information Security Program. The contractor shall provide initial and follow-on training to contractor personnel who work in Air Force controlled/restricted areas.
Air Force restricted and controlled areas are explained in AFI 31-101, Integrated Defense.
7. Additional Security Requirements. In accordance with DoDM 5200.01, Information Security Program and AFMAN 16-1404, the contractor shall comply with local communications squadron policy.
8. Freedom of Information Act Program (FOIA). The contractor shall comply with DoD Manual 5400.07_AFMAN33-302, DoD Freedom of Information Act Program, requirements.
9. Reporting Requirements. The contractor shall comply with AFI 71-101, Volume- 1, Criminal Investigations, and Volume-4, Counterintelligence, requirements, as referenced in AFMAN 16-1406, para 2.2.e.
10. Physical Security. Areas controlled by contractor employees shall comply with AFI 31-101
11. Operating Instructions. For controlled areas used exclusively by the contractor, the contractor shall develop an Operating Instruction (OI) for internal circulation control, protection of resources and to regulate entry into Air Force controlled areas during normal, simulated and actual emergency operations.
The OI shall be written in accordance with AFI 31-101, and coordinated through the Information Protection (IP) office.
12. Lock Combinations. The contractor shall comply with DoDM 5200.01, Vol 3 security requirements for changing combinations to storage containers used to maintain classified materials.
(END OF PERFORMANCE WORK STATEMENT)
File details come from the government source that posted it. Updated .