Performance Work Statement.pdf
PDF 268 KB Posted
- Attached to
- Synopsis and Solicitation ProModel Software Technical Consulting Services Federal contract opportunity
- Solicitation number
- W911SD-23-R-0189
About this file
This Performance Work Statement outlines technical consulting services required by the Department of the Army. The contractor shall provide 120 hours of Promodel Software Technical Consulting Services at the Senior SME I level or equivalent to support the Operations Research Center in extending two existing simulations of the Future Vertical Lift program. Services include remote consultations, trainings, demonstrations, and support between January 2022 and September 2022. The contractor must be available via email or teleconference during regular business hours to respond to requests within 24 hours. The contractor shall have expertise in ProModel versions 2016-2018 and the ability to design rapid prototype solutions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911SD-23-R-0189 - Amendment 0001.pdf | ||
| Wage Determinations.pdf | ||
| Performance Requirements Summary.pdf | ||
| W911SD-23-R-0189.pdf | ||
| Performance Assessment Questionnaire.pdf | ||
| 52.212-2 Addendum-ProModel Consulting Services.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 – Performance Work Statement Page 1 of 20
PERFORMANCE WORK STATEMENT (PWS)
ProModel Technical Consulting Services ProModel Professional Services for the Operations Research Center, Department of Systems
Engineering COR: Mr. Dan Evans, Daniel.evans@westpoint.edu
Part I
General Information
1. GENERAL: This is a non-personal services contract to provide Promodel Software Technical Consulting Services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or subcontractor personnel.
1.1. Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Promodel Software Technical Consulting Services, as defined in this Performance Work Statement (PWS), except for those items specified as government furnished property and services. The Contractor shall perform in accordance with (IAW) the terms and conditions of the contract and consistently with the established standards in this PWS and contract.
1.1.1. This Performance Work Statement (PWS) describes the proposed conduct of the ProModel Software Technical Consulting services contract scheduled for 1 December 2021 to 21 September 2022 in support of the Operations Research Center and Department of Systems Engineering.
1.2. Background: The Operations Research Center (ORCEN) seeks to purchase non-personal ProModel technical consulting services as described in Multiple Award Schedule GSA Contract # GS-00F-421GA for 120 hours of SIN 541420 “Technical and Engineering Services, Engineering System Design and Integration Services” at the Senior SME I labor category level, or equivalent expertise and service from a competitor specializing in ProModel. See Multiple Award Schedule at GSA Advantage for further detail, ProModel Corporation Quote, and the attached quote from PMC Simulation Solutions.
The Senior SME I level brings 12 plus years of experience using ProModel simulation software.
ProModel is the sole developer of ProModel software products for which the technical services are necessary. ProModel software is the premiere software in the field of Discrete Event Simulation.
The ORCEN currently maintains 5 Professional licenses for this software (ProModel Simulation Software 2018 version 10.X or later) and uses those licenses to develop computer simulations in support of Department of Army and Defense. Converting to a different simulation software at this point would require weeks of market research to identify an alternative equivalent software, a purchase of new licenses while the ProModel licenses are still valid, and weeks of training and familiarization for the ORCEN analysts.
mailto:Daniel.evans@westpoint.edu
Attachment 1 – Performance Work Statement Page 2 of 20
1.3. Objectives: The basic service objective includes the following:
The contractor shall provide personnel, equipment, and software (ProModel 10 or higher) as necessary to perform ProModel Software Technical Consulting Servies in support of the FVL simulations. The contractor shall provide the consultations via phone, email, or video teleconference. The contractor shall be available for remote meetings during regular business hours, Monday through Friday, except federal holidays. The contractor shall respond to emails or phone calls within 24 hours of the request.
1.4. Scope: In order to provide professional level computer simulations in support of Army’s Future Vertical Lift (FVL) efforts, the ORCEN requires professional consulting services on the ProModel software. The technical consultations will extend two pre-existing, ORCEN developed, simulations in support of the FVL. These have been developed in ProModel version 10.5. The ORCEN analysts are currently trained via a 10-day entry-level course in the basic use of the ProModel software. The benefit from Technical Consulting Services is twofold. It will allow:
• ORCEN analysts to advance from their basic training in the software to an advanced level in a shorter amount of time and deliver quality computer simulations.
• ORCEN analysts to save weeks of development time by conferring with a ProModel simulation subject matter expert when troubleshooting their simulations.
ORCEN will furnish ProModel professional licenses and the IT hardware needed to support the simulation development.
This contract will adhere to all Contract Manpower Reporting Requirements (CMRA).
1.4.1. Consultation deliverables include 1 consultant, at the Senior SME I level or equivalent, in support of the projects that is available for the required number of hours each month and is available via email or phone between the hours of 0800 and 1700 EST. The contractor shall respond to emails or phone calls within 24 hours of the request. A security clearance is not required, however if an in-person consultation is required, then the contractor should be able to pass a basic background check to be admitted through the West Point Visitor’s Center.
1.4.2. Schedule (Total = 120 hours):
• January – Initial meeting to introduce ProModel SME to the current ORCEN simulation efforts (2 hours)
• February/March/April – As necessary consultations and simulation development (75 hours)
• May – Initial demonstration of the FVL simulations (2 hours)
• June/July/August – As necessary consultations to incorporate feedback from the demonstration (40 hours)
• September – Final demonstration of the FVL simulations (1 hour)
1.5. Period of Performance: 1 December 2021 to 21 September 2022 with an option to extend based on project requirements.
1.6. General Information
Attachment 1 – Performance Work Statement Page 3 of 20
1.6.1. Quality Control: Quality Control is the responsibility of the Contractor. The Contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.246-1 Contractor Inspection Requirements).
1.6.1.1. Quality Control Program: The Government is committed to a highly interactive relationship between quality control by the Contractor and quality assurance by the government recipient of services. This relationship shall be achieved through an effective Prevention Based Quality Control Program dedicated to ensuring the best possible products and services to end users.
1.6.1.1.1. The Contractor’s quality program shall demonstrate its prevention-based outlook by meeting the objectives stated in the PWS throughout all areas of performance. The QCP shall be developed to specify the Contractor’s responsibility for management and quality control actions to meet the terms of the contract. The QCP as a minimum shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection;
discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies;
procedures for trend analysis; procedures for collecting and addressing customer feedback/complaints.
1.6.1.1.2. Upon request of the COR, the Contractor shall provide, all reports generated as a result of the Contractor’s quality control efforts via email. This shall include any summary information used to track quality control, including any charts/graphs.
1.6.1.1.3. The Contractor’s QCP shall be incorporated into and become part of this contract after the plan has been accepted by the KO. Proposed changes made after KO acceptance shall be submitted in writing through the COR to the KO for review and acceptance prior to implementing any revision. The Contractor’s QCP shall be maintained throughout the life of the contract and shall include the Contractor’s procedures to routinely evaluate the effectiveness of the plan to ensure the Contractor is meeting the performance standards and requirements of the contract.
1.6.1.2. Contractor Discrepancy Report (CDR): When the Contractor's performance is unsatisfactory, a CDR will be issued. The Contractor shall reply in writing within five (5) work days from the date of receipt of the CDR, giving the reasons for the unsatisfactory performance, corrective action taken, and procedures to preclude recurrence.
1.6.1.3. Quality Assurance: The COR will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the COR must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). When an observation indicates defective performance, the COR will require the Contractor or designated on-site representative to initial the observation to acknowledge the defective performance. The acknowledgement of the observation does not necessarily constitute Contractor concurrence with the observation, only that the Contractor has been made aware of the defective performance.
1.6.2. Property Management System: NA
1.6.3. Recognized Federal Holidays: The Contractor shall not be required to perform services on recognized federal holidays. The recognized federal holidays include:
Attachment 1 – Performance Work Statement Page 4 of 20
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day Washington’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.6.3.1. When a holiday occurs on a Saturday, Federal employees are normally granted the previous Friday as the holiday observance. When a holiday occurs on a Sunday, Federal employees are normally granted the following Monday as the holiday. The contractor shall work on the days the Government is scheduled to work.
1.6.3.2. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor will have the following options:
1.6.3.2.1. Reschedule the work so it is performed the following day unless the following day falls on a weekend.
1.6.3.2.2. Reschedule the work on any day that is mutually satisfactory.
1.6.4. Hours of Operation: The Contractor shall be responsible for providing services, between the hours of 8:00 AM – 5:00 PM EST Monday through Friday, except federal holidays or when the government facility is closed due to local or national emergencies, administrative closings or similar government directed facility closings. (Use the following for all). The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential to successful performance under this contract. No overtime (OT) or compensatory time (CT) is authorized. Contractor personnel shall not exceed a 40 hour work week; flexible work schedule may be considered.
1.6.5. Place of Performance: Remote. Via Teleconference (MS Teams)
1.6.6. Security Requirements: NA
1.6.7. Special Qualifications. The consultant should have significant familiarity with modeling personnel flow within the US Army, depot level maintenance operations, and mobilization activities associated with US Army Reserve and National Guard. The consultant should have significant expertise in Promodel’s suite of software versions 2016-2018, and should be very comfortable designing rapid prototype solutions to complex problems.
1.6.7.1. General:
1.6.7.1.1. The Contractor shall be responsible for ensuring all personnel performing work under this contract possess and maintain current certifications as indicated in PWS [1.6.6.]; security requirements during the execution of this contract.
1.6.7.1.2. Contractor personnel performing work under this contract shall be able to read, write, speak, and understand the English language to effectively carry out all contract requirements.
They shall have a command of both the written and spoken English language to properly clearly, Attachment 1 – Performance Work Statement Page 5 of 20 and effectively communicate in person or via electronic devices (telephone or Email) with co-workers, customers, and the general public.
1.6.7.1.3. Contractor personnel performing work under this contract shall be U.S. citizens unless the provisions of Army Regulation 25-2, Information Assurance have been fully completed and approval has been granted by the Government for the non-U.S. citizen to perform the required support.
1.6.7.1.4. NA
1.6.7.1.5. Access and General Protection/Security Policy and Procedures: (if applicable) All Contractor personnel performing work under this contract shall comply with applicable installation, facility and area commander installation/facility access, local security policies and security procedures provided by the Security Manager Government representative. Contractor personnel shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor personnel shall comply with all personal identity verification requirements as directed by Department of Defense (DoD), HQ Department of Army (DA) or local policies. Sponsoring organizations, activities, and persons will be responsible for monitoring contractor access by submitting a completed and approved DES Form 118 to the Installation All American VCC, detailing the contracted services to be performed, location of services, and duration of the contract. Contractors requesting access for less than one year may receive an AIE visitor card on a case by case basis, or a temporary vehicle pass for 90 days. Contractor cards will be issued for periods of one to three years depending on the terms of their contract. AIE card expirations may be updated to reflect a new contract period by submitting an approved DES Form 118 to the All American VCC. Renewed short term passes must be re-processed at the All American VCC. In addition to the changes otherwise authorized by this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor and subcontractor security matters or processes.
1.6.7.1.5.1. The contractor will comply with HSPD-12 standards.
1.6.7.1.6. Anti-Terrorism Program
1.6.7.1.6.1. The contractor will comply with HSPD-12 standards by completing the AT Level I training.
1.6.7.1.6.1. Anti-Terrorism (AT) Level I Training: Contractor personnel performing work under this contract that require access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after commencing performance under this contract. The Contractor shall submit employee certificates of completion within 30 calendar days after completion of the training. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html.
1.6.7.1.7. NA
1.6.7.1.8. NA
1.6.7.1.9. NA
http://jko.jten.mil/courses/atl1/launch.html
Attachment 1 – Performance Work Statement Page 6 of 20
1.6.7.1.10. NA
1.6.7.1.11. NA
1.6.7.2. Other Qualifications: NA
1.6.8. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The post award conference will also be utilized to ensure contractor understands all HSPD-12 requirements. The KO, COR (and other government personal) will hold a quarterly progress meet with the Contractor to review the Contractor's performance. At these meetings the KO and COR will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.6.9. Contracting Officer Representative (COR): The COR will be identified by separate letter of appointment. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: Assures that the Contractor performs the technical requirements of the contract; performs inspections necessary in connection with contract performance; maintains written and oral communications with the Contractor concerning technical aspects of the contract; issues written interpretations of technical requirements, including government drawings, designs, specifications; monitors Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinates availability of government furnished property, and provides site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.
1.6.10. Key Personnel: Key personnel shall not be added to or removed from the contract without express acknowledgement of the COR. Any changes to the working status of these key personnel shall be transmitted (in writing) to the KO/COR within ten (10) work days of the proposed change. If, for any reason, any of the key personnel becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding 30 work days the contractor shall promptly replace personnel with personnel who possess qualifications equal to or better than that of the original employee. The Contractor shall ensure all key personnel terminated or released from employment under this contract are replaced within ten (10) work days of the termination.
1.6.10.1. The follow are considered key personnel by the Government: The Contractor shall provide a Program Manager (PM) who shall be responsible for the performance of the work under this contract. The name of this person, and an Alternate PM (APM), who shall act for the Contractor when the PM is absent, shall be designated in writing to the KO at the post award conference. The PM or APM shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The PM or APM shall be available between the hours of 8:30 AM to 5:30 PM, Monday through Friday, except federal holidays or when the government facility is closed for administrative reasons.
Attachment 1 – Performance Work Statement Page 7 of 20
1.6.10.2. Qualifications for all Key Personnel: No special requirements.
1.6.11. Contractor Personnel:
1.6.11.1. Identification of Contractor Personnel: All Contractor personnel attending meetings, answering government telephones, and working in other situations where their Contractor status is not obvious to third parties, are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are government officials. The purchase consists only of Federal Information Processing Standard (FIPS) Publication (PUB) 201 compliant products and service components (FAR 4.1302(c).
1.6.11.1.1. All Contractor personnel performing work under this contract shall obtain a Department of Defense (DoD) Common Access Card (CAC) if they do not have one already. The CAC shall be worn at all times, when performing work under this contract, to include attending government meetings and conferences. Unless otherwise specified in the contract, Contractor personnel shall wear the the CAC in a conspicuous place on the front of exterior clothing and above the waist, except when safety or health reasons prohibit such placement or when being used for computer access.
1.6.11.1.2. Contractor personnel shall be required to obtain a CAC at least ten (10) work days prior to start of base contract period or prior to performance under this contract, whichever comes first.
1.6.11.1.3. The Contractor shall develop, maintain, and provide to the COR an updated roster which shall include names and positions of all Contractor personnel as well as indicating which employees were issued CAC or other forms of government identification cards. The Contractor shall submit initial roster to the COR within ten (10) calendar days after commencement of base period of performance.
1.6.11.1.4. The Contractor shall immediately report any lost CAC or government issued identification cards to the COR and Military and/or DoD police agencies. The Contractor shall immediately collect the CAC and other government issued forms of identification upon termination of employee, or at the end of the contract performance period. The CAC and other government issued forms of identification shall be returned to the COR within one (1) hour of employee termination, or at the end of contract performance period, whichever comes first. Final payment may be delayed if Contractor fails to comply with these requirements.
1.6.11.2. Contractor Personnel Appearance and Performance: It is essential that all Contractor personnel meet the highest standards of professionalism and personal integrity. The Contractor shall ensure their personnel do not perform work under the influence of alcohol, illegal prescribed drugs or any other incapacitating agents. Contractor personnel shall be neatly groomed and dressed in business casual attire to present a professional appearance at all times.
1.6.12. Contractor Travel: Contractor shall be required to travel CONUS during the performance of this contract to attend consultations and meetings. The Contractor may be required to travel to Fort Belvoir in support of this contract. Contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR), FAR 31.205-46, and the limitation of funds specified in this contract.
1.6.12.1. NA
Attachment 1 – Performance Work Statement Page 8 of 20
1.6.12.1.1. The Local Travel Log template shall include, at a minimum: Name, duty position, reason for travel, key personnel assisted (name, position, and phone number), significant activities accomplished during visit, follow-up requirements, recommendations/comments and signature block.
1.6.12.1.2. Long Distance Trip Report. Upon completion of long distance travel, a Long Distance Trip Report is required. Trip Reports shall be provided to COR within five (5) work days after travel has been completed. Additionally, all trip reports for the month will be rolled up into the monthly TSR. This report shall be submitted on the approved template and provide a synopsis of accomplishments performed during the travel period. The Contractor shall submit monthly invoices for reimbursement citing the appropriate CLIN. Each individual travel instance must be captured; copies of receipts, travel vouchers, etc. shall be attached to the invoice to support charges. Original receipts shall be maintained by the Contractor and made available to Government auditors upon request.
1.6.12.1.2.1. The long distance trip report template shall include at a minimum: Travelers name, position, reason for travel, mode of travel, duration of travel, destinations, organization visited, key personnel assisted (name, position, and phone number), significant activities accomplished, systems involved, discussion background, follow-up requirements, recommendations/ comments, and signature block.
1.6.13. Other Direct Costs (ODC): NA
1.6.14. Data Rights: The government has unlimited rights to all documents/material produced under this contract to the extent permitted by the data rights clauses. The parties mutually acknowledge their understanding that this is the government’s intent. All documents and materials, to include the source codes of any software, produced under this task order shall be government owned and are the property of the government with all rights and privileges of ownership/copyright belonging exclusively to the government. These documents and materials may not be used or sold by the contractor without written permission from the contracting officer.
All materials supplied to the government shall be the sole property of the government and may not be used for any other purpose. This right does not abrogate any other government rights.
1.6.15. Organizational Conflict of Interest:
1.6.15.1. Purpose. To aid in ensuring that:
1.6.15.1.1. The Contractor does not obtain an unfair competitive advantage by establishing the ground rules for a future competition;
1.6.15.1.2. The Contractor's objectivity and judgment are not biased because of its present or future interests (financial, contractual, organizational, or otherwise) which relate to work performed under this contract; and
1.6.15.1.3. The Contractor does not obtain an unfair competitive advantage by virtue of its access to non-public or proprietary information belonging to others.
1.6.15.2. Definitions.
1.6.15.2.1. The term “Contractor” herein used in section 1.6.16., Organizational Conflict of Interest, means: (a) the organization (hereinafter referred to as "it" or "its") entering into this
Attachment 1 – Performance Work Statement Page 9 of 20 agreement with the Government; (b) all business organizations with which it may merge, join or affiliate now or in the future and in any manner whatsoever, or which hold or may obtain, by purchase or otherwise, direct or indirect control of it; (c) it’s parent organization, if any and any of its present or future subsidiaries, associates, affiliates, or holding companies, and; (d) any organization or enterprise over which it has direct or indirect control now or in the future.
1.6.15.2.2. The term "proprietary information" for purposes of section 1.6.16., Organizational Conflict of Interest, means any information considered so valuable by its owners that it is held secret by them and their licensees. Information furnished voluntarily by the owner without limitations on its use, or which is available without restrictions from other sources, is not considered proprietary.
1.6.15.3. Organizational Conflicts of Interest Examples. The following examples illustrate situations in which organizational conflicts of interest may arise. These examples are not all inclusive.
1.6.15.3.1. Biased Ground Rules. This type of conflict may arise in situations where a company sets the ground rules for a future competition. For example, when a Contractor develops requirements then competes to provide products or services to satisfy those requirements, thus obtaining a competitive advantage.
1.6.15.3.2. Impaired Objectivity. This type of conflict may exist where a Contractor’s obligations under a contract require objectivity, but another role of the Contractor casts doubt on its ability to be truly objective. An example of this type of conflict is where a Contractor’s work under one contract entails evaluating itself, its affiliates, or its competitors under a separate contract.
1.6.15.3.3. Unequal Access to Information. This type of conflict may arise when a Contractor has access to nonpublic or proprietary information as part of its performance under a contract that gives it an unfair advantage in a competition for a later contract.
1.6.15.4. General Constraints. The provisions of FAR Subpart 9.5, Organizational and Consultant Conflicts of Interest, concerning organizational conflicts of interest govern this contract. Potential conflicts may exist in accordance with FAR 9.505-1, Providing Systems Engineering and Technical Direction, through 9.505-4, Obtaining Access to Proprietary Information. In this regard, the Contractor is responsible for identifying any actual or potential organizational conflicts of interest to the KO that arise as the result of performance under this contract. To avoid or mitigate a potential conflict related to performance under this contract, the KO will impose appropriate constraints such as the constraints discussed below. Since it is impossible to foresee all of the circumstances that might give rise to organizational conflicts of interest, the constraints discussed below are not all inclusive and the KO may impose constraints other than, or in addition to, the constraints listed below.
1.6.15.4.1. The Contractor agrees that if it provides, under a contract or task order or delivery order, systems engineering and technical guidance for systems and programs, but does not have overall contractual responsibility, it will not be allowed to be awarded a contract or task or delivery order to supply the system or any of its major components or be a subcontractor or consultant to a supplier of the system or any of its major components (FAR 9.505-1).
1.6.15.4.2. The Contractor agrees that if it prepares complete specifications for non-developmental items or assists in the preparation of work statements for a system or services
Attachment 1 – Performance Work Statement Page 10 of 20 under a contract or task order or delivery order, it will not be allowed to furnish these items, either as a prime Contractor, a subcontractor or as a consultant (FAR 9.505-2).
1.6.15.4.3. The Contractor agrees that it will neither evaluate nor advise the Government with regard to its own products or activities. The Contractor will objectively evaluate or advise the Government concerning products or activities of any prospective competitors (FAR 9.505-3).
1.6.15.4.4. The Contractor agrees that if it gains access to proprietary information of other companies, it will exercise diligent effort to protect such proprietary information from unauthorized use or disclosure (FAR 9.505-4). In addition, the Contractor agrees to protect the proprietary information of other organizations disclosed to the Contractor during performance of this contract with the same caution that a reasonably prudent Contractor would use to safeguard highly valuable property. The Contractor also agrees that if it gains access to the proprietary information of other companies it will enter into written agreements with the other companies to protect their information from unauthorized use or disclosure for as long as it remains proprietary and to refrain from using the information for any purpose other than that for which it was furnished. The Contractor shall provide copies of such agreements to the KO.
1.6.15.4.5. If the Contractor, in the performance of this contract, obtains access to plans, policies, reports, studies, financial plans, data or other information of any nature which has not been released or otherwise made available to the public, the Contractor agrees that without prior written approval of the KO, it shall not: (a) use such information for any private purpose unless the information has been released or otherwise made available to the public, or (b) release such information unless release is otherwise authorized under the contract or such information has previously been released or otherwise made available to the public by the Government.
1.6.15.5. Non-Disclosure Agreements. The Contractor shall obtain from each employee who has access to proprietary information under this contract, a written agreement which shall in substance provide that such employee shall not, during his/her employment by the Contractor or thereafter, disclose to others or use for their benefit, proprietary information received in connection with the work under this contract. The Contractor will educate its employees regarding the restrictions imposed by FAR 9.505-4, so that they will not use or disclose proprietary information or data generated or acquired in the performance of this contract, except as provided herein.
1.6.15.6. Training. The Contractor shall effectively educate its employees, through formal training, company policy, information directives and procedures, in an awareness of the legal provisions of FAR Subpart 9.5 and its underlying policy and principles, so that each employee will know and understand the provisions of that Subpart and the absolute necessity of safeguarding information from anyone other than the Contractor's employees who have a need to know, and the U.S. Government.
1.6.15.7. Subcontracts. The Contractor agrees that it will include the provisions in paragraphs 1.6.15.4., 1.6.15.5., and 1.6.15.6., above and this paragraph in consulting agreements, teaming agreements, and subcontracts of all tiers, which involve access to information or the performance of services described in paragraph 1.6.15.4., above. The use of section 1.6.15., in such agreements, shall be read by substituting the word "consultant" or "subcontractor" for the word "Contractor" whenever the latter appears.
1.6.15.8. Additional Constraints. NA
Attachment 1 – Performance Work Statement Page 11 of 20
1.6.15.9. Conflicts Involving Future Procurements. The award of this contract, government taskings or acquiescence in the Contractor’s performance of services hereunder shall not constitute or be interpreted as a determination that the Contractor is eligible to participate in future procurements, developmental efforts, implementation efforts, or related activities. Only the KOs for such efforts, applying the rules, principles, and procedures of FAR Subpart 9.5, have the authority to determine whether a conflict exists, in connection with such procurements.
1.6.15.10. Representations and Disclosures.
1.6.15.10.1. The Contractor represents that it has disclosed to the KO, prior to award of this contract, all facts relevant to the existence or potential existence of organizational conflict of interest as that term is used in FAR Subpart 9.5.
1.6.15.10.2. The Contractor represents that if it discovers an organizational conflict of interest or potential conflict of interest after award of this contract, a prompt and full disclosure shall be made in writing to the KO. This disclosure shall include a description of the action the Contractor has taken or proposes to take in order to avoid or mitigate such conflict.
1.6.15.11. Remedies and Waiver.
1.6.15.11.1. For breach of any of the above restrictions or for non-disclosure or misrepresentation of any relevant facts required to be disclosed concerning this contract, the Government may terminate this contract for default, disqualify the contractor for subsequent related contractual efforts, and pursue such other remedies as may be permitted by law or this contract. If, however, in compliance with section 1.6.16., the Contractor discovers and promptly reports an organizational conflict of interest (or the potential thereof) subsequent to contract award, the KO may terminate this contract for convenience, if such termination is deemed to be in the best interest of the Government.
1.6.15.11.2. The parties recognize that this clause has potential effects, which will survive the performance of this contract, and that it is impossible to foresee each circumstance to which it might be applied in the future. Accordingly, the Contractor may at any time seek a waiver from the cognizant KO by submitting a full written description of the requested waiver and the reasons in support thereof (FAR 9.503).
1.6.16. Phase-In/Phase-Out Periods: NA
1.6.16.1. Phase-In: To minimize any decreases in productivity and to prevent possible negative impact on additional services, the Contractor shall have the consultant on board, during the month July phase-in period. During the phase-in period, the Contractor shall become familiar with performance requirements, in order to commence full performance of services on the start of the base period of performance.
1.6.16.2. Phase-Out: NA
1.6.16.2.1. NA
1.6.16.2.2. Phase-Out Plan. NA
Attachment 1 – Performance Work Statement Page 12 of 20
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and/or terminate contracts, and to make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.
Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor, as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. CONTRACTOR PERSONNEL. Contractor and subcontractor employees performing working under this contract.
2.1.5. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement (PWS).
2.1.6. DELIVERABLE. Anything that can be physically delivered, but may include non-physical things, such as meeting minutes or reports.
2.1.7. FACILITY CLEARANCE. A facility clearance (FCL) is an administrative determination that, from a national security standpoint, a facility is eligible for access to classified information at the same or lower classification category as the clearance being granted. The FCL may be granted at the Confidential, Secret, or Top Secret level. The FCL includes the execution of a Department of Defense Security Agreement (DD Form 441). Under the terms of the agreement, the Government agrees to issue the FCL and inform the Contractor as to the security classification of information to which the Contractor will have access. The Contractor, in turn, agrees to abide by the security requirements set forth in the National Industrial Security Program Operating Manual, commonly referred to as the NISPOM.
2.1.8. GOVERNMENT-FURNISHED PROPERTY (GFP) OR GOVERNMENT PROPERTY
(GP). in the possession of or directly acquired by the Government and subsequently made available to the Contractor.
2.1.9. KEY PERSONNEL. Contractor employees who are critical for achieving PWS objectives.
Key personnel shall meet position qualification and experience requirements indicated in the PWS. When key personnel qualifications are used as an evaluation factor in “Best Value” procurement, the Contracting Officer is the only one authorized to concur with key personnel replacement after award of the contract. When proposed key personnel resumes are used as an evaluation factor in best value procurement, a letter of commitment may be required from the individual whose resume is provided.
Attachment 1 – Performance Work Statement Page 13 of 20
2.1.10. LOCAL TRAVEL: Any travel that is required to perform services IAW the PWS that is within a 50-mile radius of the place of performance.
2.1.11.
2.1.12. PERFORMANCE PREQUIREMENT SUMMARY (PRS). A listing of the service outputs under the contract that are to be evaluated by the COR on a regular basis, the surveillance methods to be used for these outputs, and the performance requirement of the listed outputs.
2.1.13. PHYSICAL SECURITY. Actions that prevent the loss or damage of government property.
2.1.14. PROPERTY ADMINISTRATOR (PA). The authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to government property in the possession of a Contractor.
2.1.15. PROPERTY MANAGEMENT SYSTEM. System established by the Contractor that is used to manage GFP/GFE in its possession to control, use, preserve, protect, repair, and maintain.
2.1.16. QUALITY ASSURANCE. A planned and systematic pattern of all actions necessary to provide confidence that adequate technical requirements are established; products and services conform to established technical requirements; and satisfactory performance is achieved. For the purposes of this document, quality assurance refers to actions by the Government.
2.1.17. QUALITY ASSURANCE SURVEILLAND PLAN (QASP). The Government’s organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
2.1.18. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.19. SUBCONTRACTOR. One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
2.1.20. WORK DAY. The length of time during a day in which the Contractor provides services, in accordance with the contract. Also referred to as Business Day.
2.1.21. WORK WEEK. Monday through Friday, unless otherwise specified.
2.2. ACRONYMS:
AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CMDF Controlled Material Destruction Facility CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTS Commercial-Off-the-Shelf
Attachment 1 – Performance Work Statement Page 14 of 20
DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Form 254 DD1466 Building Pass DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase-In/Phase- Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Plan TE Technical Exhibit
Attachment 1 – Performance Work Statement Page 15 of 20
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: The Government will provide ProModel professional licenses for the ORCEN analysts.
3.2. Facilities: The Government will provide the Contractor PM with office space at Mahan Hall, Operations Research Center, if necessary.
3.3. Utilities: NA
3.4. Equipment: The government will provide the IT hardware needed to support the simulation development.
3.5. Materials: NA
Attachment 1 – Performance Work Statement Page 16 of 20
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Part 3 of this PWS. The contractor should have access to their own ProModel license.
4.2. Secret Facility Clearance: NA
4.3. Materials: NA
4.4. Equipment: NA
Attachment 1 – Performance Work Statement Page 17 of 20
PART 5
SPECIFIC TASKS
5. Specific Tasks:
5.1. Basic Services. The Contractor shall provide services Promodel Software Technical Consulting Services at an SME 1 level or higher, as defined in this Performance Work Statement (PWS), except for those items specified as government furnished property and services.
5.1.1. The Contractor shall perform in accordance with (IAW) the terms and conditions of the contract and consistently with the established standards in this PWS and contract. Work is performed in support of ORCEN research project. All model development milestones are met.
5.1.2 Contractor is responsive to consultation requests throughout the contract period.
5.1.3 Periodic Inspection by the COR and Customer Feedback from the ORCEN analyst that this effort is supporting.
5.1.4 Failure to meet this requirement will be recorded and will be considered in future contracts.
5.2. Contractor shall provide consultant hours in support of these projects that specifically provides expertise in the ProModel Simulation Software version 10.X or higher.
5.3. Contractor Manpower Reporting: The contractor will report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Department of the Army via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:
http://www.ecmra.mil, and then click on “Department of the Army CMRA” or the icon of the DoD organization that is receiving or benefitting from the contracted services.
Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s CMR website at http://www.ecmra.mil. The required data fields include:
(1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative;
(2) Contract number, including task and delivery order number;
(3) Beginning and ending dates covered by reporting period;
(4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data;
(5) Estimated direct labor hours (including sub-contractors);
(6) Estimated direct labor dollars paid this reporting period (including sub- contractors);
(7) Total payments (including sub-contractors);
(8) Predominant Product Service Code (PSC)/Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant PSC/FSC for each sub-contractor if different);
(9) Estimated data collection cost;
http://www.ecmra.mil/ http://www.ecmra.mil/
Attachment 1 – Performance Work Statement Page 18 of 20
(10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information);
(11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);
(12) Presence of deployment or contingency contract language; and
(13) Number of contractor, and sub-contractor employees deployed in theater this reporting period (by country).
As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement.
Attachment 1 – Performance Work Statement Page 19 of 20
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS): NA
Attachment 1 – Performance Work Statement Page 20 of 20
PART 7
TECHNICAL EXHIBIT LISTING
NA
7. Technical Exhibit List:
7.1. Technical Exhibits:
Technical Exhibit 1 Performance Requirements Summary Technical Exhibit 2 Quotes and Estimates Technical Exhibit 3 QASP Technical Exhibit 4 SCAF
| 2. DEFINITIONS AND ACRONYMS: |
| 3. GOVERNMENT FURNISHED ITEMS AND SERVICES: |
| 4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES: |
| 6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS): NA |
| 7. Technical Exhibit List: |
File details come from the government source that posted it. Updated .