This is a Request for Proposals (RFP) issued by the City of Decatur, Georgia, for the installation of pedestrian signal equipment at two intersections: West Howard Avenue at Commerce Drive and West Howard Avenue at Paden Circle. The project involves furnishing all materials, labor, and equipment necessary to install pedestrian crossing signals at these currently signalized intersections. Work includes installing 4-foot aluminum poles with concrete foundations, pedestrian signal heads with countdown displays, pushbutton assemblies, conduit installation, wiring (7-conductor and 3-pair cable), load switches, and configuration of new pedestrian phases. At Intersection #1, the scope includes 4 pedestrian signal housings, 4 signal inserts with countdown, 1 corner adaptor, 4 poles, 700 linear feet of 7-conductor cable, 750 linear feet of 3-pair cable, 1 load switch, 4 side-of-pole mounts, 6 bulldog buttons with frames and instruction signs, 1 concrete class A foundation, 1 DC isolator, and installation work. At Intersection #2, the scope includes 6 pedestrian signal housings, 6 signal inserts with countdown, 1 corner adaptor, 1 pole, 1,000 linear feet each of 7-conductor and 3-pair cable, 1 load switch, 6 side-of-pole mounts, 6 bulldog buttons with frames and instruction signs, 1 concrete foundation, and installation, plus rework of traffic signal heads. A mandatory pre-bid conference is scheduled for November 24, 2025, at 2:00 PM at the City of Decatur Public Works facility located at 2635 Talley Street, Decatur, Georgia. Written questions must be submitted by November 26, 2025, at 12:00 PM noon. Proposals are due on December 10, 2025, at 11:00 AM, with an anticipated award date of December 15, 2025. The contractor must commence work within ten calendar days of receiving the Notice to Proceed and complete all work within 60 calendar days thereafter.

Pricing is submitted on a unit price basis, with bidders providing separate cost proposals for each intersection. Bid security is not required. The contractor must provide three references of similar-sized projects, a list of proposed subcontractors, a non-collusion affidavit, and Federal Work Authorization Program forms for the prime bidder and all listed subcontractors. All work shall comply with Georgia Department of Transportation Standard Specifications for Construction of Transportation Systems, current edition. The contractor is responsible for utility location notification, traffic control, protection of existing infrastructure, and coordination with DeKalb County. Construction work is permitted Monday through Friday from 7:00 AM to 6:00 PM and Saturday from 9:00 AM to 5:00 PM only. The successful contractor must provide a Faithful Performance Bond and Labor and Material Bond, each in an amount equal to 100 percent of the total contract amount, along with comprehensive general liability insurance of $1,000,000 per occurrence, automobile liability of $1,000,000, and an umbrella policy of $1,000,000 or the contract value, whichever is greater. Monthly progress payments will be made less 5 percent retainage, with final payment due within thirty days of completion and acceptance. The contractor warrants all work for twelve months from the date of substantial completion and is liable for liquidated damages of $100 per calendar day for failure to complete work within the 60-day deadline. The contract documents are available online at no charge at www.decaturga.com/rfps.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST

FOR

PROPOSALS

PEDESTRIAN SIGNAL INSTALLATIONS AT TWO INTERSECTIONS FOR THE CITY OF

DECATUR

Locations:

1) WEST HOWARD AVENUE AT COMMERCE DRIVE

2) WEST HOWARD AVENUE AT PADEN CIRCLE

BIDS DUE: No later than Wednesday, December 10, 2025 at 11:00 AM

Questions should be directed in writing to David Junger, Deputy City Manager, via e‐mail to:

David.junger@decaturga.com

Submit Proposals to:

City Manager’s Office

2nd Floor City Hall

509 North McDonough Street P.O. Box 220 Decatur, Georgia 30031

November 14, 2025 mailto:David.junger@decaturga.com

TABLE OF CONTENTS

SECTION 1: NOTICE TO BIDDERS

SECTION 2: INSTRUCTION TO BIDDER

SECTION 3: COST SUBMISSION

SECTION 4: SCOPE OF PROJECT/SPECIFICATION

SECTION 5: SAMPLE CONTRACT AGREEMENT

SECTION 6: TERMS AND CONDITIONS

SECTION 7: LOCATION MAP

APPENDIX A – STANDARD FORMS & DETAILS

REFERENCES

LIST OF SUBBIDDERS

NON-COLLUSION AFFIDAVIT

FEDERAL WORK AUTHORIZATION PROGRAM

CITY CONSTRUCTION STANDARDS AND DETAILS

APPENDIX B - CONSTRUCTION PLANS

SECTION 1 : NOTICE TO BIDDERS

The City of Decatur will receive sealed proposals for the installation of pedestrian crossing signal equipment at two intersections until 11:00 AM on Wednesday, December 10, 2025. The intersections are currently signalized and this project seeks to add additional signalized pedestrian crossings at the two intersections. All concrete and striping work is being performed under another contract. Signal timing will be performed by others.

Prior to beginning construction, the successful bidder will file with the City the required Agreement, Certificate of Insurance and other applicable documents as outlined in the Section 6: Terms and Conditions.

The City reserves the right to reject any and all proposals and to waive informalities in bidding.

Proposals are to be submitted on a proper form furnished by the City sealed, dated and enclosed in an envelope appropriately marked on the outside "Pedestrian Signal Equipment Installation”, marked with the name of the bidder and date and hour of opening. The proposal shall be mailed or delivered to reach the designated office on or before Wednesday, December 10, 2025, 11:00 AM at which time they will be publicly opened and read aloud.

The following documents, at a minimum, are required to be submitted as part of the Bidder’s proposal package:

• Instructions to Bidders, completed with data required,

• Bid Proposal form completed and executed,

• References,

• List of Proposed SubBidders,

• Non-Collusion Affidavit of Prime Bidder,

• Federal Work Authorization Program forms for Prime Bidder and all listed SubBidders, &

• Terms and Condition requirements.

Proposals Bids may be held by the City of Decatur for a period not-to-exceed sixty (60) days from the date of the opening of bids for the purpose of reviewing the bid and investigating the qualifications of bidder, prior to awarding of the contract.

A mandatory pre-bid conference is scheduled for Monday, November 24, 2025 at 2:00pm.

This mandatory meeting will be held at the City of Decatur Public Works facility located at 2635 Talley Street, Decatur, GA, 30030 and a site visit will take place as part of the meeting. Any questions regarding bids and/or misunderstandings that may arise from this proposal should be submitted, in writing, and should be directed to David Junger, Deputy City Manager, at 404-370- 4102 or at david.junger@decaturga.com, no later than 12:00 noon on Wednesday, November 26, 2025.

The Contract Documents are available on-line at no charge at www.decaturga.com/rfps.

http://www.decaturga.com/rfps

SCHEDULE OF EVENTS DATE

Bid Opportunity Date................................................................November 14, 2025

Mandatory Pre-Bid Meeting………………………………………………..November 24, 2025 (2:00 PM)

Deadline for Receipt of Written Questions ...............................November 26, 2025 (12:00 PM)

Deadline for Written Answers to City’s Website…………………...November 26, 2025 (5:00 PM)

Proposal Due……………...............................................................December 10, 2025 (11:00 AM)

Anticipated Award Date .............................................................December 15, 2025

SECTION 2 : INSTRUCTION TO BIDDERS

A. EXAMINATION OF SITE AND CONTRACT DOCUMENTS

i. Bidders shall inform themselves of all conditions under which the work is to be performed, concerning the site of the work, the structure of the ground, the obstacles which may be encountered, whether shown in the Scope of Project/Specification or not, and all other relevant matters concerning the work to be performed.

A Bidder to whom a contract is awarded will not be allowed any extra compensation by reason of any such matters or things concerning which the Bidder was not informed of prior to bidding. The successful Bidder must employ, as far as possible, such methods and means in the carrying out of this work as will not cause any interruption or interference with any other Bidders.

ii. Bidders must satisfy themselves by personal examination of the locations of the proposed work and by such other means as they may prefer locations of the proposed work and by such other means as they may prefer as to the correctness of any quantities listed in the proposal, and shall not, after submission of their proposal, dispute or complaint of such estimate nor assert that there was any misunderstanding in regard to the nature or amount of work to be done.

iii. Before submitting a proposal, each Bidder shall carefully examine all Exhibits and Addenda thereto, all of which contain provisions applicable to the successful bidder and the bidding team.

iv. Each bidder is expected to base the proposal bid on materials and equipment complying fully with the Scope of the Project and Specifications, and in the event materials or equipment which do not conform are proposed, the bidder will be responsible for furnishing materials and equipment which fully conform at no additional change to the proposal bid.

Bidder hereby certifies that , a (Name) duly qualified representative of (Firm Name) inspected all job locations on (Fill in Dates)

B. INTERPRETATION OF CONTRACT DOCUMENTS

Bidders should carefully review this document in its entirety including all instructions, requirements, specifications, and terms/conditions and promptly notify the City, in writing or via e‐mail of any ambiguity, inconsistency, unduly restrictive specifications, or error which may be discovered upon examination of this bid opportunity.

The City of Decatur may revise this RFP by issuing an addendum prior to its opening. The addendum will be posted on the City’s website alongside the posting of the R F P at http://www.decaturga.com/rfps. Addenda will become part of the bid documents and subsequent contract. Bidders must sign and return any addendum with their proposal response. Failure to propose in accordance with an addendum may be cause for rejection. In unusual circumstances, the City of Decatur may postpone an opening in order to notify vendors and to give Bidders sufficient time to respond to the addendum.

Bidders with questions or requiring clarification or interpretation of any section within this RFP must address these questions in writing via e‐mail to the City referenced above on or before November 26, 2025. Each question must provide clear reference to the section, page, and item in question. Questions received after the deadline may not be considered.

The City of Decatur will provide responses by November 26, 2025 at 5 PM. The City of Decatur’s response will be by formal written addendum. Any other form of interpretation, correction, or change to this RFP will not be binding upon the City of Decatur. Any formal written addendum will be posted on the City’s website alongside the posting of the ITB at http://www.decaturga.com/rfps by the close of business on the date listed. Bidders must sign, scan and return any addendum with their response.

C. APPROXIMATE QUANTITIES

On all items on which bids are to be received on a unit price basis the quantities stated in the Proposal will not be used in establishing final payment due the Bidder. The quantities stated on which unit prices are so invited, are approximate only, and each bidder shall make their own estimate from the Contract Specifications of the quantities required on each item and calculate the unit price bid for each item accordingly. Bids will be compared on the basis of number of units stated in the Bidding Schedule set forth in the Proposal.

Payment on the contract on unit price items will be based on the actual number of units installed upon completion of the project.

D. SIGNING OF PROPOSALS

If the bidder is a corporation, the legal name of the corporation shall be set forth together with the signature of the officer or officers authorized to sign contracts on behalf of the corporation; if a bidder is a co-partnership, the true name of the firm shall be set forth together with the signatures of all the partners; and if bidder is an individual, his (her) signature shall be inscribed. If signature is by agent, other than an officer of a corporation or a member of a partnership, a power of attorney must be on file with the Owner prior to opening bids or submitting bids; otherwise, the bid may be disregarded as irregular and unauthorized.

E. BID SECURITY

No bid security is required.

F. QUALIFICATION OF BIDDERS

It is the intention of the City to award a contract only to a bidder who furnishes satisfactory evidence of requisite experience and ability along with sufficient capital, facilities and plant access to work successfully and promptly, and to complete the work within the required time stated in the contract documents.

Bidder shall provide a list of the last three (3) clients/projects of the same general size and scope that is proposed in this b i d o p p o r t u n i t y . The City reserves the right to use any information or additional references deemed necessary to establish the ability of the Bidder to perform the conditions of the contract. Note that the reputation of the Bidder regarding adequacy of their past skillful performance of work of this type and magnitude required herein, shall be considered when making the award of contract and lack thereof is grounds for bid rejection. (See Appendix A)

G. DISQUALIFICATION OF BIDDERS

More than one proposal for the work described in this document, to be included under a Contract, from an individual, firm or partnership, a corporation or an association under the same or different names, will not be considered. Reasonable grounds for believing that any bidder is interested in more than one proposal for the work contemplated will cause the rejection of all proposals in which such bidder is interested. If there are reasonable grounds for believing that collusion exists among the bidders, the proposals of the bidders in such collusion will not be considered.

H. AGREEMENT, BONDS, INSURANCE

The attention of bidders is specifically directed to the forms of agreement, and types of insurance to be taken out in the event a contract award is made.

I. FAILURE TO EXECUTE AGREEMENT AND FILE REQUIRED BONDS AND INSURANCE

Failure of the successful bidder to execute the agreement and file required bonds and insurance within the required time shall be just cause for the annulment of the award. On failure of the successful bidder to execute the agreement and file the required bonds and insurance within the required time, the contract award is forfeited and the bid security as agreed will be assessed as liquidated damages. The bidder, by filing a proposal agrees to this proviso. Upon annulment of an award as aforesaid, the City may then award a contract to the next lowest qualified bidder.

SECTION 3 : COST SUBMISSION

STATE OF GEORGIA,

COUNTY OF DeKALB

PROPOSAL OF:

TO THE CITY MANAGER OF THE CITY OF DECATUR, GEORGIA:

The undersigned, as bidder, hereby submits this bid for:

Pedestrian Signal Equipment Installation

The Bidder has carefully examined and fully understands the Contract, Specifications, and other documents hereto attached, has made a personal examination of the Site of the proposed Work, is satisfied as to the actual conditions and requirements of the Work, and hereby proposes and agrees that if the bid is accepted, the bidder will contract with the City of Decatur in full conformance with the Contract Documents.

Unless otherwise directed, all work performed shall be in accordance with the Georgia Department of Transportation Standard Specifications Construction of Transportation Systems, current edition.

It is the intent of this Bid to include all items of construction and all Work indicated called for in the Specifications, or otherwise a part of the Contract Documents.

In accordance with the foregoing, the undersigned proposes to furnish and construct the items listed in the attached Bid schedule for the unit prices stated.

The Bidder agrees that payment shall be made upon actual quantities used and at the unit price set forth herein. The Bidder agrees that the cost of any work performed, materials furnished, services provided or expenses incurred, which are not specifically delineated in the Contract Documents but which are incidental to the scope, intent, and completion of the Contract, shall be deemed to have been included in the prices bid for the various items scheduled.

No Bidder may withdraw his Bid within sixty (60) days after the actual date of the opening of thereof. Bids may be held by the City for a period not to exceed sixty (60) days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of the Bidders prior to awarding the contract.

The Bidder further proposes and agrees hereby to promptly commence the Work with adequate forces and equipment within ten (10) calendar days from receipt of Notice to Proceed and to complete all Work within 60 calendar days thereafter.

If awarded a Contract under the Proposal, the undersigned proposes to complete work within 60 days of the notice to proceed.

Attached hereto is a bid bond made by

BID BOND NOT REQUIRED

N

, a surety company qualified to do business in Georgia, payable to the City of Decatur, Georgia (or certified check) in the amount of five percent (5%) of the above bid; to wit

If this bid shall be accepted by the City of Decatur and the undersigned shall fail to execute a satisfactory contract in the form of said proposed Contract, and give satisfactory Performance and Payment Bonds, or furnish satisfactory proof of carriage of the insurance required within ten (10) days from the date of Notice of Award of the Contract, then the City of Decatur may, at its option, determine that the undersigned abandoned the Contract and there upon this bid shall be null and void, and the sum stipulated in the attached Bid Bond shall be forfeited to the City of Decatur as liquidated damages.

Bidder further declares that the full name and residence address of all persons and parties interested in the foregoing bid as principals are as follows:

Bidder has carefully examined the Bidding Documents entitled:

Pedestrian Signal Equipment Installation Bid Due Date: December 10, 2025

Acknowledges receipt of the following addenda numbers and dates, if any:

And has examined the premises and conditions affecting the Work, the undersigned proposes to furnish all services, labor and materials called for by them for the Base Bid Work in accordance with said documents, for the sum of:

Page | 11

Intersection #1 West Howard Avenue at Commerce Drive

_______________________________________________________________________DOLLARS (Words)

($_____________________________________________________________________) (Numbers)

Intersection #2 West Howard Avenue at Paden Circle

_______________________________________________________________________DOLLARS (Words)

($_____________________________________________________________________) (Numbers)

Signed, sealed and dated this_ day of _ , 2025

By Signature Title

Intersection #1 West Howard Avenue at Commerce Drive

Description of Services:

- Install 4' pole with concrete foundation for pushbutton assembly on both NW and SW corners and install conduit to nearby strain poles

- Install 4' pole with concrete foundation for push button assembly on both NE and SE corners and install conduit to nearby strain poles

- Install 2 EA yellow finish ped signals with countdown for crossing W Howard Ave on western approach

- Install 2 EA yellow finish ped signals with countdown for crossing W Howard Ave on eastern approach

- Install 6 EA ped buttons with instruction signs (replace buttons for existing approach crossing Commerce Drive)

- Install new 7C/ 3 pair wiring from traffic cabinet to 4 approaches and route wiring to new signals/ buttons

- Configure new pedestrian phase

Item QTY Unit Price Subtotal

Ped signal housing, yellow 4.00 $________ EA $___________ ped signal inserts with countdown 4.00 $________ EA $___________ corner adaptor for ped button, yellow 1.00 $________ EA $___________

4' alum pole with square base, anchor bolts 4.00 $________ EA $___________

3 pair 750.00 $________ LF $___________

7C 700.00 $________ LF $___________

load switch 1.00 $________ EA $___________

Page | 12

Item QTY Unit Price Subtotal ped signal side of pole mount, yellow 4.00 $_______ EA $____________ __ ped bulldog button with frame and instruction sign, yellow

6.00 $_______ EA $____________

Concrete class A for ped pole foundation 1.00 $_______ EA $____________ ped dc isolator 1.00 $_______ EA $____________

Installation 1.00 $_______ LS $____________

Subtotal:

*0% Tax: $0.00

Intersection #2 West Howard Avenue at Paden Circle

Description of Services:

- Install 4' pole with concrete foundation for push button assembly on NE corner and install conduit to nearby strain pole

- Remove ped signal heads for crossing Paden Circle as they are too high and are faded

- Install 6 EA yellow finish ped signals with countdown for crossing Paden Circle and both legs of W Howard Ave

- Install 6 EA ped buttons with instruction signs

- Install new 7C/ 3 pair wiring from traffic cabinet to 4 approaches and route wiring to new signals/ buttons

- Configure new pedestrian phase as exclusive ped to cross W Howard Ave

Item QTY Price Subtotal

Ped signal housing, yellow 6.00 $_________EA $_________ ped signal inserts with countdown 6.00 $_________EA $_________ corner adaptor for ped button, yellow 1.00 $_________EA $_________

4' alum pole with square base, anchor bolts 1.00 $_________EA $_________

3 pair 1,000.00 $_________LF $_________

7C 1,000.00 $_________LF $_________

load switch 1.00 $_________EA $_________ ped signal side of pole mount, yellow 6.00 $_________EA $_________ ped bulldog button with frame and instruction sign, yellow

6.00 $_________EA $_________

Concrete class A for ped pole foundation 1.00 $_________EA $_________

Installation 1.00 $_________LS $_________

Subtotal: $__________ $

Page | 13

Rework traffic signal heads $__________LS

Description of Services:

Adjust Eastbound signal heads/ street name signs appropriate for new configuration with bike lane

*0% Tax: $0.00

Intersection #1 + #2 TOTAL: $____________

NOTE: Unit Abbreviations in each proposal section stand for the following:

EA - Each LF – Linear Feet LS – Lump Sum

Page | 14

SECTION 4 : SCOPE OF PROJECT/SPECIFICATION

1. APPLICABLE SPECIFICATIONS

All work shall be done in accordance with the Georgia Department of Transportation Standard Specifications Construction of Transportation Systems, current edition and these contract documents, that shall govern this project, as they may be applicable, except as stipulated otherwise in these contract documents, or as amended herein and which are part of this contract and shall have the same force and effect as if fully recited herein. The following sections of the Georgia Department of Transportation Standard Specifications for Construction of Transportation Systems are hereby amended:

1. Section 101.14 Commissioner. Commissioner shall mean the City of Decatur, Georgia.

2. Section 101.22 Department. Department shall mean the City of Decatur, Georgia.

3. Section 101.24 Engineer. Engineer shall mean the City Manager of the City of Decatur, acting directly or through a duly authorized representative.

4. Section 101.31 Holidays. Holidays shall mean those holidays designated by the City of Decatur, Georgia.

5. Section 101.62 State Highway Engineer. State Highway Engineer shall mean the City Manager of the City of Decatur, acting directly or through a duly authorized representative.

2. DESCRIPTION

The City of Decatur is accepting bids for the furnishing of all materials, labor, and equipment for the completion of the installation of pedestrian signals at the intersections of West Howard Avenue at Commerce Drive and West Howard Avenue at Paden Circle within the City of Decatur.

This project shall include traffic control, concrete, signing and pavement markings, signal installation, erosion control, and other items that may be related to the project work.

DeKalb County coordination shall be conducted by the contractor for this work. The coordination effort shall be included in the overall bid proposal for the project.

3. GENERAL NOTES

i. It shall be the contractor’s responsibility to notify any and all utility companies for marking and location of any facilities which may be in conflict.

ii. City of Decatur will not be responsible for any delay caused by the failure of any utility companies to respond in a timely manner. No claims will be considered for extra compensation.

Page | 15

iii. Any items, which must be removed and disposed of during construction and are not specially called for on the plans, shall be removed and disposed of properly and in a timely manner. The cost shall be included in other unit prices bid. No claims will be considered for extra compensation.

iv. The quantities provided are approximate quantities and are subject to be used as directed by the engineer. Actual quantities used in the field are dictated by the field conditions. The final quantities used will be measured and paid for based on the actual quantities in place and the unit prices bid. No claims will be considered for extra compensation.

v. City of Decatur reserves the right to reject any unreasonable unit prices bid which are considered out of the norm.

4. LOCATION

The project is located at the intersection of West Howard Avenue at Commerce Drive and West Howard Avenue at Paden Circle. See Appendix B for location map along with the construction plan documents.

5. LIMITS OF WORK

See Appendix B for the construction plan documents for reference only.

6. STANDARDS AND DETAILS

All current and applicable Georgia Department of Transportation Standards and Details shall be utilized in the construction of the specified components for work associated with this Project.

Reference GDOT’s website at http://mydocs.dot.ga.gov/info/gdotpubs/ConstructionStandardsAndDetails/For ms/AllIt ems.aspx for a list of all current standards and details.

7. NOTIFICATION

Prior to the start of construction, the contractor shall provide 3-day advanced notification to property owners within the limits of the work by the placement of signage along each street and flyers disbursed to each property owner notifying the property owners of the date(s) of the work.

http://mydocs.dot.ga.gov/info/gdotpubs/ConstructionStandardsAndDetails/Forms/AllItems.aspx

Page | 16

8. WORK HOURS

Construction work is only permitted during the following hours:

Monday-Friday 7 am to 6 pm Saturday 9 am to 5 pm Sunday No Work Permitted

Deviation from the standard working hours may be requested in writing with specific alternate work hours, the reason those hours are needed, and is subject to approval by the City Manager.

9. PROTECTION

It shall be the contractor’s responsibility to protect driveways, driveway aprons, sidewalks, curbs, catch basins, utilities, mailboxes, street signage and other such infrastructure inside and outside of the project limits during construction. Damage to any infrastructure inside and outside the project limits of construction caused by the Bidder shall be replaced or repaired at the contractor’s expense. The contractor shall use considerable care in protecting the riding surface of all roadways. Any damages or insufficient work shall be corrected to the satisfaction of the Project Manager at the contractor’s expense. The contractor shall arrange for the location of underground utilities that might impact the project construction prior to commencement of work in each Project Area by contacting the Georgia One-Call Center at 811 or 1 (800) 282-7411 before deep patching operations commence.

10. SUBMITTALS

The contractor shall make the following submittals to the Project Manager for approval prior to, concurrent with, or after (as applicable) proceeding, with incorporating any of the required items into the work:

1. Pedestrian poles.

2. Ped signal button.

3. Signage.

11. MEASUREMENT

Documentation of measurements shall be submitted to the Project Manager in the methods detailed in the Georgia Department of Transportation Standard Specifications Construction of Transportation Systems in accordance with unit price quantities in the Proposal.

12. PAYMENT

Documentation of measurements shall be submitted to the Project Manager. Payments shall be requested in accordance with unit price quantities in the bid.

Page | 17

SECTION 5 : SAMPLE CONTRACT AGREEMENT

GEORGIA, DeKALB COUNTY, THIS AGREEMENT, made and entered into this day of _, 20___, by and between the City of Decatur, Georgia, Party of the First Part, hereinafter referred to as the City, and of the State of Georgia, Party of the Second Part, hereinafter called the Bidder.

WITNESSETH:

That the Bidder has agreed and by these presents does agree with the City to furnish all equipment, tools, materials, skill, labor of every description, and all things necessary to carry out and complete in a good, firm, substantial and workmanlike manner the work and construction in strict conformity with the specifications for:

Pedestrian Signal Equipment Installation which together with the Notice to Bidders, Proposal, Instructions to Bidders, Federal Work Authorization Program, Special Conditions of Contract, General Conditions, Special General Conditions, Project Specifications, including Exhibits and Appendices and the Georgia Department Of Transportation Standard Specifications for Construction of Transportation Systems, latest edition, as applicable, are incorporated in and made a part of this Contract by reference.

The Bidder shall commence work under this Contract as soon as possible after the award and must complete work no later than 60 days after the notice to proceed.

If said work is not completed within the time stated above, the Bidder shall be liable and hereby agrees to pay the City as liquidated damages and not as a penalty the sum of 100 dollars per calendar day for each and every day or part of a day thereafter that said work remains incomplete.

As full payment for the faithful performance of this Contract, the City shall pay said Bidder for the actual quantities of work done at the price set forth in the proposal.

Payments shall be made as follows: Monthly as the work progresses, the City shall pay said Bidder the amounts earned during the preceding month less 5% and within thirty days after the work is fully completed and accepted by the City of Decatur, the balance due hereunder shall be paid; provided, however, that final payment shall not be made until said Bidder shall submit satisfactory proof to the City that all just claims for labor, material, skill, tools, and equipment incident to said work have been fully paid by said Bidder, and that said Bidder has settled and satisfied every lawful claim for damages against the Bidder incident to said work.

Page | 18

Within ten calendar days from the date of this Contract, the Bidder as principal an , a surety company qualified to do business in Georgia, as surety shall provide the required bonds and Certificate of Insurance as outlined in the General Conditions for the amounts and terms as specified therein.

The Bidder agrees to maintain said construction for a period of sixty days after its completion and acceptance by the City and does hereby warrant and guarantee said construction against all defects for a period of 12 months after its completion and acceptance by the City.

This Contract, executed in triplicate, constitutes the full agreement between the parties, and no part of this Contract shall be sublet by the Bidder without written approval of the City.

IN WITNESS WHEREOF, the parties hereto have set their hands and caused their seals to be affixed hereupon the day and year first above written.

CITY OF DECATUR, GEORGIA

(Party of the First Part)

By:

City Manager

ATTEST:

Clerk

Bidder (Party of the Second Part)

By:

Approved as to form:

City Attorney

Page | 19

SECTION 6 : GENERAL CONDITIONS

A. HOLD HARMLESS AGREEMENT, INTERMEDIATE FORM

The Contractor agrees to indemnify and save harmless the Owner, the Architect, the Engineer, and all of their officers, partners, agents and employees from and against all loss or expense (including court costs and attorney's fees) by reason of liability imposed by law upon Owner, Architect or Engineer for damages because of bodily injury, including death at any time, resulting therefrom sustained by any person or persons or on account of damage to or destruction of property, real or personal, including loss of use thereof, arising out of or in consequence of performance of this work, whether such injuries to property are due or claimed to be due to the negligence of the Contractor, his Sub-Contractors, the Owner, Architect or Engineer, their officers, Partners, agents and employees except only such injury, death or damage as shall have been occasioned by the sole negligence of the Owner, Architect or Engineer.

B. CONTRACTOR'S BONDS – No Bonds Required Faithful Performance Bond - As a part of the execution of this Contract, the Contractor shall furnish to the Owner a bond payable to the Owner in the form of Faithful Performance Bond, secured by a surety company acceptable to the Owner, conditioned upon the faithful performance of all covenants and stipulations under this contract, specifically including, but not limited to, the performance of the warranty set forth in Section 3 below. The amount of the bond shall be not less than one hundred percent (100%) of the total contract amount, as this sum is set forth in the Agreement.

i. Labor and Material Bond - As a part of the execution of this Contract, the Contractor shall furnish to the Owner a bond of a surety company acceptable to the Owner in a sum of one hundred percent (100%) of the total contract amount, as this sum is set forth in the Agreement for the payment in full of all persons, companies or corporations who perform labor upon or furnish material to be used in the work under this Contract.

ii. Date of Substantial Completion – When the work authorized by the contract Agreement has been completed, the Owner will make all final inspections it deems appropriate for the purpose of ascertaining that the work has been completed in accordance with the requirements of the Contract Documents. The Contractor shall correct all deficiencies that are found. When the Owner has determined that all deficiencies have been corrected and that the work has been completed in all respects in accordance with the Contract Documents, the Owner will take possession of the work and issue a written Substantial Completion statement with a date mutually agreed to between the Owner and Contractor.

iii. Notice of Completion – A Notice of Completion shall be issued by the Owner not earlier than one (1) year from the date of substantial completion. In the event the Faithful Performance Bond provided to the Owner contains a limitation on the time within which suit may be initiated on the Faithful Performance Bond, such limitation shall commence no earlier than the date of Notice of Completion.

Page | 20

iv. Notification of Surety Companies - The Contractor shall advise the surety companies and other signers of any of the bonds listed above to familiarize themselves with all of the conditions and provisions of this contract, and they shall waive the right of special notification or any change or modification of this contract or of extension of time, or of decreased or increased work, or of the cancellation of the contract or any other act or acts by the Owner or its authorized employees and agents, under the terms of this contract and failure to so notify the aforesaid surety companies of changes shall in no way relieve the surety companies of their obligation under their contract.

C. CONTRACTOR’S WARRANTY

Contractor warrants to the Owner that, for a period of one (1) year from the date of substantial completion, the work performed under this Contract will conform to the requirements of the Contract Drawings and Specifications and will be free from defects. If at any time prior to substantial completion or within one (1) year after substantial completion, Owner discovers that the work does not conform to the requirements of the Contract Drawings and Specifications or is not free from defects, Contractor shall promptly correct such work within a reasonable time of receiving written notice from the Owner. If the work is not corrected by Contractor within a reasonable time of receiving written notice from the Owner, Owner may undertake to correct the work. Owner’s undertaking of such corrective work shall not limit in any way Owner’s rights of recourse against Contractor or Owner’s rights of recourse against Contractor’s surety under the Faithful Performance Bond.

D. CONTRACTOR'S INSURANCE

The Contractor shall, at the time of execution of this Contract, file with the Owner the certificate of insurance as contained in the Agreement, which shall cover all of the Contractor’s insurance as required herein including evidence of payment of premiums thereon, and the policy or policies of insurance covering said Owner, the Engineer and their officers, agents and employees. Each such policy and certificate shall be satisfactory to the Owner and shall bear an endorsement precluding the cancellation or reduction in coverage without giving the Owner at least fifteen (15) days prior notice thereof in writing. All policies shall be written by insurers licensed to do business in the State of Georgia and acceptable to the Owner, with a current A.M. Best rating of no less than A-:VII. All coverages indicated on the certificate of insurance shall be included in the Comprehensive General Liability and Automobile Liability insurance policies unless they are not applicable due to the nature of the work under this Contract Document.

Nothing contained in these insurance requirements is to be construed as limiting the extent of the Contractor’s responsibilities for payment of damages resulting from its operations under this Contract.

On all required coverages, the Contractor shall secure from all subcontractors certificates of insurance as evidence that each subcontractor carries insurance to provide coverage under this Contract up to the same minimum limits required of the Contractor in this Agreement.

The Contractor shall submit copies of its subcontractors’ insurance certificates to the Owner and Engineer as evidence of such insurance coverage. The Contractor acknowledges and

Page | 21 agrees that each subcontractor performing work for this Contract will meet these minimum insurance requirements and that any costs or uninsured events arising from or involving a subcontractor working on behalf of the Contractor for this Contract is the sole responsibility of the Contractor. The Contractor agrees to indemnify said Owner for any costs, expenses or damages that may arise from any subcontractor having insufficient insurance coverage.

i. Public Liability and Property Damage Insurance – The Contractor shall take out, pay for, and maintain until completion and acceptance of the work required by this Contract, public liability and property damage insurance as shall protect the Contractor and the said Owner from all claims for bodily injury and property damage which may arise because of the nature of the work or from operations under this Contract.

The Contractor is not required to have its subcontractors named as co-insureds in the Contractor’s policy of public liability and property damage; but the policy shall protect the Contractor and the Owner from contingent liability which may arise from operations of subcontractors.

Each of said policies of insurance shall provide coverage in the following minimum amounts: Commercial general liability insurance with a minimum combined bodily injury and property damage limit of One Million Dollars ($1,000,000) per occurrence, a personal and advertising injury limit of One Million Dollars ($1,000,000), a products-completed operations aggregate limit of Two Million Dollars (2,000,000) and a general aggregate limit of Two Million Dollars ($2,000,000) per location.

$1,000,000 Each Occurrence Limit $1,000,000 Personal and Advertising Injury Limit $2,000,000 Products/Completed Operations Aggregate $2,000,000 General Aggregate

ii. Comprehensive Automobile Liability - The Contractor shall also take out, pay for, and maintain until completion and acceptance of the work required by this Contract, automobile public liability and property damage insurance as shall protect the Contractor and said Owner from claims for bodily injury or property damage which may arise from the use of motor vehicles engaged in various operations under this Contract.

The policy or policies of automobile insurance shall provide coverage in the following minimum amounts: Automobile liability insurance covering owned, hired and non-owned vehicles, with separate coverage in an amount not less than One Million Dollars ($1,000,000) combined single limit for bodily injury and property damage.

$1,000,000 Bodily Injury or death to any one person $1,000,000 Bodily Injury, each occurrence $1,000,000 Property Damage, each occurrence

iii. Umbrella Policy- The Contractor shall have an umbrella policy over General Liability, Automobile Liability, Workers’ Compensation/Employers’ Liability and any such policies

Page | 22 that the umbrella can be placed over that involves insurance that is applicable to the work under this contract or at least applicable to the minimum required insurance under this contract. The policy shall be placed in the amount of One Million Dollars ($1,000,000) or an amount equal to that to be paid for the work being performed under this agreement, whichever is greater.

iv. Workers’ Compensation Insurance - Before beginning the work, the Contractor shall furnish to the Owner satisfactory proof that it has taken out, for the period covered by the work under this Contract, Statutory Workers’ Compensation, Employers’ Liability Insurance and/or United States Longshore and Harbor Workers’ Compensation Act and Liability under Admiralty or Federal Jurisdiction, whichever is necessary for appropriate Workers’ Compensation Coverage for applicable work being performed under said Contract. Such insurance shall be maintained in full force and effect during the period covered by this Contract.

v. Notification of Insurance Companies - The Contractor shall advise all insurance companies to familiarize themselves with all of the conditions and provisions of this Contract, and insurance companies shall waive the right of special notification or any change or of decreased or increased work, or of cancellation of the Contract or of any other act or acts by the Owner or its authorized employees and agents, under the terms of this Contract and failure to so notify the aforesaid insurance companies of changes shall in no way relieve the insurance companies of their obligation under this Contract.

vi. Indemnification - The Contractor shall indemnify and save harmless the Owner, the

Engineer and all of their officers, agents, and employees from all suits, actions or claims of any character brought for or on account of any injuries to or death of or damages received by any person, persons or property resulting from the operations of the Contractor or any of its subcontractors, in prosecuting the work under this Contract.

vii. Additional Insured-The Contractor shall name the Owner as an additional insured and shall provide Owner with proof thereof with the certificate of insurance and copy of endorsement that meets the additional insured requirement or specifically lists owner as additional insured for said contract in the policy for said work by Contractor on behalf of this Contract.

viii. Subrogation Waiver-The Contractor waives all rights of subrogation against the Owner.

Written evidence that each respective insurer acknowledges and agrees to such waivers of subrogation rights shall be submitted to Owner prior to commencement of the project (at minimum, a certificate of insurance, followed by a copy of an endorsement or policy language evidencing the insurer’s acknowledgement of an agreement to such waiver). In the event such requirement is not met and/or any subrogation proceeding is commenced by or on behalf of the Contractor or its insurers, the Contractor shall fully indemnify and save harmless the Owner for all costs, expenses and damages resulting therefrom, and shall take action necessary to stop any subrogation proceedings by the Contractor’s insurers.

Page | 23

E. NONDISCRIMINATION IN EMPLOYMENT

During the performance of this Contract, the Contractor agrees as follows:

1. The Contractor and its Subcontractors shall not discriminate against any employee or applicant for employment because of race, creed, color, religion, sex, national origin, age or disability. The Contractor and its Subcontractors shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their gender, race, color, genetic information, religion, national origin, political affiliation, age, handicapped status, sexual orientation, sexual preference, or gender identity and expression. Such action shall include, but not be limited to the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places available to employees and applicants for employment, notices setting for the policies of nondiscrimination.

2. The Contractor and its Subcontractors shall, in all solicitations or advertisements for employees placed by them or on their behalf, state that all qualified applicants will receive consideration for during employment, without regard to their gender, race, color, genetic information, religion, national origin, political affiliation, age, handicapped status, sexual orientation, sexual preference, or gender identity and expression.

F. DEFINITIONS

a. "Owner" shall mean the City of Decatur, Georgia.

b. "Project Manager" shall mean the Project Manager or her/his duly authorized representative.

G. SAFETY

In accordance with generally accepted construction practice, the Contractor will be solely and completely responsible for conditions of the job site, including safety of all persons and property during performance of the work. This requirement will apply continuously and not be limited to normal working hours.

The duty of the Engineer to conduct construction review of the Contractor's performance is not intended to include review of the adequacy of the Contractor's safety measures, in, on, or near the construction site.

H. LAWS TO BE OBSERVED

The Contractor shall keep himself fully informed of all existing and future Federal, State, County, and municipal laws, ordinances and regulations which in any manner affect those engaged or employed in the work or the materials used in the work or the conduct of the work or the rights, duties, powers or obligations of the Owner or of the Contractor or which otherwise affect the Contract, and of all orders and decrees of bodies or tribunals having any jurisdiction or authority over the same. He shall at all times observe and comply with, and shall cause all his agents, sub-contractors and employees to observe and comply with, all such laws, ordinances, regulations, orders and decrees; and shall protect and indemnify the Owner, the Engineer and all of their officers, agents and employees, against any claim, loss or liability arising or resulting from or based upon the violation of any such laws, ordinance, regulation, order or decree, whether by himself or by his agents, sub-contractors or employees. If any discrepancy or inconsistency is discovered in the plans, Contract Drawings, Contract Specifications or other Contract Documents for the work in relation to such laws, ordinance, regulation, orders or decree, the Contractor shall forthwith report the same to the Engineer.

I. PROVISIONS OF LAW

It is specifically provided that this Contract is subject to all applicable laws and that the rules of law shall prevail over any provision contained in any of the Contract Documents which may be in conflict thereto or inconsistent therewith.

J. SUBCONTRACTORS

The Contractor shall notify the Owner in writing of the names of all Subcontractors they propose to employ on the Contract and shall not employ any Subcontractors until the Owner's approval in writing covering such Subcontractors has been obtained. See Appendix A.

The Contractor agrees to be fully and directly responsible to the Owner for all acts and omissions of his Subcontractors and of any other person employed directly or indirectly by the Contractor or Subcontractors, and this contract obligation shall be in addition to the liability imposed by law upon the Contractor.

Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the Owner. It shall be further understood that the Owner will have no direct relations with any Subcontractor. Any such necessary relations between Owner and Subcontractor shall be handled by the Contractor.

The Contractor agrees to bind every Subcontractor (and every Subcontractor of a Subcontractor, etc.) by all terms of the Contract Documents as far as applicable to the Subcontractors work unless specifically noted to the contrary in a subcontract approved in writing as adequate by the Owner.

Should any Subcontractor fail to perform in a satisfactory manner the work undertaken by him, such subcontract shall be terminated immediately by the Contractor upon notice from the Owner.

K. LICENSES, PERMITS, AND REGULATIONS

The Contractor shall secure all Federal, State and Local licenses required by law. He shall obtain and pay for all necessary permits. He shall give all notices and comply with all laws, ordinances and regulations bearing on the conduct of the work as drawn and specified. If the Contractor observes that the drawings or Contract Specifications are at variance therewith, he shall promptly notify the Engineer in writing, and any necessary changes shall be adjusted as provided in the Contract for changes in the work.

L. TAXES

Contractor shall, without additional expense to the Owner, pay all applicable Federal, State and local sales and other taxes, except taxes and assessments on the real property comprising the site of the project.

M. LOCATION OF EXISTING UTILITIES AND PIPING

The location of existing and underground utilities, such as gas mains, water mains, electric lines, etc., as shown on the Contract Drawings, have been taken from the record drawings of the parent utility companies where available. However, the Owner does not assume responsibility for the possibility that during construction utilities other than those shown may be encountered or that the actual location of those shown may be different from the locations designated on the Contract Drawings.

At the locations wherein detailed positions of these facilities become necessary to the new construction, the contractor shall, at his own expense, furnish all labor and tools to either verify and substantiate the record drawing location or definitely establish the position of the facilities.

Because of the nature of the work, adjustments may be required in new construction to meet existing conditions. Such adjustments shall be made by the Contractor without additional cost to the Owner.

N. PROGRESS ESTIMATES AND PAYMENTS

No payments under this Contract will be made except upon the presentation of Periodical Estimate for Partial Payment prepared by the Contractor on forms, supplied by Owner, and approved in writing by the Engineer which shall show that the work covered by the payments has been done and the payments therefore are due in accordance with this Contract. Such Payment Forms shall be submitted to the Engineer on the 25th day of a calendar month to permit checking before the end of the calendar month.

Upon presentation of certified copies of purchase bills and freight bills the Owner will, unless specifically stated otherwise in the General Conditions of Contract, include in such monthly estimates payments for materials that will eventually be incorporated in the project, providing that such material is suitably stored on the site of the project, at the time of submission of the estimate for payment. At the time the next following monthly estimate is submitted, certified copies of receipted purchase and freight bills for the stored materials included in the previous monthly payment estimate shall be submitted. If the Contractor fails to submit proof of payment with the next monthly payment estimate, those items of stored materials for which no proof of payment has been submitted will be deleted from the current payment estimate. Such materials when so paid for by the Owner will become the property of the Owner and in case of default on the part of the Contractor the Owner may use or cause to be used by others these materials in construction of the project.

However, the Contractor…