This is a work control plan drawing for the Portland International Airport Passenger Boarding Bridges Floor Replacement project in Oregon. The document is a technical drawing (Sheet GI3.01) dated October 2026 that illustrates the typical gate work control plan for passenger boarding bridge (PBB) floor replacement operations. The drawing provides a scaled layout of a gate area showing the aircraft parking envelope, temporary safety controls, and construction personnel access points. Key safety requirements include candlesticks positioned at maximum 8-foot intervals along the aircraft parking envelope with continuous red warning rope per Port safety requirements, red warning rope and temporary signage at the exterior stairs of the PBB restricting access to construction personnel only, and moveable stanchions with temporary signage at the holdroom door to the PBB inside the terminal. The drawing is designed for reference purposes only and indicates that the drawing scale is reduced 50 percent when printed on 11-inch by 17-inch sheet size.

The document serves as a design control and safety planning reference for construction contractors undertaking floor replacement work on the airport's passenger boarding bridges. No specific pricing, contract term, set-asides, incumbent contractor information, or funding details are provided in this technical drawing. The plan is primarily intended to guide on-site construction personnel regarding temporary safety barriers, work zones, and restricted access areas during the floor replacement project execution at Portland International Airport.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G

G

NO

PARKING

BUS

ONLY

NO

PARKING

BUS

ONLY

10/23/2026 lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E-

FO

R R

EF

ER

EN

C

E O

N

LY

gr ay

11:06:06 AMx:\pdx pbb carpet\d-drawings\00 current\gi3.01.dwg DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGNED BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

1/ 4"

1/

2" 1"

BY REVISIONS APP

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

NO.DATE BY REVISIONS APPNO.

TYPE:

DISC. SHT. NO.

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

A

LL

T H

R

EE

P

LA

N

ES

A R

E

VI

SI

BL

E.

T

H

IS

G U

ID

AN

C E

IS

P

R O

VI

D

ED

F

O R

R

EF

ER

EN

C E

O N

LY

D R

AW

IN

G S

C

AL

E

IS

R E

D U

C E

D

0% W

H

EN

S H

EE

T

SI

ZE

IS

1" x

7"

DATE

PORTLAND INTERNATIONAL AIRPORT

PASSENGER BOARDING BRIDGES FLOOR REPLACEMENT

WORK CONTROL PLAN - TYPICAL GATE

ERIC HEIN

D. CALEM

A. LASKEY

D. CALEM

OCTOBER 2026

04 CD

PDX 2026-518 GI3.012026D017 103105

SCALE:

WORK CONTROL PLAN - TYPICAL GATE

1" = 20'1

N

E3

LEGEND:

KEY NOTE(S) :

1. CANDLESTICKS AT 8'-0" O.C. MAX. WITH CONTINUOUS

RED WARNING ROPE PER PORT SAFETY REQUIREMENTS

ALONG AIRCRAFT PARKING ENVELOPE STRIPING -

CONFIRM EXTENTS WITH THE PORT PRIOR TO

CONSTRUCTION

2. RED WARNING ROPE AND TEMPORARY SIGNAGE AT

BOTTOM OF THE PBB EXTERIOR STAIRS STATING

"CONSTRUCTION PERSONNEL ONLY"

3. MOVEABLE STANCHIONS AND TEMPORARY SIGNAGE AT

HOLDROOM DOOR TO PBB INSIDE TERMINAL STATING

"CONSTRUCTION PERSONNEL ONLY"

EXISTING ITEM TO REMAIN

TEMPORARY CAUTION CANDLESTICKS AT

8'-0" O.C. MAX. WITH CONTINUOUS RED

CAUTION ROPE

TYP.

SCALE: IN FEET

0' 10' 20' 40' 60'

Sheets and Views
GI3.01
2026-10-23T11:17:40-0700
Dave Calem

File details come from the government source that posted it. Updated .