PCS_PHUHS_Boiler_Repalcement_Mechanical.pdf

PDF 5 MB Posted

Attached to
Boiler Replacement
Solicitation number
26-CD-035
Issued by
Pinellas County, Florida

About this file

This is a 100% construction bid set for the Palm Harbor University High School Boiler Replacement Project prepared by consulting engineering firms BAL Engineering and MPS Engineering for the Pinellas County School District. The project involves the installation of two new gas-fired condensing hydronic heating boilers (Riello AR 2000 model, 2,000 MBH each) with all associated piping, ductwork, hydronic accessories, and DDC controls at the facility located at 1900 Omaha St, Palm Harbor, FL 34683. The design documents include mechanical demolition plans, renovation plans, mechanical details, and controls documentation with a current revision date of 08-12-2026. An alternate bid item (Alternate No. 1) requires pricing to replace two existing base-mounted end suction pumps (HHWP-1 and HHWP-2) with new in-kind units. Electronic sealed bids are due before 4:00 pm on Wednesday, September 23, 2026, via the Pinellas County Schools e-Procurement Portal at https://procurement.opengov.com/portal/PCSB.

The project specifications require compliance with the 8th Edition (2023) Florida Building Code, NFPA standards, ASHRAE guidelines, and SMACNA standards. Key technical requirements include boilers with 96.1% thermal efficiency, 7-inch capacitive touchscreen interfaces with WiFi and Ethernet connectivity, BACnet MSTP controls with cascade sequencing, stainless steel fire-tube condensing heat exchangers, and integral system sensors. The boilers must be CSA certified, ANSI Z21.13 compliant, and AHRI certified. Contractor responsibilities include site verification of clearances, coordination with electrical, plumbing, and fire protection trades, shop drawing submissions with performance schedules, commissioning services by an independent authority, test and balancing by the owner's retained agency, and seasonal equipment testing. As-built drawings, operations and maintenance manuals, certified test and balance reports, and final commissioning reports must be submitted to the owner within 90 days of certificate of occupancy receipt. The boiler design accommodates a 40°F temperature differential at 95 GPM flow rate with supply water at 180°F and return water at 140°F, and new natural gas piping is supplied from existing mechanical room infrastructure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSULTING ENGINEERS

154A Whitaker Rd.

Lutz, Florida 33549 (813)333-2103 www.BALengineering.com

DESIGN TEAM PROJECT INFORMATION DRAWING INDEX

CONSULTANTS:

PALM HARBOR UNIVERSITY HS

BOILER REPLACEMENT PROJECT

1900 Omaha St, Palm Harbor, FL 34683

100% CONSTRUCTION BID SET

08-12-2026

PROJECT SHEET INDEX

Sheet Number Sheet Name Project Issue Date Current Revision

M0.1 LEGEND, NOTES, & SCHEDULES 08-12-2026

M1.1 MECHANICAL DEMOLITION PLAN 08-12-2026

M2.1 MECHANICAL RENOVATION PLANS 08-12-2026

M3.1 MECHANICAL DETAILS 08-12-2026

M3.2 MECHANICAL DETAILS 08-12-2026

M4.1 CONTROLS LEGEND, NOTES, & DETAILS 08-12-2026

E1.1 ELECTRICAL RENOVATION PLAN 08-12-2026

240 Pine Ave. N Oldsmar, Florida 34677 (813)855-2721 www.MPSENG.com

SCHOOL BOARD MEMBERS

KEVIN K. HENDRICK - SUPERINTENDENT

CAPRICE EDMOND - CHAIRPERSON

DAWN M. PETERS - VICE CHAIRPERSON

KATIE BLAXBERG - MEMBER

LISA N. CANE - MEMBER

LAURA HINE - MEMBER

EILEEN M. LONG - MEMBER

STEPHANIE MEYER - MEMBER

AREA MAP

CAMPUS LOCATION

CAMPUS MAP

AREA OF WORK

PCS PROJECT NUMBER: 9576

GENERAL MECHANICAL NOTES

M

230000

1. THE INTENT OF THESE NOTES AND THE MECHANICAL NOTES ON THE DRAWINGS IS TO CLARIFY THE SCOPE OF WORK AND ALERT THE CONTRACTOR OF FIELD CONDITIONS. CONTRACTOR TO VISIT SITE AND VERIFY ALL CLEARANCES BEFORE FABRICATION OF DUCTWORK AND PROVIDE ADDITIONAL OFFSET AND/OR CHANGES IN DUCT SIZES TO MEET FIELD CONDITIONS AND COORDINATE WITH ELECTRICAL, PLUMBING, AND FIRE PROTECTION SUBCONTRACTOR BEFORE ANY CONSTRUCTION WORK. NO ALLOWANCES WILL BE MADE FOR THE

CONTRACTOR'S UNFAMILIARITY WITH THE JOB SITE AND CONDITIONS.

2. PLANS SHALL NOT BE SCALED. PLANS INDICATE THE SCHEMATIC LAYOUT AND LOCATION OF THE MECHANICAL SYSTEM COMPONENTS.

UNLESS SPECIFIC DIMENSIONS ARE NOTED, THE ACTUAL LOCATION OF THESE COMPONENTS SHALL BE DETERMINED IN THE FIELD IN COORDINATION WITH THE WORK OF OTHER TRADES, THE USE OF MANUFACTURER’S SHOP DRAWINGS AND SIMILAR CERTIFIED DATA. THE ELEVATION OF EXPOSED DUCTWORK SHALL BE COORDINATED WITH THE ARCHITECT PRIOR TO ORDERING ANY DUCTWORK.

3. NO EXCLUSIONS FROM OR LIMITATIONS IN THE LANGUAGE USED IN THE CONTRACT DOCUMENTS SHALL BE INTERPRETED AS MEANING THAT THE EQUIPMENT, APPURTENANCES, AND/OR ACCESSORIES NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM ARE NOT TO

BE PROVIDED AS REQUIRED.

A. THE CONTRACTOR SHALL HAVE A COMPLETE SET OF THE CONTRACT DOCUMENTS. THE SEPARATE DIVISIONAL DRAWINGS AND

SPECIFICATIONS DO NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY TO PROVIDE THE WORK WHICH IS INDICATED ON ANY OF THE DRAWINGS OR DIVISION OF THE SPECIFICATIONS. REVIEW AND COORDINATE THE SCOPE OF WORK TO ASSURE A COMPLETE AND FUNCTIONAL SYSTEM IS INSTALLED. SHOP DRAWINGS OF ALL EQUIPMENT AND MATERIALS FOR REVIEW.

4. SUBMIT SHOP DRAWINGS OF ALL EQUIPMENT AND MATERIALS FOR REVIEW. WHERE MANUFACTURERS ARE LISTED IN THE PROJECT MANUAL, ONE OF THOSE MANUFACTURERS SHALL BE PROVIDED UNLESS A REQUEST FOR SUBSTITUTION HAS BEEN SUBMITTED PRIOR TO BID AND THE MANUFACTURER SUBSEQUENTLY IS LISTED AS AN ACCEPTABLE MANUFACTURER IN AN ADDENDUM. PARTIAL SUBMITTALS WILL NOT BE ACCEPTED FOR REVIEW AND APPROVAL. INSTALL AND TEST ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS AND RECOMMENDATIONS. FOR ALL EQUIPMENT, WHICH HAS BEEN SCHEDULED DIRECTLY ON THE DRAWINGS, PROVIDE WITHIN THE SUBMITTAL, A PERFORMANCE SCHEDULE FOR THE PROPOSED EQUIPMENT IN THE EXACT SAME FORMAT AS INCLUDED ON THE CONTRACT DOCUMENTS. FAILURE TO PROVIDE REQUIRED PERFORMANCE SCHEDULE WILL RESULT IN REJECTION OF THE ENTIRE SUBMITTAL.

SUBMIT DRAWINGS AND CUT SHEETS FOR ALL PRODUCTS ALL AT ONE TIME. INDEX ALL ITEMS TO THE PROJECT MANUAL OR DRAWINGS AS APPLICABLE. SHOP DRAWINGS THAT DEVIATE FROM THE REQUIREMENTS OF THE CONTRACT DOCUMENTS SHALL LIST ALL DIFFERENCES IN A COVER LETTER ATTACHED TO FRONT OF THE SUBMITTAL. ANY UNLISTED DEVIATIONS FOUND DURING REVIEW WILL RESULT IN THE REJECTION OF THE ENTIRE SUBMITTAL. FOR ITEMS REVIEWED AND MARKED "REJECTED" OR "REVISE AND RESUBMIT”, ONLY ONE ADDITIONAL SUBMITTAL WILL BE REVIEWED TO VERIFY PRODUCT COMPLIANCE WITH THE CONTRACT DOCUMENTS. SHOULD FURTHER SUBMITTALS BE REQUIRED FOR THE DESIGN PROFESSIONAL TO VERIFY THE SUBMITTAL WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS, THE HOURLY RATE OF $150.00 PLUS EXPENSES WILL BE BILLED TO THE CONTRACTOR FOR THE PROFESSIONAL(S) TIME IS SPENT ON THE REVIEW.

5. ALL PIPING AND/OR DUCTWORK MUST BE INSTALLED 6” AWAY FROM ANY FIRE RATED WALL.

6. ALL PIPE PENETRATIONS SHALL BE SEALED USING APPROVED UL DETAILS. ALL FIRE DAMPERS SHALL BE DYNAMIC TYPE.

7. PROVIDE ADDITIONAL DUCTWORK AND PIPING SUPPORTS ON BOTH SIDES AND WITHIN 18" OF FIRE RATED WALLS. DUCTWORK OR PIPING

SHALL NOT BE SUPPORTED FROM ANY FIRE RATED WALL.

8. ROOF MOUNTED EQUIPMENT SHALL BE SECURED TO THE CURB AND THE CURBS SHALL BE SECURED TO THE STRUCTURE AS DETAILED BY THE

ARCHITECT OR STRUCTURAL ENGINEER.

9. PROVIDE PAINTED GALVANIZED EXPANDED METAL GRILLE OVER ALL CONDENSER COILS.

10. ALL EQUIPMENT (AIR HANDLERS, CONDENSING UNITS, ROOFTOP UNITS, ETC.) SHALL BE LABELED WITH PLASTIC SIGNS, LAMINATED. ENGRAVED: 1/8"

THICK BLANKS FOR SIGNS SHALL BE A MINIMUM OF 1 3/4" HIGH, WITH 1" HIGH LETTERS. LENGTH OF THE SIGN SHALL BE THE SUM OF THE LETTERS/NUMBERS PLUS 3/4” EACH END. SIGNS DESIGNATED FOR INSTALLATION ON THE OUTSIDE, IN OPEN AREAS, OR LOCATED IN A PROTECTED AREA THAT IS SUBJECT TO DIRECT SUNLIGHT, SHALL BE UV RATED, DESIGNATED AND MANUFACTURED TO BE EXPOSED TO THE ELEMENTS. SUBMITTAL DATA INDICATING THE ABOVE WILL BE REQUIRED. LABELS SHALL ALSO INCLUDE THE ROOM NUMBER, CORRESPONDING AIR HANDLER LOCATION OR AREA SERVED TO ASSIST IN THE DETERMINATION OF THE SERVICE LOCATION OF SAID EQUIPMENT. PROVIDE ADDITIONAL NAMEPLATE ON CEILING GRID DIRECTLY BELOW EQUIPMENT CONCEALED ABOVE CEILINGS TO AID IN LOCATING THE UNIT. NAMEPLATE DESIGNATION SHALL CONSIST OF UNIT

NUMBER.

11. EQUIPMENT SHALL BE MANUFACTURED AND/OR COATED AS REQUIRED FOR INSTALLATION IN A SEA COAST ENVIRONMENT.

12. ALL WALL MOUNTED TEMPERATURE AND HUMIDITY SENSORS SHALL BE INSTALLED AT A CENTER LINE ELEVATION OF 4’—0” ABOVE FINISHED

FLOOR UNLESS OTHERWISE NOTED ON DRAWINGS. LOCATION OF THE WALL MOUNTED THERMOSTAT SHALL BE COORDINATED WITH THE OTHER TRADES FOR A NEAT APPEARANCE. FINAL LOCATION OF THERMOSTAT SHALL BE SUBJECT TO THE APPROVAL OF THE ARCHITECT OR HIS REPRESENTATIVE IN THE FIELD. WHEN SENSOR IS INSTALLED ON EXTERIOR WALLS, PROVIDE AN INSULATED SUB—BASE.

13. THE OWNER WILL RETAIN THE SERVICES OF A TEST AND BALANCE AGENCY TO PERFORM FINAL TESTING AND BALANCING OF ALL HVAC SYSTEMS.

CONTRACTOR SHALL COORDINATE WITH THE OWNER'S VENDOR TO PROVIDE SITE ACCESS AND ALL COORDINATION NECESSARY TO PERFORM THE

WORK.

14. PROVIDE SCHEDULE 40 STEEL PIPE SLEEVES FOR CONDENSATE DRAIN LINES PENETRATING EXTERIOR WALLS. NEATLY SEAL VOIDS AROUND PIPING

WITH A WEATHER TIGHT PERMANENT NON—SHRINKING SEALANT.

15. EQUIPMENT SERVICE ACCESS: PROVIDE ADEQUATE SERVICE SPACE AROUND AIR HANDLING UNITS, VARIABLE VOLUME BOXES, ELECTRIC DUCT HEATERS AND THE PULL SIDE OF FILTERS, OR AS REQUIRED BY THE MANUFACTURER’S INSTALLATION INSTRUCTIONS. SERVICE AREA SHALL BE CLEAR OF DUCTS, PIPES, CONDUITS, WALL STUDS, CEILING HANGERS. AND ANY OTHER CONSTRUCTION APPURTENANCE.

16. ADEQUATE MEANS OF PROTECTION FOR ALL UTILITIES SHALL BE PROVIDED AND. IF UTILITIES ARE DAMAGED DURING WORKING OPERATIONS, SUCH

SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, AT NO COST TO THE CONTRACT.

17. ACCESS PANELS THAT MAY BE REQUIRED FOR INSPECTION OF DUCTWORK, PIPING. DUCT MOUNTED DEVICES OR PIPE MOUNTED DEVICES SHALL BE PROVIDED AND ADEQUATELY SIZED. REFER TO THE ARCHITECTURAL CONTRACT DOCUMENTS FOR DOOR SPECIFICATIONS.

18. ALL DUCTWORK SHALL BE STORED IN CLEAN AREAS. PROTECT ALL DUCTWORK FROM DUST AND DEBRIS WHILE IT IS STORED ON SITE. WHILE UNDER CONSTRUCTION, ALL INSTALLED DUCT\I/WORK SHALL BE TEMPORARILY SEALED WITH VISQUEEN PRIOR TO TEST AND BALANCE IN ORDER TO LIMIT ACCUMULATION OF CONSTRUCTION DUST INSIDE THE DUCTWORK SYSTEM. IF EITHER OF THESE PROCEDURES IS NOT CONDUCTED, THE ENTIRE ASSOCIATED DUCTWORK SYSTEM AND MECHANICAL EQUIPMENT SHALL BE CLEANED TO THE OWNER'S’S SATISFACTION.

19. RETAIN THE SERVICES OF AN INDEPENDENT COMMISSIONING AUTHORITY TO PERFORM COMMISSIONING SERVICES OF ALL NEW HVAC SYSTEMS AND CONTROL SYSTEMS IN ACCORDANCE WITH THE FLORIDA ENERGY CONSERVATION CODE. THE COMMISSIONING AUTHORITY SHALL BE HIRED INDEPENDENTLY FROM THE MECHANICAL CONTRACTOR THROUGH THE CONSTRUCTION MANAGER. THE COMMISSIONING AUTHORITY CANNOT BE THE SAME AS THE TEST AND BALANCE CONTRACTOR. THE COMMISSIONING AUTHORITY SHALL DEVELOP A COMMISSIONING PLAN, PERFORM FUNCTIONAL TESTING WITH THE ASSISTANCE OF THE ASSOCIATED CONTRACTOR(S), AND PROVIDE A PRELIMINARY AND FINAL COMMISSIONING

REPORT.

20. AS— BUILT DRAWINGS, O&M MANUALS, CERTIFIED TEST AND BALANCE REPORT, AND THE FINAL COMMISSIONING REPORT ARE TO BE PROVIDED TO THE OWNER WITHIN 90 DAYS OF THE DATE OF RECEIPT OF THE CERTIFICATE OF OCCUPANCY AND SHALL BE SUBMITTED TO THE ARCHITECT FOR

REVIEW.

21. SYSTEMS SHALL BE MAINTAINED IN ACCORDANCE WITH ASHRAE STANDARD 180—2018— STANDARD PRACTICE FOR INSPECTION AND MAINTENANCE OF

COMMERCIAL BUILDING HVAC SYSTEMS.

22. CONTRACTOR SHALL PROVIDE SEASONAL TESTING OF EQUIPMENT TO PROVE PERFORMANCE AT DESIGN CONDITIONS. HYDRONIC HEATING BOILERS

SHALL BEST TESTED BETWEEN JANUARY AND MARCH.

MECHANICAL CODE COMPLIANCE STATEMENT

M

230000

1. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE 8TH EDITION (2023) FLORIDA BUILDING CODE

A. BUILDING EDITION

B. EXISTING BUILDING EDITION

C. MECHANICAL EDITION

D. PLUMBING EDITION

E. FUEL GAS EDITION

F. ENERGY EFFICIENCY EDITION

G. 8TH EDITION (2023) FLORIDA FIRE PREVENTION CODE.

H. SREF MANUAL, 2014 EDITION.

2. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

A. NFPA-1 NATIONAL FIRE CODE WITH FLORIDA MODIFICATIONS

B. NFPA-70 NATIONAL ELECTRIC CODE

C. NFPA-72 NATIONAL FIRE ALARM CODE

D. NFPA-90A STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS E. NFPA-90B STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR CONDITION SYSTEMS

F. NFPA-101 NATIONAL LIFE SAFETY CODE

3. AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR CONDITIONING ENGINEERS, INC. (ASHRAE) A. ASHRAE GUIDELINE 4-2008 - PREPARATION OF OPERATING AND MAINTENANCE DOCUMENTATION FOR BUILDING SYSTEMS B. ASHRAE STANDARD 62.1-2019 AND APPROVED ADDENDA - VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY

C. ASHRAE STANDARD 126-2016 - METHOD OF TESTING HVAC AIR DUCTS

D. ASHRAE STANDARD 180-2016 - STANDARD PRACTICE FOR INSPECTION AND MAINTENANCE OF COMMERCIAL BUILDING HVAC

SYSTEMS.

4. SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION (SMACNA)

OUTDOOR

INDOOR

CONDITION

35.0°F

70.0°F

WINTER

DRY BULB

95.0°F

74.0°F

SUMMER

DRY BULB

62.5°F

WET BULB

80.0°F

DESIGN CONDITIONS

M

230000

NOTE:

ALL SYMBOLS OR ABBREVIATIONS MAY NOT APPEAR ON PLANS. CONTRACTOR

IS ONLY RESPONSIBLE FOR EQUIPMENT INDICATED ON CONSTRUCTION PLANS

OR BY SPECIFICATION.

BD

AD

NEW DUCTWORK OR

EQUIPMENT

NEW COMBINATION

FIRE/SMOKE DAMPER

NEW AUTOMATIC

SMOKE

DAMPER

NEW AUTOMATIC FIRE

DAMPER

COUNTER BALANCED

BACKDRAFT DAMPER

MANUAL VOLUME DAMPER

WITH 2" INSULATION

STAND-OFF

DRAWING SYMBOL DESCRIPTION DRAWING SYMBOL DESCRIPTION

EXISTING DUCTWORK OR

EQUIPMENT

DUCTWORK OR EQUIPMENT

TO BE REMOVED

NEW SMOKE

WALL

PENETRATION

NEW INTERNALLY LINED

DUCTWORK

ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION

INSULATED FLEXIBLE

DUCTWORK

DUCT ACCESS DOOR

ROUND DUCT TURNING

DOWN

ROUND DUCT TURNING UP

SUPPLY OR OA DUCT

TURNING DOWN

SUPPLY OR OA DUCT

TURNING UP

RETURN DUCT TURNING

DOWN

RETURN DUCT TURNING UP

EXHAUST DUCT TURNING

DOWN

EXHAUST DUCT TURNING UP

MITERED ELBOW WITH

TURNING VANESMITERED ELBOW

NEW / EXISTING

THERMOSTAT

NEW / EXISTING HUMIDISTAT

NEW / EXISTING

COMBINATION THERMOSTAT

/ HUMIDISTAT

NEW / EXISTING CO2 SENSOR

NEW / EXISTING FIRESTAT

NEW / EXISTING MOTOR

ACTUATOR

NEW / EXISTING SMOKE

DETECTOR (PROVIDED BY

DIV. 26)

PLAN NOTE

REVISION MARK

DEMOLITION NOTE

POINT OF DISCONNECT OR

CONNECTION

SUPPLY AIR DEVICE

EXHAUST AIR DEVICE

ROUND SUPPLY AIR DEVICE

RETURN AIR DEVICE

SIDEWALL SUPPLY

AIR

DEVICE

SIDEWALL EXHAUST

OR

RETURN AIR DEVICE

1" UNDERCUT FLOW ARROW

LEGEND

M

230000

ABBREVIATIONS

H

T

T/H

CO2

H

T

T/H

CO2

F

SD

M

F

SD

M

NEW / EXISTING SMOKE

DETECTOR (PROVIDED BY

DIV. 26)

TS TS

KEF

SA

MUA

EF

KH

SF

CT

CH

FP

MB

VV

RTU

CU

AH

AC

RA

OA

EA

[E]

[D]

TYP

CHW

CW

HW

CF

(0)

TF

CONDENSING UNIT

AIR HANDLING UNIT

AIR CONDITIONING UNIT

ROOF TOP UNIT

FAN POWERED VAV BOX

VAV BOX

MIXING BOX

CHILLER

COOLING TOWER

EXHAUST FAN SUPPLY FAN

KITCHEN HOOD

MAKE-UP AIR UNIT

KITCHEN EXHAUST FAN

SUPPLY AIR

RETURN AIR

OUTSIDE AIR

EXHAUST AIR

EXISTING TO REMAIN

TO BE DEMOLISHED

TYPICAL

CHILLED WATER

CONDENSER WATER

HEATING HOT WATER

CIRCULATING FAN

POSITIVE PRESSURE

NEGATIVE PRESSURE

NEUTRAL PRESSURE

TRANSFER FAN

[R] TO BE RELOCATED

MS

HP

MINI SPLIT

HEAT PUMP

L LOUVER

RD

NIC

RETURN AIR DEVICE

NOT IN CONTRACT

ED

UNO

EXHAUST AIR DEVICE

UNLESS NOTES OTHERWISE

CD CONDENSATE DRAIN

F FAN

P PUMP

PCHWP

PRIMARY CHILLED WATER

PUMP

SCHWP

SECONDARY CHILLED

WATER PUMP

CWP CONDENSER WATER PUMP

SD SUPPLY AIR DEVICE

SCOPE OF WORK

M

230000

THE PROJECT INCLUDES ALL MATERIAL, LABOR, EFFORT, & COORDINATION REQUIRED TO INSTALL (2) NEW GAS FIRED CONDENSING HYDRONIC HEATING BOILERS AND ALL ASSOCIATED PIPING, DUCTWORK, HYDRONIC ACCESSORIES, AND DDC CONTROLS AS DESCRIBED IN THE CONTRACT DOCUMENTS.

ADD ALTERNATE NO. 1

• CONTRACTOR SHALL PROVIDE A LINE ITEM PRICE TO REPLACE (2) EXISTING BASE MOUNTED

END SUCTION PUMPS (HHWP-1 AND HHWP-2) WITH NEW "IN-KIND" PUMPS. REFER TO PLANS

AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

HOT WATER FLOW DIAGRAM

M

230000

6"øHWR TO/FROM

HEAT RECOVERY

CHILLER CH-4.

CH-4

350 GPM

HWS&R BELOW

GRADE TO CAMPUS

LOOP. EXISTING 3-

WAY VALVES AT ALL

EXISTING AHUS.

EXISTING 6"HWS&R

PIPING THROUGH

BOILER ROOM SLAB

"ø

H W

R

6"øHWR

6"øHWS

B-1[N]

2,000 MBH

95 GPM

4"øHWS

B-2[N]

2,000 MBH

95 GPM

4"øHWR

4"øHWR

4"øHWS

"ø

H W

S

6"øHWS

8"ø

EXHAUST

FLUE

THROUGH

ROOF

8"ø

EXHAUST

FLUE

THROUGH

ROOF

HWP-1[N]

530 GPM

90 FT. HD

20 HP

HWP-2[N]

530 GPM

90 FT. HD

20 HP

6"øHWS

6"øHWS

6"øHWS

6"øHWS

6"øHWR

6"øHWS

ET-1[E] ET-2[E]

1 1/2"ø CW TO

MAKEUP WATER

ASSEMBLY

1 1/2"øCW1 1/2"øCW

1 1/2"øCW

1 1/2"øCW

CONTROL VALVE

1 1/2"

MAKEUP

WATER

ASSEMBLY

1 1/2"ø CW TO HWS

HEADER

Scale

Project number

Date

Drawn by

Checked by

CONSULTING ENGINEERS

154A WHITAKER RD.

LUTZ, FLORIDA 33549

(813)333-2103

WWW.BALENGINEERING.COM

Pinellas County Schools 301 4TH St. SW Largo, FL 33770

727-588-6000 https://www.pcsb.org

TO THE BEST KNOWLEDGE OF THE ENGINEERS AND

ARCHITECTS, SAID PLANS AND SPECIFICATIONS

COMPLY WITH THE APPLICABLE MINIMUM BUILDING

CODES AND THE APPLICABLE MINIMUM FIRE SAFETY

STANDARDS

12" = 1'-0"

M0.1

LEGEND, NOTES, &

SCHEDULES

26015

PCS PALM HARBOR

UNIVERSITY HS BOILER

REPLACEMENT PROJECT

08-12-2026

ADT

BAL

1900 Omaha St, Palm Harbor, FL 34683

100% CONSTRUCTION BID SET

1. 125 PSI ASME RATED STEEL BODY TANGENTIAL AIR SEPARATOR WITH FLANGED CONNECTIONS, INTERNAL STRAINER, AND

NPT AIR VENT CONNECTION.

2. SUPPORT FROM STRUCTURE ABOVE. REFER TO DETAILS FOR ADDITIONAL INSTALLATION REQUIREMENTS.

1. CONSTANT SPEED BASE MOUNTED END SUCTION HOT WATER PUMP WITH SUCTION DIFFUSER.

2. ANCHOR NEW PUMP TO EXISTING CONCRETE HOUSEKEEPING PAD. VERIFY PUMP DIMENSIONS WITH EXISTING PAD.

3. PROVIDE 5-YEAR WARRANTY.

4. REFER TO END SUCTION PUMP DETAIL FOR ADDITIONAL INFORMATION.

No. Description Date

NOTE: NEW BOILERS SUPPLIED BY EXISTING NATURAL GAS PIPING IN EXISTING MECHANICAL ROOM. GAS PIPE SIZING CALCULATIONS ARE PROVIDED FROM THE NEW AUTOMATIC SHUT OFF VALVE AT BUILDING

EXTERIOR. ASSUMED GAS PRESSURE UPSTREAM OF EXISTING IS 2 PSI.

2 86 < 2 0.5 0.6

PIPE SIZE

(IN. DIA.)

PIPE LENGTH

(EQUIVALENT LENGTH)

INLET

PRESSURE

(PSI)

PRESSURE

DROP

(IN. W.C.)

SPECIFIC GRAVITY

2023 FBC-FUEL GAS, SECTION 402.4(4)

TOTAL GAS CONSUMPTION (CFH) 4000

B-2[N] FORCED DRAFT CONDENSING BOILER 1 NG 2,000

B-1[N] FORCED DRAFT CONDENSING BOILER 1 NG 2,000

Mark Description Quantity NG/LP

GAS INPUT

(MBH)

231123

P

NATURAL GAS / LP SERVICE CALCULATIONS

14. FACTORY TRAINED START-UP AND OWNERS TRAINING REQUIRED. FULL VERIFICATION OF SPECIFIED

TURNDOWN RATIO SHALL BE WITNESSED BY OWNERS REP.

13. PRESSURE VESSEL AND HEAT EXCHANGER SHALL BE PROTECTED BY A FACTORY WARRANTY THAT COVERS

LIFETIME THERMAL SHOCK, 5 YEAR ON BURNER AND 18 MONTHS ON PARTS.

12. BOILER SHALL BE ABLE TO ANTICIPATE SYSTEM LOAD CHANGES VIA A 0-10VDC SIGNAL FROM BOILER LOW

VOLTAGE CONTACTS.

11. VARIABLE PRIMARY PIPING: BOILER ISOLATION VALVES SHALL BE PROVIDED ON THE OUTLET OF EACH

BOILER AND CONTROLLED BY THE BOILER OPERATING SYSTEM.

10. BOILER SHALL HAVE 7 ” CAPACITIVE TOUCHSCREEN INTERFACE WITH WIFI AND ETHERNET CONNECTION FOR

REMOTE MONITORING AND CONTROL.

9. BOILER MUST INTEGRAL CASCADE SEQUENCER WITH BACNET MSTP INTERFACE, LEAD/LAG, EFFICIENCY

OPTIMIZATION, AND CASCADE REDUNDANCY.

8. BOILER SHALL NOT HAVE A PUBLISHED EXCESS OXEGYN OF MORE THAN 5.8%. EXCESS OXEGYN PERCENTAGE SHALL BE VALIDATED BY THE INTERNAL OXEGYN SENSOR AND READOUT ON DIGITAL DISPLAY.

7. PROVIDE BOILER WITH MANUFACTURER'S SYSTEM SENSOR, OUTDOOR SENSOR, CONDENSATE

NEUTRALIZER, ANCHORING BRACKETS, SYSTEM TEMPERATURE THERMOWELL, AND INLINE GAS FILTER.

6. PROVIDE BOILER WITH INLINE REGULATOR EQUAL TO MAXITROL RV81 WITH ANSI COMPLIANT VENT LIMITER.

5. BOILER SHALL BE CSA CERTIFIED, AT SITE ALTITUDE AT HIGH AND LOW TURNDOWN RATIO.

4. BOILER HEAT EXCHANGER SHALL BE CONDENSING, STAINLESS STEEL, FIRE TUBE DESIGN. NO EXCEPTIONS.

3. BOILER TO BE CSD-1 / FACTORY MUTUAL / GAPS, AND CALIFORNIA CODE COMPLIANT.

2. BOILER SHALL MEET ANSI STANDARD Z21.13 AND THERMAL AND COMBUSTION EFFICIENCIES AND SHALL BE

AHRI CERTIFIED.

1. CONDENSING HYDRONIC HEATING BOILER WITH MULTIPLE INDEPENDENT BURNER MODULES WITH INTERNAL

BOILER PUMP AND FACTORY MODULATION AND CASCADE CONTROL.

NOTES:

NOTES --- ALL ALL

MODEL --- AR 2000 AR 2000

MANUFACTURER --- RIELLO RIELLO

LOCATION --- 13-102 MECH. RM. 13-102 MECH. RM.

VENT SIZE DIA. INCHES 8 8

WEIGHT (DRY) LBS. 1,676 1,676

CONTROLS --- BACnet BACnet

TOTAL AMPS (FLA) AMPS 15.5 15.5

ELECTRICAL V/PH./HZ. 240/1/60 240/1/60

THERMAL EFFICIENCY % 96.1 96.1

HEATING SURFACE SQ. FT. (4) 43 (4) 43

GAS PRESSURE MIN./MAX. IN. WC. 3.5 / 13.5 3.5 / 13.5

NG/LP GAS --- NG NG

OUTPUT (LOW) BTUH 96,100 96,100

OUTPUT (HIGH) BTUH 1,922,000 1,922,000

MIN. INPUT BTUH 100,000 100,000

MAX. INPUT BTUH 2,000,000 2,000,000

RETURN WATER TEMP. °F 140 140

SUPPLY WATER TEMP. °F 180 180

FLOW RATE (@ 40°F ΔT) GPM 95 95

FLOW RATE (MAX) GPM 150 150

FLOW RATE (MIN) GPM 85 85

STORAGE CAPACITY (TOTAL) GAL. 35 35

OPERATING PRESSURE (MAX) PSIG 80 80

MODULES --- 4 4

SERVICE --- HEATING HOT WATER HEATING HOT WATER

ITEM NO. --- B-1[N] B-2[N]

235216

M

BOILER SCHEDULE

NOTES:

NOTES --- 2

MODEL --- TASS004

MANUFACTURER --- PATTERSON

OPERATING WEIGHT LBS 108

LOCATION --- 13-102

PIPE SIZE CONNECTIONS IN. DIA. 6

MAX. PRESSURE DROP FT. WTR. <1

FLOW RATE GPM 450

SERVICE --- HOT WATER

ITEM NO. --- AS-01

233700

M AIR SEPARATOR SCHEDULE

NOTES --- ALL ALL

MODEL --- E3D13A-2 E3D13A-2

MANUFACTURER --- PATTERSON PATTERSON

LOCATION --- 13-102 13-102

WEIGHT LBS. 1037 1037

CONTROL --- STARTER STARTER

FLA AMPS 24 24

ELECTRICAL V/PH./HZ. 460/3/60 460/3/60

DISCHARGE DIA. IN. 3 3

SUCTION DIA. IN. 4 4

IMPELLER DIA. IN. 13.5 13.5

FRAME SIZE --- 256T 256T

BASE TYPE --- FRAME MOUNTED FRAME MOUNTED

MOTOR TYPE --- TEFC TEFC

EFFICIENCY % 75.20% 75.20%

SPEED RPM 1760 1760

MOTOR BHP/HP -- / 20 -- / 20

TOTAL DYNAMIC HEAD FT. HD. 90 90

WATER FLOW GPM 530 530

TYPE --- END SUCTION END SUCTION

SERVICE --- HOT WATER HOT WATER

ITEM NO. --- HWP-1 HWP-2

232123

M

PUMP SCHEDULE (ADD ALTERNATE NO. 1)

MECHANICAL SHEET INDEX

Sheet Number Sheet Name Project Issue Date Current Revision

M0.1 LEGEND, NOTES, & SCHEDULES 08-12-2026

M1.1 MECHANICAL DEMOLITION PLAN 08-12-2026

M2.1 MECHANICAL RENOVATION PLANS 08-12-2026

M3.1 MECHANICAL DETAILS 08-12-2026

M3.2 MECHANICAL DETAILS 08-12-2026

M4.1 CONTROLS LEGEND, NOTES, & DETAILS 08-12-2026

B-1[D]

HWP-2[D]

HWP-1[D]

ET-2[E]ET-1[E]

BP-1[D]

MECHANICAL

13-102

MECHANICAL

13-101

CONTROL ROOM

13-103

6"ø HHWR[E]

6"ø HHWR[E]

"ø

H H

W R

[E

6"ø HHWS[D]

6"ø HHWS[E]

"ø

H H

W S

[E

"ø

H H

W S

[E

6"ø HHWR[E]

LV-1[E]

48"x72"

LV-1[E]

48"x72"

1 1/2"ø CW[E]1 1/2"ø CW[E]

6"ø HHWR[D]

"ø

H H

W S

[D

2"ø GAS[E]

"ø

G A

S [E

"ø

H H

W S

[D

14"ø[D]

11 11

"ø

G A

S [E

/2

"ø G

A S

[E

2"ø GAS[E]

DELEWARE AVE.

O M

A H

A S

T

19 19

Scale

Project number

Date

Drawn by

Checked by

CONSULTING ENGINEERS

154A WHITAKER RD.

LUTZ, FLORIDA 33549

(813)333-2103

WWW.BALENGINEERING.COM

Pinellas County Schools 301 4TH St. SW Largo, FL 33770

727-588-6000 https://www.pcsb.org

KEY PLAN

TO THE BEST KNOWLEDGE OF THE ENGINEERS AND

ARCHITECTS, SAID PLANS AND SPECIFICATIONS

COMPLY WITH THE APPLICABLE MINIMUM BUILDING

CODES AND THE APPLICABLE MINIMUM FIRE SAFETY

STANDARDS

1/4" = 1'-0"

M1.1

MECHANICAL DEMOLITION

PLAN

26015

PCS PALM HARBOR

UNIVERSITY HS BOILER

REPLACEMENT PROJECT

08-12-2026

ADT

BAL

1900 Omaha St, Palm Harbor, FL 34683

100% CONSTRUCTION BID SET

1/4" = 1'-0"M1.1

1 BUILDING 13 - PARTIAL DEMOLITION PLAN

DEMOLITION NOTES

1. EXISTING CENTRAL PLANT BUILDING. NO WORK IN EXISTING CHILLER

PLANT.

2. REFER TO ELECTRICAL PLANS FOR WORK IN THIS AREA.

3. EXISTING GAS FIRED BOILER PREVIOUSLY REMOVED BY OWNER (SHOWN

FOR REFERENCE).

4. EXISTING HHW PUMPS TO BE DEMOLISHED AS PART OF BID ALTERNATE

NO. 1. REFER TO BID ALTERNATE NO. 1 ON SHEET M0.1.

5. EXISTING BOILER PUMP, STRAINER, AND ASSOCIATED PIPIING TO BE

DEMOLISHED. REMOVE SUPPORTS AND CONDUITS. NEW BOILERS

PROVIDED WITH INTEGRAL BOILER PUMP.

6. EXISTING GAS REGULATOR AND PIPING TO BE DEMOLISHED FOR

INSTALLATION OF NEW AUTOMATIC GAS SHUT OFF VALVE. CONTRACTOR

SHALL FIELD VERIFY EXISTING GAS METER AND REGULATOR FOR

ISOLATION OF UNDERGROUND GAS PIPING FOR NEW WORK. REFER TO

RENOVATION PLANS AND SECTIONS FOR ADDITIONAL INFORMATION.

7. EXISTING 2”GAS PIPING TO REMAIN. DEMOLISH EXISTING VALVE TRAIN

AND PREPARE PIPING FOR NEW CONNECTION.

8. EXISTING 1½”CW TO REMAIN. DEMOLISH EXISTING MAKEUP WATER

ASSEMBLY AND PREPARE PIPING FOR NEW CONNECTIONS.

9. EXISTING VENTILATION LOUVERS TO REMAIN.

10. EXISTING 14” BOILER FLUE TO BE DEMOLISHED. REMOVE EXISTING FLUE

CAP ON ROOF AND CAP ROOF CURB OPENING PERMANENTLY.

11. EXISTING EXPANSION TANKS TO REMAIN.

12. EXISTING CHEMICAL SHOT FEEDER TO BE DEMOLISHED.

13. EXISTING PARTICULATE FILTER TO BE REMOVED.

14. EXISTING FIRE ALARM PULL STATION TO REMAIN. CONTRACTOR SHALL

TEST AND VERIFY OPERATION. REFER TO ELECTRICAL PLANS FOR

ADDITIONAL INFORMATION.

15. EXISTING BUTTERFLY ISOLATION VALVES TO BE REPLACED WITH NEW

VALVES.

16. EXISTING 3-WAY CONTROL VALVE TO BE DEMOLISHED.

17. EXISTING HOT WATER RETURN PIPING TO / FROM HEAT RECOVERY

CHILLER TO REMAIN.

GENERAL NOTES

1. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO

START OF THE WORK. VERIFY EXISTING ISOLATION VALVES ARE

WORKING PRIOR TO DRAINING OF SYSTEMS.

2. CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH OWNER'S

SCHEDULE. REFER TO SPECIFICATIONS FOR SPECIFIC CONTRACT

REQUIREMENTS.

3. COORDINATE DEMOLITION AND NEW WORK WITH EXISTING CONTROLS

SEQUENCES. CH-4 HEAT RECOVERY CHILLER SHALL BE DISABLED WHILE

HOT WATER LOOP IS NOT ACTIVE.

No. Description Date

ESO

EXT. FIN. FLOOR

0' - 0"

EXT ROOF DECK

17' - 0"

B-1[N]

B-2[N]

M2.1

6"ø HHWR[E]

6"ø HHWR[E]

6"ø HHWR[E]

"ø

H H

W S

[E

6"ø HHWS[N]

4"ø HHWS[N]

4"ø HHWR[N]

2"ø GAS[E]

6"ø HHWR[E]

"ø

H H

W S

[E

6"ø HHWS[E]

4"ø HHWS[E]

2"ø GAS[E]

1 1/2"ø CW[E]

"ø

[N

"ø

[N

HWP-1[N]

HWP-2[N]

MECHANICAL

13-101

CONTROL ROOM

13-103

MECHANICAL

13-102

4"ø HHWS[N]

M2.1

1 1/2"ø GAS[N]

6"ø HHWS[N]

15AS-1[N]

6"ø HHWR[E]

ET-1[E] ET-2[E]

2"ø GAS[E]

1/2"ø GAS[E]

1 1/2"ø CD[N] 17

2' - 6"

1 1/2"ø CD[N] 17

EXT. FIN. FLOOR

0' - 0"

NEW 2" GAS

LOCKWING BALL

VALVE EQUAL TO

JOMAR 175-LWN

NEW 2 1/2"NPT AUTOMATIC

GAS VALVE. EQUAL TO ASCO

8215 SERIES N.C.

1/2" EXISTING

GAS TO BUILDING

19 BELOW

GRADE

6"ø HHWR[E] 6"ø HHWS[E]

EXISTING COVER PLATE

EXISTING GFCI OUTLET

NEW 2"GAS THROUGH

EXISTING PENETRATION

1/2" EXISTING

ISOLATION

VALVE

2" EXISTING GAS

PIPING BELOW

GRADE. (2 PSI).

CONTRACTOR TO

FIELD VERIFY.

MECHANICAL

13-102

MECHANICAL

13-101

CONTROL ROOM

13-103

EXST. PAD

4' - 10"

NEW PAD EXT.

0' - 6"

E X

S T

P

A D

2' - 4"

M

IN

/1

B O

IL

E

R

/1

BOILER

5' - 0 13/16"

BOILET TO EXST. WALL

2' - 4 25/32"

M

IN

S

E R

V

IC

E C

L E

A R

A N

C E

/1

MIN. BOILER SERVICE CLEARANCE

9' - 8 5/16"

EXST. DOOR

6 '- 0" x 7'-10"

EXST. BOILER ROOM

16' - 9 5/8"

E X

S T

B

O

IL

E R

R O

O M

/8

2' - 7 1/2" 2' - 0"

B-2[N]

B-1[N]

N E

W F

E N

C E

NEW FENCE

6' - 7 5/8"

NEW GATE

3' - 0"

ET-1[E]

ET-2[E]

HWP-1[N]

HWP-2[N]

FD[E]

6"ø HHWS[E]

6"ø HHWR[E]

2"ø GAS[E]

"ø

G A

S [E

B-2[N]

B-1[N]

8"ø[N] 8"ø[N]

"ø

[D ]8

"ø [D

AS-1[N]

6"ø HHWR[E]

6"ø HHWS[E]

4"ø HHWS[N]

4"ø HHWR[N]

1 1/2"ø HHWS[E]

6"ø HHWR[E]

EXT. FIN. FLOOR

0' - 0"

EXT ROOF DECK

17' - 0"

4"ø HHWS[N]

6"ø HHWS[N]

4"ø HHWR[N]

8"ø[N]

8"ø[N]

1 1/2"ø GAS[N]

2"ø GAS[E]

1 1/2" DRIP LEG AND

THREADED CAP

1 1/2"NPT QUARTER TURN GAS BALL

VALVE EQUAL TO APOLLO 82-100

1 1/2" GAS REGULATOR EQUAL TO

MAXITROL RV81 WITH VENT LIMITER.

MAX. 13.5" W.C.

1 1/2"ø CD[N]

MANUFACTURER

PROVIDED 20

MICRON GAS

FILTER

4" HWR CONTROL VALVE

4" HWR STRAINER

8" DOUBLE WALL STAINLESS

BOILER EXHAUST FLUE UP

THROUGH EXISTING ROOF WITH

NEW FLUE CAP.

8" SCH.40 PVC

COMBUSTION AIR DUCT

4" BUTTERFLY

ISOLATION

VALVES. HWS&R.

BOILER ON NEW 1/4"

NEOPRENE ISOLATION

PADS WITH

MANUFACTURER'S

ANCHORING BRACKETS

ANCHORED TO MODIFIED

CONCRETE HOUSEKEEPING

PAD.

SLOPE NEW CONDENSATE DISCHARGE

PIPING TO NEW MANUFACTURER

PROVIDED CONDENSATE NEUTRALIZER

ROUTE NEW 2 1/2"

RELIEF DRAIN PIPING

TO EXISTING FLOOR

DRAIN.

REFER TO SPECIFICATIONS FOR PIPE

SUPPORT SIZING AND SPACING

REQUIREMENTS.

3/8" ATR WITH NVENT

CADDY FROM METAL ROOF

JOISTS ABOVE

DELEWARE AVE.

O M

A H

A S

T

19 19

Scale

Project number

Date

Drawn by

Checked by

CONSULTING ENGINEERS

154A WHITAKER RD.

LUTZ, FLORIDA 33549

(813)333-2103

WWW.BALENGINEERING.COM

Pinellas County Schools 301 4TH St. SW Largo, FL 33770

727-588-6000 https://www.pcsb.org

KEY PLAN

TO THE BEST KNOWLEDGE OF THE ENGINEERS AND

ARCHITECTS, SAID PLANS AND SPECIFICATIONS

COMPLY WITH THE APPLICABLE MINIMUM BUILDING

CODES AND THE APPLICABLE MINIMUM FIRE SAFETY

STANDARDS

1/4" = 1'-0"

M2.1

MECHANICAL RENOVATION

PLANS

26015

PCS PALM HARBOR

UNIVERSITY HS BOILER

REPLACEMENT PROJECT

08-12-2026

Author

BAL

1900 Omaha St, Palm Harbor, FL 34683

100% CONSTRUCTION BID SET

1/4" = 1'-0"M2.1

1 BUILDING 13 - PARTIAL RENOVATION PLAN

RENOVATION NOTES

1. NEW CONDENSING HYDRONIC HEATING GAS FIRED BOILER ON MODIFIED

CONCRETE HOUSEKEEPING PAD. REFER TO SECTIONS AND DETAILS FOR

ADDITIONAL REQUIREMENTS.

2. NEW HHWS&R HEADERS CONNECTED TO EXISTING HHW LOOP PIPING.

3. MIN. REQUIRED DISTANCE BETWEEN SUPPLY AND RETURN

CONNECTIONS TO HHW LOOP, PER MFGR.

4. NEW 4”ø HHWS&R PIPING CONNECTIONS TO NEW BOILERS. INSTALL WITH

MANUAL BUTTERFLY ISOLATION VALVES IN ACCESSIBLE LOCATION.

REFER TO SECTIONS AND DETAILS FOR ADDITIONAL REQUIREMENTS.

5. NEW 8”ø COMBUSTION AIR CPVC PIPE THROUGH EXISTING CMU WALL TO

NEW BOILER COMBUSTION AIR INLET. PROVIDE 90° ELBOW DOWN WITH

INSECT SCREEN AT EXTERIOR OF BUILDING.

6. NEW 8”ø VENTILATION AIR DUCT UP THROUGH ROOF TO NEW BOILER

FLUE CAP. PROVIDE NEW ROOF FLASHING AT NEW PENETRATION. REFER

TO DETAILS FOR ADDITIONAL INFORMATION.

7. NEW WYE STRAINER, 2-WAY CONTROL VALVE, AND MANUAL BUTTERFLY

VALVE IN HHWR PIPING TO BOILER. TYPICAL OF EACH BOILER. REFER TO

SECTIONS AND ISOMETRICS FOR ADDITIONAL INFORMATION.

8. NEW PAD MOUNTED END SUCTION PUMPS ON EXISTING HOUSEKEEPING

PADS AS PART OF BID ALTERNATE NO. 1. REFER TO DETAILS FOR

ADDITIONAL REQUIREMENTS. REFER TO SHEET M0.1 FOR BID ALTERNATE

NO. 1 DESCRIPTION.

9. NEW CHEMICAL SHOT FEEDER ON EXISTING HOUSEKEEPING PAD.

10. NEW CARBON MONOXIDE (CO) AND METHANE (CH4) GAS DETECTOR

SYSTEM WITH AUTOMATIC GAS SHUT OFF VALVE AND FIRE ALARM DRY

CONTACT RELAYS. REFER TO ELECTRICAL DRAWINGS FOR 120V CIRCUIT.

REFER TO CONTROLS DRAWINGS AND DETAILS FOR ADDITIONAL

INFORMATION.

11. NEW MAKEUP WATER ASSEMBLY CONNECTED TO EXISTING 1½”CW

PIPING.

12. NEW 2” GAS PIPING WITH NEW ISOLATION AND AUTOMATIC CONTROL

VALVE IN NEW 6'-0" TALL CHAIN LINK FENCE WITH 3'-0" MIN. WIDE GATE.

REFER TO SECTION AND SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

13. NEW 1-1/2"GAS PIPING FROM EXISTING 2" PIPE ALONG WALL. INSTALL

NEW QUARTER TURN GAS BALL ISOLATION VALVE, 7-14" WC GAS

REGULATOR, AND 20 MICRON MESH GAS FILTER UPSTREAM OF BOILER

GAS INLET CONNECTION.

14. NEW AUTOMATIC GAS VALVE TIED INTO NEW GAS MONITORING SYSTEM

WITH NEW DRY CONTACT RELAY TO EXISTING FIRE ALARM. NEW

AUTOMATIC GAS SHUT OFF VALVE EQUAL TO ASCO 8215 N.C. REFER TO

ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

15. NEW AIR SEPARATOR SUSPENDED FROM STRUCTURE ABOVE. REFER TO

SCHEDULES AND DETAILS FOR ADDITIONAL INFORMATION.

16. INSTALL NEW BUTTERFLY ISOLATION VALVES AT HWS&R RISERS UP

THROUGH FLOOR. INSTALL NEW ELECTROMAGNETIC FLOW METER IN

EXISTING HWS UPSTREAM OF VALVE IN VERTICAL RISER DOWN

THROUGH SLAB.

17. INSTALL NEW 1 1/2" COPPER DWV CD PIPING SLOPED FROM UNIT

DISCHARGE TO NEW MANUFACTURER PROVIDED CONDENSATE

NEUTRALIZER ON SLAB. TREATED CONDENSATE DISCHARGE TO

EXISTING FLOOR DRAIN.

18. INSTALL NEW 2 1/2" COPPER DWV RELIEF DRAIN SLOPED FROM UNIT

DISCHARGE TO EXISTING FLOOR DRAIN.

GENERAL NOTES

1. REFER TO RENOVATION FLOOR PLANS FOR NEW AND EXISTING

HOUSEKEEPING PAD DIMENSIONS AND EQUIPMENT SERVICE CLEARANCE

REQUIREMENTS.

2. NEW BOILERS AND ACCESSORIES SHALL BE INSTALLED IN EXISTING

MECHANICAL ROOM. COORDINATE NEW EQUIPMENT AND PIPING WITH

EXISTING COMPONENTS TO REMAIN.

3. PROVIDE THREADED UNIONS AT ALL GAS CONNECTIONS TO EQUIPMENT

AND AT ALL SERVICEABLE COMPONENTS. REFER TO DETAILS FOR

ADDITIONAL INFORMATION.

4. PROVIDE ALL MANUFACTURER'S ADAPTERS TO MAKE CONNECTIONS TO

NEW BOILERS AS SPECIFIED.

5. ALL NEW GAS PIPING ABOVE AND BELOW GRADE SHALL BE EQUAL TO

ASTM A53/A53M SCHEDULE 40 BLACK STEEL WITH (2) COATS OF SAFETY

YELLOW DTM EPOXY EQUAL TO RUSTOLEUM 9100 ROC EPOXY AND PIPE

LABELS PER SPECIFICATIONS.

6. PROVIDE AND INSTALL NEW PIPE LABELS AND VALVE TAGS IN

ACCORDANCE WITH SPECIFICATION 230553.

1/4" = 1'-0"M2.1

5 GAS REGULATOR SECTION

1/4" = 1'-0"M2.1

2 BUILDING 13 - RENOVATION FLOOR PLAN

M2.1

3 RENOVATION ISOMETRIC VIEW

1/4" = 1'-0"M2.1

4 TYPICAL BOILER SECTION

PIPE

BOLT BOLT

PIPE

CLAMP

MOLDED

NEOPRENE

MATERIAL

CLAMP

FASTEN CHANNEL TO STRUCTURE WITH #12 SELF TAPPING STEEL SCREWS 12" O.C.

WITH MINIMUM OF 1/2" OF THREADS THROUGH STEEL STRUCTURE OR 3/16" TAPCON

12" O.C. WITH MINIMUM 2" ENGAGEMENT INTO CONCRETE.

CUSH-A-CLAMP DETAIL

SCALE: NONE

M 230500

MOLDED

NEOPRENE

MATERIAL

PIPE HANGER DETAIL

SCALE: NONE

M 230500

MIN.

12"

12"

MIN.

PROVIDE A SECTION OF HIGH COMPRESSION STRENGTH INSULATION AT EACH HANGER

POINT. INSULATION SHALL BE HALF ROUND AND EXTEND 2" BEYOND GALVANIZED

SHIELD EACH WAY

GALVANIZED

IRON HANGER

ROD &

HANGER

16 GAUGE

GALVANIZED SHEET

SHIELDINSULATION

PIPE

U-CLAMP OR

CONDUIT

CLAMP

GALVANIZED

IRON TRAPEZE

OR UNISTRUT

16 GAUGE

GALVANIZED SHEET

SHIELD FULLY

WRAPPED AROUND

INSULATION

INSULATION

PIPE

MAXIMUM PAIR AT 10' SPACING PAIR AT 5' SPACING

1" x 20 GA.

1" x 18 GA.

1" x 16 GA.

STRAP

1" x 22 GA.

1.5" x 16 GA.

1.5" x 16 GA.

NOTES:

1" x 16 - TWO 3/8" BOLT

PLACE FASTENERS IN SERIES, NOT SIDE BY

SIDE

30"

72"

96"

120"

HALF OF

PERIMETER

168"

192"

193"

UP"

WHEN STRAPS ARE LAP JOINED

1" x 18, 20, 22 GA. - TWO

#10 OR ONE 1/4" BOLT

1" x 16 - TWO 1/4" BOLT

USE THESE MINIMUM FASTENERS:

P

P

P

P

P

P

P

DUCT

NOT GIVEN

1.5" x 16 GA. 1/2"

1/2"

1" x 22 GA.

1" x 18 GA.

1" x 16 GA.

1.5" x 16 GA.

STRAP ROD/WIRE

10 GA.

(0.135")

3/8"

3/8"

1/2"

3/8" - 680 LBS.

1/2" - 1250 LBS.

5/8" - 2000 LBS.

3/4" - 3000 LBS.

1.5" x 16 GA. - 1100 LBS.

1/4" - 270 LBS.

WIRE OR ROD

(DIA.)

0.106" - 80 LBS.

0.135" - 120 LBS.

0.162" - 160 LBS.

SINGLE HANGER MAXIMUM ALLOWABLE

LOAD

1" x 16 GA.

1" x 16 GA.

1" x 22 GA. - 260 LBS.

1" x 20 GA. - 320 LBS.

1" x 18 GA. - 420 LBS.

1" x 16 GA. - 420 LBS.

SPECIAL ANALYSIS REQUIRED

STRAP

1/2"

1/2" 3/8"

3/8"

STRAP

1" x 18 GA.

1" x 20 GA.

1" x 22 GA.

1" x 22 GA.(0.135")

1/4"

3/8"

3/8"

(0.106")

3/8"

1/4"

3/8"

3/8"

3/8"1" x 16 GA.

1" x 18 GA.

(0.106")

1/4"

1/4"

1/4"

STRAP

1" x 20 GA.

1" x 22 GA.

1" x 22 GA.

1" x 22 GA.

HANGER STRAP

24"∅ MAX. BAND

FOR STRAP HANGER

HANGER STRAP

HANGER

STRAPS

S.S.

FASTENERS

S.S. LOAD

RATED

FASTENERS

50"∅ MAX. BAND

OF ONE PIECE

HANGER

STRAP HANGERS

HANGER

ROD

ANGLE IRON

LOAD RATED

FASTENER

NUTS

(TYP.)

HANGER ROD

ANGLE IRON

HANGER ROD

TRAPEZE HANGERS

HANGER STRAP

a. DIMENSIONS OTHER THAN GAUGE ARE IN INCHES.

b. TABLES ALLOW FOR DUCT WEIGHT, 1 LB./SF. INSULATION WEIGHT AND NORMAL

REINFORCEMENT AND TRAPEZE WEIGHT, BUT NO EXTERNAL LOADS.

c. STRAPS ARE GALVANIZED STEEL, OTHER MATERIALS ARE UNCOATED STEEL

d. ALLOWABLE LOADS FOR P/2 ASSUME THAT DUCTS ARE 16 GA. MAX., EXCEPT THAT WHEN

MAX. DUCT DIMENSION (W) IS OVER 60" THEN P/2 MAX. IS 1.25

W.

60" MAX

DUCT HANGER DETAIL (IN ACCORDANCE WITH SMACNA - THIRD EDITION)

SCALE: NONE

M 233300

TABLE 5-1 RECTANGULAR DUCT HANGERS MINIMUM

SIZE

TABLE 5-5 MINIMUM HANGER SIZES FOR ROUND

DUCT

DIAMETER

10 IN. DIA.

11-18 IN. DIA.

19-24 IN. DIA.

25-36 IN. DIA.

37-50 IN. DIA.

51-60 IN. DIA.

61-84 IN. DIA.

85-96 IN. DIA.

MAXIMUM SPACING WIRE DIA. ROD STRAP

12 FT

12 FT

12 FT

12 FT

12 FT

12 FT

12 FT

12 FT

ONE 12 GA.

TWO 12 GA. OR ONE 8 GA.

TWO 10 GA.

TWO 8 GA.

1/4 IN.

1/4 IN.

1/4 IN.

3/8 IN.

TWO 3/8 IN.

TWO 3/8 IN.

TWO 3/8 IN.

TWO 1/2 IN.

1 IN. X 22GA.

1 IN. X 22GA.

1 IN. X 22GA.

1 IN. X 20GA.

TWO 1 IN. X 20GA.

TWO 1 IN. X 18GA.

TWO 1 IN. X 16GA.

TWO 1-1/2 IN. X 16GA.

REFERENCE SMACNA HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE - THIRD EDITION, CHAPTER 5.

ROD/WIRE

10 GA.

ROD/WIRE

12 GA.

PAIR AT 8' SPACING PAIR AT 4' SPACING

ROD/WIRE

12 GA.

SINGLE PIPE SUPPORT DETAIL

SCALE: NONE

M 230500

EQUAL TO NVENT CADDY

ALL THREAD ROD

CLEVIS STYLE HANGER

PIPE

PIPE INSULATION

METAL SADDLE 1/2

THE DIAMETER OF

INSULATED PIPE

EXTEND ALL-THREAD ROD AS

REQUIRED TO PROPERLY

SUPPORT MECHANICAL

EQUIPMENT IN AN APPROVED

MANNER

ALL-THREAD ROD

ATTACH TO

STRUCTURE IN AN

APPROVED MANNER

WASHER AND LEVELING

NUT

LOCKING NUT

AND WASHER

ANGLE

ALL-THREAD ROD

ATTACH TO

STRUCTURE IN

AN APPROVED MANNER

CHANNEL

LEVELING NUT

AND WASHER

LOCKING NUT

AND WASHER

STEEL SUPPORT DETAIL

SCALE: NONE

M 230500

SUPPORT CHANNELSUPPORT ANGLE

BAR JOIST HANGER DETAIL - TOP AND BOTTOM CHORD

SCALE: NONE

M 230529

EQUIPMENT BASE PAD DETAIL

SCALE: NONE

M 230500

FIELD VERIFY

1. MAKE CONCRETE BASE PAD 6" LARGER ALL AROUND THAN EQUIPMENT BASE.

2. SUBMIT SHOP DRAWINGS FOR APPROVAL.

3. CONCRETE 3000 PSI.

VARIESFIELD VERIFY

EMBED #5 MIN. 4" INTO

EXISTING PAD. PROVIDE MIN.

4" EXPOSED IN NEW PAD.

EMBED WITH EPOXY EQUAL

TO HILTI HIT-RE 500

1/2"ATR MIN. 4" EMBEDMENT

ON 12" CENTERS. ROUGHEN

EXISTING SLAB AND PREP

SURFACE WITH BONDING

AGENT.

EXISTING PAD

EXISTING SLAB

NEW PAD EXTENSION

Scale

Project number

Date

Drawn by

Checked by

CONSULTING ENGINEERS

154A WHITAKER RD.

LUTZ, FLORIDA 33549

(813)333-2103

WWW.BALENGINEERING.COM

Pinellas County Schools 301 4TH St. SW Largo, FL 33770

727-588-6000 https://www.pcsb.org

TO THE BEST KNOWLEDGE OF THE ENGINEERS AND

ARCHITECTS, SAID PLANS AND SPECIFICATIONS

COMPLY WITH THE APPLICABLE MINIMUM BUILDING

CODES AND THE APPLICABLE MINIMUM FIRE SAFETY

STANDARDS

As indicated

M3.1

MECHANICAL DETAILS

26015

PCS PALM HARBOR

UNIVERSITY HS BOILER

REPLACEMENT PROJECT

08-12-2026

ADT

BAL

1900 Omaha St, Palm Harbor, FL 34683

100% CONSTRUCTION BID SET

SCALE: NONE

M 232100

CHEMICAL SHOT FEEDER DETAIL

AIR RELEASE

VALVE

FLOW

DRAIN

ONE SHOT FEEDER

WITH TANK WITH

FILTER. EQUAL TO

NEPTUNE DPFC-5

GATE VALVE (TYP.)

FUNNEL

PUMP

SCALE: NONE

M 232100

TYPICAL EXPANSION TANK CONNECTIONS AND MAKEUP WATER DETAIL

GLOBE VALVE

UNION (TYP.)

STRAINER W/

HOSE BIBB

LINE SIZE SHALL BE AS

SHOWN ON DRAWINGS.

DOUBLE CHECK BACKFLOW

PREVENTER EQUAL TO

WATTS SERIES 709-QT

GATE VALVE

(TYP.)

(2) EXISTING BLADDER TYPE

EXPANSION TANK(S)

RUN TO FLOOR DRAIN

PRESSURE RELIEF VALVE (30 PSIG)

PRESSURE REDUCING

VALVE (12 PSIG

ADJUSTABLE)

P

EXISTING 6"ø HWR

HEADER

AIR SEPARATOR DETAIL

SCALE: NONE

M 232100

AUTOMATIC AIR

VENT - PATTERSON

MODEL AR-075

LUG TYPE

BUTTERFLY

ISOLATION VALVE

STRAINER

1"∅ MAKE-UP

WATER.

GATE

VALVE

GATE

VALVE

AIR

SEPARATOR

WITH

STRAINER

END SUCTION PUMP DETAIL

SCALE: NONE

M 232100

PRESS.

GAGE

BUTTERFLY VALVE

FLEXIBLE CONNECTION (TYP.)

SUCTION

DIFFUSER/STRAINER

RUN TO NEAREST

FLOOR DRAIN

MOTOR

COUPLING

ASSY.

PUMP

NON SLAM WAFER CHECK

VALVE

BALANCING VALVE

WYE STRAINER WITH VALVE

AND BLOW DOWN

STACK CAP

STORM COLLAR TALL CONE

FLASHING

SEAL WATERTIGHT

AROUND FLASHING

DOUBLE WALL FLUE STACK AND THIMBLE AS MANUFACTURED

BY METALBESTOS. VERIFY SIZE WITH EQUIPMENT.

ROOF

'-0

M

IN

BOILER EXHAUST STACK DETAIL

SCALE: NONE

M 233300

BOILER

CONDENSATE

DRAIN

CONNECTION

BOILER CONDENSATE DETAIL

SCALE: NONE

M 232100

DRAIN LINE SHALL BE AT LEAST

THE SAME SIZE AS THE NIPPLE ON

THE BOILER

CLEAN

OUT

PITCH TOWARD

NEUTRAILZER

CLEAN

OUT

PROVIDE UNION AT

THREADED CONNECTIONS,

TYPICAL

BOILER

CONDENSATE PH

NEUTRALIZER,

EQUAL TO

NEUTRASAFE

CN4BC-2000C

PITCH AND

EXTEND TO

EXISTING

SANITARY

FLOOR DRAIN

DO NOT TRAP

BOILER

CONDENSATE

CONNECTION. UNIT

CONDENSATE IS

INTERNALLY

TRAPPED

SUPPORT PIPING

ABOVE FLOOR

BOILER EXHAUST STACK DETAIL

SCALE: NONE

M 233300

Scale

Project number

Date

Drawn by

Checked by

CONSULTING ENGINEERS

154A WHITAKER RD.

LUTZ, FLORIDA 33549

(813)333-2103

WWW.BALENGINEERING.COM

Pinellas County Schools 301 4TH St. SW Largo, FL 33770

727-588-6000 https://www.pcsb.org

TO THE BEST KNOWLEDGE OF THE ENGINEERS AND

ARCHITECTS, SAID PLANS AND SPECIFICATIONS

COMPLY WITH THE APPLICABLE MINIMUM BUILDING

CODES AND THE APPLICABLE MINIMUM FIRE SAFETY

STANDARDS

As indicated

M3.2

MECHANICAL DETAILS

26015

PCS PALM HARBOR

UNIVERSITY HS BOILER

REPLACEMENT PROJECT

08-12-2026

ADT

BAL

1900 Omaha St, Palm Harbor, FL 34683

100% CONSTRUCTION BID SET

NOTE:

ALL SYMBOLS OR ABBREVIATIONS MAY NOT APPEAR ON PLANS. CONTRACTOR IS ONLY

RESPONSIBLE FOR EQUIPMENT INDICATED ON CONSTRUCTION PLANS OR BY SPECIFICATION.

FAN

DRAWING SYMBOL DESCRIPTION DRAWING SYMBOL DESCRIPTION

ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION

CONTROL DIAGRAM LEGENDM

230900

ABBREVIATIONS

HP

RPM

LO

EA

HI

SDSP

EFF STG

RH

CMP

A

AFF

RDSP

MOD

DP

DMD

DH

SFTY

COV

HC

VLV

WRN

SF

COMPRESSOR

AMPS

ABOVE FINISHED FLOOR

RELATIVE HUMIDITY

EFFECTIVE STAGE

EXHAUST AIR

SUPPLY DUCT STATIC PRESSURE

HIGH

LOW

HORSE POWER

ROTATIONS PER MINUTE

RETURN DUCT STATIC PRESSURE

MODULATING

DIFFERENTIAL PRESSURE

DEMAND

DEHUMIDIFICATION

SAFETY

CHANGE OF VIEW

HEATING COIL

VALVE

WARNING/FAULT

SUPPLY FAN

RA RETURN AIR

FLT FILTER

HW HEATING WATER

RF

MA

RETURN FAN

MIXED AIR

DPT

STBY

DEW POINT TEMPERATURE

STANDBYEF EXHAUST FAN

P PRESSURE

PI PROPORTIONAL + INTEGRAL CONTROL

S STATUS

CW CONDENSER WATER

SD SMOKE DETECTOR

PCT PERCENT

CLG

CC

CHW

C

COOLING COIL

COOLING

CHILLED WATER

COMMAND

BYP BYPASS

ALM ALARM

PID PROPORTIONAL + INTEGRAL + DERIVATIVE CONTROL

PWR POWER

SA SUPPLY AIR

D DAMPER

DLY DELAY

DA DISCHARGE AIR

BHP BRAKE HORSE POWER

F FEEDBACK

SP SETPOINT

O OUTPUT

SUC SUCTION

T

UNOCC UNOCCUPIED

V VOLTS

TEMPERATURE

BSP BUILDING STATIC PRESSURE

SPD SPEED

DIS DISCHARGE

CFM CUBIC FEET PER MINUTE

HTG HEATING

KW KILOWATT

OCC OCCUPIED

OA OUTSIDE AIR

VFD VARIABLE FREQUENCY DRIVE

ISO ISOLATION

LIM LIMIT

AI ANALOG INPUT (0-10 VDC, 4-20 MA)

AO ANALOG OUTPUT (0-10 VDC, 4-20 MA)

DI DIGITAL INPUT (DRY CONTACT, 0 OR 24 VDC)

DO DIGITAL OUTPUT (DRY CONTACT, 0 OR 24 VDC)

2-WAY MOTORIZED BALL VALVE

3-WAY MOTORIZED BALL VALVE

AVERAGING TEMPERATURE SENSOR - SENSOR

LENGTH TO CROSS FACE OF COIL MINIMUM 2X

DUCT TEMPERATURE SENSOR - SENSOR LENGTH

TO BE A MINIMUM OF 1/4 THE TOTAL WIDTH OF

DUCT OR INSTALLED TO SENSE THE MIDDLE OF

THE DUCTWORK.

VLV-X

VLV-X

ATS

DTS

DHS

--- DUCT HUMIDITY SENSOR - OUTPUT SHALL BE

0-10VDC OR 4-20MA WITH A 2% ACCURACY

DPT

HI LO

DIFFERENTIAL PRESSURE TRANSMITTER - OUTPUT

SHALL BE 0-10VDC OR 4-20MA WITH A 2%

ACCURACY

DPS

HI LO

DIFFERENTIAL PRESSURE SWITCH - DRY CONTACT

NORMALLY CLOSED

DPS

HI LO

DIFFERENTIAL PRESSURE SWITCH MANUAL

RESET - DRY CONTACT NORMALLY CLOSED

MRS

CT

CURRENT TRANSDUCER - DRY CONTACT

NORMALLY OPEN

RL

--- 24 VDC COIL RELAY - NORMALLY OPEN CONTACT

xAD

--- MOTORIZED DAMPER

OAD = OUTSIDE AIR DAMPER

RAD = RETURN AIR DAMPER

FILTER

OAF

EBTRON AIR MONITOR: MODEL GTx116e-PC

OAF = OUTDOOR AIR FLOW IN CFM

RAF = RETURN AIR FLOW IN CFM

SAF = SUPPLY AIR FLOW IN CFM

PUMP

WM

--- WATER METER - OUTPUT SHALL BE PWM, 0-10VDC

OR 4-20MA WITH A 0.4% ACCURACY

FM

--- FLOW METER - OUTPUT SHALL BE 0-10VDC OR

4-20MA WITH A 1% ACCURACY

WELL TEMPERATURE SENSOR

WTS

2-WAY, 2-POSITION MOTORIZED BUTTERFLY VALVE

VLV-X

2-WAY, 2-POSITION SOLENOID VALVE

VLV-X

2S

I CURRENT

BMS BUILDING MANAGEMENT SYSTEM

M5.1

M5.1

HEATING HOT WATER CONTROL DIAGRAM

SCHEDULING:

THE BOILERS SHALL BE SCHEDULED BASED ON A USER INTERFACE SCHEDULE WITH 2 MODES OF OPERATION, ENABLED OR DISABLED. EXISTING OCCUPANCY SCHEDULE TO

REMAIN

ENABLED MODE:

WHEN OUTSIDE AIR TEMP. IS LESS THAN 55°F(ADJ.) AND ANY AIR HANDLER CALLS FOR HEATING THE HEATING PLANT SHALL BE ENABLED. THE CONTROLLER SHALL ENABLE THE SECONDARY HOT WATER HWP-1. IF FLOW IS NOT PROVEN WITHIN (3) MINUTES (ADJ.) THE CONTROLS SHALL GENERATE AN ALARM SIGNAL FOR HWP-1, LOCKOUT PUMP, AND ENERGIZE HWP-2. UPON PROOF OF FLOW THROUGH SECONDARY LOOP AS CONFIRMED BY NEW FLOW SENSOR THE CONTROLLER SHALL ENABLE B-1, OPEN IT'S MOTORIZED ISOLATION VALVE, AND ENERGIZE INTERNAL BOILER PUMP. BOILER SHALL MODULATE FIRING AND FLOW TO MAINTAIN DISCHARGE SET POINT OF 180°F(ADJ.) AS SENSED BY THE BOILER HWS SENSOR.

UPON A DROP IN HWR RETURN TEMPERATURE AS SENSED BY HW LOOP HWR SENSOR BELOW 140°F(ADJ.) THE CONTROLLER SHALL ENABLE BOILER B-2. BOILER SHALL MODULATE FIRING AND FLOW TO MAINTAIN DISCHARGE SET POINT OF 180°F(ADJ.) AS SENSED BY THE HW LOOP HWS SENSOR.

DISABLED MODE:

WHEN OUTSIDE AIR TEMP. IS ABOVE 55°F(ADJ.) THE HEATING PLANT SHALL BE LOCKED OUT. REHEAT HEATING HOT WATER PROVIDED BY EXISTING HEAT RECOVERY CHILLER (CH-4).

EXISTING CHILLER SEQUENCES TO REMAIN.

HOT WATER PUMP ROTATION:

HOT WATER PUMPS HHWP-1 AND HHWP-2 ARE REDUNDANT PUMPS AND SHALL ONLY OPERATE ONE AT A TIME. THE ACTIVE PUMP SHALL BE ROTATED WEEKLY VIA USER ADJUSTABLE

SCHEDULE. INACTIVE PUMP SHALL BE LOCKED OUT THROUGH THE CONTROLS.

GAS LEAK DETECTION:

SHALL BE PROVIDED VIA A SELF CONTAINED PROGRAMMABLE CONTROLLER WITH CARBON MONOXIDE (C0) AND NATURAL GAS METHANE (CH4) GAS DETECTORS WITH EITHER 24VAC OR 120VAC OUTLET SIGNAL TO AUTOMATIC GAS SHUT-OFF VALVE AND FIRE ALARM TIE-IN, AND 0.5 A BMS RELAY FOR ALARM. PROVIDE DRY CONTACT RELAYS FROM NEW GAS

MONITORING CONTROLLER TO :

NEW 120VAC AUTOMATIC GAS SHUT OFF VALVE

BOILER SAFETY SHUT DOWN CONTACTS

FIRE ALARM CONTACT

ORANGE STROBE WARNING LIGHT (EXTERIOR WALL ABOVE BOILER PLANT DOOR)

EMERGENCY SHUT DOWN PANIC BUTTON (EXTERIOR WALL OF BOILER PLANT)

BMS ALARM

GAS MONITOR EQUAL TO AGS MINI MERLIN WITH REMOTE ESO BUTTON

FORCED DRAFT CONDENSING HYDRONIC HEATING BOILER

HAND

OFF

AUTO

HWP-1

STARTER

HAND

OFF

AUTO

HWP-2

STARTER

RL-1

HWP1C

BO-1

CT-1

HWP1S

BI-1

RL-2

HWP2C

BO-2

CT-2

HWP2S

BI-2

HEATING WATER SUPPLY AND

RETURN TO & FROM CAMPUS

HWP-2

HWP-1

WTS-4

HHWS-T

AI-4

WFS-1

HHWS-F

AI-6

WTS-2

HHWR-T

AI-2

BLR-1

B1-EN

BO-3

BLR-1

B1-A

BI-4

BLR-1

B1-S

BI-3

BLR-1

B1-SP

AI-9

B-1

WTS-3

HHWR-T

AI-3

B-2

WTS-5

HHWS-T

AI-5

HEATING WATER

RETURN TO AND FROM

CH-4 (HEAT RECOVERY

CHILLER)

BLR-2

B2-EN

BO-4

BLR-2

B2-A

BI-7

BLR-2

B2-S

BI-6

BLR-2

B2-SP

AI-10

B-2

CONTROLS

B-1

CONTROLS

VLV-2

B1-P

AI-8

VLV-2

B1-O

AO-2

VLV-1

B1-P

AI-7

VLV-1

B1-O

AO-1

BLR-1

B1-CMDPR-S

BI-5

BLR-2

B2-CMDPR-S

BI-8

GAS MONITOR

CO & CH4 GAS SENSORS

GM

CO-PALRM

BI-9

GM

CH4-PALRM

BI-10

RL-3

GASVLV

BO-5

RL-4

B1SSHTDWN

BI-11

RL-5

B2SSHTDWN

BI-12

RL-6

BP FALRM

BI-13

WTS-1

HHWR-T

AI-1

Scale

Project number

Date

Drawn by

Checked by

CONSULTING ENGINEERS

154A WHITAKER RD.

LUTZ, FLORIDA 33549

(813)333-2103

WWW.BALENGINEERING.COM

Pinellas County Schools 301 4TH St. SW Largo, FL 33770

727-588-6000 https://www.pcsb.org

TO THE BEST KNOWLEDGE OF THE ENGINEERS AND

ARCHITECTS, SAID PLANS AND SPECIFICATIONS

COMPLY WITH THE APPLICABLE MINIMUM BUILDING

CODES AND THE APPLICABLE MINIMUM FIRE SAFETY

STANDARDS

As indicated

M4.1

CONTROLS LEGEND,

NOTES, & DETAILS

26015

PCS PALM HARBOR

UNIVERSITY HS BOILER

REPLACEMENT PROJECT

08-12-2026

Author

Checker

1900 Omaha St, Palm Harbor, FL 34683

100% CONSTRUCTION BID SET

BOILER PLANT CONTROLS POINTS LIST

Point Type Device ID Point Name Description

AI-1 WTS-1 HHWR-T COMMON HEATING HOT WATER SUPPLY FLOW SENSOR

AI-2 WTS-2 HHWR-T COMMON HEATING HOT WATER RETURN TEMPERATURE SENSOR

AI-3 WTS-3 HHWR-T BOILER LOOP HEATING HOT WATER RETURN TEMPERATURE SENSOR

AI-4 WTS-4 HHWS-T BOILER LOOP HEATING HOT WATER SUPPLY TEMPERATURE SENSOR

AI-5 WTS-5 HHWS-T COMMON HEATING HOT WATER SUPPLY TEMPERATURE SENSOR

AI-6 WFS-1 HHWS-F COMMON HEATING HOT WATER SUPPLY FLOW SENSOR

AI-7 VLV-1 B1-P B-1 HEATING HOT WATER RETURN VALVE POSITION

AI-8 VLV-2 B1-P B-2 HEATING HOT WATER RETURN VALVE POSITION

AI-9 BLR-1 B1-SP BOILER 1 CURRENT SET POINT

AI-10 BLR-2 B2-SP BOILER 2 CURRENT SET POINT

AO-1 VLV-1 B1-O B-1 HEATING HOT WATER RETURN VALVE OUTPUT

AO-2 VLV-2 B1-O B-2 HEATING HOT WATER RETURN VALVE OUTPUT

BI-1 CT-1 HWP1S HEATING HOT WATER PUMP 1 STATUS

BI-2 CT-2 HWP2S HEATING HOT WATER PUMP 2 STATUS

BI-3 BLR-1 B1-S B-1 STATUS

BI-4 BLR-1 B1-A B-1 ALARM STATUS

BI-5 BLR-1 B1-CMDPR-S B-1 COMUSTION DAMPER STATUS

BI-6 BLR-2 B2-S B-2 STATUS

BI-7 BLR-2 B2-A B-2 ALARM STATUS

BI-8 BLR-2 B2-CMDPR-S B-2 COMBUSTION DAMPER STATUS

BI-9 GM CO-PALRM CARBON MONOXIDE PRE ALARM > 20 PPM

BI-10 GM CH4-PALRM METHANE PRE ALARM > 8% LEL

BI-11 RL-4 B1SSHTDWN B-1 SHUT DOWN RELAY

BI-12 RL-5 B2SSHTDWN B-2 SHUT DOWN RELAY

BI-13 RL-6 BP FALRM FIRE ALARM CONTACT

BO-1 RL-1 HWP1C HEATING HOT WATER PUMP 1 START/STOP

BO-2 RL-2 HWP2C HEATING HOT WATER PUMP 2 START/STOP

BO-3 BLR-1 B1-EN B-1 ENABLE

BO-4 BLR-2 B2-EN B-2 ENABLE

BO-5 RL-3 GASVLV AUTOMATIC GAS SHUT OFF VALVE

Sheets
000 - COVER
M0.1 - LEGEND, NOTES, & SCHEDULES
M1.1 - MECHANICAL DEMOLITION PLAN
M2.1 - MECHANICAL RENOVATION PLANS
M3.1 - MECHANICAL DETAILS
M3.2 - MECHANICAL DETAILS
M4.1 - CONTROLS LEGEND, NOTES, & DETAILS

File details come from the government source that posted it. Updated .