PBS.pdf

PDF 62 KB Posted

Attached to
Clarence J. Brown Reservoir Project Office Re Roofing
Solicitation number
W912QR25QA058
Issued by

About this file

The document is a Price Breakout Schedule for the Clarence J. Brown Reservoir Project Office Re-Roofing contract. The schedule outlines three primary line items for the project: (0001) Removal and Re-installation of solar panels, (0002) Preparation of existing roof, and (0003) Installing new roof. Each line item is designated as a "Job" with a corresponding cost column to be filled in by the bidder. The document provides a structured template for contractors to detail their pricing for each specific phase of the roofing project, allowing for a clear and organized cost breakdown of the required work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE BREAKOUT SCHEDULE

LINE

ITEM DESCRIPTION UNIT COST

0001 Removal and Re-installation of solar panels: Job

TOTAL LINE ITEM 0001

LINE

ITEM DESCRIPTION UNIT COST

0002 Preparation of existing roof: Job

TOTAL LINE ITEM 0002

LINE

ITEM DESCRIPTION UNIT COST

0003 Installing new roof: Job

TOTAL LINE ITEM 0003

Total Cost Line Item 0001, 0002, and 0003:

File details come from the government source that posted it. Updated .