The document is a Price Breakout Schedule for the Clarence J. Brown Reservoir Project Office Re-Roofing contract. The schedule outlines three primary line items for the project: (0001) Removal and Re-installation of solar panels, (0002) Preparation of existing roof, and (0003) Installing new roof. Each line item is designated as a "Job" with a corresponding cost column to be filled in by the bidder. The document provides a structured template for contractors to detail their pricing for each specific phase of the roofing project, allowing for a clear and organized cost breakdown of the required work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE BREAKOUT SCHEDULE
LINE
ITEM DESCRIPTION UNIT COST
0001 Removal and Re-installation of solar panels: Job
TOTAL LINE ITEM 0001
LINE
ITEM DESCRIPTION UNIT COST
0002 Preparation of existing roof: Job
TOTAL LINE ITEM 0002
LINE
ITEM DESCRIPTION UNIT COST
0003 Installing new roof: Job
TOTAL LINE ITEM 0003
Total Cost Line Item 0001, 0002, and 0003: