Pavilion at Mixville Park.pdf

PDF 7 MB Posted

Attached to
2627-04 Pavilion Replacement at Mixville Park
Solicitation number
39403
Issued by
New Haven County, Connecticut

About this file

This is an architectural and site planning document prepared by SLR Consulting for the Town of Cheshire, Connecticut, detailing the Pavilion at Mixville Park project located on Notch Road in Cheshire. The project involves the demolition of the existing pavilion structure, foundations, asphalt pad, and adjacent sidewalks, followed by construction of a new pre-engineered pavilion with reinforced concrete footings, slab, and sidewalks. The scope includes installation of electrical improvements, including new electrical site work, conduit, spot lighting, and camera installations, as well as restoration of disturbed areas with loam and seeding. The site plan document set contains seven sheets of drawings, including existing conditions, proposed plans, sedimentation and erosion control plans, structural plans and details, and electrical site plans for both demolition and new work. All construction materials and methods shall conform to Connecticut Department of Transportation Standard Specifications for Roads, Bridges, Facilities and Incidental Construction, Form 819, dated January 2026, along with supplemental specifications and special provisions. A pre-construction meeting is required between all parties, including the Town Environmental Planner, prior to contractor mobilization.

The drawings are prepared for Marek Kement, PE/LS, Town of Cheshire, 84 South Main Street, Cheshire, Connecticut 06410, with project number 11047.00076 and a date of September 29, 2026. The project site is situated adjacent to Upper and Lower Mixville Pond near Mixville Road and Ten Mile River, with existing conditions including parking areas, septic facilities, existing buildings with restrooms, and bituminous walks. Contractor responsibilities include coordination with utility companies regarding facility relocation and protection, daily site clearing for trash and debris, provision of on-site lavatory facilities throughout construction, and strict compliance with sediment and erosion control measures conforming to Connecticut Guidelines for Soil Erosion and Sediment Control (Revised 2002). All fuel, oil, paint, and hazardous materials must be stored in secondary containers in locked indoor areas during non-work hours, and all refueling of construction equipment must occur a minimum of 100 feet away from wetlands and watercourses.

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

60.2'

.3

Spot Lt. & Camera

Spot Lt. & Camera

Elec. Conduit

Ground

Spot Lt.

(Typ.)

Existing Building

O .H

. D r.

Ped.

Dr.

Ped.

Dr.

Existing Elec. Panel

Existing

Pavillion

Bit. Walk

Assumed Location UG Elec.

Bit. Walk

Bi t.

Ap ro n

Existing Building

(Restrooms)

FF=97.3±

60.2'

.3

Spot Lt. & Camera

Spot Lt. & Camera

Elec. Conduit

Ground

Spot Lt.

(Typ.)

Existing Building

O .H

. D r.

Ped.

Dr.

Ped.

Dr.

Existing Elec. Panel and Wall

Existing

Pavillion

Bit. Walk

Assumed Location UG Elec.

Bit. Walk

Bi t.

Ap ro n

Existing Building

(Restrooms)

FF=97.3±

60.2'

.3

Spot Lt. & Camera

Spot Lt. & Camera

Elec. Conduit

Ground

Spot Lt.

(Typ.)

Existing Building

O .H

. D r.

Ped.

Dr.

Ped.

Dr.

Existing Elec. Panel

Existing

Pavillion

Bit. Walk

Assumed Location UG Elec.

Bit. Walk

Bi t.

Ap ro n

Existing Building

(Restrooms)

FF=97.3±

60.2'

.3

Spot Lt. & Camera

Spot Lt. & Camera

Elec. Conduit

Ground

Spot Lt.

(Typ.)

Existing Building

O .H

. D r.

Ped.

Dr.

Ped.

Dr.

Existing Elec. Panel and Wall

Existing

Pavillion

Bit. Walk

Assumed Location UG Elec.

Bit. Walk

Bi t.

Ap ro n

Existing Building

(Restrooms)

FF=97.3±

PROJECT SITE VICINITY MAP:

PREPARED BY:

LOCATION MAP:

PAVILION AT MIXVILLE PARK

NOTCH ROAD

CHESHIRE, CONNECTICUT

SLR PROJECT NO. 11047.00076

SEPTEMBER 29, 2026

PREPARED FOR:

MAREK KEMENT, PE/LS

TOWN OF CHESHIRE

84 SOUTH MAIN STREET

CHESHIRE, CONNECTICUT 06410

LIST OF DRAWINGS

NO. NAME TITLE

01 TITLE TITLE SHEET

02 N-01 GENERAL NOTES & LEGEND

3 EX-01 EXISTING CONDITIONS AND BASELINE INFORMATION

4 PR-01 PROPOSED PLAN

5 SE-01 SEDIMENTATION & EROSION CONTROL PLAN

6 STR-01 STRUCTURAL PLAN AND DETAILS

7 STR-02 STRUCTURAL DETAILS

8 E-1 ELECTRICAL SITE PLAN - DEMOLITION

9 E-2 ELECTRICAL SITE PLAN - NEW WORK

10 E-3 ELECTRICAL SCHEDULE AND DETAILS

0' 50' 100'

SCALE 1" = 100'

0 1/2" 1"

0' 100' 200'

SCALE 1" = 200'

0 1/2" 1"

99 REALTY DRIVE

CHESHIRE, CT 06410

203.271.1773

SLRCONSULTING.COM

GENERAL NOTES:

1. CONSTRUCTION SPECIFICATIONS:

CONNECTICUT DEPARTMENT OF TRANSPORTATION, STANDARD

SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES AND

INCIDENTAL CONSTRUCTION, FORM 819, DATED JANUARY 2026; AND

SPECIAL PROVISIONS.

2. COORDINATE SYSTEM:

NORTH ORIENTATION AND COORDINATES BASED ON CONNECTICUT

GRID SYSTEM NAD 83.

3. VERTICAL DATUM:

ELEVATIONS BASED ON NAVD 88.

4. SURVEYED BY:

SLR CONSULTING, INC.

5. MAINTENANCE RESPONSIBILITY:

TOWN OF CHESHIRE.

UPPER

MIXVILLE

POND

LOWER

MIXVILLE

POND

UPPER MIXVILLE POND

MIXVILLE PARK

PROJECT LOCATION

NOTCH ROAD

MIXVILLE

PARK

M

IX

V

IL

LE

R

O A

D

TE

N

M

IL

E R

IV

ER

LOWER MIXVILLE POND

Know what's below.

before you dig.Call

R www.digsafelynewyork.com

SHEET NAME

DATE

N-01

PROJECT NO.

DESIGNED

KP

SCALE

DRAWN

SR

CHECKED

KP

AS NOTED

G

EN

ER

A

L N

O

TE

S

L

EG

EN

D

C H

ES

H

IR

E, C O

N N

EC

TI

C U

T N

O

TC

H R

O A

D

SHEET NO.

D

ES

C R

IP

TI

O N

B Y

D A

TE

R

EA

LT

Y D

RI

VE

CH

ES

H

IR

E, C

T

3.

1.

SL

RC

O N

SU

LT

IN

G

.C O

M

GENERAL NOTES

1. SLR CONSULTING ACCEPTS NO RESPONSIBILITY FOR THE ACCURACY OF MAPS

AND DATA WHICH HAVE BEEN SUPPLIED BY OTHERS.

2. WETLAND LIMITS SHOWN HAVE BEEN DELINEATED BY SLR CONSULTING. THE

CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE "BEST

MANAGEMENT PRACTICES FOR THE PROTECTION OF THE ENVIRONMENT" AS

OUTLINED IN THE STANDARD SPECIFICATIONS.

3. THE PROPERTY LINES DEPICTED HAVE BEEN COMPILED FROM VARIOUS SOURCES

INCLUDING TOWN OF CHESHIRE LAND RECORDS AND ARE NOT TO BE CONSTRUED

AS BEING OBTAINED AS THE RESULT OF A FIELD SURVEY, NOR DO THEY

REPRESENT A PROPERTY/BOUNDARY OPINION.

4. ALL CONSTRUCTION MATERIALS AND METHODS SHALL CONFORM TO THE

APPLICABLE SECTIONS OF THE STATE OF CONNECTICUT DEPARTMENT OF

TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES,

AND INCIDENTAL CONSTRUCTION, FORM 819 (2025); SUPPLEMENTAL

SPECIFICATIONS DATED JANUARY 2026; AND SPECIAL PROVISIONS.

5. THE CONTRACTOR SHALL BE AWARE OF THE WORK WHICH IS TO BE PERFORMED

WITHIN AND ADJACENT TO PRIVATE PROPERTY RIGHT-OF-WAYS.

6. SEDIMENT AND EROSION CONTROL MEASURES AS DEPICTED ON THESE PLANS

AND DESCRIBED WITHIN THE SEDIMENT AND EROSION CONTROL NARRATIVE

SHALL BE IMPLEMENTED AND MAINTAINED UNTIL PERMANENT COVER AND

STABILIZATION IS ESTABLISHED. ALL SEDIMENT AND EROSION CONTROL

MEASURES SHALL CONFORM TO THE "GUIDELINES FOR SOIL EROSION AND

SEDIMENT CONTROL, CONNECTICUT - REVISED 2002", AND IN ALL CASES BEST

MANAGEMENT PRACTICES SHALL PREVAIL.

7. THE PLANS REQUIRE A CONTRACTOR'S WORKING KNOWLEDGE OF LOCAL,

MUNICIPAL, WATER AUTHORITY, AND STATE CODES FOR UTILITY SYSTEMS.

ANY CONFLICTS BETWEEN MATERIALS AND LOCATIONS SHOWN, AND LOCAL

REQUIREMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR

TO THE EXECUTION OF WORK. THE MUNICIPALITY WILL NOT BE HELD LIABLE FOR

COSTS INCURRED TO IMPLEMENT OR CORRECT WORK WHICH DOES NOT CONFORM

TO LOCAL CODE.

8. ALL FUEL, OIL, PAINT, OR OTHER HAZARDOUS MATERIALS SHOULD BE STORED IN

A SECONDARY CONTAINER AND REMOVED TO A LOCKED INDOOR AREA WITH AN

IMPERVIOUS FLOOR DURING NON-WORK HOURS.

9. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE RE-FUELED A MINIMUM

OF 100-FT AWAY FROM WETLANDS AND WATERCOURSES.

10. CONSTRUCTION EQUIPMENT SHALL BE STORED OUTSIDE OF AREAS SUBJECT TO

FLOODING.

11. CONTRACTOR TO STAKE OUT WORK LIMITS AND COORDINATE SELECTIVE

CLEARING WITH THE TOWN. NO SEPARATE PAYMENT.

12. A PRE-CONSTRUCTION MEETING SHALL BE HELD BETWEEN ALL PARTIES

INCLUDING THE TOWN ENVIRONMENTAL PLANNER PRIOR TO MOBILIZATION BY

THE CONTRACTOR.

13. THE CONTRACTOR SHALL REVIEW AND CLEAR THE SITE DAILY FOR TRASH AND/OR

DEBRIS.

14. THE CONTRACTOR SHALL PROVIDE ON-SITE LAVATORY FACILITIES TO BE

MAINTAINED THROUGHOUT CONSTRUCTION. TO BE PAID UNDER ITEM

"MOBILIZATION AND PROTECTION CLOSEOUT."

UTILITIES

1. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH APPROPRIATE

UTILITY COMPANIES REGARDING RELOCATION AND PROTECTION OF THEIR

FACILITIES AND SCHEDULING OF SUCH WORK.

PROPOSEDEXISTING

LEGEND

STREET LINE

PROPERTY LINE

CONTOUR

SPOT GRADE

STATE WETLAND BOUNDARY

FEDERAL WETLAND BOUNDARY

FEMA FLOODWAY

FEMA 100 YEAR FLOOD

UPLAND REVIEW AREA

ORDINARY HIGH WATER

TREE LINE

TREE

SHRUB

FENCE LINE

GUIDERAIL

STORM DRAIN W/ CATCH BASIN

UNDERGROUND ELECTRIC

UNDERGROUND COMMUNICATION

LIGHT POST

ELECTRIC MANHOLE

ELECTRIC BOX

TRANSFORMER

SIGN

MAILBOX

WELL

MONUMENT

CONTROL POINT

CURB

CONSTRUCTION EASEMENT LINE

DRAINAGE EASEMENT LINE

SEDIMENT EROSION CONTROL

SYSTEM

CUT LIMIT

FILL LIMIT

BORING

OHW

B-1

T

PA

VI

LI

O

N A

T M

IX

VI

LL

E

PA

R

K

SEPTEMBER 29, 2026

11047.00076

GRAVEL WALK Ex Parking

SEPTIC TANK

COVER

Ex. Driveway

Spot Lt.

(TYP.)

Spot Lt. & Camera

Existing Pavilion

Elec. Panel On ±5' Wide Wall

Existing Building

Existing Building (Restrooms)

FF=±97.3

Bit. Walk

Bit. Walk

Bit. Apron

ASPHALT PAD

EX. CONCRETE FOUNDATION

AND POSTS TO BE REMOVED

(SEE DETAIL ON STR-01)

(TYP.)

Assumed Location UG Elec.

SEPTIC DRYWELL

SEPTIC GALLERIES

SHEET NAME

DATE

EX-01

PROJECT NO.

DESIGNED

SCALE

DRAWN

TL

CHECKED

KP

SEPTEMBER 29, 2026

1"=10'-0"

EX

IS

TI

N

G C

O N

D

IT

IO

N

S

N O

TC

H

R O

A D

SHEET NO.

D

ES

C R

IP

TI

O N

B Y

D A

TE

0' 5' 10'

0 1/2" 1"

S

W

N

E

R

EA

LT

Y D

RI

VE

CH

ES

H

IR

E, C

T

3.

1.

SL

RC

O N

SU

LT

IN

G

.C O

M

EXISTING CONDITIONS LEGEND

CONTOUR

TREE LINE

GUARDRAIL

11047.00076

PA

VI

LI

O

N A

T M

IX

VI

LL

E

PA

R

K

C H

ES

H

IR

E, C O

N N

EC

TI

C U

T

99.0

99.1

99.2

97.46

97.36

100.0

99.90

99.1

94.42

99.1

99.0

96.7

97.3

97.30

97.32

95.50

95.50

96.8

97.20 97.30

97.40

99.60

99.40

99.50

99.30

99.20

99.12

240.5

235.0

240.5

235.0

4'

5'

-7

Ex. Bit. Walk (TYP.)

Ex. Spot Light

(TYP.)

Ex. Spot Light & Camera (TYP.)

Ex. Bit Apron

Assumed Ex.

Location UG Elec.

Existing Building

Existing Building (Restrooms)

FF=±97.3

CONCRETE

SIDEWALK

CONCRETE

SIDEWALK

PROPOSED PAVILION

CONCRETE SLAB

Ex. Driveway

5' CONCRETE

SIDEWALK

(7%± SLOPE)

Ex. Parking

Ex. Septic Galleries

Ex. Septic Drywell

Ex. Septic Tank Cover5' ACCESSIBLE

CONCRETE

SIDEWALK

(SLOPE <5%)

5' ACCESSIBLE

CONCRETE

SIDEWALK

(SLOPE <5%)

'-6

" 80'-0"

2" EXPANSION JOINT

IN-BETWEEN CONCRETE

SLAB TO CONCRETE SIDEWALK

ADD ALTERNATE #1

REBUILD WALL

EX. ELEC. PANEL

TO REMAIN

(SEE ELEC. DRAWING)

TURF ESTABLISHMENT

AND TOPSOIL (TYP.)

SEE PAVEMENT REPAIR DETAIL

(TYP.)

MATCH EXISTING

GRADE

CRICKET FOR

WATER DIVERSION

SHEET NAME

DATE

PR-01

PROJECT NO.

DESIGNED

SCALE

DRAWN

TL

CHECKED

KP

SEPTEMBER 29, 2026

11047.00076

1"=10'-0"

PR

O

PO

SE

D P

LA

N

C H

ES

H

IR

E, C O

N N

EC

TI

C U

T

PA

VI

LI

O

N A

T M

IX

VI

LL

E

PA

R

K

N O

TC

H

R O

A D

SHEET NO.

D

ES

C R

IP

TI

O N

B Y

D A

TE

0' 5' 10'

0 1/2" 1"

S

W

N

E

R

EA

LT

Y D

RI

VE

CH

ES

H

IR

E, C

T

3.

1.

SL

RC

O N

SU

LT

IN

G

.C O

M

PROPOSED CONDITIONS LEGEND

CONTOUR

SPOT GRADE

TREE LINE

GUARDRAILNOTE:

1. CONTRACTOR SHALL PROTECT EXISTING SEPTIC TANK COVER, GALLERIES, DRYWELL, AND RAILINGS.

2. CONTRACTOR IS RESPONSIBLE TO RESTORE ANY DAMAGE AT NO ADDITIONAL COST.

3. GRADE AWAY FROM PAVILION, SIDEWALK, AND EXISTING BUILDING (RESTROOM).

SE-01

PROJECT NO.

DESIGNED

KP

SCALE

DRAWN

SR

CHECKED

KP

SEPTEMBER 29, 2026

11047.00076

AS NOTED

SE

D

IM

EN

TA

TI

O N

E

R O

SI

O

N C

O N

TR

O

L

PL

A N

C H

ES

H

IR

E, C O

N N

EC

TI

C U

T

PA

VI

LI

O

N A

T M

IX

VI

LL

E

PA

R

K

N O

TC

H

R O

A D

SHEET NO.

D

ES

C R

IP

TI

O N

B Y

D A

TE

R

EA

LT

Y D

RI

VE

CH

ES

H

IR

E, C

T

3.

1.

SL

RC

O N

SU

LT

IN

G

.C O

M

SEDIMENT & EROSION CONTROL SPECIFICATIONS

GENERAL

1. THESE GUIDELINES SHALL APPLY TO ALL WORK CONSISTING OF ANY AND ALL

TEMPORARY AND/OR PERMANENT MEASURES TO CONTROL WATER POLLUTION

AND SOIL EROSION, AS MAY BE REQUIRED, DURING THE CONSTRUCTION OF

THE PROJECT.

2. IN GENERAL, ALL CONSTRUCTION ACTIVITIES SHALL PROCEED IN SUCH A

MANNER SO AS NOT TO POLLUTE ANY WETLANDS, WATERCOURSE,

WATERBODY, AND CONDUIT CARRYING WATER, ETC. THE CONTRACTOR SHALL

LIMIT, INSOFAR AS POSSIBLE, THE SURFACE AREA OF EARTH MATERIALS

EXPOSED BY CONSTRUCTION METHODS AND IMMEDIATELY PROVIDE

PERMANENT AND TEMPORARY POLLUTION CONTROL MEASURES TO PREVENT

CONTAMINATION OF ADJACENT WETLANDS, WATERCOURSES, AND

WATERBODIES, AND TO PREVENT, INSOFAR AS POSSIBLE, EROSION ON THE

SITE.

3. THE CONTRACTOR SHALL BE THE RESPONSIBLE PARTY FOR THE

IMPLEMENTATION AND MAINTENANCE OF THE SEDIMENT AND EROSION

CONTROL MEASURES ON SITE.

4. THE ENGINEER OF RECORD SHALL SUBMIT SEDIMENT AND EROSION CONTROL

REPORTS TO THE INLAND WETLANDS AND WATERCOURSES AGENCY ON A

WEEKLY BASIS AND AFTER RAINFALL EVENTS GREATER THAN ONE HALF INCH

(0.5"), WHICHEVER IS SOONER.

5. THE CONTRACTOR SHALL MONITOR WEATHER REPORTS AND BE PREPARED TO

STABILIZE THE SITE IF MORE THAN ONE HALF INCH (0.5") OF RAINFALL IS

PREDICTED BY THE NATIONAL WEATHER SERVICE (70% CHANCE OR HIGHER).

6. THE CONTRACTOR SHALL MAINTAIN A STOCKPILE OF SEDIMENT AND EROSION

CONTROL MATERIALS FOR THE PURPOSE OF MAINTAINING AND/OR REPAIRING

PROPOSED SEDIMENT AND EROSION CONTROL MEASURES.

7. NO BYPASS PUMPING OF THE WATERCOURSE IS PROPOSED AS A PART OF THIS

PROJECT.

LAND GRADING

GENERAL

1. THE RESHAPING OF THE GROUND SURFACE BY EXCAVATION AND FILLING OR A

COMBINATION OF BOTH, TO OBTAIN PLANNED GRADES, SHALL PROCEED IN

ACCORDANCE WITH THE FOLLOWING CRITERIA:

a. THE CUT FACE OF EARTH EXCAVATION SHALL NOT BE STEEPER THAN

TWO HORIZONTAL TO ONE VERTICAL (2:1).

b. THE PERMANENT EXPOSED FACES OF FILLS SHALL NOT BE STEEPER THAN

TWO HORIZONTAL TO ONE VERTICAL (2:1).

c. THE CUT FACE OF ROCK EXCAVATION SHALL NOT BE STEEPER THAN ONE

HORIZONTAL TO FOUR VERTICAL (1:4).

d. PROVISION SHOULD BE MADE TO CONDUCT SURFACE WATER SAFELY TO

STORM DRAINS TO PREVENT SURFACE RUNOFF FROM DAMAGING CUT

FACES AND FILL SLOPES.

e. EXCAVATIONS SHOULD NOT BE MADE SO CLOSE TO PROPERTY LINES AS

TO ENDANGER ADJOINING PROPERTY WITHOUT PROTECTING SUCH

PROPERTY FROM EROSION, SLIDING, SETTLING, OR CRACKING.

f. NO FILL SHOULD BE PLACED WHERE IT WILL SLIDE OR WASH UPON THE

PREMISES OF ANOTHER OWNER OR UPON ADJACENT WETLANDS,

WATERCOURSES, OR WATERBODIES.

g. PRIOR TO ANY REGRADING, A STABILIZED CONSTRUCTION ENTRANCE

SHALL BE PLACED AT THE ENTRANCE TO THE WORK AREA IN ORDER TO

REDUCE MUD AND OTHER SEDIMENTS FROM LEAVING THE SITE.

TOP SOILING

GENERAL

1. TOPSOIL SHALL BE SPREAD OVER ALL EXPOSED AREAS IN ORDER TO PROVIDE

A SOIL MEDIUM HAVING FAVORABLE CHARACTERISTICS FOR THE

ESTABLISHMENT, GROWTH, AND MAINTENANCE OF VEGETATION.

2. UPON ATTAINING FINAL SUBGRADES, SCARIFY SURFACE TO PROVIDE A GOOD

BOND WITH TOPSOIL.

3. REMOVE ALL LARGE STONES, TREE LIMBS, ROOTS AND CONSTRUCTION

DEBRIS.

4. APPLY LIME ACCORDING TO SOIL TEST OR AT THE RATE OF TWO (2) TONS PER

ACRE.

MATERIAL

1. TOPSOIL SHOULD HAVE PHYSICAL, CHEMICAL, AND BIOLOGICAL

CHARACTERISTICS FAVORABLE TO THE GROWTH OF PLANTS.

2. TOPSOIL SHOULD HAVE A SANDY OR LOAMY TEXTURE.

3. TOPSOIL SHOULD BE RELATIVELY FREE OF SUBSOIL MATERIAL AND MUST BE

FREE OF LARGE STONES, LUMPS OF SOIL, ROOTS, TREE LIMBS, TRASH, OR

CONSTRUCTION DEBRIS. IT SHOULD BE FREE OF ROOTS OR RHIZOMES SUCH

AS THISTLE, NUTGRASS, AND QUACKGRASS.

4. AN ORGANIC MATTER CONTENT OF SIX PERCENT (6%) IS REQUIRED. AVOID

LIGHT COLORED SUBSOIL MATERIAL.

5. SOLUBLE SALT CONTENT OF OVER 500 PARTS PER MILLION (PPM) IS LESS

SUITABLE. AVOID TIDAL MARSH SOILS BECAUSE OF HIGH SALT CONTENT AND

SULFUR ACIDITY.

6. THE pH SHOULD BE MORE THAN 6.0. IF LESS, ADD LIME TO INCREASE pH TO

AN ACCEPTABLE LEVEL.

APPLICATION

1. AVOID SPREADING WHEN TOPSOIL IS WET OR FROZEN.

2. SPREAD TOPSOIL UNIFORMLY TO A DEPTH OF AT LEAST FOUR INCHES (4"), OR

TO THE DEPTH SHOWN ON THE PLANS.

PERMANENT VEGETATIVE COVER

GENERAL

1. PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED AS VARIOUS

SECTIONS OF THE PROJECT ARE COMPLETED IN ORDER TO STABILIZE THE

SOIL, REDUCE DOWNSTREAM DAMAGE FROM SEDIMENT AND RUNOFF, AND TO

ENHANCE THE AESTHETIC NATURE OF THE SITE. IT WILL BE APPLIED TO ALL

CONSTRUCTION AREAS SUBJECT TO EROSION WHERE FINAL GRADING HAS

BEEN COMPLETED AND A PERMANENT COVER IS NEEDED.

SITE PREPARATION

1. INSTALL REQUIRED SURFACE WATER CONTROL MEASURES.

2. REMOVE LOOSE ROCK, STONE, AND CONSTRUCTION DEBRIS FROM AREA.

3. PERFORM ALL PLANTING OPERATIONS PARALLEL TO THE CONTOURS OF THE

SLOPE.

4. APPLY TOPSOIL AS INDICATED ELSEWHERE HEREIN.

5. APPLY FERTILIZER ACCORDING TO SOIL TEST OR:

*SPREAD SEEDING: WORK DEEPLY IN SOIL, BEFORE SEEDING, 300 LBS. OF

10-10-10 FERTILIZER PER ACRE (7 LBS. PER 1,000 SQ. FT.); THEN SIX (6) TO

EIGHT (8) WEEKS LATER, APPLY ON THE SURFACE AN ADDITIONAL 300 LBS. OF

10-10-10 FERTILIZER PER ACRE. AFTER SEPTEMBER 1, TEMPORARY VEGETATIVE

COVER SHALL BE APPLIED.

*FALL SEEDING: WORK DEEPLY IN SOIL, BEFORE SEEDING, 600 LBS. OF 10-10-10

FERTILIZER PER ACRE (14 LBS. PER 1,000 SQ. FT.)

PLANTING NOTES

GENERAL

1. THE LANDSCAPE CONTRACTOR SHALL PROVIDE A 6" MINIMUM DEPTH OF

TOPSOIL FOR ALL LAWN AREAS. WATER AS NECESSARY TO ESTABLISH TURF.

2. ALL PLANT MATERIAL IS SUBJECT TO INSPECTION AND APPROVAL BY THE

LANDSCAPE ARCHITECT PRIOR TO AND AFTER PLANTING.

3. IN AREAS OF SEEDING - TOPSOIL TO CONTAIN 6-12% ORGANIC CONTENT (BY

WEIGHT), AMEND SOIL WITH ORGANIC MATTER (LEAF COMPOST).

EROSION CHECKS

GENERAL

1. TEMPORARY PERVIOUS BARRIERS USING BALES OF HAY OR STRAW, HELD IN

PLACE WITH STAKES DRIVEN THROUGH THE BALES AND INTO THE GROUND OR

GEOTEXTILE FABRIC FASTENED TO A FENCE POST AND BURIED INTO THE

GROUND, SHALL BE INSTALLED AND MAINTAINED AS REQUIRED TO CHECK

EROSION AND REDUCE SEDIMENTATION.

CONSTRUCTION

1. BALES SHOULD BE PLACED IN A ROW WITH ENDS TIGHTLY ABUTTING THE

ADJACENT BALES.

2. EACH BALE SHALL BE EMBEDDED INTO THE SOIL A MINIMUM OF FOUR INCHES

(4").

3. BALES SHALL BE SECURELY ANCHORED IN PLACE BY WOOD STAKES OR

REINFORCEMENT BARS DRIVEN THROUGH THE BALES AND INTO THE GROUND.

THE FIRST STAKE IN EACH BALE SHALL BE ANGLED TOWARD THE PREVIOUSLY

LAID BALE TO FORCE BALES TOGETHER.

4. GEOTEXTILE FABRIC SHALL BE SECURELY ANCHORED AT THE TOP OF A THREE

FOOT (3') HIGH FENCE AND BURIED A MINIMUM OF FOUR INCHES (4") TO THE

SOIL. SEAMS BETWEEN SECTIONS OF FILTER FABRIC SHALL OVERLAP A

MINIMUM OF TWO FEET (2').

INSTALLATION AND MAINTENANCE

1. BALED HAY EROSION BARRIERS SHALL BE INSTALLED AT ALL STORM SEWER

INLETS.

2. BALED HAY EROSION BARRIERS AND GEOTEXTILE FENCE SHALL BE INSTALLED

AT THE LOCATION INDICATED ON THE PLAN AND IN ADDITIONAL AREAS AS

MAY BE DEEMED APPROPRIATE DURING CONSTRUCTION.

3. ALL EROSION CHECKS SHALL BE MAINTAINED UNTIL ADJACENT AREAS ARE

STABILIZED.

4. INSPECTION SHALL BE FREQUENT (AT MINIMUM MONTHLY AND BEFORE AND

AFTER HEAVY RAIN) AND REPAIR OR REPLACEMENT SHALL BE MADE PROMPTLY

AS NEEDED.

5. EROSION CHECKS SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR

USEFULNESS SO AS NOT TO BLOCK OR IMPEDE STORMWATER FLOW OR

DRAINAGE.

EROSION CONTROL MAINTENANCE INTERVALS

EROSION CONTROL

MEASURE CONTROL OBJECTIVE INSPECTION/MAINTENANCE FAILURE INDICATORS REMOVAL

SILT FENCE (SF)

(RELATED: IP, STK)

- INTERCEPT, AND REDIRECT/DETAIN

SMALL AMOUNTS OF SEDIMENT FROM

SMALL DISTURBED AREAS.

- DECREASE VELOCITY OF SHEET FLOW.

- PROTECT SENSITIVE SLOPES OR

SOILS FROM EXCESSIVE WATER FLOW.

INSPECT AT LEAST ONCE A WEEK AND WITHIN 24 HOURS

OF THE END OF A STORM WITH A RAINFALL OF 0.5

INCHES OR MORE. ACCUMULATED SEDIMENT MUST BE

REMOVED ONCE ITS DEPTH IS EQUAL TO ½ THE TRENCH

HEIGHT. INSPECT FREQUENTLY DURING PUMPING

OPERATIONS IF USED FOR DEWATERING OPERATIONS.

- PHYSICAL DAMAGE OR

DECOMPOSITION

- EVIDENCE OF OVERTOPPED OR

UNDERCUT FENCE

- EVIDENCE OF SIGNIFICANT FLOWS

EVADING CAPTURE

- REPETITIVE FAILURE

SILT FENCE MAY BE REMOVED AFTER

UPHILL AND SENSITIVE AREAS HAVE

BEEN PERMANENTLY STABILIZED.

HAY BALES (HB)

- INTERCEPT, AND REDIRECT/DETAIN

SMALL AMOUNTS OF SEDIMENT FROM

SMALL DISTURBED AREAS.

- DECREASE VELOCITY OF SHEET FLOW.

- PROTECT SENSITIVE SLOPES OR

SOILS FROM EXCESSIVE WATER FLOW.

INSPECT AT LEAST ONCE A WEEK AND WITHIN 24 HOURS

OF THE END OF A STORM WITH A RAINFALL OF 0.5

INCHES OR MORE. ACCUMULATED SEDIMENT MUST BE

REMOVED ONCE THE DEPTH OF SEDIMENT IS EQUAL TO

½ THE HEIGHT OF THE BARRIER. INSPECT FREQUENTLY

DURING PUMPING OPERATIONS IF USED FOR

DEWATERING OPERATIONS.

- PHYSICAL DAMAGE OR

DECOMPOSITION

- EVIDENCE OF OVERTOPPED OR

UNDERCUT FENCE

- EVIDENCE OF SIGNIFICANT FLOWS

EVADING CAPTURE

- REPETITIVE FAILURE

HAY BALES MAY BE REMOVED AFTER

UPHILL AREAS HAVE BEEN

PERMANENTLY STABILIZED.

STOCKPILE

PROTECTION

(STK)

- RETAIN SOIL STOCKPILE IN

LOCATIONS SPECIFIED, AND REDUCE

WATER-TRANSPORT.

INSPECT SILT FENCE AT THE END OF EACH WORK DAY

AND IMMEDIATELY REPAIR DAMAGES. PERIODIC

REINFORCEMENT OF SILT FENCE, OR ADDITION OF HAY

BALES MAY BE NECESSARY.

- EVIDENCE OF STOCK PILE

DIMINISHING DUE TO RAIN EVENTS

- FAILURE OF SILT FENCE

STOCKPILE PROTECTION MAY BE

REMOVED ONCE THE STOCKPILE IS

USED OR REMOVED.

FLO

W

TWO STAKES PER BALE

BACKFILL AND COMPACT

EXCAVATED SOIL ON

UPHILL SIDE OF BALES

PLACE BALES SO

BINDINGS ON BALES ARE

PARALLEL TO THE GROUND

ENTRENCH BALES TO A

DEPTH OF 2" TO 4"

FILL VOIDS

WITH LOOSE

STRAW

NOTES

1. IDEALLY, BALES SHOULD BE ENTRENCHED 2 TO 4 INCHES AND TIGHTLY

BUTTED TOGETHER. BALES CAN BE SUCCESSFULLY PLACED WITHOUT A

TRENCH IF GOOD GROUND CONTACT IS MADE. REMOVE HEAVY BRUSH AND

FILL ALL VOIDS WITH LOOSE STRAW.

2. BALES SHALL BE ONLY USED AS A TEMPORARY BARRIER AND FOR NO

LONGER THAN 60 DAYS.

3. WHEN SEDIMENTATION DEPOSITS REACH WITHIN 3" OF THE TOP OF BALES,

REMOVE SEDIMENTATION OR ADD ADDITIONAL BALES ON SEDIMENTATION

DIRECTION BEHIND FIRST ROW OF BALES AS DIRECTED BY THE ENGINEER.

4. UPON ESTABLISHMENT OF GROUND COVER ON DISTURBED AREAS AND

WHEN DIRECTED BY THE ENGINEER, HAY BALES WILL BE REMOVED AND

USED AS MULCH. ANY SEDIMENTATION WILL BE THINLY SPREAD UPON

ESTABLISHED GROUND COVER.

HAYBALE BARRIER PROTECTION

NOT TO SCALE

FILTER

FENCE

STAKED

STRAW BALE

NOT TO SCALE

SEDIMENT FILTER

FENCE AND HAY BALE

FLOW

SEDIMENT FILTER FENCE

FENCE POST (TYPICAL)

AMOCO PROPEX SILT STOP

SEDIMENT CONTROL FABRIC OR

APPROVED EQUAL (GEOTEXTILE)

EXISTING

GRADE

BURY END OF GEOTEXTILE

MIN. 6" INTO SOIL

FLOW

NOT TO SCALE

0°

12" MIN.

STR-01

PROJECT NO.

DESIGNED

SCALE

DRAWN

TL

CHECKED

KP

AS NOTED

ST

R

U C

TU

R

A L

PL

A

N S

A N

D D

ET

A

IL

S

N O

TC

H

R O

A D

SHEET NO.

D

ES

C R

IP

TI

O N

B Y

D A

TE

R

EA

LT

Y D

RI

VE

CH

ES

H

IR

E, C

T

3.

1.

SL

RC

O N

SU

LT

IN

G

.C O

M

0" (M

IN

5" CONCRETE SLAB

(SEE DETAIL)

5x8 CEDAR COLUMNS

(TYP.)

2x8 CEDAR FASCIA BOARD

POWDER COATED STEEL

BASE SHOE (TYP.)

40'-6"

(CONCRETE SLAB)

PAVILION SECTION

SCALE: 14"=1'-0"

STR-01

PROPOSED PAVILION FOUNDATION

SEE DETAIL (TYP.)

8" (TYP.)

2" EXPANSION

JOINT (TYP.)

CONCRETE SIDEWALK (TYP.)

(SEE DETAIL)

2" EXPANSION JOINT

(TYP.)

36'-0"

(CENTER)

40'-6"

(PAVILION)

2'-3" 2'-3"

12" 12"SAWCUT CONTROL

JOINT (TYP.)

13'-6" 13'-6" 13'-6"

2'-6"Ø CONCRETE FOOTING

5"x8" CEDAR COLUMNS

POWDER COATED

STEEL BASE SHOE

(6) - #4 TIES @ EQ.

SPACING

(10) - #6 VERTICAL

BARS 3

4"Ø F1554 HEADED ANCHORS

W/ MIN. 12" EMBEDMENT (TYP.)

3" COVER

PROPOSED PAVILION FOUNDATION - PLAN

SCALE: 12"=1'-0"

NOTE:

1. FOR ILLUSTRATION AND BIDDING PURPOSE ONLY.

2. FINAL FOOTING DETAIL AND DIMENSION TO BE FINALIZED

AFTER REVIEW OF SHOP DRAWING.

2'-6"Ø

6' -0

5" CONCRETE SLAB

SEE DETAIL (TYP.)

(6) - #4 TIES @ EQ. SPACING

(10) - #6 VERTICAL BARS

12" (MIN.)

F1554 HEADED ANCHORS

4"Ø ANCHOR BOLTS W/

12" MIN. EMBEDMENT (TYP.)POWDER COATED

STEEL BASE SHOE

3" 3"

5"

(2) - #4 TIES AT TOP

PROPOSED PAVILION FOUNDATION

SCALE: 12"=1'-0"

2" EXPANSION JOINT (TYP.)

5x8 CEDAR COLUMN

NOTE:

1. FOR ILLUSTRATION AND BIDDING PURPOSES

ONLY.

2. FINAL FOOTING DETAIL AND DIMENSIONS TO BE

FINALIZED AFTER REVIEW OF SHOP DRAWING.

80'-0"

(CONCRETE SLAB)

12'-7"

(TYP.)

2x8 CEDAR FASCIA BOARDS

ASPHALT SHINGLES OVER

SYNTHETIC UNDERLAYMENT

OVER 2x6 SYP T&G DECKING

5" THICK CONCRETE

SLAB (SEE DETAIL)

0" (M

IN

PROPOSED PAVILION - ELEVATION

SCALE: 14"=1'-0"

5x8 CEDAR COLUMNS

(TYP.)

5"

(TYP.)

STR-01

PROPOSED PAVILION

FOUNDATION

SEE DETAIL (TYP.)

2" EXPANSION JOINT

(TYP.)

12" 12"

80'-0"

(PAVILION)

8'-61 2"

(TYP.)

12'-7"

(TYP.)

SAWCUT CONTROL

JOINTS (TYP.)

CRICKET FOR

WATER DIVERSION

6" (C

O N

C R

ET

E S

LA

B

80'-0"

(CONCRETE SLAB)

PAVILION LAYOUT

SCALE: 18"=1'-0"

0" (C

EN

TE

R S

STR-01

STR-01

8'-61 2"

(TYP.)

12'-7"

(TYP.)

SAW-CUT CONTROL

JOINTS (TYP.)

NOTE:

1. 1

2" EXPANSION JOINT IN-BETWEEN CONCRETE SIDEWALK TO THE PERIMETER OF THE CONCRETE SLAB.

2. 1

2" EXPANSION JOINT IN-BETWEEN CONCRETE SLAB AND PAVILION FOUNDATION.

2" EXPANSION JOINT

ALL AROUND (TYP.)

6"

6"

6"

2'-3"

(TYP.)12'-7"

(TYP.)

2' -3

(T

YP

2" EXPANSION JOINT

AROUND FOOTING (TYP.)

Rebuild Wall and Ex. Elec.

Panel To Remain (See Elec.Drawing)

SEPTEMBER 29, 2026

11047.00076

C H

ES

H

IR

E, C O

N N

EC

TI

C U

T

PA

VI

LI

O

N A

T M

IX

VI

LL

E

PA

R

K

±2'-0"

SQUARE

2'

-6

Ex. Asphalt Base

NOTES:

1. EXISTING PAVILION FOUNDATION SHOWN WAS

MEASURED AT ONE LOCATION AND MAY VARY.

2. CONTRACTOR SHALL REMOVE ALL EXISTING PAVILION

FOUNDATIONS AT NO ADDITIONAL COST.

Ex. Post To Be Removed

Ex. Expansion Joint

EXISTING PAVILION FOUNDATION

SCALE: 12"=1'-0"

Ex. Foundation To Be Removed

PROPOSED PAVILION SECTION

NOT TO SCALE

NOTE:

1. ALL EXPOSED HARDWARE AND CONDUITS SHALL BE PAINTED BLACK.

2. PAVILION TO BE MANUFACTURED BY THE FOLLOWING:

A) CEDAR FOREST PRODUCTS

PH. 800-552-9495

B) OR APPROVED EQUAL

3. SHINGLES:

A) COLOR: SLATE OR BLACK, TO BE DETERMINED BY TOWN.

B) CERTAINTEED LIFETIME WARRANTY OR APPROVED EQUAL.

STR-02

PROJECT NO.

DESIGNED

SCALE

DRAWN

TL

CHECKED

KP

AS NOTED

ST

R

U C

TU

R

A L

D

ET

A

IL

S

N O

TC

H

R O

A D

SHEET NO.

D

ES

C R

IP

TI

O N

B Y

D A

TE

R

EA

LT

Y D

RI

VE

CH

ES

H

IR

E, C

T

3.

1.

SL

RC

O N

SU

LT

IN

G

.C O

M

XXX5"

8"

4"

PROCESSED AGGREGATE

BASE

COMPACTED SUBGRADE

4x4 - W4.0xW4.0 W.W.F

CONCRETE SIDEWALK

SCALE: 1"=1'-0"

NOTES:

1. EXPANSION JOINTS AT 20' O.C. MAX. CONSTRUCTION JOINTS AT 5' O.C. TYPICAL.

2. PROCESSED AGGREGATE SHALL EXTEND 4" MIN. BEYOND LIMIT OF CONCRETE

STIFF BROOM FINISH

PERPENDICULAR TO

DIRECTION OF TRAVEL

3" CLEAR

CONCRETE SIDEWALK EXPANSION JOINT

SCALE: 1"=1'-0"

NOTES:

1. PROVIDE PREFORMED EXPANSION JOINT AT ALL CONSTRUCTION JOINT, SAWCUT,

AND OTHER LOCATIONS WHERE CONCRETE ABUTS EXISTING CONCRETE.

X

X

2" WIDTH FIBER BOARD

& POLYETHYLENE

DIAMOND SHAPED LOAD PLATE

AND PLASTIC POCKET

CONCRETE SIDEWALK (SEE DETAIL)

CONCRETE SLAB

SCALE: 1"=1'-0"

PROCESSED AGGREGATE BASE COMPACTED SUBGRADE

4x4 - W4.0xW4.0 W.W.F

XXX

8" 5"

212"

3"

4"

3" 5"

2"2"

1' -4

1'-4"

8"

(8) - 34"Ø LAG BOLT W/

NUT AND WASHER

ELEVATION

2"

1'-11 2"

1' -4

4"Ø F1554 HEADED ANCHORS

W/ MIN 12" EMBEDMENT (TYP.)

SECTIONAL

5"

NOTE:

1. FOR ILLUSTRATION AND BIDDING PURPOSES ONLY.

2. FINAL CONNECTION DETAIL AND DIMENSIONS WILL BE FINALISED ONCE SHOP DRAWINGS ARE PROVIDED.

TYPICAL STEEL BASE SHOE

SCALE: 11

2"=1'-0"

1'-1"

1' -4

4"Ø F1554 HEADED ANCHORS

W/ MIN. 12" EMBEDMENT

PLAN

2"

9" 2"

SEPTEMBER 29, 2026

11047.00076

C H

ES

H

IR

E, C O

N N

EC

TI

C U

T

PA

VI

LI

O

N A

T M

IX

VI

LL

E

PA

R

K

COMPACTED SUBGRADE

SUBBASE COURSE

PROCESSED AGGREGATE BASE

BITUMINOUS CONCRETE FINISH COURSE

(HMA S0.375)

BITUMINOUS CONCRETE BINDER COURSE

(HMA S0.5)112"2"

6" 8"

EXISTING SUBGRADE TO BE

EXCAVATED @ 1:1 SLOPE

NOTE:

1. PRIOR TO PAVING, SAWCUT EDGE OF EXIST. PAVEMENT, CLEAN &

PAINT WITH LIQUID BITUMEN (TYPICAL) FINAL BITUMINOUS

CONCRETE BINDER COURSE TO MEET ELEV. OF EXISTING PAVEMENT.

PAVEMENT REPAIR

SCALE: 1"=1'-0"

SCORE JOINT - SAWCUT

SCALE: 11

2"=1'-0"

X

NOTE:

1. SCORE JOINTS AS SHOWN ON PLANS.

114"

4" 1

4"x11

4" SAWCUTSEE CONCRETE

SLAB DETAIL

Nirdosh Patel Polygon Line

Nirdosh Patel Callout

ADD ALTERNATE #2

Nirdosh Patel Text Box

NOTE

ALL EXPOSED HARDWARE AND CONDUITS SHALL BE PAINTED BLACK.

File details come from the government source that posted it. Updated .