PAR 56 500W Production Unit Test Plan Procedure and Results.pdf
PDF 241 KB Posted
- Solicitation number
- 6973GH-21-R-00006
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
February 28, 2020 Attachment: Appendix D
P a g e 1 | 15
Production Unit Test Plan, Procedure, & Results For FAA 20A 500W Par 56
Q20A/PAR-56/C INCANDESCENT LAMP
TYPE I, MOGUL END PRONG, 500W
NSN: 6240-01-217-0894
1.0 Scope
1.1 The specifications covers halogen-cycle PAR-56 aviation service lamps or equivalent used for runway approach lighting systems.
1.2 Reference FAA-E-2408b Dated July 31, 2000.
1.3 This procedure will outline all test requirements for production build units.
1.4 A test sample rate of 5 units or 1% whichever is greater shall be tested per production batch.
2.0 Test Equipment List with calibration date (as needed).
• Multimeter
• DC power supply
• Tape Measure
• Photo-Meter PMEX
• FAA PAR-56 lamp holder
• Calculator
• Digital Thermometer
• Infrared Thermometer
• 3M Masking Tape 203
• Spray Nozzle Tool #083
• Digital Caliper
• Rain Gauge
• Digital Level
• Data Logger
• Stop Watch
3.0 Test methods
All testing of the Unit Under Test (UUT) shall be performed IAW FAA-E-2408b Dated July 31, 2000, paragraph 4.5.
3.1 Photometric Testing (Paragraph 4.5.4)
3.2 Wattage Rating Test (Paragraph 4.5.1)
3.3 Filament Motion and Shorting Test (Paragraph 4.5.2)
3.4 Two Hour Test (Paragraph 4.5.13)
3.5 Examination of Product (Paragraph 4.4.1)
P a g e 2 | 15
Table I
Lamp Design Parameters (Mogul End Prong, Type I)
Q20A/PAR56/C
Wattage Rating 500 ±30
Rated Amperes (RMS) 20 ±0.5%
Average Life, Hours 500
Minimum Candela Requirements Within Beam Field
Point Location (degrees from mechanical axis)
3.5 up - 13.5 left 20,000
3.5 down - 13.5 left 20,000
3.5 up - 13.5 left 20,000
3.5 down - 13.5 left 20,000
4 up - vertical 20,000
4 down - vertical 20,000 horizontal - 14 left 20,000 horizontal - 14 right 20,000 Maximum Intensity, Candela (not to be exceeded in any direction)
55,000
Cover Glass Prismatic Base All three (3) lamps - Mogul End Prong
Burning Position All three (3) lamps - Horizontal to 25° Base Down
P a g e 3 | 15
Figure1 Lamp Design Parameters (Mogul End Prong) Type
P a g e 4 | 15
Prepared for: FAA Logistics Center
Name of Company:
Address:
Phone Number:
Prepared By:
Title:
Date:
List of test performed and attach the test procedure for each test.
3.1 Photometric Test
3.2 Wattage Rating Test
3.3 Filament Motion Test and Shorting of Turn Test
3.4 Two hour Test
3.5 Examination of Product
P a g e 5 | 15
List of Test Equipment and calibration date:
Test Equipment Used Calibration Date Calibration Due Date
P a g e 6 | 15
Testing Fixture 1
3.1 Photometric Testing
Start Date/Time:
Details/Requirements Results Measured Voltage:
25V Nominal Actual measured:
Measured Current:
20Amps +/-.5% (19.9-20.1) Actual measured:
Max Candela Measurement 55,000 Max Candela allowed Actual measured: Pass/Fail 3.5° up 13.5° left Reading 20,000 Candela Min. Actual measured: Pass/Fail 3.5° down 13.5° left Reading 20,000 Candela Min. Actual measured: Pass/Fail 3.5° up 13.5° right Reading 20,000 Candela Min. Actual measured: Pass/Fail 3.5° down 13.5° left Reading 20,000 Candela Min. Actual measured: Pass/Fail 4.0° up 0° Vertical Reading 20,000 Candela Min. Actual measured: Pass/Fail 4.0° down 0° Vertical Reading 20,000 Candela Min. Actual measured: Pass/Fail 0° Horizontal 14° Left Reading 20,000 Candela Min. Actual measured: Pass/Fail 0° Horizontal 14° Right Reading 20,000 Candela Min. Actual measured: Pass/Fail
3.2 Wattage Rating Test
UUT start date/time Date: Time:
Measured current at start 20 Amps +/-.5%(19.1-20.1) Actual measured: Pass/Fail Measured voltage at start 25 Volt nominal Actual measured: Pass/Fail Time accumulated on UUT 5 hour minimum Actual measured: Pass/Fail Measured current after 5 hours 20 Amps +/-.5%(19.1-20.1) Actual measured: Pass/Fail Measured voltage after 5 hours 25 volts nominal Actual measured: Pass/Fail Calculated watts 500 Watt Actual measured: Pass/Fail
P a g e 7 | 15
3.3 Filament Motion and Shorting Test:
Measured current at start Actual measured:
Measured voltage at start Actual measured: Pass/Fail 15 min interval Measured voltage within +/-0.5 volts of original Measurement Actual measured: Pass/Fail 30 min interval Measured voltage within +/-0.5 volts of original Measurement Actual measured: Pass/Fail 60 min interval Measured voltage within +/-0.5 volts of original Measurement Actual measured: Pass/Fail 120 min interval Measured voltage within +/-0.5 volts of original Measurement Actual measured: Pass/Fail
3.4 Two Hour Test Pass/Fail
Stop Date/Time:
Test Procedure Pass/Fail
3.5 Examination of Product Pass/Fail
P a g e 8 | 15
Testing Fixture 2
25V Nominal Actual measured:
Measured Current:
20Amps +/-.5% (19.9-20.1) Actual measured:
Max Candela Measurement 55,000 Max Candela allowed Actual measured: Pass/Fail 3.5° up 13.5° left Reading 20,000 Candela Min. Actual measured: Pass/Fail 3.5° down 13.5° left Reading 20,000 Candela Min. Actual measured: Pass/Fail 3.5° up 13.5° right Reading 20,000 Candela Min. Actual measured: Pass/Fail 3.5° down 13.5° left Reading 20,000 Candela Min. Actual measured: Pass/Fail 4.0° up 0° Vertical Reading 20,000 Candela Min. Actual measured: Pass/Fail 4.0° down 0° Vertical Reading 20,000 Candela Min. Actual measured: Pass/Fail 0° Horizontal 14° Left Reading 20,000 Candela Min. Actual measured: Pass/Fail
Measured current at start 20 Amps +/-.5%(19.1-20.1) Actual measured: Pass/Fail Measured voltage at start 25 Volt nominal Actual measured: Pass/Fail Time accumulated on UUT 5 hour minimum Actual measured: Pass/Fail Measured current after 5 hours 20 Amps +/-.5%(19.1-20.1) Actual measured: Pass/Fail Measured voltage after 5 hours 25 volts nominal Actual measured: Pass/Fail
P a g e 9 | 15
Measured voltage at start Actual measured: Pass/Fail 15 min interval Measured voltage within +/-0.5 volts of original Measurement Actual measured: Pass/Fail 30 min interval Measured voltage within +/-0.5 volts of original Measurement Actual measured: Pass/Fail 60 min interval Measured voltage within +/-0.5 volts of original Measurement Actual measured: Pass/Fail 120 min interval Measured
P a g e 10 | 15
Testing Fixture 3
25V Nominal Actual measured:
Measured Current:
20Amps +/-.5% (19.9-20.1) Actual measured:
Max Candela Measurement 55,000 Max Candela allowed Actual measured: Pass/Fail 3.5° up 13.5° left Reading 20,000 Candela Min. Actual measured: Pass/Fail 3.5° down 13.5° left Reading 20,000 Candela Min. Actual measured: Pass/Fail 3.5° up 13.5° right Reading 20,000 Candela Min. Actual measured: Pass/Fail 3.5° down 13.5° left Reading 20,000 Candela Min. Actual measured: Pass/Fail 4.0° up 0° Vertical Reading 20,000 Candela Min. Actual measured: Pass/Fail 4.0° down 0° Vertical Reading 20,000 Candela Min. Actual measured: Pass/Fail 0° Horizontal 14° Left Reading 20,000 Candela Min. Actual measured: Pass/Fail
Measured current at start 20 Amps +/-.5%(19.1-20.1) Actual measured: Pass/Fail Measured voltage at start 25 Volt nominal Actual measured: Pass/Fail Time accumulated on UUT 5 hour minimum Actual measured: Pass/Fail Measured current after 5 hours 20 Amps +/-.5%(19.1-20.1) Actual measured: Pass/Fail Measured voltage after 5 hours 25 volts nominal Actual measured: Pass/Fail
P a g e 11 | 15
Measured voltage at start Actual measured: Pass/Fail 15 min interval Measured voltage within +/-0.5 volts of original Measurement Actual measured: Pass/Fail 30 min interval Measured voltage within +/-0.5 volts of original Measurement Actual measured: Pass/Fail 60 min interval Measured voltage within +/-0.5 volts of original Measurement Actual measured: Pass/Fail 120 min interval Measured
P a g e 12 | 15
Testing Fixture 4
25V Nominal Actual measured:
Measured Current:
20Amps +/-.5% (19.9-20.1) Actual measured:
Max Candela Measurement 55,000 Max Candela allowed Actual measured: Pass/Fail 3.5° up 13.5° left Reading 20,000 Candela Min. Actual measured: Pass/Fail 3.5° down 13.5° left Reading 20,000 Candela Min. Actual measured: Pass/Fail 3.5° up 13.5° right Reading 20,000 Candela Min. Actual measured: Pass/Fail 3.5° down 13.5° left Reading 20,000 Candela Min. Actual measured: Pass/Fail 4.0° up 0° Vertical Reading 20,000 Candela Min. Actual measured: Pass/Fail 4.0° down 0° Vertical Reading 20,000 Candela Min. Actual measured: Pass/Fail 0° Horizontal 14° Left Reading 20,000 Candela Min. Actual measured: Pass/Fail
Measured current at start 20 Amps +/-.5%(19.1-20.1) Actual measured: Pass/Fail Measured voltage at start 25 Volt nominal Actual measured: Pass/Fail Time accumulated on UUT 5 hour minimum Actual measured: Pass/Fail Measured current after 5 hours 20 Amps +/-.5%(19.1-20.1) Actual measured: Pass/Fail Measured voltage after 5 hours 25 volts nominal Actual measured: Pass/Fail
P a g e 13 | 15
Measured voltage at start Actual measured: Pass/Fail 15 min interval Measured voltage within +/-0.5 volts of original Measurement Actual measured: Pass/Fail 30 min interval Measured voltage within +/-0.5 volts of original Measurement Actual measured: Pass/Fail 60 min interval Measured voltage within +/-0.5 volts of original Measurement Actual measured: Pass/Fail 120 min interval Measured
P a g e 14 | 15
Testing Fixture 5
3.2 Photometric Testing
25V Nominal Actual measured:
Measured Current:
20Amps +/-.5% (19.9-20.1) Actual measured:
Max Candela Measurement 55,000 Max Candela allowed Actual measured: Pass/Fail 3.5° up 13.5° left Reading 20,000 Candela Min. Actual measured: Pass/Fail 3.5° down 13.5° left Reading 20,000 Candela Min. Actual measured: Pass/Fail 3.5° up 13.5° right Reading 20,000 Candela Min. Actual measured: Pass/Fail 3.5° down 13.5° left Reading 20,000 Candela Min. Actual measured: Pass/Fail 4.0° up 0° Vertical Reading 20,000 Candela Min. Actual measured: Pass/Fail 4.0° down 0° Vertical Reading 20,000 Candela Min. Actual measured: Pass/Fail 0° Horizontal 14° Left Reading 20,000 Candela Min. Actual measured: Pass/Fail
Measured current at start 20 Amps +/-.5%(19.1-20.1) Actual measured: Pass/Fail Measured voltage at start 25 Volt nominal Actual measured: Pass/Fail Time accumulated on UUT 5 hour minimum Actual measured: Pass/Fail Measured current after 5 hours 20 Amps +/-.5%(19.1-20.1) Actual measured: Pass/Fail Measured voltage after 5 hours 25 volts nominal Actual measured: Pass/Fail
P a g e 15 | 15
Measured voltage at start Actual measured: Pass/Fail 15 min interval Measured voltage within +/-0.5 volts of original Measurement Actual measured: Pass/Fail 30 min interval Measured voltage within +/-0.5 volts of original Measurement Actual measured: Pass/Fail 60 min interval Measured voltage within +/-0.5 volts of original Measurement Actual measured: Pass/Fail 120 min interval Measured
File details come from the government source that posted it. Updated .