This is a Performance Work Statement (PWS) for post-wide fire systems inspection, testing, and repair services at Fort Jackson, South Carolina, along with grease duct and hood cleaning and fire suppression system maintenance.

The contractor shall provide all personnel, equipment, supplies, and materials necessary to perform comprehensive fire protection system inspections, testing, and repairs across all facilities at Fort Jackson. Services include annual, two-year, and five-year frequency inspections and testing on fire alarm systems, wet pipe sprinkler systems, dry pipe sprinkler systems, wet chemical systems, clean agent systems, fire hydrants, and related components, in accordance with UFC 3-601-02 and applicable NFPA standards. The contractor must immediately notify the Contracting Officer's Representative (COR) of any system impairments and provide repair cost estimates within 48 hours of inspections. Minor repairs up to $500 are included in the contract pricing with no additional compensation; repairs exceeding $500 require separate proposals. Hood and duct cleaning services cover 17 hoods across nine facilities, with cleaning frequency ranging from one to four times annually per facility per Technical Exhibit 4. The Period of Performance is one 12-month base year with four optional 12-month renewal years. The contract is a fixed firm price award with normal operating hours of 0730–1630 Monday through Friday, except federal holidays, though some testing of dining facilities and kitchen hood systems may occur between 1900–0500 hours. The contractor must maintain a Quality Control Plan approved within 30 days of award and ensure all personnel possess current NICET certifications, including at least one employee at Fire Protection Systems Level IV. All contractor employees require AT Level I training, iWATCH training, and OPSEC training within 15 calendar days of contract award, along with clean local background checks and compliance with Fort Jackson's contractor vetting policy. Inspection and testing reports must be submitted electronically by noon Monday each week, and a color-coded tagging system (green, yellow, orange, red) must be used to identify system conditions per NFPA standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

POST WIDE FIRE SYSTEMS INSPECTION, TESTING AND REPAIR

GREASE DUCTS, HOODS CLEANING AND FIRE SUPPRESSION

FORT JACKSON, SC

Part 1

General Information

1. GENERAL: This is a non-personnel services contract to provide Fire Systems Inspection, Testing and Repair, and includes repair and cleaning of hood systems noted on a separate Technical Exhibit below. The Government shall not exercise any supervision or control over the contract service providers performing the services herein.

Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Fire Systems Inspection, testing and Repair and ducts and hoods Cleaning as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background:

The intent of acquisition is to provide inspection and testing and repair of fire protection systems, and cleaning of hood and duct systems, for the building and facilities listed on attached Tech Exhibits located on Fort Jackson, SC. The term Fire Alarm systems refer to all features of the Fire Alarm system to include sub systems such as Monaco transmitter, notification/monitoring system, Ducts, Hoods, fire Suppression and sprinkler system

1.3 Objectives:

Maintain operational facility Fire Systems through a continuous inspection, Testing and repair schedule throughout identified facilities on Fort Jackson SC.

1.4 Scope:

The intent of this contract is to provide Fort Jackson with high quality, consistent inspection, testing and repair program for all fire alarm protection systems, water-based fire protection systems, and special agent systems that provides complete, efficient, reliable, and safe operation, as designed, and complies with the latest published Unified Facilities Code 3-601-02, applicable National10 Fire Codes, manufacturer’s recommendations, and other recognized industry standards when the work is being performed. Grease ducts must be in compliance with National Fire Protection Association (NFPA) 96 as well as all other applicable building and fire codes. Cleaning takes place every 6 months or as specified on the TE. Compliance must be proven through certificates issued by the cleaning and maintenance contractors. Purpose-designed fire suppression systems inside the hoods must also be routinely maintained. Proper cleaning must be enabled through the use of approved, fire-resistant access panels.

1.5 Period of Performance:

The Period of Performance (POP) shall be for one (1) Base Year of 12 months and four

(4) 12-month option years.

1.6 General Information:

1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure nonrecurrence of defective services. The contractor’s quality control program is the means by which they assure themselves that the work complies with the requirement of the contract. At a minimum, the contractor shall develop quality control procedures that address the areas identified in Performance Requirements Summary (PRS). Within fifteen days (30) days after the time of award, the successful contractor shall submit to the Contracting Officer the contractor’s Quality Control Plan (QCP) for review and approval. After acceptance of the quality control plan the contractor shall receive the Contracting Officer’s acceptance in writing. Any subsequent changes or any proposed changes to this QC system shall likewise require the Contracting Officer’s approval.

1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3 Recognized Holidays:

The Contractor for this contract is not required to perform work on this contract on recognized Holidays.

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day

1.6.4 Hours of Operation:

With the exception listed in 1.6.4.1 the contractor is responsible for conducting business, between the hours of 07:30 – 16:30 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this performance work statement when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the work force are essential. Due to mission requirements some systems may require inspection and testing to be performed outside of normal business hours. These locations are identified as dining facilities or locations where kitchen hood systems will require testing after the kitchen has closed for business between 19:00 and 05:00.

1.6.4.1 The Contractor shall schedule and arrange work so as to cause the least interference with the normal operation of Government business and mission. Steps must be taken to minimize the impact on our customers by disabling or testing audio visual devices to cause the least interference. In those cases where interferences may be unavoidable, the Contractor shall make every effort to minimize the impact of the interference, inconvenience, equipment downtime, interrupted service, or customer discomfort.

1.6.5 Place of Performance: The work to be performed under this contract will be performed at locations Fort Jackson, SC also identified Appendix 1.

1.6.6 Type of Contract: The government will award a Fixed Firm Price Contract.

1.6.7 Security Requirements: Contractor personnel performing work under this contract must have a clean local background check at time of the proposal’s submission and must maintain the level of security required for the life of the contract.

1.6.7.1 Antiterrorism (AT) Level I Training: This provision/contract text is for the contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor personnel, including subcontractor employees, requiring access to those locations, shall complete AT Level I awareness training with 15 calendar days after contract award date. The contractor shall submit certificates of completion to the COR within 15 calendar days after completion of training and within 15 calendar days of new employees commencing performance under this contract. AT Level I training is located at the following link:

https://jkodirect.jten.mil/. This training shall be at no additional cost to the Government.

1.6.7.2 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch and instruct employees to report suspicious activity to the COR. This training shall be completed within fifteen (15) calendar days of contract award and within fifteen (15) calendar days of new employees commencing performance with the results reported to the COR NLT five (5) calendar days after contract award. This training shall be at no additional cost to the government.

1.6.7.3 OPSEC Training: Per AR 530-1, Operations Security, new Contractor employees must complete Level I OPSEC training within 30 calendar days of contract award. All Contractor employees must complete annual OPSEC awareness training. This is an annual requirement for all contractor employees. Training can be accessed on line at the following link: https://jkodirect.jten.mil/. The course number is EUC-ECJ6-110-N-LB.

This training shall be at no additional cost to the Government.

1.6.7.4 PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.6.8 Key Control. The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references for keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.6.8.1. In In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks;

however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.8.2. The Contractor shall prohibit the use of Government issued keys/key cards by any person other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.6.9. Lock Combinations. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.6.10 Special Qualifications: The contractor personnel shall establish and maintain National Institute for Certified Engineering Technologies (NICET) in the following areas: at least one (1) Fire Protection Systems Level IV, Inspection and Testing of Water Based Systems Level III, Special Hazards Suppression Systems Level III and ITM. The contractor is responsible for ensuring all employees possess and maintain current factory training certification on the multiple brands/models of Fire Systems during the execution of this contract. A lower-level employee may perform inspection and testing tasks under the supervision of properly certified employee. Example: an apprentice may perform fire alarm inspections if under the supervision of NICET Fire Protection Level III or IV employee. The contractor is responsible for ensuring at minimum one employee possesses and maintains current certification during the execution of this contract.

1.6.11 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5.

The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.6.12 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.13 Key Personnel: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0730 - 1630, Monday through Friday except Federal holidays or when the government facility is closed for administrative reasons.

1.6.14 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.15 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the

OCI.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations.

This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An

organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.13. WORK WEEK. Monday through Friday, unless specified otherwise.

2.1.14. PERFORMANCE WORK STATEMENT (PWS) a statement of work for performance-based acquisitions that describes the required results in clear, specific and objective terms with measurable outcomes.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement

DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: The Government will provide assistance with accessing buildings and correspondence with building representatives. Government will assure that building coordinators/or mangers are aware of testing and inspection being conducted on scheduled dates and times provided by Contractor.

3.2 Facilities: The Government will not provide any facilities for the performance of this contract.

3.3 Utilities: The Government will provide utilities in buildings being inspected only of water and electricity to be used by contractors to perform testing and inspections only.

Electricity shall be provided from accessible outlets for the contractor to plug in testing equipment and tools required to complete tasks. Water shall be provided from accessible from sinks and washrooms for cleaning of equipment and for contractor’s cleanup. The Contractor shall instruct employees in utilities conservation practices.

The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

3.4 Equipment: The Government will not provide any equipment for the

3.5 Materials: The Government will provide any available as-built drawings for buildings fire alarm or sprinkler systems if available.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this

PWS.

4.2. Materials: The Contractor shall supply any materials required to complete the tasks of this contract i.e. ladders, scaffolding, hand tools or power tools.

4.3. Equipment: The Contractor shall provide all testing equipment to complete the tasks of this contract. Contractor will be responsible for assuring that all testing equipment is properly calibrated to manufacture or industry standards.

PART 5

SPECIFIC TASKS

5. SPECIFIC TASKS

5.1 BASIC SERVICES. The Contractor shall provide services for testing all fire alarm systems, an accessory to include and not limited to Mass Notification System (MNS) Monaca Notification system, water or dry-based sprinkler systems, fire hydrants, special agent suppression systems, grease ducts, hoods, fire clean and repair suppressions systems, exit lights and emergency lights, etc., per latest version/publication of UFC 3- 601-02 and NFPA 96. After all inspections and testing, the contractor will immediately notify the COR for any conditions identified that result or create a system impairment.

Regardless of reporting system of format, all discrepancies to be reported SHALL be annotated in an executive summary of the inspection report. The Contractor shall provide the Government /COR with any recommended repairs which must include a cost estimate within Forty-Eight (48) hours of inspections. The cost estimate is not for the purpose of authorizing repair work to the Contractor.

5.2 In the event that there is a conflict between NFPA and UFC 3-601. The UFC would take preference and the COR Shall be notified and give concurrences before any action is taken to affect the tasking.

5.3 Delivery & Set up. The Contractor shall perform a site survey within 15 days of Contract award.

5.3.1 Fire Alarm Systems and Fire Alarm Transmitters. Contractor will perform all annual inspection and testing tasks identified on UFC 3-601-02 table 2-1 on all buildings listed in technical exhibit 2. It is the intent of the Government to have one week per month dedicated to performing annual inspections. Contractor shall establish a schedule to have annual inspection and testing performed during the dedicated week of each month during the period of performance of this contract. Each week, a specific number of buildings will be scheduled for inspection. By the end of the period of performance all buildings shall have annual testing and inspection requirements of table 2-1 completed. Contractor shall perform 2-year frequency inspection and testing requirements on the buildings identified/due for such ITM in the Technical Exhibit 2 and UFC Table 2-1 with the exception of device removal. Any devices which can be removed per the requirements of UFC 3-600-01 shall be identified to the Government.

Contractor shall establish a schedule to have 2-year inspection and testing performed during one week of each month during the period of performance of this contract. By the end of the period of performance all of the buildings shall have 2-year inspection and testing tasks completed.

5.3.2 Contractor shall perform 5-year frequency inspection and testing requirements on all of the buildings due for such ITM/ identified in Technical Exhibit 2 and UFC Table 2-1 with the exception of device removal. Any devices which can be removed per the requirements of UFC 3-600-01 shall be identified to the Government. Contractor shall establish a schedule to have 5-year inspection and testing performed during one week of each month during the period of performance of this contract. By the end of the period of performance all of the buildings requiring 5year testing and inspection IAW table 2-1 will be completed.

5.4 Wet Pipe Sprinkler Systems. Contractor will exclude the monthly tasks identified in UFC 3-601-02 table 2-2.

5.4.1 Contractor will perform all annual inspection and testing tasks identified on UFC 3601-02 table 2-2 on all buildings listed in technical exhibit 2 with sprinkler systems. It is the intent of the Government to have one week per month dedicated to performing annual inspections. Contractor shall establish a schedule to have annual inspection and testing performed during the dedicated week of each month during the period of performance of this contract. Each week, a specific number of buildings will be scheduled for inspection. By the end of the period of performance all buildings with sprinkler systems shall have annual testing and inspection requirements of table 2-2 completed. The contractor will immediately notify the COR for any conditions identified that result or create a system impairment.

5.5 Forward Flow Test. Contractor will perform a forward flow test of backflow prevention assembly on all buildings listed in technical exhibit 2 with a sprinkler system.

The assembly must be tested at system flow demand, including all applicable hose streams, as specified in NFPA 13. The Contractor must provide all equipment and instruments necessary to conduct a complete forward flow test, including 2.5-inch diameter hoses, playpipe nozzles or flow diffusers, calibrated pressure gauges, and pitot tube gauge. The Contractor must provide all necessary support to safely secure hoses and nozzles during the test. At the system demand flow, the pressure readings and pressure drop (friction loss) across the assembly must be recorded. A report must be provided that lists the pressure readings both upstream and downstream of the assembly, total pressure drops, and the system test flow rate determined during the preliminary testing. The pressure drop must be compared to the manufacturer's data and the readings observed during the final inspections and tests. By the end of the performance period all buildings with sprinkler systems will have a forward flow test completed.

5.5.1 Contractor shall perform 2-year frequency inspection and testing requirements on buildings due for such ITM identified in Technical Exhibit 2 with sprinkler systems and UFC Table 2-2. Contractor shall establish a schedule to have 2-year inspection and testing performed during one week of each month during the period of performance of this contract. By the end of the period of performance all buildings require 2-year testing and inspection requirements of table 2-1 will be completed.

5.5.2 Contractor shall perform 5-year frequency inspection and testing requirements on buildings due for ITM identified in Technical Exhibit 2 and UFC Table 2-1 and 2.2.

Contractor shall establish a schedule to have 5-year inspection and testing performed during one week of each month during the period of performance of this contract. By the end of the period of performance all buildings requiring 5-year testing and inspection requirements of table 2-1 will be completed. The contractor will immediately notify the COR for any conditions identified that result or create a system impairment.

5.5.3 Contractor will not perform any of the 10-year, 20 year, or 50-year inspection and testing tasks identified in UFC 3-601-02 table 2-2. Contractor will only list systems which are found to require any of these tasks. Government will perform these tasks either in-house or with a separate contract.

5.6 Dry Pipe Automatic Sprinkler Systems. Contractor will exclude the monthly tasks identified in UFC 3-601-02 table 2-3. Note the Government does not have an inventory separating wet and dry sprinkler systems.

5.6.1 Contractor will perform all annual inspection and testing tasks identified on UFC 3-601-02 table 2-3 on all buildings listed in technical exhibit 2 with sprinkler systems. It is the intent of the Government to have one week per month dedicated to performing annual inspections. Contractor shall establish a schedule to have annual inspection and testing performed during the dedicated week of each month during the period of performance of this contract. Each week, a specific number of buildings will be scheduled for inspection. By the end of the period of performance all buildings with sprinkler systems shall have annual testing and inspection requirements of table 2-3 completed. The contractor will immediately notify the COR for any conditions identified that result or create a system impairment.

5.6.2 Contractor shall perform 2-year frequency inspection and testing requirements on all buildings due for such ITM identified in Technical Exhibit 2 with sprinkler systems and UFC Table 2-3. Contractor shall establish a schedule to have 2-year inspection and testing performed during one week of each month during the period of performance of this contract. By the end of the period of performance all buildings requiring 2-year testing and inspection requirements of table 2-3 will be completed. The contractor will immediately notify the COR for any conditions identified that result in or create a system of impairment.

5.6.3 Contractor shall perform 5-year frequency inspection and testing requirements on all buildings due for such ITM identified in Technical Exhibit 2 and UFC Table 2-3.

Contractor shall establish a schedule to have 5-year inspection and testing performed during one week of each month during the period of performance of this contract. By the end of the period of performance all buildings requiring 5-year testing and inspection requirements of table 2-3 will be completed.

5.6.4 Contractor will not perform any of the 10-year, 20 year, or 50-year inspection and testing tasks identified in UFC 3-601-02 table 2-3. Contractor will only list systems which are found to require any of these tasks. Government will perform these tasks either in-house or with a separate contract.

5.6.5 Contractor will perform 5-year frequency inspection and testing task identified on table 2-14 of UFC 3-601-02 on all (32) of these fire hydrants. Contractor will provide a schedule to have all (32) of the fire hydrants inspected and tested during the period of

5.7 Wet Chemical Systems. Fort Jackson Training Center currently has (18) wet chemical systems in its inventory. The Contractor will develop a schedule which is acceptable to the Government and customer to have all (semiannual and annual) inspection and testing tasks identified in UFC 3-601-02 table 2-19 completed. The contractor will immediately the COR for any conditions identified that result or create a system of impairment.

5.7.1 Any systems which have storage tanks requiring hydrostatic testing will be identified to the Government. Government will address those issues either in-house or through a separate contract.

5.8 Clean Agent Systems. Fort Jackson Training Center currently has (5) FM 200 Clean Agent Systems in its inventory. The Contractor will perform all annual inspection and testing tasks identified in UFC 3-601-02 Table 2-21., the contractor will immediately notify the COR for any conditions identified that result or create a system impairment. Contractor shall provide the Government /COR with any recommended repairs which must include a cost estimate within Forty-Eight (48) hours of inspections.

The cost estimate is not for the purpose of authorizing repair work to the Contractor awarded this contract.

5.8.1 Contractor will perform 2-year inspection tasks on table 2-21 on all systems.

5.8.2 Contractor will perform 5-year inspection tasks on table 2-21 on all systems.

5.9 The Contractor must strictly follow the inspection schedule provided to the Government, which is built in accordance with UFC 3-601-02 and applicable NFPA standards.

5.10 Hood Systems Cleaning and Repair

5.10.1 The Contractor shall remove all oily sludge, grease, dirt, and other foreign substances from all surfaces of all hoods, grease removal devices, fans, ducts, and other appurtenances complete, in all systems within buildings listed in Technical Exhibit 3.

When required, the Contractor shall cut access holes for the purpose of cleaning duct work. Upon completion of cleaning, the Contractor shall install an access panel over the opening. Access panels shall be sealed with NON-COMBUSTIBLE material and shall be secured with screws. Solvents: Flammable solvents or other flammable cleaning aids shall not be used.

5.10.2 Electrical Switches and Components: Prior to performing any cleaning operations the Contractor shall inspect the hood and system and identify deficiencies and make record. At the start of the cleaning process, electrical switches, detection devices, and system components shall be protected, tagged out, locked, pinned, protectively covered and/or sealed as required to prevent premature starting and damage.

Upon completion of cleaning procedures, all electrical switches, detection devices, and system components shall be returned to an operable state by qualified personnel.

Cover plates shall be replaced, and dampers and diffusers shall be positioned for air flow. The Contractor shall be responsible for replacing missing screws and resealing ducts. Fan base shall be secured to curb system of duct work with screws.

5.10.3 Cleaning Chemicals: Care shall be taken not to apply cleaning chemicals of fusible links or other detection devices of the automatic extinguishing system.

5.10.4 Pilot Lights: The Contractor, prior to cleaning, shall extinguish pilot lights and relight pilot lights upon completion of work.

5.10.5 After-hours Inspection: The Contractor shall the Contracting Officer’s Representative (COR) for approval of after normal duty hours work before starting work, and upon completion of work, in each facility.

5.10.6 Inspection: The Contractor shall inspect the entire oven system to include grease removal devices, exhaust duct systems, fans, and fire suppression systems following the cleaning process in accordance with NFPA 96-2024 or latest version.

5.10.7 Service completion, clean up, and closeout. When a system’s inspection and testing is completed, the Contractor shall provide a professionally printed report or electronically submitted to the Government. Report must provide a complete inventory of what was tested, to what standard it was tested, whether system is complaint or noncompliant, and any recommendations.

5.10.8 Miscellaneous repairs. The contractor shall at no additional cost to the Government make minor repairs to all systems encountered during monthly, annual, 2 year, or 5-year inspections. These repairs include but are not limited to defective detectors, pull stations, batteries, sprinkler heads, gauges, individual modules, or other minor items. A minor repair is defined as any repair of $500 or less. To avoid confusion and to highlight the meaning of "minor repair", the following illustrative example is provided. For example, if a building has 50 sprinkler heads, and three (3) need to be replaced, then the contractor would be responsible to repair all three (3) assuming each sprinkler head repair was $500 or less. Each sprinkler head in the forgoing example is one single, independent minor repair. This example should be used for any other "minor repairs" and its interpretation should be broadly read in the government's favor.

As noted above, the contractor shall at no additional cost to the Government make minor repairs as defined because those repairs are already built into the contractor's pricing. In other words, these minor repairs are not being performed for "free" but rather are part of the contractor's pricing as supplied and relied upon by the Government.

These repairs include, but are not limited to, the replacement or correction of defective items such as:

• Fire alarm detectors (smoke, heat, etc.)

• Manual pull stations

• System batteries

• Fire sprinkler heads

• Pressure gauges

• Individual system modules (e.g., monitor, control, relay modules)

• Other minor items necessary to ensure system functionality and compliance. The Government shall not be invoiced for, nor provide additional compensation for, any work classified as a minor repair under this section. Such repairs are not performed for "free" but are considered an integral part of the services for which the Contractor's pricing was supplied, relied upon, and accepted by the Government at the time of contract award.

5.10.9 Significant Repairs. The Contractor shall submit a proposal to make major repairs and/or replacements to system components found to be defective during any contract inspection that exceed $500.00 for parts and labor. These repairs include but are not limited to fire alarm control panels, power supplies, relay control switches, transmitter devices, and system rewiring. The proposal shall be submitted to the government within five (5) business days of the defect being identified. If the proposal is accepted by the government, the Contractor shall complete the repair within thirty

(30) calendar days. All major repairs and replacements shall be billed against the Repairs - Parts & Supplies CLIN.

The contractor will identify any conditions that are not corrected during ITM that require maintenance or repair and classify the conditions as follows:

(a) Non-Critical Deficiency: A deficiency that does not have a material effect on the ability of the fire protection system or unit to function in a fire event, but correction is needed to meet the requirements of this standard or for the proper inspection, testing, and maintenance of the system or unit.

(b) Critical deficiencies: A deficiency that, if not corrected, can have a material effect on the ability of the fire protection system or unit to function as intended in a fire event.

(c) Impairments: A condition where a fire protection system or unit or portion thereof is out of order, and the condition can result in the fire protection system or unit not functioning in a fire event.

The contractor will immediately notify the COR for any system impairment identified during ITM of any fire protection system. The contractor will immediately notify the COR for any conditions identified that result or create a system impairment. Contractor shall provide the Government /COR with any recommended repairs which must include a cost estimate within Forty-Eight (48) hours of inspections. The cost estimate is not for the purpose of authorizing repair work to the Contractor awarded this contract Any systems found to be in a condition of immediate risk to life, health, and safety shall be reported to the KO and COR immediately. Notification shall be by both a phone call and email detailing specifically why the system is an immediate risk to life, health, and safety.

5.11. The contractor will utilize a color-coded tagging system IAW the applicable NFPA identifying the system conditions discovered upon completion of any inspection during the ITM process. Additionally, an executive summary of the inspection status placed in a document protector SHALL be safely placed/attached to the control valve/pipe or an area easily seen and accessed by inspector. The color-coded tags will be used based on conditions found as follows:

a. Green tag - No deficiencies or impairments found when inspections and tests performed at the required frequency were completed as indicated on the ITM report provided.

b. Yellow tag - Noncritical deficiencies found and recorded on the ITM report

c. Orange tag - Critical deficiencies found and recorded on the ITM report

d. Red tag - Impairments found and recorded on the ITM report

5.11.1. Important Definitions to include:

5.11.1.a Deficiency.

For the purposes of inspection, testing, and maintenance of fire protection systems, a condition that will or has the potential to adversely impact the performance of a system or portion thereof but does not rise to the level of an impairment.

5.11.1.b Critical Deficiency.

A deficiency that, if not corrected, can have a material effect on the ability of the fire protection system or unit to function as intended in a fire event.

5.11.1.c Noncritical Deficiency.

A deficiency that does not have a material effect on the ability of the fire protection system or unit to function in a fire event, but correction is needed to meet the requirements of this standard or for the proper inspection, testing, and maintenance of the system or unit.

5.11.1.d Impairment.

A condition where a fire protection system or unit or portion thereof is out of order, and the condition can result in the fire protection system or unit not functioning in a fire event.

5.12 (Reserved)

5.12.1 All documentation required under this contract shall be created electronically using a personal computer and issued to the Government in either electronic format or professionally printed. Handwritten paperwork, other than required signatures, will not be accepted. Format must be compatible to be viewed and printed on the software used by the Government i.e. Microsoft Office 2007 or Adobe Reader X. Contractor at times may perform some minor maintenance. A billable CLIN is established for replacement of items such as smoke detectors, heat detectors, pull stations, batteries, sprinkler heads, gauges, individual modules, or other minor items. No additional money will be added to this CLIN each year. The intent is to replace an item if it fails due to normal testing and inspection, i.e. a smoke detector which will not clear or manual pull station that breaks when tested. Items are found in need of repair or replacement, they are to be documented on inspection reports. They shall be replaced and repaired under the Repairs - Parts & Supplies CLIN.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

6.1. Publications and forms applicable to this Performance Work Statement are listed below. The publications and forms have been coded as mandatory or advisory. The Contractor is obligated to follow those publications and use those forms coded as mandatory to the extent (that is, a specific procedure in a paragraph, section, chapter or volume) specified in the Performance Work Statement. The Contractor shall be guided by those publications or use those forms coded advisory to the extent necessary to accomplish requirements in the Performance Work Statement. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.

6.1.1 Applicable Publications and Directives

1. Unified Facilities Criteria 3-601-02 current addition

2. Unified Facilities Criteria 3-600-01 current addition

3. National Fire Protection Agency Life Safety Code 101 current addition

4. International Building Code current addition

5. Army AR 420-1 Chapter 25 6. DoDI 6055.06

6. Fire Pump ITM IAW Table 2-16

7. Precaution System ITM IAW Table 2-5

8. Standpipes ITM IAW table 2-13

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. Attachment/Technical Exhibit List:

7.1. Attachment 1/Technical Exhibit 1 – Performance Requirements Summary

7.2. Attachment 2/Technical Exhibit 2 – Deliverables Schedule

7.3. Attachment 3/Technical Exhibit 3 – Estimated Workload Data Fire Systems ITM

7.4. Attachment 4/Technical Exhibit 4 – Estimated Workload Data Hood Cleaning

7.5. Attachment 5/Technical Exhibit 5 - Fort Jackson Vetting Policy

TECHNICAL EXHIBIT 1

Performance Requirements Summary The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective (The Service required—usually a shall statement)

Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)

Method of Surveillance

PRS#1

Effective Fire Systems Inspection and Repair

Contractor controls Fire Systems Inspection and Repair to the standards specified in the PWS 100% of the time.

Zero deviation from standard

100% Inspection

PRS#2

Submit all Documents required by PWS as listed in Technical Exhibit 3 and 4

100% of all documents listed in TE 3 and 4 are submitted to the COR

Zero deviation from standard

100% Inspection

PRS#3

Submission of reports

Contractor submits reports timely and accurate 95% of the time

95% deviation from standard

100% Inspection

PRS #4

All Contractor personnel shall maintain the qualifications specified in the PWS Paragraph 1.6.10 Special Qualifications

Inspector personnel will be certified in the categories as stated in PWS para 1.6.10

Zero deviation from standard

100% Inspection

TECHNICAL EXHIBIT 2

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To Contractor Quality Control Plan PWS Para 1.6

Within 30 days of contract award

1 Electronic file by e-mail as an MS Word or Excel spreadsheet Attachment.

COR and Contracting Officer

AT Level I training certificates within 15 days after contract start; within 15 days after new employee start.

Includes all contract and sub-contract employees. Para 1.6.7.1

Within 15 days of contract start/within 15 days of new employee start.

1 per contract or subcontract employee

Electronically/MS Word

COR and Contracting Officer iWatch Training completed within 15 days of contract award;

within 15 days of new employee start. Includes all contract and sub-contract employees. Para 1.6.7.2

Within 15 days of contract start/within 15 days of new employee start.

1 statement that all employees have been briefed

Electronically/MS word

COR and Contracting Officer

OPSEC Training Certification within 30 days of contract start.

Contract employees only.

ANNUAL

REQUIRE-

MENT. Para 1.6.7.3

Within 30 days of contract start.

Annually thereafter

1 certificate per contract employee.

Electronically COR and Contracting Officer

Deliverable Frequency # of Copies Medium/Format Submit To Completed Inspection and Testing Reports per system 5.3 thru 5.11

No later than 12 noon Monday each week unless Monday is Holiday or Government is closed.

1 report per building/per system

Electronically approved format

COR

TECHNICAL EXHIBIT 3

ESTIMATED WORKLOAD DATA

0 BLDG ID

Building

SQ Ft

Wet Sprinkler System

Dry

Sprinkler

System

Pre-action

Sprinkler

System

DRY

Chem

Sprinkler

System

Wet

Chem Sprinkler

System

Clean

Agent

System

Fire

Alarm

Control

Panel

Mass

Notification System/Com municator

1558 FURN MGMT 36,783 1 1 1

1565 TASO 95,951 1 1

1698 Haz-mat 120 1 1 1

1865 TROOP PX 8400 1 1

2009 VANGUARD

GYM

19961 1

2090 DPW BAYS 7390 1 1

2100 DPW 54758 2 1 1

2190 MWR MAINT

BAYS

14160 1 1

2287 HAZ MAT 120 1 1 1

2289 CLASSROOMS 4500 1 1

2340 RECRUITING

BN

9838 1 1 1

2350 REC BN

ANNEX

2512 1 1 1

2375 POSTAL

SCHOOL

21556 1 1

2395 IVY LANES 20661 1 1 1 1

2400 POST HQ 41,702 1 1 1

2420 GATE 2 SHOP 6125 1

2435 MEPS 45650 1 1 1

2442 SGL SOLDIER 22550 1 1 1

2446 SGL SOLDIER 22550 1 1 1

2447 SS COMM OFC 5000 1 1 1 1

2449 SGL SOLDIER 22550 1 1 1

2450 LRC/CIF 125000 1 1 1

2453 SGL SOLDIER 22550 1 1 1

2460 SGL SOLDIER 22550 1 1 1

2461 SGL SOLDIER 22550 1 1 1

2463 SS COMM OFC 14822 1 1 1 1

2467 SGL SOLDIER 22550 1 1 1

2468 SGL SOLDIER 22,550 1 1 1

2539 HAZ MAT 150 1 1 1

2558 RE-USE CTR 222 1 1 1

2561 STORAGE DPW

YD

351 1 1

2562 DPW 14418 1 1

2563 DPW ENV 9889 1 1

SQ Ft

Wet Sprinkler System

Dry

Sprinkler

System

Pre-action

Sprinkler

System

DRY

Chem

Sprinkler

System

Wet

Chem Sprinkler

System

Clean

Agent

System

Fire

Alarm

Control

Panel

Mass

Notification System/Com municator

2567 USACE 3683 1

2568 ENV STORAGE

BLDG

1,456 1 1 1

2600 JAG 11,754 1 1

2601 DPW/LRC 48120 1 1 1

2602 LRC 32226 1 1 1

2603 MAINT 40241 2 1 1

2604 MAINT 35747 2 1 1

2605 WPNS POOL 27848 1 1 1

2606 TMP 6616 1 1

2609 NEC VAULT 989 1 1 1 1

2620 NAVAL

RESERVE

23500 2 1 1 1

3100 NEC Vault 1 1 1

3216 TNG

SPT/SCHOOLS

DIR

41092 1 1 1

3225 42,898 1 1

3255 ARMY PT

SCHOOL

20333 1 1 1

3285 3285 26796 1 1

3295 LRC/DRM 41,496 1 1

3296 KNIGHT POOL 21,139 1

3302 SIGN 3301

BLDG 3302

3500 1 1

3319 POST THEATER 17287 1 1

3320 282 BAND 5445

3330 BDE HQ 9,839 1 1 1

3390 HHC 6150 1 1

3392 JOE E. MANN 27997 1 1

3630 VICTORY

HALL

23645 1 2 1 1

3652 FJGC 9127 1 1 1 1

3661/2 FJGC 3,528 1 1

3665 FJGC 5,000 1 1

4110 MAIN PX 106811 1 1 1 1

4120 GATE 2 SHOP 5,160 1 1

4149 PEREZ 20500 1

4159 BELONGS TO

PX

3851 1

4169 VIDEORAMA 6720 1

SQ Ft

Wet Sprinkler System

Dry

Sprinkler

System

Pre-action

Sprinkler

System

DRY

Chem

Sprinkler

System

Wet

Chem Sprinkler

System

Clean

Agent

System

Fire

Alarm

Control

Panel

Mass

Notification System/Com municator

4200 MULTIPLE BAYS 12,757 1 1

4203 RELOCATEABLE 5,922 1

4204 RELOCATEABLE 5,068 1

4220 MULTIPLE BAYS 12,755 1 1

4250 MULTIPLE BAYS 12,884 1 1

4282 NEC/MP 9180 1 1…