TE 3 PRS.docx

DOCX document 25 KB Posted

Attached to
McChord Field Irrigation
Solicitation number
PANMCC-24-P-0000015263
Issued by

About this file

This document is a Performance Requirements Summary (PRS) for a federal contract opportunity related to Irrigation Repair Services at Joint Base Lewis-McChord (JBLM). The key details are:

The government is seeking a non-personal services contract to provide Grounds Maintenance Service on JBLM, with a small business set-aside. The contract will have a base period of 1 April 2025 - 31 March 2026 and four 12-month option periods. The contractor will be responsible for inspecting, repairing, and operating irrigation systems, including sprinkler heads, pipes/fittings, valves, wiring, controllers, and shutoff valves. The contractor must document all discrepancies and submit reports monthly. The PRS outlines the performance standards, including 95% irrigation system operability and timely completion of tasks. Responses should provide company information, experience, pricing, and recommendations to improve the acquisition approach.

View the file

Other files

File Type Posted
TE 2 McChord Field Cantonment Map.pdf PDF
MF Irrigation PWS.pdf PDF
TE 6 Historical Data.xlsx XLSX spreadsheet
TE 7 JBLM Access Procedures.pdf PDF
TE 5 Irrigation List.xlsx XLSX spreadsheet
TE 4 CDRLs.docx DOCX document
TE 1 McChord Field Irrigation Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE 3 Performance Requirements Summary Controlled Unclassified Information (CUI)

Performance Requirement
PWS

Section Performance Standard Allowable Deviation

1. Program and Operate Irrigation Systems
Paragraph

5.2.2.1

Complete task within the month IAW the PWS.
Irrigation systems will be 95% operational.
2. Repair Irrigation Systems
Paragraph

5.2.2.2

Complete repairs within one week after discovery.
Irrigation systems will be 95% operational.
3. Start up and Winterization
Paragraph

5.2.2.3

Complete winterization and start up procedure.
All irrigation systems will be 100% complete.
4. Invoicing and Reporting
Paragraph 5.2.3
Not later than the fifth (5th) business day of the following month.
Contractor shall meet performance on 100% of the reports according to contract requirements in a month.

File details come from the government source that posted it. Updated .