SALIENT CHARACTERISTICS C 6321 UPS BATTERY CAPACITOR UPGRADE.pdf
PDF 130 KB Posted
- Solicitation number
- PANAPG25P0000029115
About this file
This document is a Salient Characteristics file for replacing equipment on an Eaton Uninterrupted Power Supply (UPS) 9390UPS80 located in building C-6321. The procurement requires 39 batteries and 39 capacitors for a UPS cabinet with serial number EG223CBC04, specifically designed for a 80kVA, 208VAC system that supports the network's DC power system.
The contractor requirements include providing a minimum one-year warranty covering replacement of faulty batteries, capacitors, and connective components. Additionally, the contractor must arrange for pickup and environmentally responsible disposal of the old batteries through a certified recycler, with final delivery to be made to Fort Liberty NEC – Service Operations Branch. The battery replacement specifications call for components equal to or better than Eaton part # PWHR12200W4FR.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q and A UPS Battery 9.5.25.pdf | ||
| - B08 RFQ Letter SAM Final.pdf | ||
| B08 OFFEROR REPRESENTATION UPDATED.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Salient Characteristics
Purchase the following replacement parts to replace defective batteries, capacitors and associated parts on an Eaton Uninterrupted Power Supply (UPS) 9390UPS80 (93930), 80kva, 208vac, s/n EG223CBC04. This is for building C-6321. This equipment supports the DC power system utilized within the network.
Description Quantity Replacement equipment:
Battery Replacement: (1 Battery String of 39 Batteries in UPS Cabinet9 390UPS80 kVA208V I/O 60Hz) Cabinet Serial #: EG223CBC04 (Equal to or better than Eaton part # PWHR12200W4FR)
Capacitors for UPS Cabinet 9390UPS80 kCa208V I/O 60Hz 39
The contractor shall:
Warranty no less than one (1) year from the date of purchase which would include replacement of faulty batteries, capacitors and/or connectors. Arrange for pick up and disposal of batteries by a certified re cycler. Ship to Fort Liberty NEC – Service
Operations Branch
File details come from the government source that posted it. Updated .