Painting_Services_Qualification_Criteria_Services_FOC (1).docx
DOCX document 31 KB Posted
- Attached to
- Task Order Painting BNL
- Solicitation number
- 376667
- Issued by
-
Department of Energy Office of Science
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HASP.pdf | ||
| AMS-Form-009.pdf | ||
| QA 101.docx | DOCX document | |
| AMS-Form-010.pdf | ||
| 11707e011.xlsx | XLSX spreadsheet | |
| Painting_Services_Contractor_Training_Requirements (1).docx | DOCX document | |
| AMS-Form-024.docx | DOCX document | |
| SF1413-13e.pdf | ||
| ny12.txt | TXT text file | |
| Draft Contract Painting 2020.docx | DOCX document | |
| AMS-Form-022.docx | DOCX document | |
| Painting_Services_Bid_Sheet_-_6_13_2019 (1).doc | DOC document | |
| IFB Letter signed.pdf | ||
| Painting_-_Spec_(Rev_1) (3).doc | DOC document | |
| AMS-Form-025.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALIFICATION CRITERIA
Task Order Painting Company Name: __________________________________
| A. | QUALIFICATION STATEMENT | |
| 1. | Contractor has completed work on one or more projects of the same scope, size and complexity as the Task Order Painting projects in the last seven years. Project(s) should be at least $2,000.00 to $ 60,000.00 and involve Painting Services for projects such as laboratory, research, industrial or office building/facilities maintenance interior and exterior painting. | |
| ____Yes | No |
| 2. | Proposed Project Supervisor has supervised work on one or more projects of the same scope, size and complexity as the Task Order Painting projects in the last seven years. Project(s) should be at least $2,000.00 to $ 60,000.00 and involve Painting Services for projects such as laboratory, research, industrial or office building construction. | |
| ____Yes | No |
*3. Contractor’s average of 2017, 2018, and 2019 rates are less than the following OSHA rates: (OSHA Table) Lost time frequency (DART) rate < 1.2.
Recordable incident rate < 2.2.
____Yes No
| *4. | Contractor’s 2017, 2018, and 2019 insurance Experience Modification Ratings are equal to or less than 1.0 for each year. | |
| ____Yes | No |
5. Contractor has a written Corporate Construction Safety and Training program.
____Yes No
* After award, Subcontractor(s) submitted for approval (as defined in BSA General Terms and Conditions for Construction and Labor Hour Agreements, Article titled “Subcontractors”) must also meet the current published OSHA DART Rate and Recordable Incidence Rates for construction in their trades. Subcontractor(s) shall also have an insurance Experience Modification Rating equal to or less than one (1).
| B. | SUBMITTALS |
| 1. | Submit list of similar projects constructed during the last seven years to demonstrate compliance with Qualification Criteria A.1. For each project indicate: |
| a) | Project Title |
| b) | Contract Amount |
| c) | Detailed Description of Work |
| d) | Name, Address and Telephone Number of Owner or Contracting Officer |
2. Submit resume for the proposed Project Supervisor to demonstrate compliance with Qualification Criteria A.2. Include in the resume the following information on similar projects:
| a) | Project Title |
| b) | Contract Amount |
| c) | Detailed Description of Work |
| d) | Name, Address and Telephone Number of Owner or Contracting Officer |
| 3. | Submit the following Contractor rating information: | ||||||||
| 2017 | 2018 | 2019 | Average | ||||||
| a) | Lost time frequency rate (DART) | = | ( ) | + | ( ) | + | ( ) | 3 = | ( ) |
| b) | Recordable Incident Rate | = | ( ) | + | ( ) | + | ( ) | 3 = | ( ) |
| c) | Experience Modification Rate | = | ( ) | ( ) | ( ) |
Provide backup documentation from an independent source, such as insurance carrier, to verify ratings.
4. Submit copy of Contractor’s OSHA 300 logs and total number of hours worked for 2017, 2018, and 2019.
5. Submit Contractor’s Corporate Construction Safety and Training Program.
This attachment addresses the Qualification Criteria the Contractor must meet to qualify to receive award. Failure to acknowledge ‘Yes’ to any of the Qualification Criteria, and provide the required substantiating submittals with your bid, may result in your bid being considered non-responsive. BSA reserves the right to accept or reject any bid based on the Qualification Criteria requirements.
COMPANY NAME:
SIGNED/TITLE:
DATE:
| MPO-007H, Rev. 3, 2/26/18; |
| Page 3 of 3 |
“The only official copy of this document is the one on-line in the F&O Operational Excellence Policies Procedures and Risk Assessments website. Before using a printed copy, verify that it is the most current version by checking the effective date.”
File details come from the government source that posted it. Updated .