Pages from 5658699_HCH OR Flooring Replacement_250430 FINAL.pdf
PDF 2 MB Posted
- Attached to
- 70619 - HCH OR Flooring Replacement
- Solicitation number
- 70619
- Issued by
- Salt Lake County, Salt Lake City, Utah
About this file
This document is a floor plan and specification sheet for a flooring replacement project at the Huntsman Cancer Hospital in Utah, specifically for Building 556, Level 3. The floor plan details three primary flooring materials: ICB-2 (Integral Cove Base, 6" wide), JSF-1 (Mannington, Fawn 842311), and SF-1 (Mannington BioSpec MD, Cool Beige 15240). The blue-highlighted areas on the architectural drawing indicate the specific zones targeted for flooring replacement, which appear to cover multiple rooms and corridors across a significant portion of the level.
The specification sheet provides precise measurements for each flooring material, with SF-1 (Cool Beige) covering the largest area at 5,039 square feet. The document includes a scale of 1" = 20'-0" and is marked as Level 3(1), suggesting this is part of a comprehensive flooring renovation project. The presence of a Docusign Envelope ID indicates this is likely a formal documentation stage in the procurement process, potentially representing a detailed technical specification for bidders or contractors involved in the Huntsman Cancer Hospital flooring replacement project.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
SCALE: 1" = 20'-0"1 LEVEL 3(1)
Subject Label Measurement
ICB-2 ICB-2; Integral Cove Base, 6" 965.75
JSF-1 JSF-1; Mannington, Fawn 842311 899.38
SF-1 SF-1; Mannington, BioSpec MD, Cool Beige 15240 5,039
Docusign Envelope ID: F332D9D4-5559-4B6C-BE48-672B4EF82FB9
File details come from the government source that posted it. Updated .