This document is an Attachment B detailing Additional Project Requirements for the Starsdale Circle Water Main Improvements project by Greenville Water. The project involves water main infrastructure improvements with a total project timeline of 90 calendar days for substantial work completion and an additional 30 calendar days for final completion. The contractor is required to begin construction within 2 weeks of contract issuance and must adhere to Greenville Water's Standard Technical Specification document. Specific technical requirements include 98% compaction under paved surfaces, 95% compaction along ditch sections, pressure and leakage testing, and compliance with specified permit and encroachment specifications.
Financial and administrative terms include a 10% retainage deduction from each pay request, liquidated damages of $1,000 per calendar day for missed deadlines, and mandatory submission of two affidavits: Ethics in Public Contracting and Noncollusion Affidavit. The project has detailed adverse weather provisions, requiring contractors to track precipitation using an on-site gauge and compare monthly rainfall against a provided historical table. Unique stipulations include a prohibition on using US Pipe products and a requirement for the contractor to maintain daily weather records and discuss potential delay days during monthly construction progress meetings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Starsdale Circle Water Main Improvements Ext 6879
ATTACHMENT B
Additional Project Requirements
1. Project will operate under Greenville Water General DES Permit.
2. Greenville Water Standard Technical Specification document will be required for all work within project scope (see Attachment A).
3. Please note that documentation of pressure and leakage testing in accordance with
GW Specification Section 4-15 will be required.
4. Project to be under construction within 2 weeks of the issuance of contract.
5. Compaction tests to be specified by GW Inspector. 98% compaction required under paved surface and 95% compaction required along ditch sections.
6. Contractor required (per Encroachment Permit Specs) to use screenings on roadway if placing excavated spoils on road surface.
7. Performance Bonds and Payment Bonds on GW standard forms required with GW
Contract.
8. Unless noted, all work shown on drawings is required whether or not a specific bid item is listed. Payment for work for which a bid item is not listed shall be included as part of other bid items.
9. Retainage of 10 percent will be deducted from each pay request until project completion and final acceptance of all work performed.
10. Within 10 days of written notice of acceptance of this bid, Contractor will execute the contract and deliver the bonds and insurance certificates to GW.
11. Contractor shall submit the two attached a9idavits with their bid:
• Ethics in Public Contracting A9idavit
• Noncollusion A9idavit of Prime Bidder
12. Contractor will be required to sign a GW release and waiver of lien before final payment is made.
13. All substantial work shall be completed within 90 calendar days from the notice to proceed. Final completion shall occur within 30 calendar days from substantial completion. Failure to complete all contractual work noted during the construction durations above will result in liquidated damages in the amount of $1,000 per calendar day. Liquidated damages will be deducted from pay requests.
jcase Line
Starsdale Circle Water Main Improvements Ext 6879
14. It will be the responsibility of the contractor to ensure that the required notice permit provided is always on the job site during work.
15. No pipe from US Pipe is permitted.
16. Adverse weather conditions having a direct e9ect on construction progress are to be handled as follows:
a. Precipitation is to be measured by the Contractor using a precipitation gauge on-site. For each month, the number of days (24 hours) that the site experiences precipitation of 0.10 inches or more shall be totaled and confirmed/reported with the Owner/Inspector.
b. For each month, the total number of days of 0.10 inches or more of precipitation shall be compared to the number of expected days for that month. The following table shall be used for the expected days with a precipitation of 0.10 inches or more.
c. Weather delay days may only be counted where total daily precipitation over a given month is greater than the anticipated monthly rain schedule listed under 16.b
d. Instances where precipitation exceeds 3.0 inches over a 24-hour period shall be handled at the discretion of the Owner based on site conditions, working conditions, and type of construction.
e. It shall be the sole responsibility of the contractor to maintain daily record keeping of rain and/or other adverse weather and discuss any potential weather delay days at the following month’s construction progress meeting.
17. Construction sequencing shall be the responsibility of the contractor to provide that meets the overall construction schedule.