The document is a detailed mechanical design drawing (Sheet MH101) for the first floor HVAC plan of the P530 Aircraft Intermediate Maintenance Facility at Kadena Air Base in Okinawa, Japan. The drawing provides comprehensive technical specifications for the facility's mechanical systems, including precise ductwork layouts, air handling unit configurations, and ventilation design for various rooms such as maintenance bays, NDI shops, tire and wheel shops, and administrative areas. The design incorporates multiple air handling units (VAV units), exhaust fans, and specialized ventilation systems with specific duct sizes, airflow directions, and equipment locations, reflecting a meticulously planned mechanical infrastructure for a complex military maintenance facility.
Key technical details include the use of variable air volume (VAV) systems, dedicated exhaust fans for specific zones, and specialized ventilation configurations for areas like maintenance bays and technical workshops. The drawing specifies ductwork sizes ranging from 100mm to 900mm, with detailed routing and connection instructions. The mechanical design follows Japanese industrial standards (JIS) and includes notes about installation requirements, such as weather hood placements, exhaust capture hoods with spring-operated hose reels, and specific mounting instructions for equipment and sensors. The document is part of a comprehensive set of engineering drawings for the U.S. Army Corps of Engineers Japan District project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD HOOK SCHEDULE
BAR
SIZE
FINISHED BEND
DIAMETER "D"
D13 80
D16 95
D19 115
D22 135
90 DEG.
HOOKS
"L"
D10 60 155
D25 155 410
"L
"D" f'c = 24 MPa f'c = 27 MPa
HOOK DEVELOPMENT
140 130
190 170
240 210
330 300
380 340
440 390
"Ldh"
CRITICAL
SECTION
LENGTH "Ldh"
D29 180 480 495 465
NOTE:
1. INCREASE DEVELOPMENT & LAP LENGTH FOR TOP BARS BY 30%.
TOP BARS ARE HORIZONTAL REINFORCING
WITH MORE THAN 300 CONCRETE CAST BELOW.
2. DEVELOPMENT & LAP LENGTHS SHOWN ASSUME CLEAR SPACING OF BARS IS
NOT LESS THAN TWO TIMES THE BAR DIAMETER AND CLEAR COVER
IS NOT LESS THAN THE BAR DIAMETER. IF CLEAR SPACING OR COVER
IS LESS THAN LIMITS INDICATED, INCREASE DEVELOPMENT & LAP LENGTHS BY 50%.
3. FOR DOWEL BARS EXTENDING FROM AN INITIAL CONC. POUR INTO A SUBSEQUENT
POUR, PROVIDE AT LEAST DEVELOPMENT LENGTH EMBEDMENT INTO INITIAL POUR.
IF DEVELOPMENT LENGTH IN INITIAL POUR IS NOT AVAILABLE, PROVIDE STANDARD
90 DEGREE HOOK W/ HOOK DEVELOPMENT LENGTH SHOWN BELOW.
DEVELOPMENT & LAP SPLICE TABLE
BAR SIZE
f'c = 24 MPa f'c = 27 MPa
SPLICE LENGTH
D10 360 340
D13 480 460
D16 600 570
D19 850 800
D22 1230 1160
D25 1400 1320
D29 1790 1680 f'c = 24 MPa f'c = 27 MPa
DEVELOPMENT LENGTH
280 270
370 350
470 440
650 620
950 890
1080 1020
1380 1300
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-002
G E
N E
R A
L S
T R
U C
T U
R A
L N
O T
E S
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -0
1 : 100
STANDARD HOOK SCHEDULE
F16
1 : 20
DEVELOPMENT LENGTH & LAP SPLICE SCHEDULE
L16
GENERAL STRUCTURAL NOTES CONTINUED
CONCRETE
3.1 REINFORCING
A. STEEL BARS FOR CONCRETE REINFORCEMENT SHALL CONFORM WITH JIS G3112 AND THE FOLLOWING.
1. REINFORCING STEEL D16 AND SMALLER SHALL BE SD295 DEFORMED BARS, WITH MINIMUM YIELD
STRENGTH OF 295 MPA UNLESS NOTED OTHERWISE.
2. REINFORCING STEEL D19 AND LARGER SHALL BE SD345 DEFORMED BARS, WITH A MINIMUM YIELD
STRENGTH OF 345 MPA UNLESS NOTED OTHERWISE.
3. WELDED WIRE FABRIC SHALL CONFORM WITH JIS G3551 AND SHALL BE CONTACT LAP SPLICED
TWO FULL WIRE SPACES.
4. REINFORCING, INCLUDING DOWELS, SHALL BE SECURELY TIED AND CAST WITH THE LOWER
MEMBER. PLACING REINFORCING AFTER CONCRETE HAS BEEN PLACED IS NOT PERMITTED.
5. FIELD BENDING OF REINFORCING PARTIALLY EMBEDDED IN CONCRETE IS NOT ALLOWED UNLESS
SPECIFICALLY NOTED IN THE STRUCTURAL DOCUMENTS OR APPROVED BY GOVERNMENT.
6. PROVIDE DOWELS FROM FOUNDATION THE SAME GRADE, SIZE, AND NUMBER AS VERTICAL WALL
OR COLUMN REINFORCING, UNLESS NOTED OTHERWISE.
7. PROVIDE CORNER BARS TO MATCH HORIZONTAL REINFORCING AT CORNERS AND INTERSECTIONS.
8. MECHANICAL COUPLERS SHALL BE UNI-AXIAL TYPE OR EQUIVALENT CAPABLE OF DEVELOPING
125% OF THE SPECIFIED TENSILE STRENGTH OF THE SPLICED BAR. FOR D19 AND LARGER BARS GAS PRESSURE WELDED SPLICES ARE ACCEPTABLE IN LIEU OF MECHANICAL COUPLERS OR LAP SPLICES.
9. ADDITIONAL REQUIREMENTS FOR BARS THAT ARE PART OF THE SPECIAL REINFORCED CONCRETE
SHEAR WALLS:
A. YIELD STRENGTH SHALL NOT EXCEED 469 MPA
B. YIELD RATIO OF 80% MAX AND PER JIS G3112 ANNEX JA. 1 SHALL BE MET
3.2 CAST-IN-PLACE CONCRETE
A. REINFORCED CONCRETE SHALL HAVE THE FOLLOWING MINIMUM 28-DAY COMPRESSIVE STRENGTHS:
1. 18 MPA AT 28-DAYS NORMAL WEIGHT CONCRETE:
A. MUD SLAB BELOW FOUNDATIONS
2. 24 MPA AT 28-DAYS NORMAL WEIGHT CONCRETE:
A. INTERIOR SLABS ON GRADE
B. ROOF TOPPING SLAB
3. 27 MPA AT 28-DAYS NORMAL WEIGHT CONCRETE:
A. COLUMNS, WALLS
B. GIRDERS, BEAMS, STRUCTURAL SLABS
4. 27 MPA AT 28-DAYS NORMAL WEIGHT CONCRETE:
A. FOOTINGS AND FOUNDATIONS
B. PROVIDE CONCRETE COVER FOR REINFORCING AS FOLLOWS UNLESS NOTED OTHERWISE:
1. CONCRETE PERMANENTLY EXPOSED TO EARTH...................................................75 MM
2. CONCRETE EXPOSED TO WEATHER ........................................................................65 MM
3. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND:
A. SLABS AND WALLS...................................................................................................20 MM B. BEAMS AND COLUMNS............................................................................................40 MM
C. PROVIDE CONSTRUCTION OR CONTROL JOINTS IN SLAB-ON-GRADE AS INDICATED IN THE
STRUCTURAL DRAWINGS.
D. CONSTRUCTION JOINTS IN WALLS SHALL BE KEYED AND PLACED AT LOCATIONS APPROVED BY
CONTRACTING OFFICER'S REPRESENTATIVE.
E. LOCATE CONSTRUCTION JOINTS FOR JOISTS, BEAMS, GIRDERS, AND SUSPENDED SLABS IN
THE MIDDLE 1/3 OF THE SPAN. PLACE JOINTS SO THEY DO NOT COMPROMISE THE STRENGTH
OF THE STRUCTURE. OFFSET JOINTS IN A GIRDER AT LEAST TWICE THE BEAM WIDTH
FROM A BEAM/GIRDER INTERSECTION.
F. INTERFACE OF CONSTRUCTION JOINTS SHALL BE ROUGHENED TO A FULL AMPLITUDE OF 6
MILLIMETERS. SURFACE OF CONSTRUCTION JOINTS SHALL BE CLEAN AND FREE OF LAITANCE.
IMMEDIATELY BEFORE NEW CONCRETE IS PLACED, CONSTRUCTION JOINTS SHALL BE WETTED AND
STANDING WATER REMOVED.
G. PROVIDE COMPRESSIBLE FILLER AND SEALANT IN SLAB-ON-GRADE AND WALL AND COLUMN
INTERFACES THAT ARE NOT DOWELED TOGETHER.
H. ALL COLUMN POCKETS SHALL BE FILLED WITH CONCRETE AFTER COLUMN IS ERECTED.
I. CONDUIT AND PIPES EMBEDDED IN WALLS, BEAMS, OR SLABS SHALL BE NO LARGER IN OUTSIDE
DIMENSION THAN 1/3 THE OVERALL MEMBER THICKNESS OR 50 MILLIMETERS MAXIMUM, AND SHALL
BE PLACED NO CLOSER THAN 3 DIAMETERS OF WIDTHS ON CENTER.
J. CONDUIT AND PIPES, WITH THEIR FITTINGS, EMBEDDED WITHIN A COLUMN SHALL NOT DISPLACE
MORE THAN 4 PERCENT OF THE AREA OF THE COLUMN CROSS SECTION.
K. PROVIDE 100 MM HIGH CONCRETE HOUSEKEEPING PADS UNDER EQUIPMENT. PADS SHALL
EXTEND BEYOND EQUIPMENT 150 MM NOMINAL ON ALL SIDES. APPLY BONDING AGENT TO
EXISTING CONCRETE SLAB PRIOR TO PLACING HOUSEKEEPING PAD. SEE DOCUMENTS FROM
OTHER DISCIPLINES FOR EQUIPMENT SIZE AND LOCATIONS.
L. AT FLOOR DRAINS, LOCALLY SLOPE FLOOR TOWARDS DRAIN. SEE DOCUMENTS FROM OTHER
DISCIPLINES FOR DRAIN LOCATIONS.
M. PROVIDE 20 MM CHAMFER AT THE CORNERS OF COLUMNS AND WALLS WITH ANGLES OF 90
DEGREES OR LESS.
N. SEE ARCHITECTURAL DOCUMENTS FOR MOLDS, GROOVES, REVEALS, ORNAMENTS, CLIPS, ETC.
REQUIRED TO BE ENCASED IN CONCRETE AND FOR LOCATION OF FLOOR FINISHES AND SLAB
DEPRESSIONS.
METALS
4.1 STRUCTURAL STEEL
A. GENERAL
1. STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED IN ACCORDANCE WITH AISC 360-16
“SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS” AND AISC 341-16
"SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS"
2. MATERIALS SHALL CONFORM TO JIS G3101 AND THE FOLLOWING, UNLESS NOTED OTHERWISE.
A. H SHAPES JIS G3136 SN490B, 325 MPA YIELD STRENGTH
B. CHANNELS AND ANGLES JIS G3106 SM400A, 235 MPA YIELD STRENGTH
C. PLATES JIS G3136 SN400B, 235 MPA YIELD STRENGTH
JIS G3136 SN490B, 325 MPA YIELD STRENGTH
(WHERE NOTED IN DETAILS
D. SQUARE AND RECTANGULAR TUBES JIS G3466 STKR400, 245 MPA YIELD STRENGTH
E. ROUND TUBES JIS G3444 STK400, 235 MPA YIELD STRENGTH
F. BOLTS JIS B1180
G. HIGH STRENGTH BOLTS JIS B1186, F10T
H. ANCHOR RODS JIS B1220 ABR 490, 325 MPA YIELD STRENGTH
I. ELECTRODES MATCHING STRENGTH, 484 MPA MIN.
J. COLD FORMED LIGHT GAUGE STEEL JIS 3350 SSC400
3. BEAM CONNECTIONS SHALL BE AS INDICATED ON THE STRUCTURAL DRAWINGS.
4. ALL BOLTED CONNECTIONS SHALL BE FULLY TENSIONED BEARING CONNECTIONS WITH
THREADS INCLUDED IN THE SHEAR PLANE, UNLESS NOTED OTHERWISE.
4.2 POST-INSTALLED ANCHORS AND DEFORMED BAR DOWELS TO CONCRETE.
A. ANCHORS SHALL BE EXPANSION OR ADHESIVE ANCHORS, AS NOTED IN CONSTRUCTION DRAWINGS, UNLESS NOTED OTHERWISE.
B. HOLES SHALL BE DRILLED AND CLEANED IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN
INSTRUCTIONS.
C. WHEN INSTALLING ANCHORS, DO NOT CUT EXISTING REINFORCING. LOCATE EXISTING REINFORCING BARS WITH PACHOMETER OR SIMILAR MEANS, MARKING LOCATION AND DIRECTION OF EACH BAR IN THE VICINITY
OF EACH PROPOSED HOLE LOCATION.
D. INSTALL ANCHORS TO ACCOMMODATE THE STANDARD HOLE SIZE IN STEEL.
E. THE CONTRACTOR SHALL ARRANGE AN ANCHOR MANUFACTURER’S REPRESENTATIVE TO PROVIDE
INSTALLATION TRAINING FOR ALL OF THEIR ANCHORING PRODUCTS SPECIFIED. THE STRUCTURAL ENGINEER OF RECORD MUST RECEIVE DOCUMENTED CONFIRMATION THAT ALL OF THE CONTRACTOR’S PERSONNEL WHO INSTALL ANCHORS ARE TRAINED PRIOR TO THE COMMENCEMENT OF INSTALLING
ANCHORS.
F. CONCRETE BASE MATERIAL ANCHORS BASIS OF DESIGN:
1. MECHANICAL ANCHORS FOR USE IN CRACKED AND UNCRACKED CONCRETE SHALL HAVE BEEN
TESTED AND QUALIFIED FOR USE IN ACCORDANCE WITH ACI 355.2 AND ICC-ES AC193.
A. HOLES SHALL BE DRILLED AND CLEANED IN ACCORDANCE WITH THE MANUFACTURER’S WRITTEN
INSTRUCTIONS.
2. ADHESIVE ANCHORS FOR USE IN CRACKED AND UNCRACKED CONCRETE SHALL HAVE BEEN TESTED
AND QUALIFIED FOR USE IN ACCORDANCE WITH ICC-ES AC308.
A . HOLES SHALL BE DRILLED AND CLEANED IN ACCORDANCE WITH THE MANUFACTURER’S WRITTEN
INSTRUCTIONS. HOLES SHALL BE CLEANED WITH ONE OF THE FOLLOWING OPTIONS:
1) SELF-CLEANING HOLLOW DRILL BIT IN CONJUNCTION WITH A COMPATIBLE VACUUM.
2) TRADITIONAL CLEANING METHOD OF TWO BLOWS OF COMPRESSED AIR, TWO BRUSHES, AND
TWO MORE BLOWS OF COMPRESSED AIR.
B. STEEL ANCHOR ELEMENT SHALL BE ISO 898, CLASS 5.8, FY = 407 MPA MIN. CONTINUOUSLY THREADED ROD OR
CONTINUOUSLY DEFORMED STEEL REBAR
C. OVERHEAD ADHESIVE ANCHORS MUST BE INSTALLED USING AN APPROVED SYSTEM.
G. FOR POST INSTALLED ANCHORS, SUBMIT THE FOLLOWING:
1. DOCUMENTATION SHOWING THAT THE PROPOSED ANCHOR HAS BEEN TESTED AND APPROVED FOR
USE IN CRACKED CONCRETE.
2. CALCULATIONS PREPARED & SEALED BY A REGISTERED PROFESSIONAL ENGINEER.
H. ANCHOR INSTALLATIONS SHALL BE TESTED AND INSPECTED BY THE CONTRACTOR’S TESTING AND
INSPECTION AGENCY. SPECIAL INSPECTIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE
REQUIREMENTS SET OUT BELOW AND PER CHAPTER 17 OF THE INTERNATIONAL BUILDING CODE:
1. WRITTEN SPECIAL INSPECTION REPORTS SHALL BE SUBMITTED TO THE GOVERNMENT INDICATING THE
NUMBER AND LOCATION OF TESTS, TEST TYPE CONDUCTED, TEST RESULTS, AND FINAL DISPOSITION OF ANCHOR INSTALLATION AND CONFIRMATION OF THE INFORMATION OUTLINED WITHIN THE “SPECIAL
INSPECTION AND TESTING REQUIREMENTS” BELOW.
2. ANY ANCHOR FAILING THE SPECIFIED CRITERIA SHALL BE MARKED WITH RED SPRAY PAINT AND NOT USED TO SATISFY CONTRACT REQUIREMENTS. ALL FAILED ANCHORS SHALL BE BROUGHT TO THE
ATTENTION OF THE CONTRACTING OFFICER FOR REINSTALLATION OR ALTERNATE ANCHORAGE
INSTALLATION BY THE CONTRACTOR.
3. SPECIAL INSPECTION AND TESTING REQUIREMENTS:
A. ADHESIVE ANCHOR TESTING SHALL BE PERFORMED PERIODICALLY BY A SPECIAL INSPECTOR PER
THE FOLLOWING CRITERIA:
1) THE SPECIAL INSPECTOR MUST BE ON THE JOBSITE INITIALLY DURING ANCHOR INSTALLATION TO
VERIFY ANCHOR PRODUCT NAME, ANCHOR TYPE, ANCHOR DIMENSIONS, CONCRETE/MASONRY
TYPE, CONCRETE/MASONRY COMPRESSIVE STRENGTH, ADHESIVE IDENTIFICATION AND
EXPIRATION DATE, HOLE DIMENSIONS, HOLE CLEANING PROCEDURES, ANCHOR SPACING, EDGE
DISTANCES, CONCRETE/MASONRY THICKNESS, ANCHOR EMBEDMENT, TIGHTENING TORQUE,
AND ADHERENCE TO THE MANUFACTURER’S PRINTED INSTALLATION INSTRUCTIONS AND SHALL
SUBMIT REPORT WHICH INCLUDES THE ABOVE INFORMATION.
2) THE SPECIAL INSPECTOR MUST VERIFY THE INITIAL INSTALLATIONS OF EACH TYPE AND SIZE OF
ADHESIVE ANCHOR BY CONSTRUCTION PERSONNEL ON SITE.
3) SUBSEQUENT INSTALLATIONS OF THE SAME ANCHOR TYPE AND SIZE BY THE SAME
CONSTRUCTION PERSONNEL ARE PERMITTED TO BE PERFORMED IN THE ABSENCE OF THE
SPECIAL INSPECTOR. ANY CHANGE IN THE ANCHOR PRODUCT BEING INSTALLED OR THE
PERSONNEL PERFORMING THE INSTALLATION REQUIRES AN INITIAL INSPECTION. FOR ONGOING
INSTALLATIONS OVER AN EXTENDED PERIOD, THE SPECIAL INSPECTOR MUST MAKE REGULAR
INSPECTIONS TO CONFIRM CORRECT HANDLING AND INSTALLATION OF THE PRODUCT.
B. MECHANICAL ANCHOR TESTING SHALL BE PERFORMED PERIODICALLY WITH THE SPECIAL
INSPECTOR SUBMITTING A REPORT THAT INCLUDES THE FOLLOWING DETAILS:
1) ANCHOR DESCRIPTION, INCLUDING THE ANCHOR PRODUCT NAME, ANCHOR TYPE, NOMINAL
ANCHOR AND BOLT DIAMETERS, AND ANCHOR LENGTH.
2) HOLE DESCRIPTION, INCLUDING HOLE DIMENSIONS, ANCHOR EMBEDMENT, AND VERIFICATION OF
DRILL BIT COMPLIANCE WITH ANSI B212.15-1994.
3) INSTALLATION DESCRIPTION, INCLUDING VERIFICATION OF CONCRETE/MASONRY TYPE,
CONCRETE/MASONRY COMPRESSIVE STRENGTH, MEMBER THICKNESS, VERIFICATION OF
ANCHOR INSTALLATION AND LOCATION (SPACING AND EDGE DISTANCE), TIGHTENING TORQUE,
AND ADHERENCE TO THE MANUFACTURER’S PRINTED INSTALLATION INSTRUCTIONS AND ESR
REPORT.
END OF GENERAL STRUCTURAL NOTES
M A
R K
D
E S
C R
IP
T
IO
N
D A
T
DRAFT
REQUIRED VERIFICATION AND INSPECTION OF STEEL CONSTRUCTION
VERIFICATION AND INSPECTION
1. MATERIAL VERIFICATION OF HIGH-STRENGTH BOLTS, NUTS AND WASHERS:
A. IDENTIFICATION MARKINGS TO CONFORM STANDARDS SPECIFIED IN THE APPROVED CONSTRUCTION DOCUMENTS.
CONTINUOUS PERIODIC
B. MANUFACTURER'S CERTIFICATE OF COMPLIANCE REQUIRED.
2. INSPECTION OF HIGH-STRENGTH BOLTING:
A. BEARING-TYPE CONNECTIONS.
B. SLIP-CRITICAL CONNECTIONS.
3. MATERIAL VERIFICATION OF STRUCTURAL STEEL:
A. IDENTIFICATION MARKINGS TO CONFORM TO ASTM STANDARDS SPECIFIED IN THE APPROVED CONSTRUCTION DOCUMENTS.
B. MANUFACTURER'S CERTIFIED MILL TEST REPORTS
4. MATERIAL VERIFICATION OF WELD FILLER MATERIALS:
A. IDENTIFICATION MARKING TO CONFORM TO AWS SPECIFICATION IN THE APPROVED CONSTRUCTION DOCUMENTS.
B. MANUFACTURER'S CERTIFICATE OF COMPLIANCE REQUIRED.
5. INSPECTION OF WELDING:
A. COMPLETE AND PARTIAL PENETRATION GROOVE WELDS.
B. MULTIPASS FILLET WELDS.
C. SINGLE-PASS FILLETS WELDS > 8 MM
D. SINGLE -PASS FILLET WELDS < 8 MM
E. COLD-FORMED STEEL DECK: FLOOR AND ROOF DECK WELDS.
F. REINFORCING STEEL: VERIFICATION OF WELDABILITY OF REINFORCING STEEL.
G. REINFORCING STEEL IN BOUNDARY ELEMENTS OF SPECIAL STRUCTURAL WALLS OF CONCRETE
H. SHEAR REINFORCEMENT.
I. OTHER REINFORCING STEEL.
6. MATERIAL VERIFICATION OF COLD-FORMED STEEL DECK:
A. IDENTIFICATION MARKINGS TO CONFORM STANDARDS SPECIFIED IN THE APPROVED CONSTRUCTION DOCUMENTS.
B. MANUFACTURER'S CERTIFIED TEST REPORTS.
REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION
1. INSPECTION OF REINFORCING STEEL AND PLACEMENT.
2. VERIFYING USE OF REQUIRED DESIGN MIX.
3. AT THE TIME FRESH CONCRETE IS SAMPLED TO FABRICATE SPECIMENS FOR STRENGTH TEST, PERFORM SLUMP AND AIR CONTENT
TESTS, AND DETERMINE THE TEMPERATURE OF THE CONCRETE.
4. INSPECTION OF CONCRETE PLACEMENT FOR PROPER APPLICATION TECHNIQUES.
5. INSPECTION FOR MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES.
6. VERIFICATION OF IN-SITU CONCRETE STRENGTH PRIOR TO REMOVAL OF SHORES AND FORMS FROM BEAMS AND STRUCTURAL SLABS.
7. INSPECTION OF FORMWORK FOR SHAPE, LOCATION, AND DIMENSIONS OF THE CONCRETE MEMBER BEING FORMED.
CONTINUOUS PERIODICVERIFICATION AND INSPECTION
REQUIRED VERIFICATION AND INSPECTION OF SOILS
1. VERIFY MATERIALS BELOW FOOTINGS ARE ADEQUATE TO ACHIEVE THE DESIGN BEARING CAPACITY.
3. PERFORM CLASSIFICATION AND TESTING OF CONTROLLED FILL MATERIALS.
4. VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES DURING PLACEMENT AND COMPACTION OF
CONTROLLED FILL.
VERIFICATION AND INSPECTION
2. VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE REACHED PROPER MATERIAL.
CONTINUOUS PERIODIC
5. PRIOR TO PLACEMENT OF CONTROLLED FILL, OBSERVE SUBGRADE AND VERIFY THAT SITE HAS BEEN PREPARED PROPERLY.
PERFORM CLASSIFICATION AND TESTING OF CONTROLLED FILL MATERIALS.
X-
X-
X-
X-
X-
X-
X-
X-
-X
-X
-X
X-
X-
X-
-X
-X
X-
X-
X-
X-
X-
-X
-X
X-
X-
X-
X-
X-
X-
X-
-X
POST-INSTALLED ANCHORS AND REINFORCEMENT BAR DOWELING
1. THE SPECIAL INSPECTOR SHALL BE ON THE JOBSITE INITIALLY DURING ANCHOR INSTALLATION TO VERIFY ANCHOR OR DOWEL TYPE, ANCHOR OR DOWEL DIMENSIONS, CONCRETE TYPE, CONCRETE COMPRESSIVE STRENGTH, HOLE DIMENSIONS, HOLE CLEANING PROCEDURES, ANCHOR SPACING, EDGE DISTANCES, CONCRETE THICKNESS, ANCHOR OR DOWEL EMBEDMENT, AND
TIGHTENING TORQUE.
CONTINUOUS PERIODIC
2. THE SPECIAL INSPECTOR MUST VERIFY THE INITIAL INSTALLATIONS OF EACH TYPE AND SIZE OF ANCHOR BY CONSTRUCTION PERSONNEL ON SITE. SUBSEQUENT INSTALLATIONS OF THE SAME ANCHOR TYPE AND SIZE BY THE SAME CONSTRUCTION PERSONNEL MAY BE PERMITTED TO BE PERFORMED IN THE ABSENCE OF THE SPECIAL INSPECTOR.
3. ANY CHANGE IN THE ANCHOR PRODUCT BEING INSTALLED OR THE PERSONNEL PERFORMING THE INSTALLATION MUST
REQUIRE AN INITIAL INSPECTION.
VERIFICATION AND INSPECTION
X
X
X
NOTE:
ALSO SEE SPECIAL INSPECTION SCHEDULE IN SPECIFICATION 01 45 35 FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
REQUIRED VERIFICATION AND INSPECTION OF PILE FOUNDATIONS
1. VERIFY PILE MATERIALS, SIZES AND LENGTHS COMPLY WITH THE REQUIREMENTS.
3. OBSERVE DRIVING OPERATIONS AND MAINTAIN COMPLETE AND ACCURATE RECORDS FOR EACH PILE.
4. VERIFY PLACEMENT LOCATIONS AND PLUMBNESS, CONFIRM TYPE AND SIZE OF HAMMER, RECORD NUMBER OF BLOWS PER FOOT OF PENETRATION, DETERMINE REQUIRED PENETRATIONS TO ACHIEVE DESIGN CAPACITY, RECORD TIP AND
BUTT ELEVATIONS AND DOCUMENT ANY PILE DAMAGE.
VERIFICATION AND INSPECTION
2. DETERMINE CAPACITIES OF TEST PILES.
CONTINUOUS PERIODIC
-X
-X
-X
-X
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-003
G E
N E
R A
L S
T R
U C
T U
R A
L N
O T
E S
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -0
STRUCTURAL ABBREVIATIONS
# NUMBER
& AND
= EQUAL, EQUALS
@ AT
A/C AIR CONDITIONING
AB ANCHOR BOLT
ACI AMERICAN CONCRETE INSTITUTE
ADDL ADDITIONAL
ADJ ADJACENT
AFF ABOVE FINISEHD FLOOR
AH, AHU AIR HANDLING UNIT
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE
APA AMERICAN PLYWOOD ASSOCIATION
APPROX APPROXIMATELY
ARCH ARCHITECTURAL
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
AT ANTI-TERRORISM
AWS AMERICAN WELDING SOCIETY
BET BETWEEN
BLW BELOW
BM BEAM
BN BOUNDARY NAIL
BOF BOTTOM OF FOOTING
BOT BOTTOM
BRG BEARING
C CHANNEL
CE CARBON EQUIVALENT
CENT CENTERED
CFMF COLD-FORMED METAL FRAMING
CFS COLD-FORMED STEEL
CIP CAST IN PLACE
CJ CONTROL JOINT/CEILING JOIST
CJP COMPLETE JOINT PENETRATION
CL CENTERLINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
COND CONDITION
CONN CONNECT, CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COR CORNER
CWB CAPILLARY WATERBARRIER
D DEEP, DEPTH
DEG DEGREE
DEM DEMOLISH, DEMOLITION
DEP DEPRESSED
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DL DEADLOAD
DO DITTO
DT DRAG TRUSS
DWG(S) DRAWINGS
DWL DOWEL
EA EACH
EF EACHFACE
EJ EXPANSION JOINT
ELEC ELECTRICAL
ELEV ELEVATION
EN EDGE NAIL
STRUCTURAL ABBREVIATIONS
EQUIP EQUIPMENT
ES EACH SIDE
EW EACH WAY
EXIST EXISTING
EXT EXTERNAL, EXTERIOR
FF FAR FACE
FFE FINISH FLOOR ELEVATION
FG WALL FOOTING TYPE
FJ FLOOR JOIST
FMG FRAMING
FN FIELD NAIL
FND FOUNDATION
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FOS FACE OF STUD
FS FAR SIDE
FT, ' FOOT
FTG FOOTING
Fy YIELD STRESS
GA GAUGE
GLB GLUED LAMINATED BEAM
GT GIRDER TRUSS
GUSS GUSSET
GYP BD GYPSUM BOARD
HD HOLD DOWN
HDR HEADER
HGR HANGER
HK HOOK
HORIZ HORIZONTAL
HP HIGH POINT
HSS HOLLOW STRUCTURAL SECTION
HT HEIGHT
HVAC HEATNG/ VENTILATING/ AIR
CONDITIONING
I MOMENT OF INERTIA
IBC INTERNATIONAL BUILDING CODE
ICF INSULATED CONCRETE FORM
ID INSIDE DIAMETER
INFO INFORMATION
INS INSULATED, INSULATION
JST JOIST
K, KIPS THOUSAND POUNDS
KN KILONEWTON
KPA KILOPASCAL
LB POUND
LG LONG
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC LOCATE, LOCATION
LONG LONGITUDINAL
LP LOW POINT
LW LIGHT WEIGHT
M METER
MB MACHINE BOLT
MBR MEMBER
MECH MECHANICAL
MED MEDIUM
MEP MECHANICAL/ELECTRICAL/PLUMBING
MEZZ MEZZANINE
MF MOMENT FRAME
MFG MANUFACTURING
MFR MANUFACTURER
MIN MINIMUM
MM MILLIMETER
MOD MODIFY, MODIFIED
MPA MEGAPASCAL
NF NEAR FACE
STRUCTURAL ABBREVIATIONS
NOM NOMINAL
NS NEAR SIDE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OPPOSITE HAND, OVERHEAD
OWSJ OPEN WEB STEEL JOIST
PAR PARALLEL
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PEN PENETRATION
PFJ PERIMETER FELT JOINT
PL PLATE
PLYWD PLYWOOD
PNL PANEL
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED, POINT,
PRETENSIONED
REINF REINFORCING, REINFORCED
REQ REQUIRED
RET RETURN, RETAINING
REV REVISION, REVISED
RF ROOF
RFT RAFTERS
RPM REVOLUTIONS PR MINUTE
RS ROUGH SAWN
RT ROOF TRUSS
S SECTION MODULUS
SC SLIP CRITICAL
SCHED SCHEDULE
SDI STEEL DECK INSTITUTE
SECT SECTION
SEIS SEISMIC
SEP SEPARATION
SH SHEAR WALL
SHT SHEET
SIM SIMILAR
SJI STEEL JOIST INSTITUTE
SMS SHEET METAL SCREW
SPEC(S) SPECIFICATION(S)
SPRT SUPPORT
SQ SQUARE
SS STAINLESS STEEL
ST SNUG TIGHT
STD STANDARD
STIF/STIFF STIFFENER
STL STEEL
STRUCT STRUCTURAL, STRUCTURE
SUSP SUSPENDED
SW SHEARWALL
SYM SYMMETRICAL
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
T/ TOP OF
TB TIE BEAM
TGB TOP OF GRADE BEAM
THK THICK, THICKNESS
TL TOTAL LOAD
TN TOE NAIL
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
UFC UNIFIED FACILITES CRITERIA
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
VB VERTICAL BRACE
VERT VERTICAL
W WIDTH, WEST, WIDE FLANGE
w/ WITH
WF WIDE FLANGE
WPT WORKING POINT
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
x BY, TIMES
M A
S
C R
IP
T
IO
N
D A
T
A
B C D E F G H
H
1 1
5 5
C
C 1C
C
C
C
C
C
C
C
C 1C
C
C
C 1 C
P C
P C
P C
P C
P C
P C
P C
3P C
P C
P C
PC
3P
C
P C
P C
FG3
FG3
F G
F G
F G
F G
FG3
F G
F G
FG3
F G
F G
T B T B
TBTB TB
TB TBTB
2.7
FG1
F G
F G
C
1PC
P C
P C
P C
P C
P C
P C
P C
P C
P C
P C
T B
F G
F G
FG3FG3
FG1
F G
FG1
F G
FG1
FG1
F G
F G
F G
TB TB TB
F G
F G
P C
L6
S-502
TYP
L6
S-502
TYP
L6
S-502
TYP
L6
S-502
TYP
P C
CJ
TYP
ELEVATOR PIT
SEE GENERAL
NOTE 7
P C
F G
P C
P C
TB
P C
F G
P C
F G
FG3 FG3 FG3
F G
F
G
F G
FG3FG3
FG1 FG1
FG1
F G
TB
TB
TB
T B
S-202
A1
S-203A11
S-205 A10
B.6
C.2 E.5
3.4
3.5
2.4
3.8
FG1
S-205 A1
S-204
A1
S-205 J15
S-203A1
S-203
J1
S-203
J6
A5 S-403
1.2
P C
2C
FG2
F G
F.3
3.6
E8
S-502
TYP @ OH
DOORS
S-202
H1
S-203 J11
S-204
H1
S-205J1
A2 S-402
G1 S-401
E8
S-502
SIM
P C
FG3
P C
PC
PC
P C
F G
P C
P
C
P C
F G
F G
P C
F G
PC
F G
P C
P
C
P C
FG1
F G
P C
PC
P C
P C
P C
P C
FG3
P C
P C
F G
F G
FG1
F G
F G
49300
80209900
4600 8850 2200 6000 8350 4450 5100 5340 4410
FG3
FG3
TBTBTB FG1
FG3
F G
F
G
F G
F
G
F G
F
G
F G
F
G
1. FINISHED FLOOR ELEVATION = 0 U.N.O.
2. ELEVATION 0 IN STRUCTURAL DRAWINGS
= ELEVATION 40.35 IN REFERENCE
DATUM. SEE CIVIL, UNO.
3. TOP OF EXTERIOR FOUNDATION = -600
MM FROM FIRST FLOOR ELEVATION,
UNO.
4. TOP OF INTERIOR FOUNDATION = -600
MM FROM FIRST FLOOR ELEVATION,
UNO.
5. TYPICAL FLOOR CONSTRUCTION IS 150
THICK CONCRETE SLAB ON GRADE ON
0.38 MM POLYETHYLENE VAPOR BARRIER
ON 300 THICK COMPACTED FREE-
DRAWING GRANULAR BASE, REINFORCE
SLAB WITH D13 AT 400 EACH WAY.
6. = INDICATES FLOOR
CONSTRUCTION IS 220 THICK CONCRETE
SLAB ON 0.38 MM POLYETHYLENE VAPOR
BARRIER ON 300 THICK COMPACTED
FREE-DRAINING GRANULAR BASE,
REINFORCE SLAB WITH D19 AT 250 EACH
WAY.
7. CONTRACTOR SHALL VERIFY ELEVATOR
DIMENSIONS (SIZE AND DEPTH) AND
LOCATION OF SUMP PIT WITH ELEVATOR
MANUFACTURER. PIT DEPTH=-1300
8. SLAB CONTROL JOINTS (CJ) SHALL
EITHER BE A CONTRACTION OR
CONSTRUCTION JOINT AT
CONTRACTOR'S OPTION, REFER TO
DETAILS ON SHEET S-501.
9. SEE ARCHITECTURAL FOR WINDOW AND
DOOR OPENING LOCATIONS, AND
DIMENSIONS OF INTERIOR CONCRETE
WALLS.
10. STRUCTURAL WALLS ARE TYPICALLY 300
THICK U.N.O. REINFORCED WITH D13 AT
250 ON CENTERED VERTICAL AND D13 AT
200 ON CENTER HORIZONTAL, EACH
FACE. PROVIDE MATCHING DOWELS INTO
FOUNDATION GIRDERS.
11. COORDINATE FLOOR DRAIN LOCATIONS
WITH PLUMBING DRAWINGS. REFER TO
ARCHITECTURAL DRAWINGS FOR
CONCRETE SLAB SLOPES IN TOILET
ROOMS AND JANITORS CLOSETS.
LEGEND
MARK DESCRIPTION REFERENCE SHEETS
C CONCRETE COLUMN
B CONCRETE BEAM
FOUNDATION GIRDERFG
S STRUCTURAL SLAB
W WALL
G CONCRETE GIRDER
/G1 S-604
/N7 S-603
/F12 S-602
/M1 S-604
/M7 S-602
/F1 S-602
TB TIE BEAM /E16 S-502
PC PILE CAP /M5 S-601
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-101
F O
U N
D A
T
IO
N P
L A
N
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -1
1 : 100
FOUNDATION PLAN
D2
GENERAL SHEET NOTES:
PLAN NORTH
0 2000
SCALE: 1: 100
M A
S
C R
IP
T
IO
N
D A
T
B C D E F G H
H
1 1
5 5
G3
G2
G2
2.7
H 350 x 252 x 11 x 19
H 350 x 252 x 11 x 19
BRIDGE CRANE END
STOP, TYP
3 METRIC TON
BRIDGE CRANE
WITH (1) 3
TONNE HOIST
OPEN
S1 S1
S
B
T
S L
A B
E L
T
S L
A B
E L
T
S L
A B
E L
T
S L
A B
E L
H 350 x 252 x 11 x 19H 350 x 252 x 11 x 19
H 350 x 252 x 11 x 19H 350 x 252 x 11 x 19
B.6
B.6
C.2 E.5
3.4
2.4
3.8
ROOF HATCH
ROOF
HATCH
A11
S-504
1.2
F17
S-505
F.3
3.6
M16
S-504
L17
S-505
T/ SLAB
EL = 5000
T/ SLAB
EL = 4820
SIM
S3
B
B
B
B
B
B
S
F5
S-505
H11
S-504
TYP
B1
B1
B2
B2
B2
B1
B
B
1690 1140 1140
B
B
B2
B2
B2
B2
B2
M11
S-504
TYP
G2
T/ PARAPET
EL = 8000
T/ PARAPET
EL = 6200
T/ PARAPET
EL = 8000 T/ PARAPET
EL = 7000
4600 5300 3550 2200 6000 8350 4450 5100 5340 4410
80209900
B
B
B
B
B
B
B
B
B
B
960 B5 8 SPA @ 1600
B8 B8 B8 B8
B1B1
B7
B4
B4B4
B7
B6 B7
G5 G5 G5
B4
B4
B4
B4
B4
B4
B4
B4 B1
B1
B1
B1 B1
B1
B1
B1
B4
1100 740
1650B5 6 SPA @ 1600
B
B
B
B
B
B
B
1. FLOOR ELEVATION = 5 000 MM U.N.O.
2. LOW ROOF SLAB ELEVATION VARIES, SEE
PLAN.
3. REFER TO ARCHITECTURE FOR
DELINEATION OF FLOOR LIVE LOADING
EXTENTS.
4. T/ CONC SECOND FLOOR EL = 5000
5. INDICATES LIMITS OF SECOND
FLOOR
LEGEND
MARK DESCRIPTION REFERENCE SHEETS
C CONCRETE COLUMN
B CONCRETE BEAM
FOUNDATION GIRDERFG
S STRUCTURAL SLAB
W WALL
G CONCRETE GIRDER
/G1 S-604
/N7 S-603
/F12 S-602
/M1 S-604
/M7 S-602
/F1 S-602
TB TIE BEAM /E16 S-502
PC PILE CAP /M5 S-601
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-102
S E
C O
N D
F L O
O R
A N
D L
O W
R O
O F
F R
A M
IN
G
P L A
N
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -1
1 : 100
SECOND FLOOR AND LOW ROOF FRAMING PLAN
D2
GENERAL SHEET NOTES:
PLAN NORTH
0 2000
SCALE: 1: 100
M A
S
C R
IP
T
IO
N
D A
T
C D E F G H
H
1 1
5 5
B
2.7
S1
B.6
T/ SLAB
EL = 10180
T/ SLAB
EL = 10000
T/ SLAB
EL = 10500
T/ SLAB
EL = 10640
T/ SLAB
EL = 11400
S1
B4 G1
B
B
F.3
3.6
B
1670 B6 14 SPA @ 1600
B1 4 SPA @ 1600
S
HOIST BEAM
B5 14 SPA @ 1600
B4 14 SPA @ 1600
B
S1
F12
S-505
L17
S-505
L12
S-505
L12
S-505
F17
S-505
T/ PARAPET
EL = 12800
T/ PARAPET
EL = 12000
T/ PARAPET
EL = 11200
T/ PARAPET
EL = 12800
T/ PARAPET
EL = 12000
T/ PARAPET
EL = 11200
T/ PARAPET
EL = 12000
T/ PARAPET
EL = 11200
T/ PARAPET
EL = 12800
T/ PARAPET
EL = 12000
T/ PARAPET
EL = 11200
T/ PARAPET
EL = 11200
T/ PARAPET
EL = 12000
3550 8200 8350 9550 5340 4410
G3 G3 G3
G1 G1 G1
G1 G1 G1
G4G4G4
B
1. ROOF SLAB ELEVATIONS VARY, REF TO
ARCH.
LEGEND
MARK DESCRIPTION REFERENCE SHEETS
C CONCRETE COLUMN
B CONCRETE BEAM
FOUNDATION GIRDERFG
S STRUCTURAL SLAB
W WALL
G CONCRETE GIRDER
/G1 S-604
/N7 S-603
/F12 S-602
/M1 S-604
/M7 S-602
/F1 S-602
TB TIE BEAM /E16 S-502
PC PILE CAP /M5 S-601
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-103
R O
O F
F R
A M
IN
G
P L A
N
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -1
1 : 100
ROOF FRAMING PLAN
D5
GENERAL SHEET NOTES:
PLAN NORTH
0 2000
SCALE: 1: 100
M A
S
C R
IP
T
IO
N
D A
T
B15 S-201
B9 S-201
J15 S-201
J9 S-201
B9 S-201
FIRST FLOOR
SECOND FLOOR
ROOF PARAPET
SEE WALL ELEVATION
FOR REINF. SIZE & SPACING
(1) D19 EF, CONT.
(1) D19 EF, CONT.
(1
D
E
F
(1
D
E
F
DWLS. TO MATCH
MECH. OPENINGS LESS
THAN 750x750 UNO
ROOF
SEE
FOR TYP. DETAILS
@ WALL ENDS &
INTERSECTIONS
DOOR OPENING
DOOR OPENING
WINDOW OPENING
OR MECH. OPENING
GREATER THAN 750x750
CLOSELY SPACED OPENINGS
(T Y
P
(TYP.)
800 (1) D16x880 EF
(TYP.)
(1) D19 EF
(TYP.)
(1) D19 EF
NOTES:
1. PROVIDE STANDARD HOOK WHERE BARS CANNOT EXTEND BEYOND
OPENING AS SHOWN.
2. SEE WALL ELEVATIONS FOR HORIZONTAL & VERTICAL WALL REINFORCEMENT.
3. PROVIDE STANDARD HOOKS AT VERTICAL BARS TERMINATING AT OPENINGS.
(1) D19 EF
VARIES
V A
R
IE
S
DWLS. TO MATCH
JAMB BARS INTO
BEAM OR WALL
BELOW (TYP.)
U-BARS TO MATCH
HORIZ WALL REINF.
SEE (TYP.) /M12 S-501
(1) D16x880 EF
DIAGONAL (TYP.)
(1) D16 EF
(TYP.)
(1) D19 EF
U-BARS TO MATCH
HORIZ WALL REINF.
SEE (TYP.)
NOTES:
1. PROVIDE STANDARD HOOK WHERE BARS CANNOT EXTEND
BEYOND OPENING AS SHOWN.
2. SEE WALL ELEVATIONS FOR HORIZONTAL & VERTICAL WALL REINFORCEMENT.
3. PROVIDE STANDARD HOOKS AT VERTICAL BARS TERMINATING AT OPENINGS.
4. IF "X" IS LESS THAN 100 COMBINE OPENINGS INTO SINGLE OPENING.
(1) D19 EF
(1) D19 EF
(1) D19 EF
VARIES
"X" VARIES
IF "X" < 750 PROVIDE
HOOPS TO MATCH
SIZE & SPACING OF
HORIZ WALL REINF.
V A
R
IE
S V
A R
IE
S
U-BARS TO MATCH
HORIZ WALL REINF.
SEE (TYP.) /M12 S-501
/M12 S-501
T Y
P
(T Y
P
(TYP.)
800 (1) D16x1250 EF
(TYP.)
(1) D19 EF
(TYP.)
(1) D19 EF
H K
(T
Y P
O
R S
T D
DWLS. TO MATCH
JAMB BARS INTO
BEAM, WALL OR
FOOTING BELOW (TYP.)
NOTES:
1. PROVIDE STANDARD HOOK WHERE BARS CANNOT EXTEND
BEYOND OPENING AS SHOWN.
2. SEE WALL ELEVATIONS FOR HORIZONTAL & VERTICAL WALL REINFORCEMENT.
3. PROVIDE STANDARD HOOKS AT VERTICAL BARS TERMINATING AT OPENINGS.
VARIES
V A
R
IE
S
U-BARS TO MATCH
HORIZ WALL REINF.
SEE (TYP.) /M12 S-501
(1) D16x880 E.F.
(TYP.)
(1) D16 E.F.
(TYP.)
(1) D19 E.F.
U-BARS TO MATCH
HORIZ. WALL REINF.
SEE (TYP.)
≤ 750
(TYP.)
(T Y
P
(1) D19 E.F.
NOTES:
1. PROVIDE STANDARD HOOK WHERE BARS
CANNOT EXTEND BEYOND OPENING AS SHOWN.
2. SEE WALL ELEVATIONS FOR HORIZONTAL &
VERTICAL WALL REINFORCEMENT.
3. REINFORCING FOR CIRCULAR OPENINGS SIMILAR.
4. POSSIBLE MULTIPLE PENETRATION CONDITION SHOWN DASHED.
5. SPREAD INTERRUPTED REINF EQUALLY EACH SIDE OF OPENING.
DO NOT CUT OR BEND BARS. ADD EXTRA BARS TO MAKE EQUAL
EACH SIDE OF OPENING IF REQUIRED. SPACE BARS 75 O.C. TYP.
6. ADDITIONAL REINF OF SAME SIZE AND SPACING AS INTERRUPTED
REINF. EXTEND ADDITIONAL REINF TO TOP AND BOTTOM.
7. OPENING REINFORCING AS SHOWN NOT REQUIRED FOR OPENING
LESS THAN 200x200.ADJUST TYPICAL WALL REINFORCING TO EXTEND
AROUND SUCH OPENINGS.
SEE NOTE 5
SEE NOTE 5 & 6SEE NOTE 5 & 6
SEE NOTE 5
/M12 S-501
NOTES:
1. NOTES PER DETAIL A8/S3-201 APPLY WHERE APPLICABLE.
EF HORIZ REINF. SEE ELEVATION
FOR NUMBER AND SIZE; PROVIDE
LAP SPLICE LENGTH BEYOND
OPENINGS EACH EDGE
SETS OF CLOSED TIES AND CROSS
TIES AT 100 MM OC UNO; EXTEND 800
MM ABOVE AND BELOW OPENING
EDGES, UNO OMIT U-SHAPED BARS
WHERE TIES OCCUR.
EF VERT REINF. SEE ELEVATIONS
FOR NUMBER AND SIZE; PROVIDE
EQUALLY SPACED BARS BETWEEN
OPENING OR SEE ELEVATIONS FOR
LENGTH. EXTEND BARS FULL HEIGHT
BETWEEN FLOORS, LAP SPLICE WITH
BARS ABOVE AND BELOW FLOOR
LINES
WALL PIER
WIDTH OF
BOUNDARY ELEMENT
LENGTH TYP. EACH
END; SEE ELEVATION
FOR LENGTH
EF HORIZ REINF. @ 100
MM OC FULL HEIGHT OF
BOUNDARY ELEMENT
HEIGHT
SETS OF CLOSED TIES AND
CROSS TIES AT 100 MM OC;
WHERE BOUNDARY ELEMENT IS
SHOWN AS FULL LENGTH OF PIER
PROVIDE SINGLE CLOSED TIES
FULL WIDTH AND CROSS TIES AT
EACH PAIR OF VERT BARS
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-201
C O
N C
R E
T E
W A
L L E
L E
V A
T
IO
N S
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -2
1 : 75
TYPICAL CONCRETE WALL OPENING
REINFORCING (U.N.O.)
B1 1 : 50
CONCRETE WALL REINFORCING @ WINDOWS
OR MECHANICAL OPENINGS > 750x750
B15
1 : 50
CONCRETE WALL REINFORCING @ CLOSELY
SPACED OPENINGS
J15
1 : 50
CONCRETE WALL OPENING REINFORCING
B9
1 : 50
CONCRETE WALL REINFORCING @
MECHANCIAL OPENINGS ≤ 750x750
J91 : 50
CONCRETE WALL REINFORCING @ WALL PIERS
WITH BOUNDARY ELEMENTS
J1
M A
S
C R
IP
T
IO
N
D A
T
FOUNDATION PLAN
SECOND FLOOR
FRAMING PLAN
ROOF FRAMING
PLAN
10000
ACDEFH
D13@250 VERT. EF
D13 @200 HORIZ. EF
FOUNDATION PLAN
SECOND FLOOR
FRAMING PLAN
ROOF FRAMING
PLAN
10000
A C D E F H
D13@250 VERT. EF
D13 @200 HORIZ. EF D13@250 VERT. EF
D13 @200 HORIZ. EF
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-202
C O
N C
R E
T E
W A
L L E
L E
V A
T
IO
N S
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -2
1 : 100
CONCRETE WALL ELEVATION LINE 2 (LOOKING EAST)
A1
0 2000
SCALE: 1: 100
1 : 100
CONCRETE WALL ELEVATION LINE 1 (LOOKING WEST)
H1
M A
S
C R
IP
T
IO
N
D A
T
SECOND FLOOR
FRAMING PLAN
ROOF FRAMING
PLAN
10000
12345 2.7
D13@250 VERT. EF
D13 @200 HORIZ. EF
FOUNDATION PLAN
SECOND FLOOR
FRAMING PLAN
ROOF FRAMING
PLAN
10000
4 2.7
D13@250 VERT. EF
D13 @200 HORIZ. EF
3.6
FOUNDATION PLAN
SECOND FLOOR
FRAMING PLAN
ROOF FRAMING
PLAN
10000
FG
D13@250 VERT. EF
D13 @200 HORIZ. EF
FOUNDATION PLAN
SECOND FLOOR
FRAMING PLAN
ROOF FRAMING
PLAN
10000
C B.6
D13@250 VERT. EF
D13 @200 HORIZ. EF
FOUNDATION PLAN
SECOND FLOOR
FRAMING PLAN
ROOF FRAMING
PLAN
10000
1 4 52.7
D13@250 VERT. EF
D13 @200 HORIZ. EF
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-203
C O
N C
R E
T E
W A
L L E
L E
V A
T
IO
N S
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -2
1 : 100
CONCRETE WALL ELEVATION ALONG LINE F (LOOKING SOUTH)
A111 : 100
CONCRETE WALL ELEVATION ALONG LINE G (LOOKING SOUTH)
A1
1 : 100
CONCRETE WALL ELEVATION ALONG LINE 2.7
(LOOKING EAST)
J1 1 : 100
CONCRETE WALL ELEVATION ALONG LINE 3
(LOOKING EAST)
J6
0 2000
SCALE: 1: 100
1 : 100
CONCRETE WALL ELEVATION ALONG GRID H (LOOKING NORTH)
J11
M A
S
C R
IP
T
IO
N
D A
T
SECOND FLOOR
FRAMING PLAN
ROOF FRAMING
PLAN
10000
C D E F G HC.2 E.5
D13@250 VERT. EF
D13 @200 HORIZ. EF
D13@250 VERT. EF
D13 @200 HORIZ. EF
FOUNDATION PLAN
SECOND FLOOR
FRAMING PLAN
ROOF FRAMING
PLAN
10000
ABCDEFGH B.6C.2E.5F.3
D13@250 VERT. EF
D13 @200 HORIZ. EF
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-204
C O
N C
R E
T E
W A
L L E
L E
V A
T
IO
N S
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -2
1 : 100
CONCRETE WALL ELEVATION ALONG LINE 4 (LOOKING WEST)
A1
0 2000
SCALE: 1: 100
1 : 100
CONCRETE WALL ELEVATION ALONG LINE 5 (LOOKING EAST)
H1
M A
S
C R
IP
T
IO
N
D A
T
SECOND FLOOR
FRAMING PLAN
ROOF FRAMING
PLAN
10000
1 2 3 4 53.52.4
D13@250 VERT. EF
D13 @200 HORIZ. EF
FOUNDATION PLAN
SECOND FLOOR
FRAMING PLAN
2 3 5
D13@250 VERT. EF
D13 @200 HORIZ. EF
FOUNDATION PLAN
SECOND FLOOR
FRAMING PLAN
ROOF FRAMING
PLAN
10000
3 53.5 3.8
D13@250 VERT. EF
D13 @200 HORIZ. EF
FOUNDATION PLAN
SECOND FLOOR
FRAMING PLAN
ROOF FRAMING
PLAN
10000
D13@250 VERT. EF
D13 @200 HORIZ. EF
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-205
C O
N C
R E
T E
W A
L L E
L E
V A
T
IO
N S
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -2
1 : 100
CONCRETE WALL ELEVATION ALONG LINE C (LOOKING NORTH)
A101 : 100
CONCRETE WALL ELVATION ALONG LINE B (LOOKING NORTH)
A1
1 : 100
CONCRETE WALL ALONG LINE B.6 (LOOKING NORTH)
J15
0 2000
SCALE: 1: 100
1 : 100
CONCRETE WALL ALONG LINE A (LOOKING SOUTH)
J1
M A
S
C R
IP
T
IO
N
D A
T
C
B.6
G15
S-401
FG2
C
B.6
G15
S-401
B2
B2
B2
FOUNDATION PLAN
SECOND FLOOR
FRAMING PLAN
53.5
C17 S-401
C1 S-401
C6 S-401
C12 S-401
3.6
D10 NOSING
BAR, TYP.
D10 @ 250, TYP.
SLAB, SEE
PLAN
BEAM,
SEE PLAN
D19 @ 300
D13 @ 300200
SLAB, SEE PLAN
BEAM,
SEE PLAN
D10 NOSING
BAR, TYP.
D10 @ 250, TYP.
D19 @ 300
D13 @ 300
TENSION LAP
D10 NOSING
BAR, TYP.
D10 @ 250, TYP.
SLAB, SEE PLAN
BEAM,
SEE PLAN
D19 @ 300
D13 @ 300
D19 @ 300
D10 NOSING
BAR, TYP.
D13 @ 300
D10 @ 250, TYP.
D13 @ 250
FG4, SEE SCHED 400
D13 @ 300 E.F.
D13 @ 300
DWLS., E.F.
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-401
E N
L A
R G
E D
S T
A
IR
P L A
N S
S
E C
T
IO
N S
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -4
1 : 50
SOUTH STAIR FIRST FLOOR PLAN
G1 1 : 50
SOUTH STAIR SECOND FLOOR PLAN
G8 1 : 50
SECTION
G15
0 1000
SCALE: 1: 50
2000500
1 : 20
SECTION
C1 1 : 20
SECTION
C6 1 : 20
SECTION
C12 1 : 20
SECTION
C17
0 400
SCALE: 1: 20
800200
M A
S
C R
IP
T
IO
N
D A
T
F G H
J2
S-402
F.3
F G
F G H
B
J2
S-402
F.3
B
B
FOUNDATION PLAN
SECOND FLOOR
FRAMING PLAN
GH
C17 S-401
C1 S-401
C6 S-401
C12 S-401
F.3
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-402
E N
L A
R G
E D
S T
A
IR
P L A
N S
S
E C
T
IO
N S
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -4
1 : 50
NORTH STAIR FIRST FLOOR PLAN
A2 1 : 50
NORTH STAIR SECOND FLOOR PLAN
A13
1 : 50
SECTION
J2
0 1000
SCALE: 1: 50
2000500
M A
S
C R
IP
T
IO
N
D A
T
G
3.8
H1
S-403
F.3
3.6
CONC. SLAB ON GRADE
SEE PLAN
DWLS TO MATCH SLAB
REINF. SIZE & SPACING
CONC. SLAB ON GRADE
SEE PLAN
SUMP PIT
SILL ANGLE BY ELEVATOR MFR
D13 @ 250 EF
D13 @ 200 EF
D13 @ 250 EF
D13 @ 200 EF
D16 @ 300 T&B
D16 @ 300 T&B
D16@300
FIRST FLOOR
200 500
300 SEE PLAN 300
D16@300
EA. WAY, TYP.
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-403
E N
L A
R G
E D
E L E
V A
T O
R
D E
T A
IL
S
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -4
1 : 50
ELEVATOR FIRST FLOOR PLAN
A5
0 1000
SCALE: 1: 50
2000500
1 : 20
SECTION
H1
M A
S
C R
IP
T
IO
N
D A
T
40MM DEEP
SAWCUT JOINT
FILL w/ SEALANT
SLAB REINF.
SEE PLAN
NOTES
C
L R
3 CJ
0.38 mm VAPOR BARRIER, TYP.
300 COMPACTED FREE
DRAINAGE GRANULAR
BASE
SLAB REINF. CONT.
THRU JOINT
SEE PLAN NOTES
40MM DEEP
GROOVE FILL
w/ SEALANT5
C
L R
3 CJ
0.38 mm VAPOR BARRIER, TYP.
300 COMPACTED FREE
DRAINAGE GRANULAR
BASE
INTERIOR EXTERIOR CORNEREXTERIOR
ADD'L DIAG REINF
BAR SIZE TO MATCH
SLAB REINF CENTER
IN SLAB - TYP
CJ
CJ
ADD'L DIAG REINF
BAR SIZE TO MATCH
SLAB REINF. CENTER
IN SLAB - TYP
TYP
10mm
EXPANSION
JOINT, TYP.
CJ
50 RIGID INSULATION
TYP. @ EXTERIOR
WALLS, SEE ARCH.
50 RIGID INSULATION
TYP. @ EXTERIOR
WALLS, SEE ARCH.
S E
E P
L A
N
T
(2) D16 CONT.
SLAB REINF,
SEE PLAN FLR. EL., SEE PLAN
600 MIN.
2 "A"
"A"
FLOOR BLOCK-OUT
SEE MECH. & ELECT.
DWGS FOR SIZE & LOCATIONS
M
IN
MATCH SLAB REINF.
STD HOOK @
INTERRUPTED
BARS, TYP.
SUBMIT LOCATION TO ARCH/ENG.
PRIOR TO CONSTRUCTION
WALL, SEE PLAN
ADD VERT. BAR EA. SIDE
OF JOINT TO MATCH WALL
REINF., E.F.
CJ
LAP SPLICE OF HORIZ. BARS
VA
R
IE
S
MATCH
HORIZ.
REINF.
TYP. WALL REINF.
SEE WALL
ELEVATIONS
NOTE:
OMIT CORNER REINF. WHERE CONCRETE PILASTER OCCURS @
CORNER
MATCH HORIZ.
REINF.
SEE SCHEDULE
LAP SPLICE SPACING SPACING
JAMB REINF.
SEE WALL
ELEVATION
(2) D16 UNO
VERT. WALL REINF. SEE WALL ELEVATION
FACE OF
WINDOW/DOOR
OPNG.
MATCH HORIZ.
REINF
SEE SCHEDULE
LAP SPLICE
S E
E S
C H
E D
U L E
L A
P S
P L
IC
E
WALL END BARS,
SEE ELEVATION
(2) D16 UNO
WALL END BARS,
SEE ELEVATION
(2) D16 UNO VARIES
WALL END BARS,
SEE ELEVATION
(2) D16 UNO
SEE SCHED.
LAP SPLICE
CONC.
PILASTER/COL.
TERMINATE HORIZ.
BARS w/ STD. HK.
INTO PILASTER/
COL. CORE
TYP. WALL REINF.
SEE WALL
ELEVATION
ADDED WALL BARS,
(2) D16 UNO
TYP. WALL REINF.
SEE WALL ELEVATIONS
55 MM DEEP
SAWCUT JOINT
FILL w/ SEALANT
SLAB REINF.
SEE PLAN
NOTES
C
L R
3 CJ
0.38 mm VAPOR BARRIER, TYP.
300 COMPACTED FREE
DRAINAGE GRANULAR
BASE
10 WIDE x 40 MM DEEP
GROOVE FILL W/ SEALANT
& 13 Ø BACKER MATERIAL
DO NOT RUN SLAB
REINF. THRU JOINT
C
L R
0.38 mm VAPOR BARRIER, TYP.
300 COMPACTED FREE
DRAINAGE GRANULAR BASE
150 150 25 Ø x 300 SMOOTH DOWEL
@ 400 O.C., GREASE ONE END
75 MAX.75 MAX.
T = AS REQ'D BY EQUIPMENT MFR., 100 MIN.
FLOOR SLAB REINF.
SEE PLAN
T
D10 HOOKED ADHESIVE DWL.
@ 600 OC INTO SLAB
EMBED. 100 mm
(TYP. @ PERIMETER)
D10@350 EA. WAY
/2
T
T
EDGE OF UNIT
ALL AROUND
100 MIN.
FOUNDATION GIRDER
SEE PLAN FOR SIZE
REINF PER SCHEDULE
D
L
TYP.
D /4
M
IN
D
/3 M
IN
NOTES:
1. PROVIDE ADD'L STIRRUPS AS REQ'D AT EA. SIDE OF SLEEVE
2. NOTIFY STRUCTURAL ENGINEER OF SLEEVE LOCATIONS
& SIZE NOT SHOWN ON PLAN
D16 IN PAIRS
(8) PER PIPE SLEEVE
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-501
T Y
P
IC
A L D
E T
A
IL
S
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -5
NTS
150 THICK SLAB ON GRADE CONTRACTION
JOINT DETAIL
P1
NTS
150 THICK SLAB ON GRADE CONTRACTION
JOINT DETAIL
K1
NTS
TYPICAL SLAB ON GRADE AT CONCRETE COLUMN DETAIL
H13
NTS
TYPICAL INTERIOR THICKENED SLAB
ON GRADE @ BLOCK-OUTS
E1 NTS
TYPICAL WALL CONSTRUCTION JOINT DETAIL
E7
NTS
TYPICAL WALL REINFORCING DETAILS
M12
NTS
220 THICK SLAB ON GRADE CONTRACTION
JOINT DETAIL
P7
NTS
220 THICK SLAB ON GRADE CONSTRUCTION
JOINT DETAIL
K7
NTS
TYPICAL HOUSEKEEPING PAD DETAIL
H7
NTS
TYPICAL HORZONTAL PIPE SLEEVE THROUGH
FOUNDATION GIRDER OR TIE BEAM
A1
M A
S
C R
IP
T
IO
N
D A
T
SEE PLAN
T/SLAB
TYP
CUT BOTTOM OF
PIPE TO MATCH
FLOOR SLOPE
WHERE REQ'D
PLAN
BASE PLATE
19x350 DIA.
4-M20 EXPANSION
ANCHORS W/ 110
MIN. EMBED
CL.
NOTE:
REFER TO ARCH
FOR LOCATION
BAL. @ 225
CL. PILE CAP
EA. END
(1) @ 100
SEE SCHEDULE
LAP SPLICE450
PILE CAP OR FOOTINGS
X, SEE NOTE 1
NOTE: 1.) PROVIDE ACI STANDARD HOOK IF X<1400.
CL. PILE CAP
SEE SCHEDULE
LAP SPLICE
SEE SCHEDULE
LAP SPLICE
BAL. @ 225
EA. END
(1) @ 100
BAL. @ 225
EA. END
(1) @ 100
PILE CAP OR FOOTING
U .N
.O
(6) D25 CONT
D13 TIES @
EQ EQ
ALIGN T/TB WITH T/PC
UNO - SEE PLAN
CL. TIE BEAM
TYP
50 CLR
FLOOR SLAB SEE PLAN
DWLS TO MATCH
VERT WALL REINF. TYP.
SEE WALL ELEVATIONS
FOR REINF.
CONC. SLAB ON GRADE
SEE PLAN
JOINT WIDTH 12
FIRST FLOOR
FOUNDATION GIRDER SEE
PLAN AND SCHEDULE
S E
E S
C H
E D
D E
V E
L O
P M
E N
T L E
N G
T H
S E
E P
L A
N
EQ EQ
CL OF WALL AND
FOUNDATION GIRDER
D16 @ 225
M
IN
PLAN
SEE 250
PRE-FABRICATED
TRENCH DRAIN w/ RATED
COVER FOR 67 KN (15 KIP)
AXLE FORKLIFT, SEE
PLUMBING DWGS
DWLS TO MATCH
SLAB REINF. SIZE &
SPACING
EXTERIOR SLAB
OR PAVEMENT
(TYPE VARIES),
SEE CIVIL SITE
CONC. SLAB ON GRADE
SEE PLAN
REINF. TO MATCH SLAB
REINF. SIZE & SPACING
TYP.
65 CLR.
L
O W
P T
C
L R
INTERIOR FACE OF
CONCRETE WALL
FOUNDATION GIRDER SEE
PLAN AND SCHEDULES
E E
S C
H E
D
D E
V E
L O
P M
E N
T L E
N G
T H
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-502
T Y
P
IC
A L D
E T
A
IL
S
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -5
1 : 20
TYPICAL INTERIOR BOLLARD DETAIL
L11
0 400
SCALE: 1: 20
800200
NTS
TYPICAL TIE BEAM CONNECTION
TO FOUNDATION
N16
NTS
TYPICAL CONTINUOUS TIE BEAM
CONNECTION TO FOUNDATION
K16
1 : 20
TYPICAL TIE BEAM DETAIL
E16
1 : 20
SECTION
L6
1 : 20
TYPICAL TRENCH DRAIN @ OH DOORS
E8
M A
S
C R
IP
T
IO
N
D A
T
400 300 400
CONCRETE PAVEMENT
SEE CIVIL
FINISH
GRADE
D16@300 OC
D16 @ 200 OC
DOWEL TO MATCH
VERTICAL BAR
TYP
150 2600 2600 2600 150
150 2750 2750 150 2000 300
EQUIPMENT
PAD SEE
DETAIL
E17
S-503
15550
PAVEMENT
SEE CIVIL
EXPANSION JOINT
BETWEEN WALL
FACE AND CONC
TYP
150 2860 2850 2850 150
150 2849 2850 2700 7000
750 5500 750
EQUIPMENT PAD
SEE DETAIL
TYP
TYP
E17
S-503
E11
S-503
400 300 400
GRAVEL
SEE CIVIL
FINISH
GRADE
D16@300 OC
(2) D13 EF CONT
D16 @ 300 TOP
(5) D16 T&B - CONT
D19 @ 200 BOT
150150
150 MASONRY WALL
SEE ARCH
D10 @ 250
(8) D16 CONT
ALL AROUND
200 MIN
C L R
EDGE OF UNIT CONCRETE PAD
ON GRADE
D16 @ 300 E.W.
MUD SLAB
300 THICK
COMPACTED
GRANULAR FILL
(2) ADDITIONAL D13
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-503
F O
U N
D A
T
IO
N D
E T
A
IL
S
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -5
1 : 20
CONCRETE WALL/DUMPSTER PARTITION
E11
1 : 50
TRANSFORMER ENCLOSURE
L4
0 1000
SCALE: 1: 50
2000500
0 400
SCALE: 1: 20
800200
1 : 50
CHILLER/TRASH ENCLOSURE
L11
1 : 20
UTILITY SCREEN WALL SECTION
E17NTS
TYPICAL EXTERIOR EQUIPMENT PAD DETAIL
M A
S
C R
IP
T
IO
N
D A
T
CL COL CL BM
BEAM,
SEE PLAN
SHIM PLATE 7 MIN x 205 x 310
W/ (4) 20Ø THREADED RODS
FOR BEAM ATTACHMENT
BENT EMBED PLATE
13x130x280x410 W/ (3) 20Ø x 130 EMBED HEADED
STUDS
(2) D13 STIRRUP SUPPORT
BARS
(4) D13 WELDED
TO BENT EMBED
PLATE
(4) D13 @
150 OC
COL,
SEE PLAN
NOTE: COL REINF NOT
SHOWN FOR CLARITY.
ASCE 30 CRANE
RAIL WITH CLAMPS
5 50-150
5 50-150
50 EA END
T/ STEEL EL = 9 350
M
IN
DOWELS TO
MATCH VERT.
WALL REINF.
CONC. SLAB
SEE PLAN, TYP.
T/SLAB
SEE PLAN
GIRDER,
SEE PLAN
D13 @ 300
SLOPE
PER PLAN
CONC. WALL
SEE ELEV'S FOR
WALL REINF.
CONC. SLAB
SEE PLAN, TYP.
SECOND FLOOR
5 000 CJ
D16 @ 300
BEAM, SEE PLAN
& SCHEDULE
FOR REINF.
SECOND FLOOR
D16 @ 300
5 000
300 CONC. WALL
SEE ELEV'S FOR
WALL REINF.
BEAM, SEE PLAN
MATCH DEPTH
OF ADJACENT
BEAM
100100
BEAM, SEE
PLAN
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-504
F R
A M
IN
G
D E
T A
IL
S
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -5
0 400
SCALE: 1: 20
800200 1 : 20
CRANE CORBEL DETAIL
A11
1 : 20
SECTION
M161 : 20
SECTION
M11
1 : 20
SECTION
H11
M A
S
C R
IP
T
IO
N
D A
T
T/SLAB: EL. VARIES
D16 @ 300
T/ PARAPET
SEE PLAN
SEE PLAN CJ
300 CONC. WALL
SEE ELEV'S FOR
WALL REINF.
EXTEND WALL REINF.
INTO PARAPET
BEAM
100 NORMAL WEIGHT
CONC. TOPPING SLAB
OVER RIGID INSULATION.
SEE ARCH. DWGS FOR
ADDITIONAL INFO
5%
T/SLAB: EL. SEE PLAN
D16 @ 300
T/ PARAPET
SEE PLAN
300 CONC. WALL
SEE ELEV'S FOR
WALL REINF.
CJ
EXTEND WALL REINF.
INTO PARAPET
BEAM, SEE PLAN
5%
100 NORMAL WEIGHT
CONC. TOPPING SLAB
OVER RIGID INSULATION.
SEE ARCH. DWGS FOR
ADDITIONAL INFO
T/SLAB: EL. SEE PLAN
D16 @ 300
300 CONC. WALL
SEE ELEV'S FOR
WALL REINF.
CJ
EXTEND WALL
REINF. INTO
PARAPET
BEAM, SEE PLAN
100 NORMAL WEIGHT
CONC. TOPPING SLAB
OVER RIGID INSULATION.
SEE ARCH. DWGS FOR
ADDITIONAL INFO
T/SLAB: EL. VARIES
D16 @ 300
T/ PARAPET
SEE PLAN
SEE PLAN CJ
300 CONC. WALL
SEE ELEV'S FOR
WALL REINF.
BEAM, SEE PLAN
MATCH DEPTH
BEAM
300 CONC. WALL
SEE ELEV'S FOR
WALL REINF.
5% 100 NORMAL WEIGHT
CONC. TOPPING SLAB
OVER RIGID INSULATION.
SEE ARCH. DWGS FOR
ADDITIONAL INFO
T/SLAB: EL. VARIES
D16 @ 300
SEE PLAN CJ
300 CONC. WALL
SEE ELEV'S FOR
WALL REINF.
BEAM
100100
BEAM, SEE
PLAN
100 NORMAL WEIGHT
CONC. TOPPING SLAB
OVER RIGID INSULATION.
SEE ARCH. DWGS FOR
ADDITIONAL INFO
T/SLAB: EL. SEE PLAN
D16 @ 300T/ PARAPET
SEE PLAN
300 CONC. WALL
SEE ELEV'S FOR
WALL REINF.
CJ
BEAM, SEE PLAN
5%
100 NORMAL WEIGHT
CONC. TOPPING SLAB
OVER RIGID INSULATION.
SEE ARCH. DWGS FOR
ADDITIONAL INFO
F
O U
N T
A
IN
S P
A R
K W
A Y
S U
IT
E
F A
IR
V
IE
W
H E
IG
H
T S
I
L
-2
.6
.7
W O
O L
P E
R T
In c
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
B
C
D
E
F
G
1 2 3 4 5 6
SHEET ID
Japan District
7 8 9 10
H
J
K
L
M
N
P
Q
R
11 12 13 14 15 16 17 18 19 20 21
Q K
K A
M
M A
IN
R
ID
G
E
L
B A
R R
R
K N
O L
L E
T
H O
R S
T M
A N
D
E S
IG
N
S U
B M
IT
T
A L
S-505
F R
A M
IN
G
D E
T A
IL
S
C O
M F
L E
A C
T O
K
IN
A W
A J
A K
A D
E N
A A
F B
O
K
IN
A W
A J A
P A
N
P A
IR
C
R A
F T
I N
T E
R M
E D
IA
T
E M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
W H
V D
J A
P A
N D
IS
T
R
IC
T U n it
A P
O A
P
-5
JU
L
Y
W
H V
D
S -5
1 : 20
SECTION
L12 1 : 20
SECTION
L17
1 : 20
SECTION
F17
0 400
SCALE: 1: 20
800200
1 : 20
SECTION
F12
1 : 20
SECTION
F5
1 : 20
SECTION
A12
M A
S
C R
IP
T
IO
N
D A
T
400…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .