Solicitation P16PS01126 Amendment 000003
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
P16PS01126
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
151059A07/29/2016000003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/05/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
NAMA 151059A - Rehabilitate Water Systems for Emergency and Potable Water Supply in Potomac
Park, Washington DC
This acquisition is a total Small Business set-aside. Proposals from large businesses will not be accepted. The North American Industrial Classification System (NAICS) code is 237110 and the associated small business size standard is $36.5M.
The purpose of Amendment No. 000003 is to:
1. Disseminate Questions and Answers concerning the solicitation.
2. Revise the construction schedule as follows: The Contractor shall undertake and complete the installation and pressure testing of waterline Line G, as identified in the
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Victoria Nosal
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
P16PS01126/000003
construction drawings, within 45-days of the construction NTP. This is work required to be completed within this period of time to allow the
Park Service to install temporary trailers and associated utilities on and around the area in which Line G is to be located.
3. Extend the proposal due date to August 16, 2016 at 1500 MT.
All other terms and conditions remain unchanged.
Legacy Doc #: NPS
Period of Performance: 09/01/2016 to 02/28/2017
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
NAMA 151059A – Solicitation P16PS01126 Questions and Answers
1) QUESTION: The trench details on drawings 38 and 39 all have the following note: “Compacted Trench Backfill (See Specification Section 02220)”. We have looked through the project specifications and have also searched the internet for Washington DC standards but have not been able to find this specification. Can you please provide it to us? The reason we are asking for this information is that we would like to find out what type of backfill is specified for the trenches. Will we be re-using the existing excavated material for backfilling the trenches, or are we required to import fill and dispose of the excavated material?
ANSWER: The trenching details shown on sheets 38 and 39 are DC Water standard details, and the specification section shown on the detail is not needed for this project. The backfill material for water line trench backfill should be the excavated material meeting the requirements of specification section 31 23 23.15 TRENCH BACKFILL.
2) QUESTION: Page 72 of 125 of the solicitation; subsection 1.68 states that the insurance requirements are elsewhere in the contract. However, we are unable to find these requirements. Please provide the insurance requirements so that we can include associated costs in our bid.
ANSWER: See Clause H.3 of the Solicitation
3) QUESTION: Can you also provide the permit fees for the various permits required on 01 31 00-9 of the specifications?
ANSWER: Determination of permit fees is the contractor's responsibility.
4) QUESTION: Can 12” Fusible C-900 piping be allowed for new water piping installed HDPE?
ANSWER: Fusible C-900 pipe is not a true substitute for DR11 HDPE pipe. Please demonstrate that the proposed pipe meets or exceeds the properties of DR11 HDPE, particularly related to pullback stresses and operating pressures once installed.
5) QUESTION: In order to eliminate a reduction of flow capacity from the 12” Ductile Iron Pipe, HDPE must be upsized to 14”. Should HDPE be upsized to 14” nominal size?
ANSWER: 12” HDPE was used in the modeling of the system and was approved by NPS. There is no consideration for 14” HDPE.
6) QUESTION: What is the definition of “timely manner “with regards to permit application? Will the contractor be granted a time extension should permitting agencies delay issuing permits?
ANSWER: “Timely Manner” refers to the responsibility of the Contractor to identify all the necessary permits and the process of application specific to each permitting agency. The Contractor shall start the permit application as early as possible in order to prevent potential delays to the project schedule. In addition, the Contractor shall notify the CO of any anticipated delays by permitting agencies.
| P16PS01126 Amendment 000003 1 |
| questions & answers |