6_NAMA_151059A_Division_2-49_Specs.pdf

PDF 2 MB Posted

Attached to
Rehabilitate Water Systems for Emergency and Potable Water Supply in Potomac Park, Washington DC.
Solicitation number
P16PS01126
Issued by

About this file

Specifications Division 2-49

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Park Service

U.S. Department of the Interior

DENVER SERVICE CENTER

in collaboration with

NATIONAL CAPITAL REGION

DIVISION OF LANDS PLANNING AND DESIGN

WASHINGTON, DC

DESIGN SERVICES FOR DESIGN

DEVELOPMENT AND CONSTRUCTION

DOCUMENTS

Rehabilitate Water Systems for Emergency and

Potable Water Supply in Potomac Park

Div 02 - 49 - Specifications

National Park Service National Capital Region

Washington, DC

100% Construction Docuemnts June 2016

Prepared by:

CH2M Hill

Contract No. P15PC00018

NAMA 151059

SECTION 00 00 02 – TABLE OF CONTENTS

NAMA - 151059 00 00 02 - 1

674699/HAINS POINT Revision 0 (17-JUN-2016)

DIVISION 1 – GENERAL REQUIREMENTS

01 10 00 - Contract Modification Procedures

01 11 00 - Summary of Work

01 27 00 Definition of Contract Line Items

01 31 00 - Project Management & Coordination

01 32 16 - Construction Schedule

01 32 33 Photo Documentation for Historic Preservation Projects

01 33 23 - Submittal Procedures

01 35 13.22 - Archeological Protection

01 35 23 - Safety Requirements

01 35 91 - Historic Preservation Treatment Procedures

01 40 00 - Quality Requirements

01 42 00 - References

01 50 00 - Temporary Facilities and Controls

01 56 39 0 Temporary Tree and Plant Protection

01 57 19.12 - Noise & Acoustics Management

01 57 23 - Storm Water Pollution Prevention

01 67 00 - Product Requirements

01 73 29 - Cutting and Patching

01 73 40 - Execution

01 74 19 - Construction Waste Management and Disposal

01 74 19A - Waste Management – Appendix A

01 74 19B - Waste Management – Appendix B

01 77 00 - Closeout Procedures

01 78 23 - Operation and Maintenance Data

01 81 13 - Sustainable Design Requirements for Non-LEED Projects

DIVISION 2 – EXISTING CONDITIONS

02 41 19 0 Selective Demolition

DIVISION 3 – CONCRETE

03 30 00 0 Cast-In-Place Concrete

DIVISION 4 – DIVISION 30

Not Applicable

DIVISION 31 – EARTHWORK

31 23 16 0 Excavation

31 23 19.01 0 Dewatering

31 23 23.15 0 Trench Backfill

31 41 00 0 Shoring

SECTION 00 00 02 – TABLE OF CONTENTS

NAMA - 151059 00 00 02 - 2

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 11 23 0 Aggregate Base Courses

32 12 16 0 Asphalt Paving

32 13 13 0 Concrete Paving

32 16 00 0 Curbs and Gutters

32 17 23 0 Pavement Markings

32 91 13 0 Soil Preparation

32 92 00 0 Turf and Grasses

DIVISION 33 – UTILITIES

33 05 01.02 0 Ductile Iron Pipe and Fittings

33 05 01.10 0 High-Density Polyethylene Pressure Pipe and Fittings

33 05 23.13 0 Utility Horizontal Directional Drilling

33 12 13 0 Water Service Connections

33 12 16 0 Water Utility Distribution Valves

33 12 16.29 0 Air and Vacuum Release Valve Assemblies

33 12 19 0 Water Utility Distribution Fire Hydrants

33 13 00 0 Disinfection of Water Utility Distribution Facilities

DIVISION 34 – TRANSPORTATION/BRIDGES

34 80 01 0 Special Provisions – Bridge Work

DIVISION 35 – DIVISION 49

Not Applicable

END OF SECTION

SECTION 024119 - SELECTIVE DEMOLITION

NAMA - 151059 02 41 19 - 1

674699/Hains Point Revision 0 (17-JUN-2016)

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Demolition and removal of selected site elements.

B. Related Requirements:

1. Section 011000 "Summary" for restrictions on use of the premises, Owner-occupancy requirements, and phasing requirements.

2. Section 015639 "Temporary Tree and Plant Protection" for temporary protection of existing trees and plants that are affected by selective demolition.

3. Section 311000 "Site Clearing" for site clearing and removal of above- and below-grade improvements not part of selective demolition.

1.3 DEFINITIONS

A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.

B. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.

C. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.

1.4 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to

Owner that may be uncovered during demolition remain the property of Owner.

1. Carefully salvage in a manner to prevent damage and promptly return to Owner.

NAMA - 151059 02 41 19 - 2

1.5 PREINSTALLATION MEETINGS

A. Predemolition Conference: Conduct conference at Project site.

1. Inspect and discuss condition of construction to be selectively demolished.

2. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.

3. Review areas where existing construction is to remain and requires protection.

1.6 INFORMATIONAL SUBMITTALS

A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection , for dust control and , for noise control. Indicate proposed locations and construction of barriers.

B. Schedule of Selective Demolition Activities: Indicate the following:

1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's on-site operations are uninterrupted.

2. Interruption of utility services. Indicate how long utility services will be interrupted.

3. Coordination for shutoff, capping, and continuation of utility services.

C. Predemolition Photographs or Video: Show existing conditions of adjoining construction, including finish surfaces, that might be misconstrued as damage caused by demolition operations. Comply with Section 013233 "Photographic Documentation." Submit before Work begins.

1.7 FIELD CONDITIONS

A. Conduct selective demolition so Owner's operations will not be disrupted.

B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

C. Notify Engineer of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the

Work.

E. Historic Areas: Demolition and hauling equipment and other materials shall be of sizes that clear surfaces within historic areas, including temporary protection, by 12 inches (300 mm) or more.

F. Storage or sale of removed items or materials on-site is not permitted.

G. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

NAMA - 151059 02 41 19 - 3

1. Maintain fire-protection facilities in service during selective demolition operations.

1.8 COORDINATION

A. Arrange selective demolition schedule so as not to interfere with Owner's operations.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ASSE A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs or video.

3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services.

1. Owner will arrange to shut off indicated services/systems when requested by Contractor.

2. Arrange to shut off utilities with utility companies.

3. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services.

3.3 PROTECTION

A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

1. Provide protection to ensure safe passage of people around selective demolition area.

B. Remove temporary barricades and protections where hazards no longer exist.

NAMA - 151059 02 41 19 - 4

3.4 SELECTIVE DEMOLITION, GENERAL

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations:

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition.

3.5 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS

A. Concrete Curb, Concrete Paving, and Asphalt Paving: Demolish in sections. Cut full depth at junctures with construction to remain and at regular intervals using power-driven saw, and then remove between saw cuts.

3.6 DISPOSAL OF DEMOLISHED MATERIALS

A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

B. Burning: Do not burn demolished materials.

3.7 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

SECTION 033000 - CAST-IN-PLACE CONCRETE

NCRO - 201409 03 30 00- 1

674699/HAINS POINT Revision 0 (03-JUN-2016)

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes cast-in-place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes.

B. Related Requirements:

1. Section 321313 "Concrete Paving" for concrete pavement and walks.

1.3 DEFINITIONS

A. Cementitious Materials: Portland cement alone or in combination with one or more of the following: fly ash, other pozzolans, and silica fume; materials subject to compliance with requirements.

B. W/C Ratio: The ratio by weight of water to cementitious materials.

1.4 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1. Before submitting design mixtures, review concrete design mixture and examine procedures for ensuring quality of concrete materials.

a. Special concrete finish Subcontractor.

2. Review special inspection and testing and inspecting agency procedures for field quality control, concrete finishes and finishing, cold- and hot-weather concreting procedures, curing procedures, construction contraction and isolation joints, and joint-filler strips, semirigid joint fillers, forms and form removal limitations, steel reinforcement installation, concrete repair procedures, and concrete protection.

1.5 ACTION SUBMITTALS

A. Product Data: For each type of product.

NCRO - 201409 03 30 00- 2

B. Design Mixtures: For each concrete mixture. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.

1. Indicate amounts of mixing water to be withheld for later addition at Project site.

C. Steel Reinforcement Shop Drawings: Placing Drawings that detail fabrication, bending, and placement. Include bar sizes, lengths, material, grade, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, splices and laps, mechanical connections, tie spacing, hoop spacing, and supports for concrete reinforcement.

1.6 INFORMATIONAL SUBMITTALS

A. Qualification Data: For testing agency.

B. Material Certificates: For each of the following, signed by manufacturers:

1. Cementitious materials.

2. Admixtures.

3. Form materials and form-release agents.

4. Steel reinforcement and accessories.

5. Fiber reinforcement.

6. Curing compounds.

7. Semirigid joint filler.

8. Joint-filler strips.

9. Repair materials.

C. Material Test Reports: For the following, from a qualified testing agency:

1. Aggregates: Include service record data indicating absence of deleterious expansion of concrete due to alkali aggregate reactivity.

D. Field quality-control reports.

E. Minutes of preinstallation conference.

1.7 QUALITY ASSURANCE

A. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.

B. Testing Agency Qualifications: An independent agency, qualified according to ASTM C 1077 and ASTM E 329 for testing indicated.

1. Personnel performing laboratory tests shall be ACI-certified Concrete Strength Testing

Technician and Concrete Laboratory Testing Technician, Grade I. Testing agency laboratory supervisor shall be an ACI-certified Concrete Laboratory Testing Technician, Grade II.

NCRO - 201409 03 30 00- 3

1.8 PRECONSTRUCTION TESTING

A. Preconstruction Testing Service: Engage a qualified testing agency to perform preconstruction testing on concrete mixtures.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and damage.

1.10 FIELD CONDITIONS

A. Cold-Weather Placement: Comply with ACI 306.1 and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.

1. When average high and low temperature is expected to fall below 40 deg F (4.4 deg C) for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301 (ACI 301M).

2. Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen subgrade or on subgrade containing frozen materials.

3. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.

B. Hot-Weather Placement: Comply with ACI 301 (ACI 301M) and as follows:

1. Maintain concrete temperature below 90 deg F (32 deg C) at time of placement. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor's option.

2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade uniformly moist without standing water, soft spots, or dry areas.

PART 2 - PRODUCTS

2.1 CONCRETE, GENERAL

A. ACI Publications: Comply with the following unless modified by requirements in the Contract

Documents:

1. ACI 301 (ACI 301M).

2. ACI 117 (ACI 117M).

NCRO - 201409 03 30 00- 4

2.2 FORM-FACING MATERIALS

A. Smooth-Formed Finished Concrete: Form-facing panels that provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints.

1. Plywood, metal, or other approved panel materials.

B. Rough-Formed Finished Concrete: Plywood, lumber, metal, or another approved material.

Provide lumber dressed on at least two edges and one side for tight fit.

C. Form-Release Agent: Commercially formulated form-release agent that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces.Ready-to-use, non-emulsified soy bean oil and canola oil based release agent, bio-degradable, non-flammable.

1. Formulate form-release agent with rust inhibitor for steel form-facing materials.

2.3 STEEL REINFORCEMENT

A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), deformed.

2.4 REINFORCEMENT ACCESSORIES

A. Joint Dowel Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), plain-steel bars, cut true to length with ends square and free of burrs.

2.5 CONCRETE MATERIALS

A. Source Limitations: Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant, obtain aggregate from single source, and obtain admixtures from single source from single manufacturer.

B. Cementitious Materials:

1. Portland Cement: ASTM C 150/C 150M, Type IIgray.

2. Fly Ash: ASTM C 618, Class F.

3. Silica Fume: ASTM C 1240, amorphous silica.

C. Normal-Weight Aggregates: ASTM C 33/C 33M, coarse aggregate or better, graded. Provide aggregates from a single source with documented service record data of at least 10 years' satisfactory service in similar applications and service conditions using similar aggregates and cementitious materials.

1. Maximum Coarse-Aggregate Size: 3/4 inch (19 mm) nominal.

2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.

D. Air-Entraining Admixture: ASTM C 260/C 260M.

NCRO - 201409 03 30 00- 5

E. Chemical Admixtures: Certified by manufacturer to be compatible with other admixtures and that do not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride.

1. Water-Reducing Admixture: ASTM C 494/C 494M, Type A.

2. High-Range, Water-Reducing Admixture: ASTM C 494/C 494M, Type F.

F. Water: ASTM C 94/C 94M and potable.

2.6 FIBER REINFORCEMENT

A.G. Synthetic Micro-Fiber: Monofilament polypropylene micro-fibers engineered and designed for use in concrete, complying with ASTM C 1116/C 1116M, Type III, 1/2 to 1-1/2 inches (13 to

38 mm) long.

2.72.6 CURING MATERIALS

A. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. (305 g/sq. m) when dry.

B. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.

C. Water: Potable.

D. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, dissipating.

2.82.7 RELATED MATERIALS

A. Expansion- and Isolation-Joint-Filler Strips: [ASTM D 1751, asphalt-saturated cellulosic fiber]

[or] [ASTM D 1752, cork or self-expanding cork].

2.92.8 FABRICATING REINFORCEMENT

A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."

2.102.9 CONCRETE MIXING

A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to

ASTM C 94/C 94M and ASTM C 1116/C 1116M, and furnish batch ticket information.

1. When air temperature is between 85 and 90 deg F (30 and 32 deg C), reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F (32 deg C), reduce mixing and delivery time to 60 minutes.

NCRO - 201409 03 30 00- 6

PART 3 - EXECUTION

3.1 FORMWORK INSTALLATION

A. Construct forms tight enough to prevent loss of concrete mortar.

B. Construct forms for easy removal without hammering or prying against concrete surfaces.

C. Chamfer exterior corners and edges of permanently exposed concrete.

D. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.

E. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.

F. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.

3.2 STEEL REINFORCEMENT INSTALLATION

A. General: Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement.

B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that reduce bond to concrete.

C. Accurately position, support, and secure reinforcement against displacement. Locate and support reinforcement with bar supports to maintain minimum concrete cover. Do not tack weld crossing reinforcing bars.

D. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.

3.3 JOINTS

A. General: Construct joints true to line with faces perpendicular to surface plane of concrete.

B. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Engineer.

3.4 CONCRETE PLACEMENT

A. Before placing concrete, verify that installation of formwork, and reinforcement is complete and that required inspections are completed.

B. Do not add water to concrete during delivery, at Project site, or during placement unless approved by Engineer.

NCRO - 201409 03 30 00- 7

C. Before test sampling and placing concrete, water may be added at Project site, subject to limitations of ACI 301 (ACI 301M).

1. Do not add water to concrete after adding high-range water-reducing admixtures to mixture.

D. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete is placed on concrete that has hardened enough to cause seams or planes of weakness.

If a section cannot be placed continuously, provide construction joints as indicated. Deposit concrete to avoid segregation.

1. Deposit concrete in horizontal layers of depth not to exceed formwork design pressures and in a manner to avoid inclined construction joints.

2. Consolidate placed concrete with mechanical vibrating equipment according to ACI 301

(ACI 301M).

3. Do not use vibrators to transport concrete inside forms. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches (150 mm) into preceding layer. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity. At each insertion, limit duration of vibration to time necessary to consolidate concrete and complete embedment of reinforcement and other embedded items without causing mixture constituents to segregate.

3.5 MISCELLANEOUS CONCRETE ITEM INSTALLATION

A. Curbs: Provide monolithic finish to interior curbs by stripping forms while concrete is still green and by steel-troweling surfaces to a hard, dense finish with corners, intersections, and terminations slightly rounded.

3.6 CONCRETE PROTECTING AND CURING

A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold-weather protection and ACI 301 (ACI 301M) for hot-weather protection during curing.

3.7 FIELD QUALITY CONTROL

A. Special Inspections: Owner will engage a qualified testing and inspecting agency to perform field tests and inspections and prepare test reports in accordance with Section 01 40 00

QUALITY REQUIREMENTS.

B. Testing Agency: Engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.

C. Inspections:

1. Steel reinforcement placement.

2. Concrete placement, including conveying and depositing.

3. Curing procedures and maintenance of curing temperature.

NCRO - 201409 03 30 00- 8

4. Verification of concrete strength.

D. Concrete Tests: Testing of composite samples of fresh concrete obtained according to

ASTM C 172/C 172M shall be performed according to the following requirements:

1. Testing Frequency: Obtain one composite sample for each day's pour of each concrete mixture exceeding 5 cu. yd. (4 cu. m), but less than 25 cu. yd. (19 cu. m), plus one set for each additional 50 cu. yd. (38 cu. m) or fraction thereof.

2. Slump: ASTM C 143/C 143M; one test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mixture. Perform additional tests when concrete consistency appears to change.

3. Air Content: ASTM C 231/C 231M, pressure method, for normal-weight concrete; one test for each composite sample, but not less than one test for each day's pour of each concrete mixture.

4. Concrete Temperature: ASTM C 1064/C 1064M; one test hourly when air temperature is

40 deg F (4.4 deg C) and below or 80 deg F (27 deg C) and above, and one test for each composite sample.

5. Compression Test Specimens: ASTM C 31/C 31M.

a. Cast and laboratory cure two sets of two standard cylinder specimens for each composite sample.

6. Compressive-Strength Tests: ASTM C 39/C 39M; test one set of two laboratory-cured specimens at 7 days and one set of two specimens at 28 days.

a. Test one set of two field-cured specimens at 7 days and one set of two specimens at 28 days.

b. A compressive-strength test shall be the average compressive strength from a set of two specimens obtained from same composite sample and tested at age indicated.

7. Strength of each concrete mixture will be satisfactory if every average of any three consecutive compressive-strength tests equals or exceeds specified compressive strength and no compressive-strength test value falls below specified compressive strength by more than 500 psi (3.4 MPa).

8. Test results shall be reported in writing to Engineer, concrete manufacturer, and

Contractor within 48 hours of testing. Reports of compressive-strength tests shall contain

Project identification name and number, date of concrete placement, name of concrete testing and inspecting agency, location of concrete batch in Work, design compressive strength at 28 days, concrete mixture proportions and materials, compressive breaking strength, and type of break for both 7- and 28-day tests.

9. Additional Tests: Testing and inspecting agency shall make additional tests of concrete when test results indicate that slump, air entrainment, compressive strengths, or other requirements have not been met, as directed by Engineer. Testing and inspecting agency may conduct tests to determine adequacy of concrete by cored cylinders complying with

ASTM C 42/C 42M or by other methods as directed by Engineer.

10. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.

11. Correct deficiencies in the Work that test reports and inspections indicate do not comply with the Contract Documents.

NCRO - 201409 03 30 00- 9

SECTION 31 23 16 - EXCAVATION

NAMA - 151059 31 23 16 - 1

PART 1 GENERAL

1.1 DEFINITIONS

A. Common Excavation: Removal of material not classified as rock excavation.

B. Rock Excavation:

1. General: Removal of solid material which by actual demonstration cannot, in

Engineer’s opinion, be reasonably loosened or ripped by single-tooth, hydraulically operated ripper mounted on crawler tractor in good condition and rated at minimum 300 flywheel horsepower; and which must be systematically drilled and blasted or broken by power-operated hammer, hydraulic rock breaker, expansive compounds, or other similar means prior to removal.

2. Trench: Removal of solid material which by actual demonstration cannot, in

Engineer’s opinion, be reasonably excavated with minimum 135 -horsepower backhoe in good condition and equipped with manufacturer’s standard boom, two rippers, and rock points or similar approved equipment; and which must be systematically drilled and blasted or broken by power-operated hammer, hydraulic rock breaker, expansive compounds, or other similar means prior to removal.

3. Term “rock excavation” indicates removal of solid material, as specified above, and does not necessarily correspond to “rock” as implied by names of geologic formations.

4. Removal of boulders larger than 1/2 cubic yard will be classified as rock excavation, if drilling and blasting or breaking them apart with power-operated hammer, hydraulic rock breaker, expansive compounds, or other similar means is both necessary and actually used for their removal.

1.2 QUALITY ASSURANCE

A. Provide adequate survey control to avoid unauthorized overexcavation.

1.3 WEATHER LIMITATIONS

A. Material excavated when frozen or when air temperature is less than 32 degrees F shall not be used as fill or backfill until material completely thaws.

B. Material excavated during inclement weather shall not be used as fill or backfill until after material drains and dries sufficiently for proper compaction.

NAMA - 151059 31 23 16 - 2

1.4 SEQUENCING AND SCHEDULING

A. Demolition: Complete applicable Work specified in Section 02 41 19, Selective

Demolition, prior to excavating.

B. Dewatering: Conform to applicable requirements of Section 31 23 19.01, Dewatering, prior to initiating excavation.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.1 GENERAL

A. Excavate to lines, grades, and dimensions shown and as necessary to accomplish Work.

Excavate to within tolerance of plus or minus 0.1 foot, except where dimensions or grades are shown or specified as maximum or minimum. Allow for forms, working space, granular base, topsoil, and similar items, wherever applicable. Trim to neat lines where concrete is to be deposited against earth.

B. Do not overexcavate without written authorization of Engineer.

C. Remove or protect obstructions as shown and as specified in Section 01 50 00, Temporary Facilities and Controls, Article Protection of Work and Property.

3.2 UNCLASSIFIED EXCAVATION

A. Excavation is unclassified. Complete all excavation regardless of the type, nature, or condition of the materials encountered.

3.3 TRENCH WIDTH

A. Minimum Width of Trenches:

1. Single Pipes, Conduits, Direct-Buried Cables, and Duct Banks:

a. Less than 4-inch Outside Diameter or Width: 18 inches.

b. Greater than 4-inch Outside Diameter or Width: 18 inches greater than outside diameter or width of pipe, conduit, direct-buried cable, or duct bank.

2. Multiple Pipes, Conduits, Cables, or Duct Banks in Single Trench: 18 inches greater than aggregate width of pipes, conduits, cables, duct banks, plus space between.

3. Increase trench widths by thicknesses of sheeting.

NAMA - 151059 31 23 16 - 3

B. Maximum Trench Width: Unlimited, unless otherwise shown or specified, or unless excess width will cause damage to existing facilities, adjacent property, or completed

Work. Pipe of greater strength or superior pipe bedding, when approved in writing by

Engineer, may be used in lieu of maintaining the pipe widths shown or specified.

3.4 STOCKPILING EXCAVATED MATERIAL

A. Stockpile excavated material that is suitable for use as fill or backfill until material is needed.

B. Post signs indicating proposed use of material stockpiled. Post signs that are readable from all directions of approach to each stockpile. Signs should be clearly worded and readable by equipment operators from their normal seated position.

C. Confine stockpiles to within easements, rights-of-way, and approved work areas. Do not obstruct roads or streets.

D. Do not stockpile excavated material adjacent to trenches and other excavations, unless excavation side slopes and excavation support systems are designed, constructed, and maintained for stockpile loads.

E. Do not stockpile excavated materials near or over existing facilities, adjacent property, or completed Work, if weight of stockpiled material could induce excessive settlement.

3.5 DISPOSAL OF SPOIL

A. Dispose of excavated materials, which are unsuitable or exceed quantity needed for fill or backfill, offsite.

B. Dispose of debris resulting from removal of underground facilities as specified in

Section 02 41 19, Selective Demolition, for demolition debris.

SECTION 31 23 19.01 - DEWATERING

NAMA - 151059 31 23 19.01 - 1

1.1 SUBMITTALS

A. Informational Submittals:

1. Water control plan.

2. Discharge permits.

1.2 WATER CONTROL PLAN

A. As a minimum, include:

1. Descriptions of proposed groundwater and surface water control facilities including, but not limited to, equipment; methods; standby equipment and power supply, pollution control facilities, discharge locations to be utilized, and provisions for immediate temporary water supply as required by this section.

2. Drawings showing locations, dimensions, and relationships of elements of each system.

3. Design calculations demonstrating adequacy of proposed dewatering systems and components.

B. If system is modified during installation or operation revise or amend and resubmit Water

Control Plan.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.1 GENERAL

A. Continuously control water during course of construction, including weekends and holidays and during periods of work stoppages, and provide adequate backup systems to maintain control of water.

B. Remove and control water during periods when necessary to properly accomplish Work.

3.2 SURFACE WATER CONTROL

A. See Section 01 50 00, Temporary Facilities and Controls, Article Temporary Controls.

B. Remove surface runoff controls when no longer needed.

SECTION 31 23 19.01 - DEWATERING

NAMA - 151059 31 23 19.01 - 2

3.3 DEWATERING SYSTEMS

A. Provide, operate, and maintain dewatering systems of sufficient size and capacity to permit excavation and subsequent construction in dry and to lower and maintain groundwater level a minimum of 2 feet below the lowest point of excavation.

Continuously maintain excavations free of water, regardless of source, and until backfilled to final grade.

B. Design and Operate Dewatering Systems:

1. To prevent loss of ground as water is removed.

2. To avoid inducing settlement or damage to existing facilities, completed Work, or adjacent property.

3. To relieve artesian pressures and resultant uplift of excavation bottom.

3.4 DISPOSAL OF WATER

A. Obtain discharge permit for water disposal from authorities having jurisdiction.

B. Treat water collected by dewatering operations, as required by regulatory agencies, prior to discharge.

C. Discharge water as required by discharge permit and in manner that will not cause erosion or flooding, or otherwise damage existing facilities, completed Work, or adjacent property.

D. Remove solids from treatment facilities and perform other maintenance of treatment facilities as necessary to maintain their efficiency.

3.5 PROTECTION OF PROPERTY

A. Make assessment of potential for dewatering induced settlement. Provide and operate devices or systems, including but not limited to reinjection wells, infiltration trenches and cutoff walls, necessary to prevent damage to existing facilities, completed Work, and adjacent property.

B. Securely support existing facilities, completed Work, and adjacent property vulnerable to settlement due to dewatering operations. Support shall include, but not be limited to, bracing, underpinning, or compaction grouting.

SECTION 31 23 23.15 - TRENCH BACKFILL

NAMA - 151059 31 23 23.15 - 1

1.1 REFERENCES

A. The following is a list of standards which may be referenced in this section:

1. American Public Works Association (APWA): Uniform Color Code.

2. ASTM International (ASTM):

a. C136, Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates.

b. D1557, Standard Test Methods for Laboratory Compaction Characteristics of Soil using

Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3)).

c. D2487, Standard Practice for Classification of Soils for Engineering Purposes (Unified

Soil Classification System).

d. D4253, Standard Test Methods for Maximum Index Density and Unit Weight of Soils

Using a Vibratory Table.

e. D4254, Standard Test Methods for Minimum Index Density and Unit Weight of Soils and Calculation of Relative Density.

3. National Electrical Manufacturers Association (NEMA): Z535.1, Safety Colors.

1.2 DEFINITIONS

A. Bedding Material: Granular material upon which pipes are placed.

B. Imported Material: Material obtained by Contractor from source(s) offsite.

C. Lift: Loose (uncompacted) layer of material.

D. Pipe Zone: Backfill zone that includes full trench width and extends from prepared trench bottom to an upper limit above top outside surface of pipe.

E. Prepared Trench Bottom: Graded trench bottom after excavation and installation of stabilization material, if required, but before installation of bedding material.

F. Relative Compaction: The ratio, in percent, of the as-compacted field dry density to the laboratory maximum dry density as determined by ASTM D1557. Corrections for oversize material may be applied to either as-compacted field dry density or maximum dry density, as determined by Engineer.

G. Relative Density: As defined by ASTM D4253 and ASTM D4254.

H. Selected Backfill Material: Material available onsite that Engineer determines to be suitable for a specific use.

I. Well-Graded: A mixture of particle sizes that has no specific concentration or lack thereof of one or more sizes producing a material type that, when compacted, produces a strong and relatively

NAMA - 151059 31 23 23.15 - 2

incompressible soil mass free from detrimental voids. Satisfying both of the following requirements, as defined in ASTM D2487:

1. Coefficient of Curvature: Greater than or equal to 1 and less than or equal to 3.

2. Coefficient of Uniformity: Greater than or equal to 4 for materials classified as gravel, and greater than or equal to 6 for materials classified as sand.

1.3 SUBMITTALS

A. Action Submittals:

1. Shop Drawings: Manufacturer’s descriptive literature for marking tapes.

2. Samples:

a. Trench stabilization material.

b. Granular backfill.

B. Informational Submittals:

1. Catalog and manufacturer’s data sheets for compaction equipment.

2. Certified Gradation Analysis: Submit not less than 30 days prior to delivery for imported materials or anticipated use for excavated materials, except for trench stabilization material that will be submitted prior to material delivery to Site.

PART 2 PRODUCTS

2.1 MARKING TAPE

A. Nondetectable:

1. Inert polyethylene, impervious to known alkalis, acids, chemical reagents, and solvents likely to be encountered in soil.

2. Thickness: Minimum 5 mils.

3. Width: 3 inches.

4. Identifying Lettering: Minimum 1-inch high, permanent black lettering imprinted continuously over entire length.

5. Manufacturers and Products:

a. Reef Industries; Terra Tape.

b. Mutual Industries; Non-detectable Tape.

c. Presco; Non-detectable Tape.

B. Color: In accordance with APWA Uniform Color Code.

Color* Facility

Red Electric power lines, cables, conduit, and lightning cables

Orange Communicating alarm or signal lines, cables, or conduit

NAMA - 151059 31 23 23.15 - 3

Color* Facility

Yellow Gas, oil, steam, petroleum, or gaseous materials

Green Sewers and drain lines

Blue Potable water

Purple Reclaimed water, irrigation, and slurry lines

*As specified in NEMA Z535.1, Safety Color Code.

2.2 TRENCH STABILIZATION MATERIAL

A. Base Rock:

1. Clean, hard, durable 3-inch minus crushed rock or gravel, or pit run, free from clay balls, other organic materials, or debris.

B. Granular Backfill:

1. Clean gravel or crushed rock, reasonably well-graded from coarse to fine.

2. Maximum Particle Size: 1-inch.

2.3 BEDDING MATERIAL AND PIPE ZONE MATERIAL

A. Unfrozen, friable, and no clay balls, roots, or other organic material.

2.4 EARTH BACKFILL

A. Soil, loam, or other excavated material suitable for use as backfill.

B. Free from roots or organic matter, refuse, boulders and material larger than 3 inches, or other deleterious materials.

2.5 GRAVEL SURFACING ROCK

A. As specified in Section 32 11 23, Aggregate Base Courses.

2.6 TOPSOIL

A. As specified in Section 32 91 13, Soil Preparation.

2.7 SOURCE QUALITY CONTROL

A. Perform gradation analysis in accordance with ASTM C136 for:

1. Trench stabilization material.

NAMA - 151059 31 23 23.15 - 4

3.1 TRENCH PREPARATION

A. Water Control:

1. As specified in Section 31 23 19.01, Dewatering.

2. Remove water in a manner that minimizes soil erosion from trench sides and bottom.

3. Provide continuous water control until trench backfill is complete.

B. Remove foreign material and backfill contaminated with foreign material that falls into trench.

3.2 TRENCH BOTTOM

A. Firm Subgrade: Grade with hand tools, remove loose and disturbed material, and trim off high areas and ridges left by excavating bucket teeth. Allow space for bedding material if shown or specified.

B. Soft Subgrade: If subgrade is encountered that may require removal to prevent pipe settlement, notify Engineer. Engineer will determine depth of overexcavation, if any required.

3.3 TRENCH STABILIZATION MATERIAL INSTALLATION

A. Rebuild trench bottom with trench stabilization material.

B. Place material over full width of trench in 6-inch lifts to required grade, providing allowance for bedding thickness.

C. Compact each lift so as to provide a firm, unyielding support for the bedding material prior to placing succeeding lifts.

3.4 BEDDING

A. Furnish imported bedding material where, in the opinion of Engineer, excavated material is unsuitable for bedding or insufficient in quantity.

B. Place over full width of prepared trench bottom in two equal lifts when required depth exceeds

8 inches.

C. Hand grade and compact each lift to provide a firm, unyielding surface.

D. Minimum Thickness: 4 inches.

E. Check grade and correct irregularities in bedding material. Loosen top 1 inch to 2 inches of compacted bedding material with a rake or by other means to provide a cushion before laying each section of pipe.

NAMA - 151059 31 23 23.15 - 5

F. Install to form continuous and uniform support except at bell holes, if applicable, or minor disturbances resulting from removal of lifting tackle.

G. Bell or Coupling Holes: Excavate in bedding at each joint to permit proper assembly and inspection of joint and to provide uniform bearing along barrel of pipe or conduit.

3.5 BACKFILL PIPE ZONE

A. Upper limit of pipe zone shall not be less than following:

1. Pipe: 12 inches, unless shown otherwise.

B. Restrain pipe as necessary to prevent movement during backfill operations.

C. Place material simultaneously in lifts on both sides of pipe.

1. Pipe 10-Inch and Smaller Diameter: First lift less than or equal to 1/2 pipe diameter.

2. Pipe Over 10-Inch Diameter: Maximum 6-inch lifts.

D. Thoroughly tamp each lift, including area under haunches, with handheld tamping bars supplemented by “walking in” and slicing material under haunches with a shovel to ensure voids are completely filled before placing each succeeding lift.

E. Each lift shall be compacted with a minimum of two passes by either a vibratory plate compactor or a power-driven impact compactor. Take care to avoid damaging pipe and pipe coating.

3.6 MARKING TAPE INSTALLATION

A. Continuously install marking tape along centerline of buried piping, as shown on Drawings.

Coordinate with piping installation drawings.

1. Nondetectable Marking Tape: Install with metallic piping.

3.7 BACKFILL ABOVE PIPE ZONE

A. General:

1. Process excavated material to meet specified gradation requirements.

2. Adjust moisture content as necessary to obtain specified compaction.

3. Do not allow backfill to free fall into trench or allow heavy, sharp pieces of material to be placed as backfill until after at least 2 feet of backfill has been provided over top of pipe.

4. Backfill to grade with proper allowances for topsoil, crushed rock surfacing, and pavement thicknesses, wherever applicable.

5. Backfill around structures with same class backfill as specified for adjacent trench, unless otherwise shown or specified.

NAMA - 151059 31 23 23.15 - 6

B. Backfill in Non-Paved Areas:

1. Place in lifts not exceeding a loose thickness of 8 inches.

2. Mechanically compact each lift to a minimum of 95 percent relative compaction prior to placing succeeding lifts.

C. Backfill in Paved Areas:

1. Backfill trench above pipe zone with granular backfill to subgrade elevation of existing pavement section.

2. Fill remainder of trench with aggregate base course, as specified, over entire trench width.

3. Compact aggregate base course, as specified.

4. Install permanent paving, as specified, to match existing pavement section and match existing grades.

3.8 REPLACEMENT OF TOPSOIL

A. Replace topsoil in top 6 inches of backfilled trench.

B. Maintain finished grade of topsoil even with adjacent area and grade as necessary to restore drainage.

3.9 MAINTENANCE OF TRENCH BACKFILL

A. After each section of trench is backfilled, maintain surface of backfilled trench even with adjacent ground surface until final surface restoration is completed.

B. Topsoil: Add topsoil where applicable and as necessary to maintain surface of backfilled trench level with adjacent ground surface.

C. Concrete Pavement: Replace concrete pavement as specified in Section 32 13 13, Concrete

Paving.

D. Asphaltic Pavement: Replace settled areas or fill with asphalt as specified in Section 32 12 16, Asphalt Paving.

E. Other Areas: Add excavated material where applicable and keep surface of backfilled trench level with adjacent ground surface.

3.10 SETTLEMENT OF BACKFILL

A. Settlement of trench backfill, or of fill, or facilities constructed over trench backfill will be considered a result of defective compaction of trench backfill.

SECTION 31 41 00 - SHORING

NAMA - 151059 31 41 00 - 1

1.1 SUBMITTALS

A. Informational Submittals:

1. Trench excavation plan.

1.2 QUALITY ASSURANCE

A. Provide surveys to monitor movements of critical facilities.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.1 GENERAL

A. Design, provide, and maintain shoring, sheeting, and bracing as necessary to support the sides of excavations and to prevent detrimental settlement and lateral movement of existing facilities, adjacent property, and completed Work.

3.2 TRENCH EXCAVATION PLAN

A. Prepare trench excavation plan addressing following topics:

1. Details of shoring, bracing, sloping, or other provisions for worker protection from hazards of caving ground.

2. Design assumptions and calculations.

3. Methods and sequencing of installing excavation support.

4. Proposed locations of stockpiled excavated material.

5. Minimum lateral distance from the crest of slopes for vehicles and stockpiled excavated materials.

6. Anticipated difficulties and proposed resolutions.

3.3 MOVEMENT MONITORING PLAN

A. Prepare movement monitoring plan addressing following topics:

1. Survey control.

2. Location of monitoring points.

3. Plots of data trends.

4. Interval between surveys.

SECTION 31 41 00 - SHORING

NAMA - 151059 31 41 00 - 2

3.4 REMOVAL OF EXCAVATION SUPPORT

A. Remove excavation support in a manner that will maintain support as excavation is backfilled.

B. Do not begin to remove excavation support until support can be removed without damage to existing facilities, completed Work, or adjacent property.

C. Remove excavation support in a manner that does not leave voids in the backfill.

3.5 TRENCHES

A. For trench excavation exceeding 5 feet in depth, provide adequate safety system meeting requirements of applicable state and local construction safety orders, and federal requirements.

SECTION 32 11 23 - AGGREGATE BASE COURSES

NAMA - 151059 32 11 23 - 1

1. American Association of State Highway and Transportation Officials (AASHTO):

a. T11, Standard Method of Test for Materials Finer Than 75m (No. 200) Sieve in Mineral Aggregates by Washing.

b. T27, Standard Method of Test for Sieve Analysis of Fine and Coarse

Aggregates.

c. T89, Standard Specification for Determining the Liquid Limit of Soils.

d. T90, Standard Specification for Determining the Plastic Limit and Plasticity

Index of Soils.

e. T96, Standard Specification for Resistance to Degradation of Small-Size

Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine.

f. T99, Standard Specification for the Moisture-Density Relations of Soils Using a 2.5 kg (5.5 pound) Rammer and a 305 mm (12 in) Drop.

g. T180, Standard Specification for Moisture-Density Relations of Soils Using a

4.54 kg (10-lb) Rammer and a 457 mm (18-in) Drop.

h. T190, Standard Specification for Resistance R-Value and Expansion Pressure of Compacted Soils.

i. T265, Standard Method of Test for Laboratory Determination of Moisture

Content of Soils.

j. T310, Standard Specification for In-Place Density and Moisture Content of

Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth).

2. ASTM International (ASTM):

a. C88, Test Method for Soundness of Aggregates by Use of Sodium Sulfate or

Magnesium Sulfate.

b. D1883, Test Method for CBR (California Bearing Ratio) of Laboratory

Compacted Soils.

c. D2419, Test Method for Sand Equivalent Value of Soils and Fine Aggregate.

d. D4791, Test Method for Flat Particles, Elongated Particles, or Flat and

Elongated Particles in Coarse Aggregate.

1.2 DEFINITIONS

A. Completed Course: Compacted, unyielding, free from irregularities, with smooth, tight, even surface, true to grade, line, and cross-section.

B. Completed Lift: Compacted with uniform cross-section thickness.

NAMA - 151059 32 11 23 - 2

1. Samples: Submit for specified materials 20 days prior to delivery to Site.

B. Informational Submittals:

1. Certified Test Results on Source Materials: Submit copies from commercial testing laboratory 20 days prior to delivery of materials to Project showing materials meeting the physical qualities specified.

2. Certified results of in-place density tests from independent testing agency.

2.1 BASE COURSE

A. Clean, hard durable, pit run gravel or crushed stone graded from coarse to fine containing enough fines to bind material when compacted.

B. Physical Qualities:

1. Abrasion, AASHTO T96: 35 percent maximum wear.

2. Fractured Face: 75 percent minimum particles.

3. Liquid Limit, AASHTO T89: Maximum 30 percent.

4. Plasticity Index, AASHTO T90: Maximum 6 percent. Nonplastic.

5. Sand Equivalency, ASTM D2419: 35 percent, minimum.

6. Resistance (R) Value, AASHTO T190: 75, minimum.

7. CBR Value, ASTM D1883: 100 percent, minimum.

8. Soundness, ASTM C88: 12 percent, maximum.

9. Flat and Elongated Particles, ASTM D4791: 8 percent, maximum.

C. Gradation, AASHTO T27, Based on U.S. Standard Sieves:

Table 1

Gradation Percent Passing by Weight

Sieve Designation Material

(Square Opening) Aggregate Base Course

2" 100

1-1/2" 95-100

3/4" 70-92

3/8" 50-70

No. 4 35-55

No. 30 12-25

No. 200 0-8

NAMA - 151059 32 11 23 - 3

2.2 SOURCE QUALITY CONTROL

A. Perform tests necessary to locate acceptable source of materials meeting specified requirements.

B. Final approval of aggregate material will be based on test results of installed materials.

C. Should separation of coarse from fine materials occur during processing or stockpiling, immediately change methods of handling materials to correct uniformity in…

This is the start of the file's text. The full file is on GovTribe.