Attachment_2_Wage_Determination_WA77.pdf

PDF 28 KB Posted

Attached to
z--Repair electrical and fuel systems at Seven Bays marina, Lake Roosevelt NRA, WA
Solicitation number
P16PS00799
Issued by

About this file

Attachment 2 Wage Determination WA77

View the file

Other files

File Type Posted
Attachment_1a_REVISED_Statement_of_Work.pdf PDF
Attachment_5_Site_visit_notes.pdf PDF
Sol_P16PS00799_Amd_000001.pdf PDF
Sol_P16PS00799.pdf PDF
Attachment_4_Project_Location.pdf PDF
Attachment_3_Drawing_and_Photos.pdf PDF
subcontracting_WorkSheet.docx DOCX document
Attachment_1_Statement_of_Work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY16 Fuel dock repairs, Seven Bays Marina Lake Roosevelt NRA Attachment 2: Wage Determination

General Decision Number: WA160077 01/08/2016 WA77

Superseded General Decision Number: WA20150077

State: WA EXCERPT FOR THIS RFQ/CONTRACT

Construction Type: Heavy including water and sewer line construction

County: Lincoln County in WA.

HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis- Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016

ELEC0073-002 07/01/2015

Rates Fringes

ELECTRICIAN......................$ 31.00 16.68

ELEC0077-001 02/01/2013

Rates Fringes Line Construction:

LINEMEN.....................$ 45.62 4%+12.90

ENGI0370-005 06/01/2015

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 26.16 13.55

GROUP 2.....................$ 26.48 13.55

GROUP 3.....................$ 27.09 13.55

GROUP 4.....................$ 27.25 13.55

GROUP 5.....................$ 27.41 13.55

GROUP 6.....................$ 27.69 13.55

GROUP 7.....................$ 27.96 13.55

GROUP 8.....................$ 29.06 13.55

ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00 Zone 1: Within 45 mile radius of Spokane, Pasco, WA; Lewiston, ID Zone 2: Outside 45 mile radius of Spokane, Pasco, WA; Lewiston, ID

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Rollers, all types on subgrade, including seal and chip coatings GROUP 2: Fork Lift GROUP 3: Bulldozer (up to D-6 or equivalent) GROUP 4: Loaders (overhead & front-end, under 4 yds. R/T); Oiler; Drill (churn, core, calyx or diamond) GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (under 3/4 yd.);

Cranes (25 tons & under); Drilling equipment (8 unch bit and over) (robbins, reverse circulation and similar); Boom Truck (Under 25 tons) GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to 110,000 gw);

Trackhoe/Excavator (3/4 yd. to 3 yd.); Cranes (over 25 tons, to and including 45 tons), Bulldozer, 834 R/T & similar; Loader Operator (front-end & overhead, 4 yds. incl. 8 yds.); Mechanic GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (3 yds & over);

Cranes (over 45 tons to but not including 85 tons); Loaders (overhead & front-end, over 8 yds. to 10 yds.)

GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower); Loaders (overhead and front-end, 10 yards and over)

BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale

NOTE: In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.

HAZMAT: Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.

LABO0238-002 06/01/2014

Rates Fringes LABORER (Spokane)

GROUP 1.....................$ 21.95 10.95

GROUP 2.....................$ 24.05 10.95

GROUP 3.....................$ 24.32 10.95

GROUP 4.....................$ 24.59 10.95

Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00

BASE POINTS: Spokane, Pasco, Lewiston Zone 1: 0-45 radius miles from the main post office.

Zone 2: 45 radius miles and over from the main post office

LABORERS CLASSIFICATIONS

GROUP 1: Flagger GROUP 2: Common or General Laborer;

GROUP 3: Mason Tender-Cement/Concrete; Pipelayer; Chipping Guns GROUP 4: Grade Checker

SUWA2009-043 08/07/2009

Rates Fringes

CARPENTER........................$ 24.03 6.50

CEMENT MASON/CONCRETE FINISHER...$ 17.21 0.00

LABORER: Landscape..............$ 14.67 0.00 TRUCK DRIVER: Dump Truck........$ 19.67 0.00 TRUCK DRIVER: Water Truck.......$ 24.36 8.30 TRUCK DRIVER: 10-Yard Truck.....$ 24.61 8.34 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE:

UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination.

08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

* The full determination can be viewed at www.wdol.gov/dba.aspx

File details come from the government source that posted it. Updated .