Pre-proposal_Site_Visit_Reminders.pdf

PDF 225 KB Posted

Attached to
Rehabilitate Stinson Beach Wastewater System, Marin County
Solicitation number
P15PS01031
Issued by

About this file

Pre_Proposal Site Visit Reminders Package

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rehabilitate Stinson Beach Wastewater System, Golden Gate National Recreation Area (GOGA), Marin County, CA.

Pre-proposal Meeting, June 10, 2015

NPS Administrative Area, in the parking lot at

Stinson Beach

Disclaimer

• The following is a brief overview of the proposal requirements

• Offerors are strongly cautioned to carefully read the requirements of the solicitation and comply accordingly.

• Agenda

– Synopsis

– Proposal Requirements

– Questions & Answers

– Site Visit

• Synopsis

– Rehabilitate Stinson Wastewater System

– Magnitude of Construction: $1M to $5M

– Firm-Fixed Price Contract

– SDVOSB Set-Aside

– Bid Bond Required

– Request for Proposal/Best Value Tradeoff

– Evaluation Factors – Technical, Past

Performance & Price

• Synopsis (Continued)

– 15 Base CLINs (Items 1 – 15)

– 9 Option CLINs (Items 16-24)

– Option Pricing Included in Price Evaluation

– Performance Period: 365 Days From NTP

– Liquidated Damages: Not Applicable to this solicitation.

• Volume 1 – Technical Proposal

- Relevant Prior Technical Experience and understanding of the project (Submit minimum of 3 projects clearly demonstrating expertise-Projects shall be >

75% complete/completed within last 5 years)

- Professional Qualifications of Key

Personnel

-Submit organization chart identifying

Minimum key personnel- e.g. Project

Manager, Quality Control Supervisor and

Superintendent and/or Subcontractor

Manager

-Submit occupational background information and professional registration documentation for key personnel

• Key Subcontractors

-Submit information to demonstrate the extent of experience and level of technical proficiency of the key subcontractors identified in the RFP (e.g. Recirculating

Textile Filter System Installer)

• Past Performance

– Questionnaires for similar Projects

– Questionnaires due at the proposal due date on the SF1442 (e.g. 9 July 2015 at

2:00 PM (PST))

– Government may Supplement Past

Performance evaluation with Past

Performance Information Retrieval System

(PPIRS) documentation

• Volume I – Technical Proposal

• Volume II- Price/Cost

– Offeror portion of SF 1442 (amendments)

– Section B – Pricing Schedule Info

– Section K – Representations and

Certifications

– Bid Guarantee

– Required pre-award information

-- If JV include Joint Venture Agreement

• Best Value Award

– Greatest Overall Benefit in Response to the Requirement

– Award is Based on Technical, Past

Performance and Price (Review relative importance factors in Section M (e.g. Price is all evaluation factors other than cost or price, when combined, are significantly more important than cost or price; or approximately equal to cost or price. )

– The Best Value may not be the Lowest

Price

• Proposal Due Date

– Proposals are due 9 July 2015 at 2:00 PM

(PDT)

– Due at the Contracting Office (Fort Mason)

– Must be Signed by an Officer of your

Company

– No Facsimile or Electronic Offers Will be

Accepted

Important Reminder

THE GOVERNMENT INTENDS TO

AWARD WITHOUT DISCUSSIONS

AND THERE MAY NOT BE A

CHANCE FOR DISCUSSIONS,

CORRECTIONS, OR REVISED

PROPOSALS

Questions???