Exhibit_C_Contract_Price_Schedule.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- P15PS01031
About this file
P15PS01031 Exhibit C Contract Price Schedule
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| CONTRACT PRICE SCHEDULE |
| SOLICITATION NUMBER: |
| PARK - PMIS: 164335 |
| DEVELOPED AREA: STINSON BEACH |
| PROJECT TITLE: Replace Stinson Beach Wastewater System |
| Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government. |
| In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation. |
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE | |
| 1 | Mobilization and Demobilization | 1 | Lump Sum | $0.00 | $0 | |
| 2 | SWPPP | 1 | Lump Sum | $0.00 | $0 | |
| 3 | PG&E Permit and Service Connection | 1 | Lump Sum | $0.00 | $0 | |
| 4 | Disposal Field Vegetation Removal | 1 | Lump Sum | $0.00 | $0 | |
| 5 | Disposal Field and Fence | 1 | Lump Sum | $0.00 | $0 | |
| 6 | 3” Force Main (RTF to Disposal Field) | 775 | Lineal Foot | $0.00 | $0 | |
| 7 | 3” Force Main | |||||
| (Primary Treatment to RTF)(2,253 trench) | 3,441 | Lineal Foot | $0.00 | $0 | ||
| 8 | Asphalt Paving | 18 | Ton | $0.00 | $0 | |
| 9 | Tank and Disposal Field Abandonment | 1 | Lump Sum | $0.00 | $0 | |
| 10 | Service and Pressure Test Tanks | 1 | Lump Sum | $0.00 | $0 | |
| 11 | Lifeguard/Ranger Building Septic | |||||
| And Wet Well Tanks | 1 | Lump Sum | $0.00 | $0 | ||
| 12 | Secondary Treatment | |||||
| (RTF System and Wood Fence) | 1 | Lump Sum | $0.00 | $0 | ||
| 13 | Primary Treatment (Wet Wells) |
Pump, Control and Local Alarm
| System | 1 | Lump Sum | $0.00 | $0 |
| 14 | Gravity Sewer Main Lifeguard, |
Ranger Building, Admin/Maintenance
| Area | 277 | Lineal Foot | $0.00 | $0 |
| 15 | Conduit and Pull Boxes for |
Future Remote SCADA
| Call Out System | 3,741 | Lineal Foot | $0.00 | $0 | ||
| TOTAL BASE PRICE (Contract Line Item Number 1 through 15) ------------------------------------ | $0 | |||||
| 16 | OPTION A, Replace South Comfort Station | |||||
| Pump Vault | 1 | Lump Sum | $0.00 | $0 | ||
| 17 | OPTION B, Replace North Comfort Station | |||||
| Septic Tank | 1 | Lump Sum | $0.00 | $0 | ||
| 18 | OPTION C, Replace Central Comfort Station | |||||
| Septic and Wet Well Tanks | 1 | Lump Sum | $0.00 | $0 | ||
| 19 | OPTION D, Remote SCADA Call Out System | 1 | Lump Sum | $0.00 | $0 | |
| 20 | OPTION E, Replace Electrical Panels at | |||||
| Comfort Stations | 3 | Each | $0.00 | $0 | ||
| 21 | OPTION F, Mill and Pave Lifeguard Driveway | 32 | Ton | $0.00 | $0 | |
| 22 | OPTION G, 3” Force Main from South Comfort station to Secondary Treatment | 1 | Lump Sum | $0.00 | $0 | |
| 23 | OPTION H, Mill and Pave 10 Foot Wide Pedestrian Path | 123 | Ton | $0.00 | $0 | |
| 24 | OPTION I, Remove and Dispose 1,800 gallon Septic Tank. Install 1,200 gallon Septic Tank | 1 | Lump Sum | $0.00 | $0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 16 through 24) ------------------------------------ | $0 | |||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 24) ----------- | $0 | |||||
| All measurement and payment information is included in the project specifications, Section 012700. |
PARK - PMIS
CPS - &P
Sheet1
File details come from the government source that posted it. Updated .