Exhibit_C_Contract_Price_Schedule.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Rehabilitate Stinson Beach Wastewater System, Marin County
Solicitation number
P15PS01031
Issued by

About this file

P15PS01031 Exhibit C Contract Price Schedule

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER:
PARK - PMIS: 164335
DEVELOPED AREA: STINSON BEACH
PROJECT TITLE: Replace Stinson Beach Wastewater System
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1Mobilization and Demobilization1Lump Sum$0.00$0
2SWPPP1Lump Sum$0.00$0
3PG&E Permit and Service Connection1Lump Sum$0.00$0
4Disposal Field Vegetation Removal1Lump Sum$0.00$0
5Disposal Field and Fence1Lump Sum$0.00$0
63” Force Main (RTF to Disposal Field)775Lineal Foot$0.00$0
73” Force Main
(Primary Treatment to RTF)(2,253 trench)3,441Lineal Foot$0.00$0
8Asphalt Paving18Ton$0.00$0
9Tank and Disposal Field Abandonment1Lump Sum$0.00$0
10Service and Pressure Test Tanks1Lump Sum$0.00$0
11Lifeguard/Ranger Building Septic
And Wet Well Tanks1Lump Sum$0.00$0
12Secondary Treatment
(RTF System and Wood Fence)1Lump Sum$0.00$0
13Primary Treatment (Wet Wells)

Pump, Control and Local Alarm

System1Lump Sum$0.00$0
14Gravity Sewer Main Lifeguard,

Ranger Building, Admin/Maintenance

Area277Lineal Foot$0.00$0
15Conduit and Pull Boxes for

Future Remote SCADA

Call Out System3,741Lineal Foot$0.00$0
TOTAL BASE PRICE (Contract Line Item Number 1 through 15) ------------------------------------$0
16OPTION A, Replace South Comfort Station
Pump Vault1Lump Sum$0.00$0
17OPTION B, Replace North Comfort Station
Septic Tank1Lump Sum$0.00$0
18OPTION C, Replace Central Comfort Station
Septic and Wet Well Tanks1Lump Sum$0.00$0
19OPTION D, Remote SCADA Call Out System1Lump Sum$0.00$0
20OPTION E, Replace Electrical Panels at
Comfort Stations3Each$0.00$0
21OPTION F, Mill and Pave Lifeguard Driveway32Ton$0.00$0
22OPTION G, 3” Force Main from South Comfort station to Secondary Treatment1Lump Sum$0.00$0
23OPTION H, Mill and Pave 10 Foot Wide Pedestrian Path123Ton$0.00$0
24OPTION I, Remove and Dispose 1,800 gallon Septic Tank. Install 1,200 gallon Septic Tank1Lump Sum$0.00$0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 16 through 24) ------------------------------------$0
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 24) -----------$0
All measurement and payment information is included in the project specifications, Section 012700.

PARK - PMIS

CPS - &P

Sheet1

File details come from the government source that posted it. Updated .