DRTO_149152A_-_Final_Specs.pdf
PDF 5 MB Posted
- Attached to
- Repair Bastions 3 & 4 on Fort Jefferson, Dry Tortugas National Park, Florida, Project No. : DRTO 149152A
- Solicitation number
- P15PS00382
About this file
Final Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A_-_DRTO_-_P15PS00382.docx | DOCX document | |
| Past_Performance_Questionnaire_-_DRTO.pdf | ||
| Revised_Bid_Schedule.docx | DOCX document | |
| P15PS00382_-_Amendment_00003.pdf | ||
| Correct_Final_Specs_Amend_2.pdf | ||
| Correct_Final_Plans_Amend_2.pdf | ||
| P15PS00382_Amendment_0002.pdf | ||
| P15PS00382_-_Amendment_00001.pdf | ||
| WD_FL150063_-_20_MAR_2015.docx | DOCX document | |
| DRTO_149152B_-_Plan_Cover.pdf | ||
| DRTO_149152A_-_Final_CD_MSL.pdf | ||
| DRTO_149152B_-_Draft_CD_MSL.pdf | ||
| P15PS00382_-_Final.pdf | ||
| DRTO_149152B_-_Phase_A_Final_CDs.pdf | ||
| DRTO_149152B_-_Phase_B_Draft_CDs.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRY TORTUGAS NATIONAL PARK
MONROE COUNTY, FLORIDA
PROJECT SOLICITATION NO. XXXXXXXXXXXXXX
PRESERVE FORT JEFFERSON PHASE 3:A
PMIS NO. DRTO 149152A
PROJECT SPECIFICATIONS
Construction Documents
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
January 30, 2015
[This page intentionally left blank]
DRTO 149152 TOC-1
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 27 00 Definition of Contract Line Items 01 31 00 Project Management & Coordination 01 32 16 Construction Schedule 01 32 33 Photographic Documentation for Historic Preservation Projects 01 33 23 Submittal Procedures 01 35 13.22 Archeological Protection 01 35 23 Safety Requirements 01 35 91 Historic Preservation Treatment Procedures 01 40 00 Quality Requirements 01 42 00 References 01 50 00 Temporary Facilities and Controls 01 57 10 Moat Protection 01 57 19.12 Noise & Acoustics Management 01 57 23 Under-An-Acre Pollution Prevention 01 67 00 Product Requirements 01 73 40 Execution 01 74 19 Construction Waste Management and Disposal 01 77 00 Closeout Procedures
DIVISION 02 – 34 TECHNICAL REQUIREMENTS
DIVISION 02 – EXISTING CONDITIONS
02 15 00 Bracing and Shoring 02 41 19 Selective Demolition
DIVISION 03 – CONCRETE
03 30 50 Coral Concrete
DIVISION 04 – MASONRY
04 01 20 Masonry Repointing and Repair 04 21 00 Clay Masonry Units 04 72 00 Concrete Fabrications
DIVISION 05 – METALS
055501 Bronze Strike Plate
DIVISION 06 – 49
Not Used
DRTO 149152 TOC-2
APPENDICES
Everglades & Dry Tortugas Hurricane Plan (Version 2014) Scarp Wall Sections for Embrasures 53-54 and 58-63 (Sections are not available for Embrasures 49-52 or 64-66)
DRTO - 149152 01 11 00 - 1
031414 SUMMARY OF WORK
SECTION 01 11 00 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. Work covered by the Contract Documents.
2. Work under other contracts.
3. Government Furnished Materials.
4. Contractor use of site.
5. Public use of site.
6. Occupancy requirements for buildings.
7. Work Restrictions.
8. Special Construction Requirements.
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location: The project is located at Fort Jefferson, Dry Tortugas National Park, Garden Key, in Monroe County, Florida. Garden Key is located in the Gulf of Mexico approximately 68 miles west of Key West. Garden Key is only accessible by boat or seaplane. The logistics of transporting personnel, supplies, materials and equipment to the Dry Tortugas and maintaining a productive construction site far from the mainland will require careful planning and coordination by the Contractor.
B. The Work consists of the following:
The Work of this project consists of the repair of the brick masonry scarp wall at embrasures 49-54 and 59-64 (as well as Embrasures 65 and 66 as Bid Options) at Fort Jefferson. The scarp wall masonry is severely deteriorated and in many areas has collapsed into the moat due to the corrosion and expansion of internal iron elements. In general, the work includes, masonry demolition, removal of iron components of the historic Totten shutter assembly, partial reconstruction of the shutter assembly using cast concrete replacement components, reconstruction of the embrasure openings and repair and repointing of the scarp wall from approximately the magistral line to the top of the parapet.
This property is listed on the National Register of Historic Places (NR) and managed as a cultural resource asset. Historical significance extends to the entire site including all associated buildings, landscapes, engineering features and marine construction. This significance also extends to subterranean items including undiscovered or unexcavated archaeological resources. During construction care must be taken to protect all cultural and natural resources.
The site’s historical and environmental significance must be considered when planning and executing construction means and methods. All proposed work and modifications to
DRTO - 149152 01 11 00 - 2
historic features shall be in accordance with the Secretary of the Interior’s “Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring and Reconstructing Historic Buildings.” Contractor shall proceed with care and attention to preservation concerns. Conservative and cautious approaches when working on or around this resource will be given precedence over radical and unproven methods.
Repair and retention of existing historic fabric is a priority. If potential exists for irreversible damage or loss of fabric, Contractor will cease work and seek guidance and approval from Contracting Officer (CO) before resuming work. Actions deemed detrimental to the resource or actions that place the resource at risk of damage or loss to its historic integrity, regardless of cause, will not be undertaken without prior review and approval by the Contracting Officer.
C. Project will be constructed under a single prime contract.
1.3 WORK UNDER OTHER CONTRACTS
A. General: Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate the Work of this Contract with work performed under separate contracts.
1.4 GOVERNMENT-FURNISHED MATERIALS
A. Government will furnish products indicated.
1. Government furnished products (brick) are currently located at the North Coaling Dock on Garden Key.
2. Contractor is responsible for receiving, unloading, and handling Government-furnished items at Project site.
3. Contractor is responsible for protecting Government-furnished items from damage during storage and handling, including damage from exposure to the elements.
4. If Government-furnished items are damaged as a result of Contractor's operations, Contractor shall repair or replace them.
5. Contractor shall install and otherwise incorporate Government-furnished items into the Work.
B. Government-Furnished Products:
1. Brick – See 042100, 2.4.A for quantities and location.
1.5 CONTRACTOR USE OF SITE
A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to areas indicated on drawings. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Limits: Confine staging and operations to Contractor work area on the North Coaling Dock and other areas indicated on drawings.
DRTO - 149152 01 11 00 - 3
2. While the Contractor Work Area shown on the drawings will be closed to the public during construction, the counterscarp needs to remain open to NPS personnel and the visiting public. If closure of the counterscarp is necessary for limited periods of time, the Contractor shall coordinate the details of this closure with the Contracting Officer. Use of the sally port will be restricted/limited by NPS from 10:30 am to 3:00 pm.
3. Contractor Mooring Area: Contractor Mooring Area shown on drawings will be available to Contractor vessels on a limited and temporary basis for loading and unloading of materials and equipment. The mooring area will not be available to the Contractor when the tour boat, NPS Ft. Jefferson or other official vessels (such as Coast Guard vessels) are scheduled to use the main dock. Contractor vessels using the mooring area will need to be relocated immediately following completion of their tasks. In order to provide temporary controls and limit public access to the area, the Contractor shall coordinate use of the mooring location with the Contracting Office. Contractor shall provide a minimum of 48hrs notice of any Contractor vessel arriving at DRTO.
4. Limits on Number of Contractor Personnel: An environmental assessment for the project was performed resulting in a finding of no significant impact (FONSI). This FONSI was based on a limitation being placed on the number of Contractor personnel that can be housed at the site to perform the work of the project. The Contractor’s crew (including subcontractor personnel) shall not exceed ten (10) individuals staying overnight on Garden Key and using water and sewage utilities during a 24-hour period.
5. Contractor Housing: There is one dormitory facility referred to as “The Crew’s Quarters” with bunk beds (10 beds total) that the Contractor may use to accommodate its staff. The cost of these accommodations is $30.00 per person/per night. If the Contractor proposes to use these dormitory facilities to accommodate its staff, the Contractor shall include in its technical proposal the number of beds by days that it intends to use. Further, during contract performance, the Contractor is responsible for tracking the number of beds used each month and making payment to Dry Tortugas National Park on a fixed payment schedule (every 3 months). The Contractor shall submit a report to the Government indicating the actual number of beds used by date with each payment. Facilities and supplies available in the Crew’s Quarters includes two toilets, two showers, one lavatory, one satellite television, three refrigerator/freezers, one freezer, one ice-maker, one microwave, range/oven, two coffee makers, pots, pans and tableware. The Contractor agrees that its staff shall not damage these accommodations and shall use reasonable amounts of electricity, water, and waste disposal. This requirement for conservation of electricity, water and waste disposal is required due to the remote location of the site and the Park’s schedule for waste and water management. No cleaning or other services are provided by the Government.
6. Provisions: The Contractor and or Contractor’s personnel shall provide their own food/condiments/drinks/toiletries and any other personal items for the length of their stay. Recreation items desired such as fishing/snorkeling gear, beach accessories, or flashlights must likewise be brought to the site by the Contractor and/or its personnel.
7. Use of Contractor Housing:
a. All food and drink containers such as plastic (all types), glass, tin and aluminum is recycled. All recycled containers that have been brought to the island must be
DRTO - 149152 01 11 00 - 4
carried back to the mainland at the Contractor’s expense. Contractor is responsible for all recyclable material.
b. Government-provided composters shall be used for fruit and vegetable waste.
c. Recyclable material and domestic waste must be removed from the island at regular intervals of no more than every three weeks.
d. All food must be removed upon departure.
e. Water shall be conserved by taking quick showers and consolidating dirty dishes to be washed only once a day.
f. Housing units must be thoroughly cleaned daily and upon departure.
g. Quiet hours are from 10:00 PM to 7:00 AM.
h. Contractor employees are restricted from using the NPS staff Recreation Room.
i. Contractor is restricted from using the Park’s laundry facilities. The Contractor must arrange to have laundry processed off-site at Contractor’s expense.
j. Contractor is restricted from using NPS boats without prior approval.
8. Construction Camp: Establishment of a camp within the park will not be permitted. The Contractor may propose to house its staff or subcontractors on boats in the harbor as long as the boats are self-contained and the contractor does not use the park’s facilities to dispose of sewage/gray water. If the Contractor proposes to house staff or subcontractors on boats in the harbor, the Contractor shall be responsible for storing and hauling out of the park, and surrounding waterways, the sewage/gray water to an appropriate treatment facility.
9. Telephone/Internet Communications Systems: There is no hard line on site for telephone/internet communications. Contractor shall be responsible for their own telephone and internet communications systems. Close coordination with Park personnel will be necessary to establish where equipment components can or cannot be located.
Contractor shall receive approval from the Contracting Officer before installing any communications equipment.
10. Conduct:
a. All Park regulations must be followed.
b. Do not litter.
c. All natural, archaeological, and historical features and artifacts are protected.
Do not take or collect anything without a permit.
d. Avoid interaction or interfering with protected, endangered species. Do not kill, harm or interact with any wildlife. Do not feed or approach any wildlife.
e. Do not enter posted closed areas.
f. Do not stand on any sea grass or coral.
g. Fishing is only allowed with a current Florida State saltwater fishing license.
h. Smoking will not be permitted inside the Fort walls.
11. Transportation to the Project Site:
a. The Contractor shall be responsible for all transportation of personnel.
b. The Contractor shall be responsible for procuring, shipping and handling all construction materials.
The Contractor shall be responsible for packaging, transporting and disposal of all construction debris and personal trash. Due to limited space on site, debris and trash shall be removed from the island at regular intervals throughout the contract period – See 1.5.A.7.c.
DRTO - 149152 01 11 00 - 5
c. Only USCG-approved vessels shall be used for transport of equipment, material and personnel. Contractor shall provide written verification that vessels used in the completion of this contract are USCG-approved.
d. Commercial Modes of Travel: The following schedules may be affected by weather conditions and are subject to cancellation or change.
1) Yankee Freedom III Ferry/Tour Boat Daily Schedule: Boat departs Key West at 8:00 AM with a 7:15 check in time. If any gear or provisions are being transported they must be loaded on the boat by 6:30 am (Gear/provisions should not exceed 60lbs dry weight – Excess gear/provisions will be charged at a rate of $0.75/lb). The amount of personal supplies/gear that can be carried on the vessel is limited.
Equipment and supplies for construction should be transported via the National Park Service’s tender, M/V Fort Jefferson. Transportation of supplies/equipment other than personal gear aboard the Yankee Freedom requires prior approval of the Captain and is subject to availability of space and freight charges. Ferry departs Fort Jefferson at 3:00 PM – check in at 2:45 PM. Approximately 2 ½ hours of travel time (each-way).
a) As of October 1, 2013, the rate for Contractors is $99.00 each way.
Breakfast and lunch is included on outbound trips. Lunch can be purchased separately for $7.00.
b) Contact Information: By phone at 305-294-7009 or 1-800-634-0939 or visit www.drytortugas.com.
2) Key West Seaplane Adventures Daily Schedule: Flight times are subject to availability. Flights leave Key West Airport at 8:00 AM, 10:00 AM, 12:00 PM and 2:00 PM. Flights leave the Fort at 11:00 AM, 1:00 PM, 3:00 PM and 5:00 PM. Approximately 45 min. flight time each way.
a) As of December 25, 2013, Contractor rates for traveling on the seaplane are $236 per person each way or the same price for a 4 hour round trip. A full day (8 hour round trip) will cost $412 and a 10 hour day trip (first flight out, last flight back) will cost $472.
b) Contact Key West Seaplane Adventures for weight limitations and lists of items that can and cannot be transported by air.
c) Contact Information: By phone: 1-305-293-9300, by email:
info@keywestseaplanecharters.com
e. National Park Service Crew Boat (Motor Vessel Fort Jefferson): The Government has a crew boat that may be available for the Contractor to arrange transportation for its construction personnel to the site rather than relying only on commercial modes of transportation. While the Contractor may make arrangements for its personnel to be transported to the construction site based on the Government crew boat’s availability and schedule, the Government crew boat’s schedule and availability is uncertain and subject to weather conditions and other operational requirements such as staff availability, boat repairs, etc. Since this alternative
DRTO - 149152 01 11 00 - 6
method of transportation might be available but is not being provided as Government-furnished property/services, the Contractor shall be responsible for determining what method to use to transport its personnel to the construction site.
If the Contractor chooses to use the Government crew boat and the crew boat is unable to make a trip, the Contractor shall bear all responsibility and expense for transporting its crew to the site; and this shall not be recognized as a Government delay of work or be an acceptable reason for the Contractor to make a request for equitable adjustment or additional time under the contract. The Contractor shall be responsible for making arrangements for the Government crew boat with the park personnel.
Information and restrictions that apply to passengers on the Government crew boat include the following:
1) All food items must be placed in cardboard boxes or coolers labeled with the owner’s name.
2) All other cargo must be labeled and easily identifiable as to the owner of the property.
3) Prior Park (and USCG) approval must be obtained in order to gain access to the docking facilities at the West Trumbo Point Naval Annex.
4) The trip is approximately 5-1/2 hours of travel time from Key West to Dry Tortugas. The Government crew boat typically departs at 9:00 am from Key West Trumbo Point Naval Annex every other Tuesday. Return trips to Key West are generally the following Thursday, departing at 7:00 am from Dry Tortugas. There would be no charge for use of the Government crew boat when used with the normal operational schedule and solely for the transportation of Contractor personnel, groceries and personal items.
Scheduled trips are generally every other week. The Government crew boat is unavailable when the crew have scheduled leave, training, scheduled maintenance at a ship yard or have chartered trips supporting research. On an annual average basis, the Government crew boat will make approximately 18 resupply trips to Dry Tortugas.
5) Arrangements for use of the Government crew boat shall be made at least two weeks in advance of travel.
6) All Contractor personnel cargo must be loaded, secured and unloaded by the Contractor or its personnel. The Government is not responsible for lost or damaged goods.
7) The Contractor and Contractor’s personnel or subcontractors’ personnel must present proper identification at the naval base gate and be escorted to the boat. The Government will not be responsible for personnel unable to access the boat prior to departure.
8) Private vehicles may not be parked overnight on the base. A small parking area is located directly outside the main gate and can be used to park privately owned vehicles. The Government shall not be liable for vehicle
DRTO - 149152 01 11 00 - 7
damage or theft if the Contractor’s or subcontractor’s personnel park their vehicle at this site.
9) Entry to the naval base may be denied anytime the national security level is elevated to orange or red or the naval base determines the individual(s) may not enter.
10) The Contractor shall be responsible for completing liability waivers for each person traveling on the Government crew boat. These waivers must be presented to the captain prior to the Government crew boat getting underway.
12. Hurricane Plan: A copy of the most recent version of the Everglades/Dry Tortugas Hurricane Plan is attached to the solicitation and made a part hereof (See Appendix).
B. Storage of Materials: Confine storage of materials to North Coaling Dock or other designated staging areas indicated on drawings. Storage in bastions and casemates must be coordinated with the Contracting Officer. Contractor shall prepare a Storage Plan that describes what equipment and materials will be housed on the island and where it will be stored during regular working conditions as well as during major weather events.
C. Preservation of Natural Features: The Contractor will take special care to protect areas and features of the site and surrounding water/marine environment that are not to be disturbed from the work in progress.
1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
2. Provide temporary barriers to protect existing trees and plants and root zones.
3. Do not remove, injure, or destroy trees or other plants without prior approval.
4. Do not fasten ropes, cables, or guys to existing trees.
5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
6. Position scaffolding and temporary staging so as to avoid impacts to sessile marine organisms such as coral and sponges. National Park Service will provide a qualified biologist to identify State-listed plant species that could be affected by the project and investigate the potential for relocating individual plants. Notify the Contracting Officer if impacts are anticipated.
7. In the event that natural features are inadvertently damaged, Contractor shall notify Construction Management Representative immediately.
D. Preservation of Cultural Resources: Due to the elevated historic status of this resource, preservation treatment approaches must concur with The Secretary of the Interior’s “Standards for the Treatment of Historic Properties,” along with The Secretary of the Interior’s Guidelines for Treatment of Cultural Landscapes.”
This property is a National Historic Landmark and it will continue to be managed as an important resource. It may contain historic features that include buildings, structures, landscapes and associated landscape features (sidewalk, planters culverts, fences, site walls, retaining walls, etc.
and engineering features such as bridges, towers, lighthouses, etc.) It is also possible that certain site features within the project boundary are not mentioned in the NR document, but those unnamed items are considered potentially eligible and are treated with the same level of concern.
DRTO - 149152 01 11 00 - 8
During construction, care must be taken to protect cultural resources. When planning construction means and methods, preservation and protection of this resource is paramount. Contractor will proceed with care, using conservative and cautious approaches when working on and around historic fabric. Recognized and approved methods, favoring hand tools over power tools along with demonstrated experience and skill, will take precedence over radical and unproven procedures. If potential exists for irreversible damage or loss of fabric, contractor will cease work and seek guidance and approval from CO (Contracting Officer) before resuming work. Actions deemed detrimental to the resource, that would otherwise place the resource at jeopardy of loss to its historical integrity, regardless of cause, will not be undertaken without prior review and approval by CO.
E. Driveways and Entrances: Keep walkways, boardwalks, sally port and counterscarp clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
1. Schedule deliveries, pick-ups/removals to minimize use of docks, seaplane ramp, counterscarp and sally port. Major delivery or pick-up of material shall not take place during peak visitor use times (10:00 am – 3:00 pm).
2. Schedule deliveries, pick-ups/removals to minimize space and time requirements for storage of materials and equipment on-site.
F. Hauling Restrictions: Vehicles shall not be driven inside the Fort unless moving materials or debris. Comply with all legal load restrictions in the hauling of materials. (Dimensions of bridge and counterscarp and associated load restrictions are indicated on drawings). Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.
1.6 PUBLIC USE OF SITE
A. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public.
Counterscarp closures will be permitted before 10:00 am and after 3:00 pm, upon specific approval of Contracting Officer (See 1.5.A.2).
1.7 OCCUPANCY REQUIRMENTS FOR BUILIDINGS
A. Existing Buildings
1. Full Government Occupancy: Government will occupy portions of the Fort that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the Contracting Officer.
b. Repair damage caused by construction operations. Protect building and its occupants during construction period.
DRTO - 149152 01 11 00 - 9
1.8 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7:00 a.m. to 6 p.m., seven days a week, except when otherwise indicated.
1. Hours for noisy activity shall only occur between the hours of 8:00 am and 5:00 pm
B. Existing Utilities
1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
2. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
C. Existing Utility Interruptions: No interruption of existing utility services shall be permitted.
D. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor air intakes. Smoking is not permitted within the Fort walls.
1.9 SPECIAL CONSTRUCTION REQUIREMENTS
A. Seasonal Shutdown: Due to the active tropical hurricane season Atlantic Ocean and Gulf of Mexico, a seasonal shutdown of the work in progress will be required from June 1st through November 1st. Contractor will be required to demobilize during this period. Any extensions or exceptions to this work restriction shall be approved by the Park Site Manager and Contracting Officer.
Casemates 94 and 95 on Front 4 are available for use by the Contractor as temporary storage areas during the designated seasonal shutdown period. This space consists of two open casemates that abut to one solid masonry wall of the powder magazine on the first tier. The casemates are open to one another and the parade ground.
Contractors will be responsible for installing temporary barriers to make a solid enclosure to store their materials and equipment. Barriers must be solid walls painted to blend with the surrounding masonry and minimize their visual impact.
All walls/barriers must be constructed in a manner so that they do not cause damage to the historic fabric or permanently fasten to the existing masonry walls, ceilings or floors. Contractor must operate with care so as not to damage historic fabric during loading and unloading operations.
Contractor will be responsible, at no cost to the Government, for repairing any damage to historic fabric in the storage area including the brick pathway leading to the storage area.
Contractor is solely responsible for all contents stored on site and the temporary barriers which shall be designed to withstand extreme weather events such as tropical storms and hurricanes.
Barriers shall be maintained in good condition at all times.
B. Project Website: A project website administered by the NPS will be used for purposes of managing communication and documents during the construction phase.
DRTO - 149152 01 11 00 - 10
1. See Section 01 31 00 “Project Management and Coordination” for requirements on using the Project Website.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 11 00
DRTO - 149152 01 27 00 - 1
082714 DEFINITION OF CONTRACT LINE ITEMS
SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS
PART 1 - GENERAL
1.1 SUMMARY
A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.
B. If no contract line item exists for a portion of the work, include the costs in a related item.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LIST OF CONTRACT LINE ITEMS
A. Contract Line Item No.1 MOBILIZATION/DEMOBILIZATION AND TEMPORARY
FACILITIES
1. This item consists of all costs associated with mobilization, demobilization and temporary facilities required to complete the work.
2. No separate measurement of quantities shall be made.
3. Payment will be made at the contract lump sum price.
B. Contract Line Item No. 2. SHORING/SCAFFOLDING
1. This item consists of all costs associated with the erection and disassembly of all scaffolding and shoring required to complete the work.
2. No separate measurement of quantities will be made.
3. Payment will be made at the contract lump sum price.
C. Contract Line Item No. 3a. TOTTEN SHUTTER REMOVAL AND LOWER LEVEL EMBRASURE RECONSTRUCTION (Bastion).
1. The work of this bid item consists of the demolition of the historic Totten shutter components embedded within the scarp wall or exposed as a result of masonry collapse.
The item also includes reconstruction of the shutter assembly using cast concrete facsimile components and reconstruction of the brick masonry embrasure opening including final pointing of the entire reconstructed area.
2. Measurement shall be per lower-level embrasure opening within the limits of the work area.
3. Payment will be made at the contract fixed unit price per each embrasure.
DRTO - 149152 01 27 00 - 2
D. Contract Line Item No. 3b. TOTTEN SHUTTER REMOVAL AND LOWER LEVEL EMBRASURE RECONSTRUCTION (Front).
1. The work of this bid item consists of the demolition of the historic Totten shutter components embedded within the scarp wall or exposed as a result of masonry collapse.
The item also includes reconstruction of the shutter assembly using cast concrete facsimile components and reconstruction of the brick masonry embrasure opening including final pointing of the entire reconstructed area.
2. Measurement shall be per lower-level embrasure opening within the limits of the work area.
3. Payment will be made at the contract fixed unit price per each embrasure.
E. Contract Line Item No. 4. PROVIDE NEW BRONZE STRIKE PLATE (Material Only)
1. This item consists of all costs associated with the fabrication of a new bronze strike plate that matches the original strike plates in dimension and material.
2. Measurement of quantities shall be per unit where indicated on the drawings.
3. Payment will be made at the contract fixed unit price per unit.
F. Contract Line Item No. 5. SCARP WALL FACE BRICK DEMOLITION &
RECONSTRUCTION.
1. This item consists of all costs associated with demolition and reconstruction of the scarp wall face brick (outer two wythes).
2. Measurement of quantities will be made per cubic foot of scarp wall demolished and reconstructed.
3. Payment will be made at the contract fixed unit price per cubic foot.
G. Contract Line Item No. 6. SCARP WALL INFILL
1. This item consists of all costs associated with reconstruction of the inner wythes of the scarp wall including installation of both brick and coral concrete infill.
2. Measurement of quantities will be made per cubic feet of scarp wall infill that is reconstructed.
H. Contract Line Item No. 7a. SCARP ARCH RECONSTRUCTION (Bastion)
1. This item consists of all costs associated with the demolition and reconstruction of the delaminated portions of the interior relieving arches of the scarp wall.
2. Measurement of quantities will be made per cubic feet of relieving arch reconstructed.
I. Contract Line Item No. 7b. SCARP ARCH RECONSTRUCTION (Front)
1. This item consists of all costs associated with the demolition and reconstruction of the delaminated portions of the interior relieving arches of the scarp wall.
2. Measurement of quantities will be made per cubic feet of relieving arch reconstructed.
J. Contract Line Item No. 8. REPOINT UNRECONSTRUCTED SECTIONS OF SCARP WALL.
DRTO - 149152 01 27 00 - 3
1. This item consists of all costs associated with repointing the unreconstructed sections of the scarp wall.
2. Measurement of quantities will be made per square foot of repointing.
3. Payment will be made at the contract fixed unit price per square foot.
K. Contract Line Item No. 9. BRICK REPLACEMENT AT CORBELLED STRING COURSE.
1. This item consists of all costs associated with replacing weathered/damaged brick at the string course.
2. Measurement of quantities will be made per square foot of brick replacement.
L. Contract Line Item No. 10. REPOINT CORBELLED STRING COURSE.
1. This item consists of all costs associated with repointing the corbelled string course.
2. Measurement of quantities will be made per square foot of repointing
M. Contract Line Item No. 11. BRICK REPLACEMENT AND REPOINTING AT PARAPET.
1. Contract Line Item No. 11.
a. This item consists of all costs associated with the comprehensive repair of the parapet wall including brick replacement and repointing.
b. No separate measurement of quantities shall be made.
c. Payment will be made at the contract fixed unit price per square foot.
N. OPTION A. COMPREHENSIVE REPAIRS TO EMBRASURE NO. 65.
1. Contract Line Item No. 12.
a. This item consists of all costs associated with the comprehensive repair of
Embrasure No. 65 from approximately the magistral line to the top of the parapet including all applicable tasks described in base bid items 1 through 11.
b. No separate measurement of quantities shall be made.
c. Payment will be made at the contract lump sum price.
O. OPTION B. COMPREHENSIVE REPAIRS TO EMBRASURE NO. 66.
1. Contract Line Item No. 13.
a. This item consists of all costs associated with the comprehensive repair of
Embrasure No. 66 from approximately the magistral line to the top of the parapet including all applicable tasks described in base bid items 1 through 11.
b. No separate measurement of quantities shall be made.
c. Payment will be made at the contract lump sum price.
END OF SECTION 01 27 00
[This page intentionally left blank]
DRTO - 149152 01 31 00 - 1
031414 PROJECT MANAGEMENT AND COORDINATION
SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION
1.1 SUMMARY
A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. Definitions
2. Construction Coordination.
3. Submittals
4. Requests for Information (RFIs).
5. NPS/DSC Share Point Project Website
6. Project Meetings
7. Environmental Coordination.
8. Permits
B. Related Requirements:
1. Section 01 32 16 “Construction Schedule” for preparing and submitting Contractor’s construction schedule.
2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.
4. Section 01 91 14 “Total Building Commissioning” for coordinating the work with
Owner’s Commissioning Authority.
1.2 DEFINITIONS
A. Authority Having Jurisdiction (AHJ): An AHJ is an agency that has been granted legal authority over a location, action or resource. This authority includes the ability to issue a permit or other legal permission document.
B. Construction Permits: Are those permits obtained by the contractor based on means and methods used to execute the work. Construction Permits are issued to the Contractor and not to the National Park Service (NPS).
C. Government Furnished Permits: Are those permits that are obtained by NPS during the design process and provided to the Contractor for compliance with the provisions through construction.
These permits may address impacts to natural resources, construction stormwater, etc.
1.3 CONSTRUCTION COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate
DRTO - 149152 01 31 00 - 2
construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.
5. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1. Preparation of Contractor's Construction Schedule.
2. Preparation of the Schedule of Values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Permit requirements.
7. Pre-installation conferences.
8. Project closeout activities.
9. Commissioning activities.
1.4 SUBMITTALS
A. Division 01 documents: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference.
1. Letter designating Project Superintendent.
2. Construction Schedule and Scheduler’s Resume/Qualifications.
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention Plan.
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor standard clauses.
DRTO - 149152 01 31 00 - 3
7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.
8. Waste Management Plan.
9. Quality Control Plan.
10. Historic Preservation Treatment Plan.
11. List of Required Construction Permits. Include the following information for each permit:
a. Name of Permit.
b. The AHJ issuing the permit.
c. Information required from the Government to complete the permit application.
B. All items listed must be provided to the Contracting Officer before the Pre-Construction Conference is held. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies.
Work shall not commence until written Notice to Proceed has been issued.
1.5 REQUESTS FOR INFORMATION (RFIs)
A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI utilizing the form created on the NPS/DSC SharePoint Project website.
1. CO will not respond to RFIs submitted by other entities controlled by Contractor.
2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.
B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:
1. RFI number, numbered sequentially.
2. Date.
3. RFI subject.
4. Specification Section number and title and related paragraphs, as appropriate.
5. Drawing number and detail references, as appropriate.
6. Field dimensions and conditions, as appropriate.
7. Contractor's suggested resolution. If Contractor's suggested resolution impacts the
Contract Time or the Contract Sum, Contractor shall state impact in the RFI.
8. Contractor's signature.
9. Requested date for response.
10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop
Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.
C. RFI Form: Complete the RFI Form on the NPS/DSC SharePoint website as follows:
1. Enter the general information at the top of the form.
DRTO - 149152 01 31 00 - 4
2. Under the “Action” section at the bottom of the form, select “Question” then select “CMR” in the drop-down of the “Send to” box.
3. Enter the details of the question and attach related documents.
4. Select “Submit Form” at the bottom of the page.
D. Contracting Officer’s Action: CO will review each RFI, determine action required, and respond. CO will determine the critical nature of each RFI and issue a response accordingly.
1. The following are not considered to be RFIs and will receive no action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for approval of Contractor's means and methods.
d. Requests for coordination information already indicated in the Contract
Documents.
e. Requests for adjustments in the Contract Time or the Contract Sum.
f. Requests for interpretation of Architect's actions on submittals.
g. Incomplete RFIs or inaccurately prepared RFIs.
2. CO's action may include a request for additional information, in which case time for response will date from time of receipt of additional information.
3. CO's action on RFIs may result in the need for a change to the Contract Time or the Contract Sum. All contract changes will be processed following the terms and conditions of the contract.
1.6 NPS/DSC SHARE POINT PROJECT WEBSITE
A. Use the NPS/DSC SharePoint Project website for communication throughout the contract period. The NPS/DSC SharePoint Project website will be used for the following functions:
1. Project directory.
2. Project correspondence.
3. Meeting agendas and minutes.
4. Contract modifications forms and logs.
5. RFI form and processing.
6. Task and issue management.
7. Photo documentation.
8. Baseline schedule, schedule updates and calendar management.
9. Submittal form and processing.
10. Payment coordination documentation.
11. Drawing and specification document hosting, viewing, and updating.
12. Online document collaboration.
13. Reminder and tracking functions.
14. Archiving functions.
15. Notification of submittal and RFI statuses and current responsible party.
16. Permits and addendums
B. Some documents however are not suitable to be shared using the NPS/DSC SharePoint Project website. Documents containing Personal Identifying Information (PII) (i.e. certified payrolls)
DRTO - 149152 01 31 00 - 5
shall not be shared using the NPS/DSC SharePoint Project website and shall be coordinated with the SharePoint Project team as appropriate.
C. Submit to the CO a list of all employees who will need access to the website. The users will receive an invitation to register from the Department of Interior (DOI). Once the user is registered on the DOI website, they will be given access to the NPS/DSC SharePoint Project website. For login procedures and other SharePoint information, refer to the Workflows website at http://www.nps.gov/dscw/precon_spproj.htm.
D. All users will be required to have the following software packages:
1. Internet Explorer version 7 or later.
2. Adobe Acrobat Professional (Pro) version 9 or later
1.7 PROJECT MEETINGS
A. Preconstruction Conference: Before start of construction, Contracting Officer will arrange an on-site meeting with Contractor. The meeting agenda will include the following as a minimum:
1. Roles & Responsibilities/ Lines of Authority.
2. Park rules and regulations.
3. Jobsite Safety.
4. Resolution of comments on required Division 01 documents.
5. Coordination of Subcontractors.
6. Labor law application.
7. Modifications.
8. Payments to Contractor.
9. Payroll reports.
10. Contract time.
11. Liquidated damages.
12. Contractor Performance Evaluation.
13. Display of Hotline posters.
14. Notice to proceed.
15. Correspondence procedures.
16. NPS/DSC SharePoint Project website.
17. Acceptance/rejection of work.
18. Progress meetings.
19. Submittal procedures.
20. Environmental requirements.
21. Permit requirements.
22. As-constructed drawings/operation and maintenance (O&M) manuals.
23. Saturday, Sunday, holiday and night work.
24. Reference materials.
25. Value engineering.
B. Progress Meetings: The Contracting Officer will schedule monthly progress meetings with the Contractor.
1. Attendees: In addition to Government Representatives, each Contractor, Subcontractor, supplier, and other entity concerned with current progress or involved in planning, DRTO - 149152 01 31 00 - 6 coordination, or performance of future activities shall be represented at these meetings.
All participants at the meeting shall be familiar with the Project and authorized to conclude matters relating to the Work.
2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. The meeting agenda will include the following:
a. Approval of minutes of previous meetings.
b. Submittal status.
c. Review of off-site fabrication and delivery schedules.
d. Requests for information (RFI) and other issues.
e. Modifications.
f. Work in progress and projected.
1) Status of required inspections (Special Inspections, Accessibility, etc.)
g. Inspections of work in progress and projected (Special inspections,
h. Construction Schedule update (provide updated CPM).
i. Status of Project Record Drawings and O&M manuals.
j. Other business relating to work.
k. Permit requirements.
C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity that requires coordination with other construction.
1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise CO of scheduled meeting dates.
2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:
a. Contract Documents.
b. Options.
c. Related RFIs.
d. Related Change Orders.
e. Purchases.
f. Deliveries.
g. Submittals.
h. Review of mockups.
i. Possible conflicts.
j. Compatibility requirements.
k. Time schedules.
l. Weather limitations.
m. Manufacturer's written instructions.
n. Warranty requirements.
o. Compatibility of materials.
p. Acceptability of substrates.
q. Temporary facilities and controls.
r. Space and access limitations.
s. Regulations of authorities having jurisdiction.
t. Testing and inspecting requirements.
u. Installation procedures.
DRTO - 149152 01 31 00 - 7
v. Coordination with other work.
w. Required performance results.
x. Protection of adjacent work.
y. Protection of construction and personnel.
3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.
4. Reporting: Distribute minutes of the meeting to each party present and to other parties requiring information.
5. Do not proceed with installation if the conference cannot be successfully concluded.
Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.
1.8 ENVIRONMENTAL COORDINATION
A. Contractor’s Environmental Manager: Designate an on-site party responsible for overseeing the Contractor’s conformance to environmental goals for the project and implementing procedures for environmental protection.
1. Qualifications: Minimum 3 years Construction experience on projects of similar size and scope; with environmental procedures similar to those of this project; must be familiar with environmental regulations applicable to construction operations.
2. Responsibilities: Responsibilities shall include:
a. Compliance with applicable Federal, State, and local environmental regulations, including maintaining required documentation.
b. Implementation of the Waste Management Plan(WMP).
c. Present an overview of environmental issues and summarize site specific procedures relating to management plans at the Preconstruction conference.
d. Training for Contractor personnel in accordance with their position requirements.
e. Monitoring and documentation of environmental procedures.
B. Perform project quality control in accordance with requirements specified in Related Sections, including:
1. Quality Requirements.
2. Regulatory Requirements.
3. Noise & Acoustics Management.
4. Construction Waste Management.
C. Contractor’s Environmental Training Program: Contractor shall provide environmental training for workers performing work on the project site. Training shall include the following:
1. Overview of environmental issues related to the building industry.
2. Overview of environmental issues related to the Project.
3. Review of site specific procedures and management plans:
a. Construction Waste Management.
b. Noise & Acoustics Management.
DRTO - 149152 01 31 00 - 8
4. Pollution Prevention (P2) practices: Submit evidence of familiarity with P2 practices.
5. Compliance with environmental regulations: As specified in Regulatory Requirements.
Submit Contractor 40 CFR employee…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .