DRTO_149152A_-_Final_CD_MSL.pdf
PDF 86 KB Posted
- Attached to
- Repair Bastions 3 & 4 on Fort Jefferson, Dry Tortugas National Park, Florida, Project No. : DRTO 149152A
- Solicitation number
- P15PS00382
About this file
Final CD MSL
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A_-_DRTO_-_P15PS00382.docx | DOCX document | |
| Past_Performance_Questionnaire_-_DRTO.pdf | ||
| Revised_Bid_Schedule.docx | DOCX document | |
| P15PS00382_-_Amendment_00003.pdf | ||
| Correct_Final_Specs_Amend_2.pdf | ||
| Correct_Final_Plans_Amend_2.pdf | ||
| P15PS00382_Amendment_0002.pdf | ||
| P15PS00382_-_Amendment_00001.pdf | ||
| DRTO_149152A_-_Final_Specs.pdf | ||
| WD_FL150063_-_20_MAR_2015.docx | DOCX document | |
| DRTO_149152B_-_Plan_Cover.pdf | ||
| DRTO_149152B_-_Draft_CD_MSL.pdf | ||
| P15PS00382_-_Final.pdf | ||
| DRTO_149152B_-_Phase_A_Final_CDs.pdf | ||
| DRTO_149152B_-_Phase_B_Draft_CDs.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C E
R T
L
A B
T E
S T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
S H
O P
D R
A W
IN
G
S A
M P
L E
/M O
C K
-U P
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
11100 1.5.B Storage Plan X
13100 1.3.A.1 Letter designating Project Superintendent X
13100 1.3.A.2 Construction Schedule and Scheduler's Resume/Quals. X
13100 1.3.A.3 Comprehensive breakdown of the Schedule of Values X
13100 1.3.A.4 Accident Prevention Plan and Hurricane Action Plan X
13100 1.3.A.5 List of Subcontractors for this project X
13100 1.3.A.6 Written statements from subcontractors certifying compliance with applicable labor standard clauses.
X
13100 1.3.A.7 Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors
X
13100 1.3.A.8 Waste Management Plan X
13100 1.3.A.9 Quality Control Plan X
13100 1.3.A.10 Historic Preservation Treatment Plan X
13216 1.3.A Electronic copies of schedules X
13216 1.3.B Schedule of Values (See also 013100.1.3.A.3) X
13216 1.3.C Construction Baseline Schedule X
13216 1.3.D CPM Reports X
13216 1.3.E Schedule Updates X
13216 1.3.F Construction Schedule Revisions and TIA X
13233 1.2.A Construction Images X
13233 1.2.B. Project Record/Closeout Images X
13513 1.3.A Daily Work Schedule X
13523 1.2.A Accident Prevention Plan X
13591 1.3.A Historic Preservation Treatment Plan (See also 013100.1.3.A.10)
X
13591 1.3.B Alternative Methods and Materials
14000 1.4.A Quality Control Plan X
14000 1.4.B Qualification Data X
14000 1.4.C Contractor's Quality Control Daily Reports X
14000 1.4.D Test Reports X
14000 1.4.E Off-Site Inspection Reports X
14000 1.4.G Permits, Licenses, and Certificates X
15710 1.4.A Moat Protection Plan X
15710 1.4.B Log of Items Entering Moat X
15710 1.4.C National Park Service Authority Approval/Citations X
15723 1.3.A Under-An-Acre Pollution Prevention Plan X
15723 1.3.B Inspection Schedule X
15723 1.3.C Erosion Control Products
16700 1.3.A.1 Affirmative Procurement Reporting Form X
16700 1.3.A.2 Environmental Data X
16700 1.3.A.3 MSDS Sheets X
17340 1.2.A Landfill Receipts X
17340 1.2.B. Quantity Surveys X
17419 1.4.A Waste Management Plan (See also 013100 1.3.A.8) X
17419 1.4.B Progress Documentation X
17419 1.4.C Waste Reduction Calculations X
17419 1.4.D Records of Donations X
17419 1.4.E Records of Sales X
17419 1.4.F Recycling and Processing Facility Records X
17419 1.4.G Landfill and Incinerator Disposal Records
17419 1.4.H Progress Payment Requirements X
17419 1.4.I Waste Management Plan Closeout Documents X
17700 1.2 Project Record Drawings X
17700 1.3.A.1 Warranties, guarantees, workmanship bonds, final certifications
X
17700 1.3.A.2 Project Record Documents X
17700 1.3.A.3 Environmental Record Documents X
LIST OF SUBMITTALS
DRTO 149152A - Preserve Fort Jefferson Phase 3:A
SUBMITTAL REQUIREMENTS(indicate with an "X")
INFORMATIONAL ACTION
Spec.
Sec.
Par. No. Description
C E
R T
L
A B
T E
S T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
S H
O P
D R
A W
IN
G
S A
M P
L E
/M O
C K
-U P
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
21500 1.5.A Bracing and Shoring Working Drawings X
21500 1.5.B Bracing and Shoring Design Calculations X
24119 1.3.A Selective Demolition Procedures X
24119 1.3.B Demolition Inventory X
24119 1.3.C Landfill Records X
33050 1.3.A Coral Concrete Sample X
33050 1.3.A Demonstration of mixing and placing procedures X
33050 1.3.B Oyster Shell Product data X
40120 1.4 A.1a Product Data Sheet for Natural Cement X
40120 1.4 A.1b Manufacturer’s storage and shipping requirements for Natural Cement
X
40120 1.4 A.1c Manufacturer’s climate requirements for installation and curing of Natural Cement
X
40120 1.4.A.2.a Sieve Analysis of Beach Sand (processed and unprocessed)
X
40120 1.4.A.2.b Aggregate void ratio X
40120 1.4.A.2.c Description of screening process X
40120 1.4.A.3.a Compressor Product Data Sheet X
40120 1.4.A.3.b Compressor plan for fuel supply and storage X
40120 1.4.A.3.c Compressor plan for repair or alternate equipment X
40120 1.4.A.4.a Written Procedure for Mixing and Preparing Mortar X
40120 1.4.A.4.b Written Procedure for Reconstructing Lower Level Embrasure
X
40120 1.4.A.4.c Written Procedure for Obtaining and Distributing Water to the Construction Site
X
40120 1.4.A.4.d Diagram of Water Distribution System X
40120 1.4.B.1 1 Cup Sample of Screened Aggregate Sample X
40120 1.4.B.2 4" x 4" x 4" Dried Mortar Sample X
40120 1.4.C Review of Tools and Accessories X
40120 1.6.C.3.a Shallow Repointing X
40120 1.6.C.3.b Deep Repointing X
40120 1.6.C.3.c Filling Small Holes with Mortar X
40120 1.6.C.3.d Joint Removal X
40120 1.6.C.3.e Removal of Mortar from Masonry Surfaces X
40120 1.6.C.3.f Handling of salvaged materials X
40120 1.6.C.3.i Removal of Mortar from salvaged brick X
40120 1.6.C.3.j Preparing Mortar Mixes X
40120 1.6.C.3.k Dry Assembly of Lower Level Embrasure Components X
40120 1.6.C.3.l Complete Construction of Lower Level Embrasure X
40120 1.6.C.3.m Horizontal Channeling/Tie-Back of Scarp Wall Reconstruction
X
40120 1.6.C3.n Sun and Wind Protection Rigging X
40120 1.6.C.4. 4' x 4' Areas of Repointing (allowed to cure for 14 days) X
42100 1.4.A.1 Materials Testing Results X
42100 1.4.B.2 Sample Review for Establishing Color Match/Range X
42100 1.4.B.3 Final Sample Approval X
47200 1.4.A Product Data X
47200 1.4.B Product Certification X
47200 1.4.C Shop Drawings X
47200 1.4.D Samples X
47200 1.4E Mock-up (Also See 040120 1.6.C.3.l and m) X
55501 1.2.A Description of Replication Process X
LIST OF SUBMITTALS
DRTO 149152A - Preserve Fort Jefferson Phase 3:A
SUBMITTAL
Par. No. Description
INFORMATIONAL
Spec.
Sec.
ACTION
REQUIREMENTS(indicate with an "X")
File details come from the government source that posted it. Updated .