P15PS00203_Addendum_00001.docx

DOCX document 31 KB Posted

Attached to
AZ MABO MATOC IDIQ Federal contract opportunity
Solicitation number
P15PS00203
Issued by
Department of the Interior National Park Service

About this file

Addendum 00001

View the file

Other files for this federal contract opportunity

Other files attached to AZ MABO MATOC IDIQ, newest first.
File Type Posted
Addendum_0005.docx DOCX document
Sol_P15PS00203_Amd_000005.pdf PDF
Sol_P15PS00203_Amd_000004.pdf PDF
Site_Visit_-_Sign-In_Sheets.pdf PDF
P15PS00203_Provisions_and_Clauses.pdf PDF
Sol_P15PS00203_Amd_000003.pdf PDF
AZ_-_MATOC_Past_Performance_Survey_Questionnaire.pdf PDF
AZ_-_MATOC_Specifications.pdf PDF
TUZI_378_3014B_ id201955 .pdf PDF
TUGI-_NEW_FLOOR_PLAN_Bid_Option_2.pdf PDF
TUZI_Rehab_Restroom-SOW_SPEC-revised.pdf PDF
MATOC_wages.pdf PDF
Sol_P15PS00203_Amd_000002.pdf PDF
TUZIBASE.DWG DWG drawing
Sol_P15PS00203_Amd_000001.pdf PDF
TUZI-_NEW_FLOOR_PLAN_Bid_Option_2_(2).pdf PDF
README.txt TXT text file
TUZI-_NEW_FLOOR_PLAN_Basis_of_design.pdf PDF
TUZICOV.DWG DWG drawing
TUZI_378_3014B_As_Constructred_Drawing.pdf PDF
PRE-SOL_NOTICE_MATOC_Feb_2015.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P15PS00203 Addendum 00001

1. Q: Is the required bid bond for the seed project or the contract?

A: Yes, seed project

2. Q: Is the proposed staffing requirement listed in the RFP for the seed project or the contract?

A: Staffing requirement is for the contract

3. Q: Is there a bid schedule for the seed project? If so will you please post it? We are unable to locate it within the RFP package.

A: Yes, it's in the Clauses and Provisions, page 17.

4. Q: Do Exhaust fans to be installed by contractor and is made a part of the SOW.

A: If code requires that we have exhaust fans with AC then you need to design in exhaust fans.

5. Q: Will bidders be provided an approximate location of the propane tank the NPS is providing so that we can know how much gas line will be required?

A: The tank will be located approx. 25’ from the building.

6. Q: The electrical panel seems to be full. Are we to include a new electrical upgrade in our proposal? If so are we to set a subpanel or provide a new service to the building?

A: If the panel is deemed to be too full to add additional power for the exhaust fans and the AC then it is up to you as a design build firm to provide proposals for a a new subpanel or new power to the building per your electrical engineer.

7. Q: We understand the ADA portion will be bid as an option, should that option include an ADA compliant route from the parking to the restroom?

A: A new accessible ADA walkway to the building is not part of this contract. If Wendell wants to add it as an additional bid item that's fine by me but we have to send it out to everybody, of course.

8. Q: If we are to match the existing floor and wall tile in the ADA option, can the NPS provide any information as to type of tile exists?

A: The manufacture and type of tile used in that building is probably not available to us in the information that we have saved. It would be up to the bidders to determine whether they can match that tile based on the information they have available to us at this time.

Regarding the issues arising at the site-visit and are provided for clarification:

Furnace: A propane tank will be provided by NPS. The contractor will be responsible for running all connections for a workable system.

Portable Toilets: The contractor will provide

Drinking Fountain: NPS will provide

Waterless Urinals: NPS will provide, (This is part of the ADA option)

Hazmat Report: NPS will arrange immediately and provide to bidders upon receipt.

NPS will arrange Hazmat survey. The sampling is scheduled for Friday May, 8th. NPS will be responsible for all required work as a result of findings.

Adding six (6) attachments:

Readme.txt TUZI-New Floor Plan Basis of Design TUZI-New Floor Plan-Bid option 2 TUZI 378-3014B_As Constructed Drawing TUZIBase.dwg (CAD ) TUZICover.dwg (CAD)

Request for Information (RFI): Last day for submission is May 12, 2015

Bid opening extended to May 21, 2015. Time remains unchanged.