Provisions and Clauses

View the file

Other files for this federal contract opportunity

Other files attached to AZ MABO MATOC IDIQ, newest first.
File Type Posted
Sol_P15PS00203_Amd_000005.pdf PDF
Addendum_0005.docx DOCX document
Sol_P15PS00203_Amd_000004.pdf PDF
Site_Visit_-_Sign-In_Sheets.pdf PDF
Sol_P15PS00203_Amd_000003.pdf PDF
AZ_-_MATOC_Past_Performance_Survey_Questionnaire.pdf PDF
AZ_-_MATOC_Specifications.pdf PDF
MATOC_wages.pdf PDF
Sol_P15PS00203_Amd_000002.pdf PDF
TUZI_Rehab_Restroom-SOW_SPEC-revised.pdf PDF
TUZI_378_3014B_ id201955 .pdf PDF
TUGI-_NEW_FLOOR_PLAN_Bid_Option_2.pdf PDF
TUZICOV.DWG DWG drawing
TUZI_378_3014B_As_Constructred_Drawing.pdf PDF
TUZIBASE.DWG DWG drawing
Sol_P15PS00203_Amd_000001.pdf PDF
TUZI-_NEW_FLOOR_PLAN_Bid_Option_2_(2).pdf PDF
TUZI-_NEW_FLOOR_PLAN_Basis_of_design.pdf PDF
P15PS00203_Addendum_00001.docx DOCX document
README.txt TXT text file
PRE-SOL_NOTICE_MATOC_Feb_2015.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROVISIONS AND CLAUSES

P15PS00203

A - Solicitation/Contract Form

B - Supplies or Services/Prices

C - Description/Specifications

G - Contract Administration Data …

H - Special Contract Requirements

I - Contract Clauses

J - List of Documents, Exhibits and Other Attachments

K - Representations, Certifications, and Other Statements of Bidders

L - Instructions, Conditions, and Notices to Bidders

M - Evaluation Factors for Award

A - Solicitation/Contract Form

52.211-10 - Commencement, Prosecution, and Completion of Work. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120-180 days. The time stated for completion shall include final cleanup of the premises. (End of clause)

52.211-10 - Commencement, Prosecution, and Completion of Work. (APR 1984) - Alternate I

(APR 1984)

52.211-13 - Time Extensions. (SEP 2000)

Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule. (End of clause)

52.211-18 - Variation in Estimated Quantity. (APR 1984)

If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgment of the Contracting Officer, is justified. (End of clause)

52.214-34 - Submission of Offers in the English Language. (APR 1991)

52.214-35 - Submission of Offers in U.S. Currency. (APR 1991)

52.222-23 - Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction. (May 1999)

52.222-27 - Affirmative Action Compliance Requirements for Construction. (FEB 1999)

(a) Definitions. "Covered area," as used in this clause, means the geographical area described in the solicitation for this contract.

"Deputy Assistant Secretary," as used in this clause, means the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, or a designee

"Employer's identification number," as used in this clause, means the Federal Social Security number used on the employer's quarterly Federal tax return, U.S. Treasury Department Form 941.

"Minority," as used in this clause, means -

(1) American Indian or Alaskan Native (all persons having origins in any of the original peoples of North America and maintaining identifiable tribal affiliations through membership and participation or community identification).

(2) Asian and Pacific Islander (all persons having origins in any of the original peoples of the Far East, Southeast Asia, the Indian Subcontinent, or the Pacific Islands);

(3) Black (all persons having origins in any of the black African racial groups not of Hispanic origin); and

(4) Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South American, or other Spanish culture or origin, regardless of race).

(b) If the Contractor, or a subcontractor at any tier, subcontracts a portion of the work involving any construction trade, each such subcontract in excess of $10,000 shall include this clause and the Notice containing the goals for minority and female participation stated in the solicitation for this contract.

(c) If the Contractor is participating in a Hometown Plan (41 CFR 60-4) approved by the U.S.

Department of Labor in a covered area, either individually or through an association, its affirmative action obligations on all work in the plan area (including goals) shall comply with the plan for those trades that have unions participating in the plan. Contractors must be able to demonstrate participation in, and compliance with, the provisions of the plan. Each Contractor or subcontractor participating in an approved plan is also required to comply with its obligations under the Equal Opportunity clause, and to make a good faith effort to achieve each goal under the plan in each trade in which it has employees. The overall good-faith performance by other Contractors or subcontractors toward a goal in an approved plan does not excuse any Contractor's or subcontractor's failure to make good-faith efforts to achieve the plan's goals.

(d) The Contractor shall implement the affirmative action procedures in subparagraphs (g)(1) through (16) of this clause. The goals stated in the solicitation for this contract are expressed as percentages of the total hours of employment and training of minority and female utilization that the Contractor should reasonably be able to achieve in each construction trade in which it has employees in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for the geographical area where that work is actually performed. The Contractor is expected to make substantially uniform progress toward its goals in each craft.

(e) Neither the terms nor conditions of any collective bargaining agreement, nor the failure by a union with which the Contractor has a collective bargaining agreement, to refer minorities or women shall excuse the Contractor's obligations under this clause, Executive Order 11246, as amended, or the regulations thereunder.

(f) In order for the nonworking training hours of apprentices and trainees to be counted in meeting the goals, apprentices and trainees must be employed by the Contractor during the training period, and the Contractor must have made a commitment to employ the apprentices and trainees at the completion of their training, subject to the availability of employment opportunities. Trainees must be trained pursuant to training programs approved by the U.S.

Department of Labor.

(g) The Contractor shall take affirmative action to ensure equal employment opportunity. The evaluation of the Contractor's compliance with this clause shall be based upon its effort to achieve maximum results from its actions. The Contractor shall document these efforts fully and implement affirmative action steps at least as extensive as the following:

(1) Ensure a working environment free of harassment, intimidation, and coercion at all sites and in all facilities where the Contractor's employees are assigned to work. The Contractor, if possible, will assign two or more women to each construction project. The Contractor shall ensure that foremen, superintendents, and other onsite supervisory personnel are aware of and carry out the Contractor's obligation to maintain such a working environment, with specific attention to minority or female individuals working at these sites or facilities.

(2) Establish and maintain a current list of sources for minority and female recruitment. Provide written notification to minority and female recruitment sources and community organizations when the Contractor or its unions have employment opportunities available, and maintain a record of the organizations' responses.

(3) Establish and maintain a current file of the names, addresses, and telephone numbers of each minority and female off-the-street applicant, referrals of minorities or females from unions, recruitment sources, or community organizations, and the action taken with respect to each individual. If an individual was sent to the union hiring hall for referral and not referred back to the Contractor by the union or, if referred back, not employed by the Contractor, this shall be documented in the file, along with whatever additional actions the Contractor may have taken.

(4) Immediately notify the Deputy Assistant Secretary when the union or unions with which the Contractor has a collective bargaining agreement has not referred back to the Contractor a minority or woman sent by the Contractor, or when the Contractor has other information that the union referral process has impeded the Contractor's efforts to meet its obligations.

(5) Develop on-the-job training opportunities and/or participate in training programs for the area that expressly include minorities and women, including upgrading programs and apprenticeship and trainee programs relevant to the Contractor's employment needs, especially those programs funded or approved by the Department of Labor. The Contractor shall provide notice of these programs to the sources compiled under subparagraph (g)(2) of this clause.

(6) Disseminate the Contractor's equal employment policy by -

(i) Providing notice of the policy to unions and to training, recruitment, and outreach programs, and requesting their cooperation in assisting the Contractor in meeting its contract obligations;

(ii) Including the policy in any policy manual and in collective bargaining agreements;

(iii) Publicizing the policy in the company newspaper, annual report, etc.;

(iv) Reviewing the policy with all management personnel and with all minority and female employees at least once a year; and

(v) Posting the policy on bulletin boards accessible to employees at each location where construction work is performed.

(7) Review, at least annually, the Contractor's equal employment policy and affirmative action obligations with all employees having responsibility for hiring, assignment, layoff, termination, or other employment decisions. Conduct review of this policy with all on- site supervisory personnel before initiating construction work at a job site. A written record shall be made and maintained identifying the time and place of these meetings, persons attending, subject matter discussed, and disposition of the subject matter.

(8) Disseminate the Contractor's equal employment policy externally by including it in any advertising in the news media, specifically including minority and female news media. Provide written notification to, and discuss this policy with, other Contractors and subcontractors with which the Contractor does or anticipates doing business.

(9) Direct recruitment efforts, both oral and written, to minority, female, and community organizations, to schools with minority and female students, and to minority and female recruitment and training organizations serving the Contractor's recruitment area and employment needs. Not later than 1 month before the date for acceptance of applications for apprenticeship or training by any recruitment source, send written notification to organizations such as the above, describing the openings, screening procedures, and tests to be used in the selection process.

(10) Encourage present minority and female employees to recruit minority persons and women.

Where reasonable, provide after-school, summer, and vacation employment to minority and female youth both on the site and in other areas of the Contractor's workforce.

(11) Validate all tests and other selection requirements where required under 41 CFR 60-3.

(12) Conduct, at least annually, an inventory and evaluation at least of all minority and female personnel for promotional opportunities. Encourage these employees to seek or to prepare for, through appropriate training, etc., opportunities for promotion.

(13) Ensure that seniority practices, job classifications, work assignments, and other personnel practices do not have a discriminatory effect by continually monitoring all personnel and employment-related activities to ensure that the Contractor's obligations under this contract are being carried out.

(14) Ensure that all facilities and company activities are non-segregated except that separate or single-user rest rooms and necessary dressing or sleeping areas shall be provided to assure privacy between the sexes.

(15) Maintain a record of solicitations for subcontracts for minority and female construction contractors and suppliers, including circulation of solicitations to minority and female contractor associations and other business associations.

(16) Conduct a review, at least annually, of all supervisors' adherence to and performance under the Contractor's equal employment policy and affirmative action obligations.

(h) The Contractor is encouraged to participate in voluntary associations that may assist in fulfilling one or more of the affirmative action obligations contained in subparagraphs (g)(1) through (16) of this clause. The efforts of a contractor association, joint contractor-union, contractor-community, or similar group of which the contractor is a member and participant may be asserted as fulfilling one or more of its obligations under subparagraphs (g)(1) through (16) of this clause, provided, the Contractor -

(1) Actively participates in the group;

(2) Makes every effort to ensure that the group has a positive impact on the employment of minorities and women in the industry;

(3) Ensures that concrete benefits of the program are reflected in the Contractor's minority and female workforce participation;

(4) Makes a good-faith effort to meet its individual goals and timetables; and

(5) Can provide access to documentation that demonstrates the effectiveness of actions taken on behalf of the Contractor. The obligation to comply is the Contractor's, and failure of such a group to fulfill an obligation shall not be a defense for the Contractor's noncompliance.

(i) A single goal for minorities and a separate single goal for women shall be established. The Contractor is required to provide equal employment opportunity and to take affirmative action for all minority groups, both male and female, and all women, both minority and nonminority.

Consequently, the Contractor may be in violation of Executive Order 11246, as amended, if a particular group is employed in a substantially disparate manner.

(j) The Contractor shall not use goals or affirmative action standards to discriminate against any person because of race, color, religion, sex, or national origin.

(k) The Contractor shall not enter into any subcontract with any person or firm debarred from Government contracts under Executive Order 11246, as amended.

(l) The Contractor shall carry out such sanctions and penalties for violation of this clause and of the Equal Opportunity clause, including suspension, termination, and cancellation of existing subcontracts, as may be imposed or ordered under Executive Order 11246, as amended, and its implementing regulations, by the OFCCP. Any failure to carry out these sanctions and penalties as ordered shall be a violation of this clause and Executive Order 11246, as amended.

(m) The Contractor in fulfilling its obligations under this clause shall implement affirmative action procedures at least as extensive as those prescribed in paragraph (g) of this clause, so as to achieve maximum results from its efforts to ensure equal employment opportunity. If the Contractor fails to comply with the requirements of Executive Order 11246, as amended, the implementing regulations, or this clause, the Deputy Assistant Secretary shall take action as prescribed in 41 CFR 60-4.8.

(n) The Contractor shall designate a responsible official to -

(1) Monitor all employment-related activity to ensure that the Contractor's equal employment policy is being carried out;

(2) Submit reports as may be required by the Government; and

(3) Keep records that shall at least include for each employee the name, address, telephone number, construction trade, union affiliation (if any), employee identification number, social security number, race, sex, status (e.g., mechanic, apprentice, trainee, helper, or laborer), dates of changes in status, hours worked per week in the indicated trade, rate of pay, and locations at which the work was performed. Records shall be maintained in an easily understandable and retrievable form; however, to the degree that existing records satisfy this requirement, separate records are not required to be maintained.

(o) Nothing contained herein shall be construed as a limitation upon the application of other laws that establish different standards of compliance or upon the requirements for the hiring of local or other area residents (e.g., those under the Public Works Employment Act of 1977 and the Community Development Block Grant Program). (End of clause)

52.225-10 -Notice of Buy American Requirement--Construction Materials (May 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American--Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of provision)

52.225-11 - Buy American - Construction Materials under Trade Agreements. (MAY 2014)

(a) Definitions. As used in this clause-

Caribbean Basin country construction material means a construction material that-

(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.

Commercially available off-the-shelf (COTS) item- (1) Means any item of supply (including construction material) that is-

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means-

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Designated country means any of the following countries:

(1) A World Trade Organization Government Procurement Agreement country (Armenia, Aruba, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, or United Kingdom);

(2) A Free Trade Agreement country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);

(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or

(4) A Caribbean Basin country ((Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St.

Kitts and Nevis, St. Lucia, St. Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).

Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.

Domestic construction material means-

(1) An unmanufactured construction material mined or produced in the United States; (2) A construction material manufactured in the United States, if-

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which non-availability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

Free Trade Agreement country construction material means a construction material that-

(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.

Least developed country construction material means a construction material that-

(1) Is wholly the growth, product, or manufacture of a least developed country; or another country, has been substantially transformed in a least developed country into a new and

United States means the 50 States, the District of Columbia, and outlying areas.

WTO GPA country construction material means a construction material that-

(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or another country, has been substantially transformed in a WTO GPA country into a new and

(b) Construction materials. (1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). In addition, the Contracting Officer has determined that the WTO GPA and Free Trade Agreements (FTAs) apply to this acquisition. Therefore, the Buy American restrictions are waived for designated country construction materials.

(2) The Contractor shall use only domestic or designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.

(3) The requirement in paragraph (b)(2) of this clause does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

NONE

(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the restrictions of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.

However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of Quantity Price measure (dollars)* Item 1:

Foreign construction material

Domestic construction material

Item 2:

Foreign construction material

Domestic construction material

*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information. (End of clause)

52.225-12 - Notice of Buy American Requirement—Construction Materials Under Trade Agreements (May 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American--Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested--

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations. (End of provision)

Alternate I (May 2014). As prescribed in 25.1102(d)(2), substitute the following paragraph (b) for paragraph (b) of the basic provision:

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute shall submit the request with its offer, including the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11.

Alternate II (Jun 2009). As prescribed in 25.1102(d)(3), add the definition of “Bahrainian, Mexican, or Omani construction material” to paragraph (a) and substitute the following paragraph (d) for paragraph (d) of the basic provision:

(d) Alternate offers.

(1) When an offer includes foreign construction material, except foreign construction material from a designated country other than Bahrain, Mexico, or Oman that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material other than Bahrainian, Mexican, or Omani construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material other than Bahrainian, Mexican, or Omani construction material. An offer based on use of the foreign construction material for which an exception was requested--

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.227-4 - Patent Indemnity--Construction Contracts. (DEC 2007)

52.232-5 - Payments Under Fixed-Price Construction Contracts. (MAY 2014)

52.236-2 - Differing Site Conditions. (APR 1984)

52.236-3 - Site Investigation and Conditions Affecting the Work. (APR 1984)

52.236-4 - Physical Data. (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. (a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by [].

(b) Weather conditions [].

(c) Transportation facilities []. (d) [].

(End of clause)

52.236-5 - Material and Workmanship. (APR 1984)

52.236-6 - Superintendence by the Contractor. (APR 1984)

At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor. (End of clause)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.236-9 - Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)

52.236-10 - Operations and Storage Areas. (APR 1984)

52.236-11 - Use and Possession Prior to Completion. (APR 1984)

52.236-12 - Cleaning Up. (APR 1984)

52.236-13 - Accident Prevention. (NOV 1991) - Alternate I (NOV 1991)

52.236-14 - Availability and Use of Utility Services. (APR 1984)

52.236-15 - Schedules for Construction Contracts. (APR 1984)

52.236-17 - Layout of Work. (APR 1984)

52.236-21 - Specifications and Drawings for Construction. (FEB 1997)

52.242-14 - Suspension of Work. (APR 1984)

52.246-12 - Inspection of Construction. (APR 1996)

52.246-21 - Warranty of Construction. (MAR 1994)

52.248-3 - Value Engineering - Construction. (OCT 2010) - Alternate I (APR 1984)

52.249-10 - Default (Fixed-Price Construction). (APR 1984)

B - Supplies or Services/Prices

Bid Item Description Proposal Line Item

Price / Cost

TUZI VC Restroom Rehab

1 Base

2 ADA Option

TOTAL: ALL CLINS

PROPOSAL PRICING / COST WORKSHEET

C - Description/Specifications

Purpose and Scope: This is a Multiple Award Task Order Contract (MATOC). All work associated with this MATOC will be for projects located in the National Park Service's Intermountain Region, primarily in Arizona, but could be used for projects in Oklahoma, Texas, and New Mexico.

The GENERAL SCOPES of the TASK ORDERS include any of the following services: The task orders will be for design/build or construction only services to repair or rehabilitate historic and non-historic structures in addition to a minimal amount of new construction for project types inclusive of but not limited to Site Utilities (gas, electric, communication), Site Improvements (trail, fence, grading, concrete work, landscaping), Water & sewer, Roadway (bike, roadway, signage, striping), Fire & safety, Building exterior, Building interior, HVAC, Electrical, Plumbing (MEP), Sustainability (energy efficiency, renewables). The project examples include renovations of historic and non-historic maintenance shops, visitor centers and fee stations, upgrades to electrical, water and sewer systems, rehabilitation of fire suppression systems and safety systems, parking lot and road paving, HVAC rehabilitation, re-roofing, water, sewer and gas tank construction. There may be minimal new construction of administrative building, comfort stations and vault toilets. All design work required for the above mentioned project shall be completed and stamped by registered design professionals, registered in the state in which the project is located and shall meet local, state, and federal regulations.

All work shall be done in strict accordance with the contract documents, industry and regulatory standards and as specified by each individual Task Order. Use of the MATOC will provide the Government with services that can accommodate quick and straight-forward projects, as well as some small but complex projects and help minimize design efforts and related overhead expenditures.

Contractor's work and responsibility shall include all contractor planning, programming, administration, and management necessary to provide support for Task Orders awarded. The Contractor shall conduct the work in strict accordance with the contract and all applicable Federal, State, and local laws, regulations, codes, or directives. The Contractor shall provide related services such as preparing and submitting required reports, perform administrative work, and submit necessary information as specified under this contract and within each Task Order. The Contractor shall ensure that all work provided meets the scope of work for each Task Order and any special specifications included with the individual Task Order or included in any applicable documents.

The Government will provide a detailed scope of work to the Contractor detailing the task to be accomplished. Depending on the complexity of the project, the detail provided may vary from a general idea of what is required, with no drawings, to substantially completed or complete design documents. The Contractor shall use the information provided by the Government and submit a complete proposal.

The Contractor shall complete all work and services under this contract in accordance with schedules established in each Task Order. Submittal dates will be included in the Task Order. These dates identify when submittals are due in the issuing office and other addresses identified in the Task Order. Types and numbers of submittals and dates and places for review meetings shall be established by each Task Order.

NUMBER OF AWARDS: Up to seven (7) Indefinite Delivery Indefinite Quantity (IDIQ) contracts for Design/Build Services can be awarded under this solicitation.

PERIOD OF SERVICE: Day one of each contract is the Contracting Officer signature date. The ordering period for each contract automatically ends upon the completion of the base period if the option period is not exercised. Modification to individual Task Orders may be issued after the expiration of the ordering period but prior to completion of the Task Order. The IDIQ contracts will be for a one base period with four option periods for a total not to exceed five years. Task orders will be competed and awarded on a Lump Sum basis. ·

OPTIONS TO EXTEND SERVICES- An option for additional years is included as part of this contract.

The Government may exercise the options at any time; however, it will be accomplished no later than the last day of the basic contract performance period.

MATOC CAPACITY:

The total combined contract capacity under the umbrella MATOC contract is valued at $40 million, if all options are exercised. All IDIQs will share the capacity; each period has capacity of $8M.

MINIMUM AND MAXIMUM TASK ORDER AMOUNTS:

Task Order minimum and maximum limits are $2,000 and $2 Million, respectively.

For the life of each IDIQ contract, including options, the Government hereby obligates itself to obtain not less than $2,000 in services. The $2,000 will be obligated at the time of award. The awardee of the seed task order will receive only the task order award and not the minimum guarantee as the guarantee will be met at the time of award.

ORDERING PROCEDURES FOR TASK ORDERS:

When the Government requires work under the MATOC; a Request for Proposal (RFP) will be issued. The RFP shall include information concerning the statement of work, guide specifications, drawings, attachments, information pertaining to a site visit, design requirements for design-build projects, evaluation criteria, and any other requirements for submission (e.g. proposal requirements, bid schedule, etc.).

All Contractors will be given fair opportunity and Task Orders will be awarded based on competition. The Government reserves the right to award Task Orders as follows:

(1) Lowest Price

(2) Lowest Price Technically Acceptable

(3) Cost I Technical Tradeoff (Best Value)

NOTE: The basis of award (methodology) of each Task order shall be specified in Task Order Request for Proposal (RFP).

In determining eligibility to compete, the Contracting Officer will consider such factors as past performance on earlier Task Orders under the MATOC, quality, timeliness, or other factors the Contracting Officer determines are relevant to award of a particular Task Order. In the event a Contractor is unable to submit an offer in response to an RFP, the Contractor shall notify the Contracting Officer in writing.

All MATOC Contractors will be given a fair opportunity to bid on projects unless the Contrag Officer determines: (1) An urgent need exists and seeking competition would result in unacceptable delay

(2) Only one Contractor is capable at the level of quality required because the requirement is unique or highly specialized

(3) A sole source is in the interest of economy and efficiency as a logical follow-on to an order already competed

(4) To satisfy contract minimum award obligations. Such determinations shall be at the discretion of the Contracting Officer.

Offerors attendance at pre-proposal site visits is considered vital to preparation of competitive and cost-effective offers, and to understanding the total results desired by the Government.

Failure to attend pre-proposal site visits shall not be used as an excuse for omission or miscalculation in offers, and may be taken into consideration in determining Contractors eligibility to participate in future Task Orders. The Contractor will not be reimbursed for attendance during negotiations, site visits, or other pre-Task Order award costs.

The Contracting Officer reserves the right to make attendance at pre-proposal site visit mandatory for specific Task Orders and to reject offers by contractors who have not attended the pre-proposal site visit

TASK ORDER AWARDS: Whenever possible, award will be made without discussions. If discussions are held, at the conclusion, each MATOC contractor will be requested to provide a final proposal revision. Task Order award will be made based on the lowest price or the best value to the Government, as described in the RFP. The awarded Task Order will be firm fixed-price with a specific completion date. The Government will notify contractors when any Task Order (competed or sole source) is awarded under the MATOC procedures. ·

Proposals will either be accepted as is or negotiated to the mutual agreement of both the Government and the Contractor. Upon conclusion of satisfactory discussions or negotiations (if required), a Task Order will be issued by the Contracting Officer reflecting the negotiated order price and payment terms as outlined in the statement of work or specifications. In any instance where there is failure to reach agreement on price, the Government reserves the right to withdraw the project and have it completed by other means.

In accordance with FAR 16.505(a) (6), no protest under Subpart 33.1 is authorized in connection with the issuance or proposed issuance of an order under a Task Order Contract except for .a protest on the grounds that the order increases the scope, period, or maximum value of the contract.

If the contractor believes it was not fairly considered for a particular task order, the contractor may present the matter to the Contracting Officer. The contractor may appeal the explanation or decision of the Contracting Officer to the Ombudsman, Michael B. Bachofen, Chief of Contracting, Intermountain Region, 12795 W. Alameda Pkwy, Denver, CO 80228. The ombudsman will review the contractor's complaint, and in coordination with the Contracting Officer ensure that the contractor was afforded a fair opportunity to be considered for the task order.

ISSUANCE OF TASK ORDERS: Task Orders will only be issued by the Contracting Officer. Orders may be placed via email, telephone, facsimile or electronic commerce. The Task Order becomes binding when the Contracting Officer signs the Order. Notice to Proceed (NTP) will be issued separately after receipt of payment and/or performance bonds, if required.

The Government's payment for the Lump Sum Amount of individual Task Orders shall constitute full compensation to the Contractor for- (1) Furnishing all plant, labor, equipment, appliances, and materials; and (2) Performing all operations required to complete the work in conformity with the drawings, specifications and/or Statement of Work. (3)- Performing Design work associated with the Statement of Work. The Contractor shall include in their proposal costs of all work required by drawings, specifications and/or Statement of work.

PLANS AND SPECIFICATIONS PROVIDE BY THE NPS: The Government may provide the contractor one copy of the construction drawings and Statement of Work (with pertinent supplemental specifications) upon issuance of each Task Order as appropriate or deemed necessary. All further Reproduction costs shall be at the Contractors expense. The Government will provide these as bard copies or as electronic media, such as e-mail or CD ROM.

PLANS AND SPECIFICATIONS.REQUIRED SUBMITTALS:

For Construction Only Projects: The NPS will not require any plans and specifications other than those typically required on Construction Projects (i.e. Mark ups to As-Builts).

For Design Build Projects: The NPS will provide a Design Build Scope of Work that includes the General Requirements (Division 1), the contractor may be required to provide specifications to a level as…