P09 SoW_657-21-117JB - Phase 2.docx

DOCX document 18 KB Posted

Attached to
Z2DA--657-21-117JB, Correct Deficiencies Identified During Triennial Testing Phase 2 Federal contract opportunity
Solicitation number
36C25525R0041
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

This Statement of Work outlines electrical construction services required at the VA St. Louis Health Care System's Jefferson Barracks Division to correct deficiencies identified during triennial testing in buildings 18, 51, and 53.

The scope includes removing and replacing a 300kVA transformer at Building 18, replacing panels MDP-51A and MSB-51A and relocating ATS-51A in Building 51, and replacing a 750kVA transformer at Building 53. All work requires construction of cast-in-place reinforced concrete pads per specifications. The contractor must create and maintain a Gantt chart for project phasing, comply with VA TIL specifications, ICRA provisions, ILSM, and all applicable safety regulations. The work must adhere to the National Electrical Code outdoor requirements and includes proper disposal/recycling of removed equipment with documented verification. The contracting officer's representative is Kim Rumpsa, EIT, COR.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--657-21-117JB, Correct Deficiencies Identified During Triennial Testing Phase 2, newest first.
File Type Posted
IMG_2523 MDP-51A.jpeg JPEG file
IMG_2529 ATS-51A.jpeg JPEG file
657-21-117JB - Ph 2 pre-proposal attendance roster 3-5-2025.pdf PDF
IMG_2518 MDP-51A.jpeg JPEG file
IMG_2528 ATS-51A.jpeg JPEG file
IMG_2534 MSB-51A.jpeg JPEG file
PreProposal Conference Site Visit Agenda 657-21-117JB Phase 2.pdf PDF
36C25525R0041 0001.docx DOCX document
IMG_2532 2 MSB-51A.jpeg JPEG file
IMG_2533 MSB-51A.jpeg JPEG file
IMG_2521 MDP-51A.jpeg JPEG file
Prebid questions 657-21-117JB Phase 2.docx DOCX document
657-21-117JB Transformer and B 51 - Drawings.pdf PDF
36C25525R0041_1.docx DOCX document
ATTACHMENT 6 PPQ 36C25525R0041.docx DOCX document
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING_CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.docx DOCX document
657-21-117JB - Specs COMBINED.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA St. Louis Health Care System Statement of Work: 657-21-117JB, Phase 2 Correct Deficiencies Identified During Triennial Testing January 23, 2025

Purpose of Project:

The VA St. Louis Health Care System, Jefferson Barracks Division, will correct various electrical deficiencies in buildings 18, 51, and 53, and outside buildings 18, and 53.

Statement of Work:

The Construction firm must provide construction services as delineated in the Plans and Specifications. This project will correct deficiencies with some VA electrical equipment. New equipment shall have all the required working clearances, according to current electrical codes.

A. Building 18: Remove and replace outside 300kVA transformer T18-A, construct cast-in-place reinforced concrete pad, per plans and specifications, and manufacturer’s recommendations.

B. Building 51:

i. Remove and replace Panels MDP-51A in Basement Mechanical Room BA101, construct cast-in-place reinforced concrete housekeeping pad, per plans and specifications, and manufacturer’s recommendations.

ii. Remove and replace Panels MSB-51A in Basement Mechanical Room BA100, construct cast-in-place reinforced concrete housekeeping pad, per plans and specifications, and manufacturer’s recommendations.

iii. Remove ATS-51A from Basement Mechanical Room BA101, and move to Basement Mechanical Room BA100, in Basement Mechanical area, construct cast-in-place reinforced concrete housekeeping pad, per plans and specifications, and manufacturer’s recommendations.

C. Building 53: Remove and replace outside 750kVA transformer, construct cast-in-place reinforced concrete pad, per plans and specifications, and manufacturer’s recommendations.

D. At the beginning of the project, the Contractor will create a Gantt chart or similar spreadsheet to indicate project phasing and supply it to the COR. The contractor shall be responsible for updating the spreadsheet as the project progresses.

E. All work shall comply with the VA TIL specifications.

F. All Contractor personnel shall wear the proper safety equipment required by all applicable VA Safety regulations and OSHA to accomplish this type of work.

G. All work shall comply with all VA health care provisions, such as ICRA (Infection Control Risk Assessment) provisions, ILSM, and all applicable State, National, and U.S. Federal Codes.

H. For all items removed by this Statement of Work, the Contractor shall be responsible for the safe and legal disposal or recycle of all items listed. The Contractor will have signed paperwork from the disposal site or recycle center indicating all removed items are disposed of properly and in accordance with all applicable State and Federal Codes and Laws.

I. All outside equipment installed through this project shall adhere to National Electrical Code (NEC) Outdoors section 10.26(F)(2).

Submitted by Kim Rumpsa, EIT, COR