This document is a Pre-Proposal Conference minutes for a VA construction project at Jefferson Barracks, St. Louis VAMC. The solicitation (36C25525R0041) is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses to correct deficiencies identified during Triennial Testing Phase 2, with a project cost estimated between $100,000 and $150,000.
Key details include a 150-calendar day performance period, NAICS code 238210 for electrical contractors, and submission requirements for proposals via email to Jennifer.Hill@va.gov. The procurement will use a Best Value Trade-Off selection process with five evaluation factors: Prime Contractor Experience, Project Execution, Key Personnel Experience, Safety Plan, and Past Performance. Non-price factors are significantly more important than price. Offerors must submit technical and price proposals electronically, with original Bid Bonds to be physically mailed, and all questions must be submitted by March 11, 2025 at 4:00 PM CST.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| IMG_2518 MDP-51A.jpeg | JPEG file | |
| IMG_2528 ATS-51A.jpeg | JPEG file | |
| IMG_2534 MSB-51A.jpeg | JPEG file | |
| 36C25525R0041 0001.docx | DOCX document | |
| IMG_2532 2 MSB-51A.jpeg | JPEG file | |
| IMG_2533 MSB-51A.jpeg | JPEG file | |
| IMG_2521 MDP-51A.jpeg | JPEG file | |
| Prebid questions 657-21-117JB Phase 2.docx | DOCX document | |
| IMG_2523 MDP-51A.jpeg | JPEG file | |
| IMG_2529 ATS-51A.jpeg | JPEG file | |
| 657-21-117JB - Ph 2 pre-proposal attendance roster 3-5-2025.pdf | ||
| P09 SoW_657-21-117JB - Phase 2.docx | DOCX document | |
| 36C25525R0041_1.docx | DOCX document | |
| ATTACHMENT 6 PPQ 36C25525R0041.docx | DOCX document | |
| 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING_CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.docx | DOCX document | |
| 657-21-117JB - Specs COMBINED.pdf | ||
| 657-21-117JB Transformer and B 51 - Drawings.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-PROPOSAL CONFERENCE- 657-21-117JB Correct Deficiencies Identified
During Triennial Testing Phase 2
Solicitation: 36C25525R0041.
a. Introduction:
• Project Title/Project NO.: 657-21-117JB Correct Deficiencies Identified During Triennial Testing Phase 2.
• Solicitation No: 36C25525R0041.
• Location: Jefferson Barracks, St. Louis VAMC.
• This meeting will discuss contractual issues, project requirements; entertain questions and a walk-thru of the project area. We will reconvene in this room after the walk-thru to entertain any further questions and allow you time to network with subcontractors that may be here.
• Before we begin, let me introduce myself, other VA staff and A&E staff.
• My name is Jenna Hill and I am the Contracting Officer assigned to this procurement.
• Kim Rumpsa will serve as the Contracting Officer’s Technical Representatives and are responsible for the day-to-day technical oversight.
b. Contractual /Administrative issues I’d like to cover are:
• Please ensure that you have signed the attendance roster – this will be published along with any applicable amendment to the solicitation on fbo.gov.
• You are reminded that this procurement is 100% set-aside for Service Disabled Veteran-Owned Small Businesses only and firms that do not meet this criteria will have their proposals rejected.
• The North Atlantic Industry Classification System (NAICS) code is 238210 Electrical Contractors and Wiring Installation Contractors) and the code must be included on your SAM Registration as well as your SBA VetCert registration. Make sure your company is certified in VetCert (https://veterans.certify.sba.gov). Ensure that your company’s SAM Records / Representations and Certifications Application are active – they are usually good for one year only.
https://veterans.certify.sba.gov/
• Make sure you are current with your Vets 4212 reporting.
• VAAR 852.219-75 VA Notice of Limitations on Subcontracting is attached to this solicitation. This must be filled out, signed and returned with your proposal.
• Cost Range: Estimate of construction magnitude for this project is between $100,000 and $150,000
• PERIOD OF PERFORMANCE: 150 calendar days.
• The prime contractor (or employees of other service-disabled veteran-owned small business concerns) is required to perform 25% of the labor for contract performance.
• The facilities will be in operation during the construction requiring that you keep all areas clean of debris and/or obstructions.
• Offerors shall submit proposals electronically by e-mail to Jennifer.Hill@va.gov. The email(s) shall include the following attachments:
(a) Part 1 - Technical Proposal (Item 2.c. below)
(b) Part 2 - Price Proposal (Item 2.a. and 2.b. below)
• The total size if any single email must be less than 10 megabytes. Use multiple emails if necessary and label each as 1 of 3, 2 of 3…
• Original Bid Bonds must still be received at the Contracting Office US Postal
Service or other courier prior to the solicitation closing time at the NCO 15 Contracting Office 3450 S 4th Street Leavenworth KS 66048. All proposals are required to have a 60-day acceptance period.
• The selection process for this procurement is Best Value Trade Off. The government plans to award without discussions but retains the right to open discussions, if deemed necessary.
• Please pay close attention proposal submittal instructions starting on page 7 of the solicitation.
• Five evaluation factors in addition to price-o EXPERIENCE OF THE PRIME CONTRACTOR o PROJECT EXECUTION o KEY PERSONNEL EXPERIENCE o PRIME CONTRACTOR’S SAFETY PLAN o PAST PERFORMANCE
• Relative importance of evaluation factors- All non-price factors, when combined, are significantly more important than price.
c. Bonds
Offerors shall submit a letter from their surety, providing the payment and performance bonds limitation. Offeror's Bonding Capability in the form of a letter from Surety.
d. Other Contracting Topics:
• The purchase of material as a result of this contract is not exempt from state sales tax. It is solely the responsibility of the offeror to include all other applicable taxes in their proposal price.
• A price change request upon award relating to the inclusion of state and local sales or use taxes will not be accepted.
• The contractor is expected to maintain insurance coverage during the contract period as directed in the specifications.
• Progress payments will be made no later than 14 days after receipt of an acceptable invoice.
e. Questions
• If questions technical in nature surface, they need to be put in writing and submitted for answering at the end of this site visit or by e-mailing to Jenna Hill at :Jennifer.Hill@va.gov. Do not contact the A&E or the COR and ask questions.
• Please make sure that all questions submitted by your company contain contact information: company name, phone number where you can be reached in case a clarification is necessary and your email address. All questions are to be submitted to Jenna Hill no later than March 11, 2025 at 4:00 PM CST. If you have more than one question, please number them 1, 2, 3 on the card or in your e-mail. Otherwise, you may not get an answer to each of them. An amendment will be issued to provide the answers to questions as well as to provide a copy of the attendance roster. If any questions warrant an amendment, one will be issued and posted to the sam.gov. All interested contractors are responsible to check the Sam.gov website prior to submitting a proposal to ensure that they have seen and acknowledged all amendments.
f. Disclaimer Statements:
• Remarks and explanations at the conference shall not qualify the terms of the solicitation
• Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing
g. Technical: I will now turn this conference over to the COR Kim Rumpsa to discuss any project requirements they wish to point out before starting on the walk -thru. Please ensure that you stay together as a group so that information can be presented only once. Again, thank you for your attendance and your interest in this procurement. After the walk thru, you will come back to this room to address any further questions and allow you to network with each other. Please do not leave the group before returning here.