This document contains an Infection Control Risk Assessment (ICRA) for a construction project to replace the emergency department roof at the Overton Brooks VA Medical Center. The project is identified as number 667-23-100.
The ICRA outlines the classification of the construction project as a Type C activity, which generates moderate to high levels of dust and requires demolition or removal of fixed building components. The affected patient risk group is determined to be highest risk, including areas such as the emergency room, intensive care unit, operating rooms, and isolation rooms. Based on these factors, the class of precautions from the ICRA matrix is identified as Class IV, the highest level.
The related federal contract opportunity is solicitation number 667-23-100 for design/build services for the project. The solicitation is identified as 36C25623R0006 and is being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25623R0006 0001.pdf | ||
| 1675887701205.jpeg | JPEG file | |
| 1675887593466.jpeg | JPEG file | |
| 1675887952406.jpeg | JPEG file | |
| 1675887555487.jpeg | JPEG file | |
| ED ROOF - Aerial View.pdf | ||
| ED ROOF - Sketch.pdf | ||
| RFI Responses.docx | DOCX document | |
| ED ROOF - Aerial Northwest Quarter.pdf | ||
| ED ROOF - Site Grounds Map.pdf | ||
| 1675887647620.jpeg | JPEG file | |
| 1675887841057.jpeg | JPEG file | |
| 1675887758930.jpeg | JPEG file | |
| P09 Revised SOW Replace ED Roof- 667-23-100 09-12-2022.docx | DOCX document | |
| 36C25623R0006 SOLICITATION .pdf | ||
| 36C25623R0006 - Exhibit A .docx | DOCX document | |
| P09 Class II Precautions - Replace ED Roof 667-23-100 Preliminary.docx | DOCX document | |
| 36C25623R0006 VHA Supplemental Contract Rqts for Combatting COVID-19 (2).docx | DOCX document | |
| 36C25623R0006 - Exhibit B.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Overton Brooks VAMC Infection Prevention & Control Construction Risk Assessment (ICRA)
Project: Replace Emergency Dept Roof 667-23-100 Preliminary Assessment* by: Vickie L Moore Date:11/2/2022 FINAL ICRA Determined and Processed by: Vickie L Moore Final Date:
STEP ONE: CIRCLE the Type of Construction Project based on scope and expected activity (Type A-D)
| TYPE A |
| Inspection and Non-Invasive Activities. Includes, but is not limited to: |
· removal of ceiling tiles for visual inspection only, e.g., limited to 1 tile per 50 square feet
· painting (but not sanding)
· wallcovering, electrical trim work, minor plumbing, activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
| TYPE B |
| Small scale, short duration activities which create minimal dust Includes, but is not limited to: |
· installation of telephone and computer cabling
· access to chase spaces
· cutting of walls or ceiling where dust migration can be controlled.
· Project Specific: Contracted asbestos abatement
| TYPE C |
| Work generates a moderate/high level of dust or requires demolition/removal of any fixed building components or assemblies Includes, but is not limited to: |
· sanding of walls for painting or wall covering
· removal of floorcoverings, ceiling tiles and casework; new wall construction
· minor duct work or electrical work above ceilings
· major cabling activities
· any activity which cannot be completed within a single work shift.
| TYPE D |
| Major demolition and construction projects Includes, but is not limited to: |
· activities which require consecutive work shifts
· requires heavy demolition, removal of a complete cabling system, or excavation
· new construction.
STEP TWO: CIRCLE the affected Patient Risk Groups. If more than one risk group will be affected, select the higher risk group.
| Low Risk |
| Medium Risk |
| High Risk |
| Highest Risk |
· Office areas
· Kitchen storage area
· Public access, hallways, elevator Lobby
· Non-clinical vacated engineering space
· Cardiology
· Echocardiography
· Endoscopy
· Nuclear Medicine
· Physical Therapy
· Radiology/MRI
· Respiratory Therapy
· Kitchen – food preparation area
· Step Down Unit
· Emergency Room
· Laboratories (specimen)
· Medical Units
· Outpatient Surgery
· Pharmacy
· Post Anesthesia Care Unit
· Surgical Units
· Minor Procedure Rooms
· Sterile Supply storage/distribution
· Immunocompromised patient care areas
· Cardiac Cath Lab
· Sterile Processing Service
· Preparation Area
· Decontamination Area
· Intensive Care Unit
· Negative pressure isolation rooms
· Oncology
· Operating rooms
STEP THREE: Using the IC Matrix CIRCLE the Class of Precautions as determined by Construction Type and Patient Risk Construction Project Type
| Patient Risk Group |
| TYPE A |
| TYPE B |
| TYPE C |
| TYPE D |
| IC Matrix |
| LOW Risk Group |
| I |
| II |
| II |
| III/IV |
| MEDIUM Risk Group |
| I |
| II |
| III |
| IV |
| HIGH Risk Group |
| I |
| II |
| III/IV |
| IV |
| HIGHEST Risk Group |
| II |
| III/IV |
| III/IV |
| IV |
Preliminary ICRA Approved Final ICRA Approved
*A preliminary ICRA is required for contracting purposes only; do not post during construction. The FINAL ICRA must be posted at the construction site.