This document appears to be a set of drawings and specifications related to a federal contract opportunity to renovate and expand the urology clinic at the Harry S. Truman Memorial Veterans' Hospital in Columbia, Missouri. The project scope includes demolition, new construction, and renovations to the first floor of the existing facility. Key details include:
The solicitation number is 36C25524R0088 and the project number is 589A4-23-050. The Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 15 is the federal agency issuing the contract. The project involves renovating and expanding the existing urology clinic, including demolition, new construction, and renovations to the first floor. The construction type is NFPA Type II (222) and the occupancy classification is Ambulatory Healthcare. The drawings and specifications provide details on demolition, floor plans, reflected ceiling plans, enlarged plans, and various construction details. The work is required to comply with the Architectural Barriers Act Accessibility Standards and the VA Barrier Free Design Standard.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEDICAL CENTER DIRECTOR
DOCUMENT SIGNATURE BLOCK
PRINT NAME SIGNATURE
ASSOCIATE DIRECTOR
PRINT NAME SIGNATURE
ASSOCIATE DIRECTOR OF PATIENT SERVICES
PRINT NAME SIGNATURE
ASSISTANT DIRECTOR
PRINT NAME SIGNATURE
CHIEF ENGINEER
PRINT NAME SIGNATURE
INFECTION CONTROL PRACTITIONER
PRINT NAME SIGNATURE
SAFETY OFFICER
PRINT NAME SIGNATURE
CHIEF OF STAFF
PRINT NAME SIGNATURE
HRO DIRECTOR
PRINT NAME SIGNATURE
ABBREVIATIONS
PROJ(D)
PLBG
PLYWD
PREFIN
RAD(R)
RESIL
REINF
REQ'D
SECT
SHWR
SPECS
REFRIG
GALVANIZEDGALVBMRK BENCHMARK
CONCRETE
MASONRY UNIT
CEILINGCLG
CLR
CMU
COL
CLO
CLEAR/CLEARANCE
COLUMN
CLOSET
CAB
CJ
CC
CB
BW
CL
BOC
BRZ
BRK
BO
BRG
BUR
BTM
BS
BUILT-UP ROOF
CENTER TO CENTER
CHALKBOARD
BOTTOM OF WALL
CENTER LINE
CONTROL JOINT/
CONSTRUCTION JOINT
CABINET
BACK OF CURB
BOTH SIDES
BOTTOM OF
BRONZE
BRICK
BEARING
BOTTOM
FOUNDATION
FLOOR DRAIN
FIRE EXTINGUISHER
FIRE
EXTINGUISHER
CABINET
FE
FEC
FDN
FD
EAST
EACH
EQUIPMENT
EXPOSED
EACH WAY
EXISTING
ELECTRICAL
EXTERIOR INSULATION
FINISH SYSTEM
ELEVATION/ELEVATOR
EXPANSION JOINT
EXISTING GRADE
ELECTRICAL CONTRACTOR
EXTERIOR
ETHYLENE PROPYLENE
DIENE TERPOLYMER
ELEV
EQUIP
EW
EPDM
EXP
EXIST
EXT
E
EA
EC
EG
EIFS
EJ
ELEC
INSULATION
INTERIOR
INSIDE DIAMETER
INSUL
IN(")
INT
ID
INCH
GRAB BAR
GENERAL CONTRACTOR
GYPSUM
GLASS/GLAZING
HOLLOW METAL
HIGH PRESSURE
DECORATIVE LAMINATE
HORIZONTAL
HARDWARE
HARDWOOD
HOSE BIB
HOT WATER
HEATING, VENTILATING
& AIR CONDITIONING
HDWR
HM
HORZ
HT
HPDL
HVAC
HW
HEIGHT
GB
GL
GRD
GYP
GC
HDWD
HB
GRADE
PART
PLAS
OVHD
PARTITION
PLASTER
OVERHEAD
SRT
SS
SQ
MISCELLANEOUS
MASONRY OPENING
NOT IN CONTRACT
NOT APPLICABLE
OUTSIDE DIAMETER
NUMBERNO(#)
NTS
OC
OA
NOM
OFF
OPNG
OD
ON CENTER
OVERALL
NOMINAL
NOT TO SCALE
OFFICE
OPENING
MISC
N
MO
MULL
MTL
NIC
NA
NORTH
MULLION
METAL
SHT
SF
SB
SND
SIM
S
RM
ROW
RO
SAT
SAN
ARCHITECT/
ARCHITECTURAL
AB ANCHOR BOLT
APPROX
BLDG
BD
ARCH
BM
BLK
ADJ
AFF
AC
ACCU
ALUM
ANOD
ALT
APPROXIMATE
BLOCK/BLOCKING
AT
BOARD
BEAM
BUILDING
AIR COOLED
CONDENSING UNIT
ABOVE FINISHED FLOOR
ADJUSTABLE
ALTERNATE
ANODIZED
ACOUSTICAL
ALUMINUM
A/C AIR CONDITIONING
PLUS OR MINUS
CONSTRUCTIONCONST
COURSE
CERAMIC TILE
CONTINUOUS
CARPET
CORRIDOR
DIAMETER
DOOR
DOWN
DITTO
DIMENSION
DOUBLE
DRINKING FOUNTAIN
DETAIL
DRAWING
DOWNSPOUT
DIA
DR
DS
DN
DO
DIM
DTL
DWG
CRS
CT
CONT
CORR
CPT
DBL
DF
CONFERENCE
CONCRETE
CONF
CONC
FINISHFIN
FLUORESCENT
FLOW LINE
FOLDING
FIELD VERIFY
FURNACE
FOOTING
FIRE RETARDANT
FOOT SCRAPER
FIBERGLASS
REINFORCED PLASTIC
FV
FT(')
FURR
FURN
FTG
G
GA
FOOT
FURRING
GAS
GAUGE
FRP
FLR
FLDG
FL
FRT
FS
FLUOR
FLOOR
FINISH GRADE
FINISH FLOOR
FG
FF
JOISTJST
LOW VOLUME CHANGE
MASONRYMAS
MANUF
MATL
MAX
MECH
MEMB
MH
MIN
MIRR
MANUFACTURER
MATERIAL
MECHANICAL
MEMBRANE
MAXIMUM
MINIMUM
MANHOLE
MIRROR
LDR
LF
LAV
LAM
LVC
LOCN
LINEAL FEET
LADDER
LAVATORY
LAMINATE
LOCATION
REF
R
RAG
RD
PT
PR
QT
PTD
JT
JAN JANITOR
JOINT
PL
UNDER CABINET LIGHTREQUIRED
PHYSICAL THERAPY
RESPIRATORY CARE
SURGICAL INTENSIVE CARE UNIT
STUDDED RUBBER TILE
STAINLESS STEEL
SQUARE
SPECIFICATIONS
YD
SUSPENDED
ACOUSTICAL TILE
SIMILAR
SANITARY NAPKIN
DISPENSER
SECTION
SHOWER
SHEET
SQUARE FEET
SPLASH BLOCK
RESILIENT
SOUTH
SANITARY
RIGHT OF WAY
ROUGH OPENING
ROOM
WD
WNDW
WH
WNSCT
WC
WT
WWF
WP
VCT
VWC
VEST
VERT
W
W/
W/O
YARD
WATERPROOFING
/WATERPROOF
WELDED WIRE FABRIC
WATER HEATER
WATER CLOSET
WINDOW
WOOD
WAINSCOT
WEIGHT
VINYL COMPOSITION TILE
VINYL WALL COVERING
VERTICAL
VESTIBULE
WEST
WITH
WITH OUT
RC
SICU
CENTRAL STERILE
LONG TERM CARE
INTENSIVE CARE UNIT
OCCUPATIONAL THERAPY
MAGNETIC RESONANCE IMAGING
POST ANESTHETIC CARE UNIT
MEDICAL INTENSIVE CARE UNIT
LABOR-DELIVERY-RECOVERY-POST PARTUM
OPERATING ROOM
FOR MEDICAL
FACILITIES ONLY
EMERGENCY ROOM
COMPUTED TOMOGRAPHY
STORPLUMBING
PROJECT/(PROJECTED)
REFER/REFERENCE
ROOF DRAIN
RADIUS
RETURN AIR GRILLE
REINFORCING
REFRIGERATOR
RISER
PRESSURE TREATED
PAINTED
QUARRY TILE
PLYWOOD
PREFINISHED
PAIR
TLT
TV
TW
TOC
TPH
TO
TYP
UCL
T&B
T
SUSP
STRUCT
TEL
TB
T&G
PLATE/PLASTIC/
PROPERTY LINE STL
STD
STORAGE
TOILET PAPER HOLDER
TOP OF CURB
TOILET
TELEVISION
TOP OF
TYPICAL
TOP OF WALL
TONGUE & GROOVE
TOP & BOTTOM
STRUCTURE/STRUCTURAL
TREAD
TELEPHONE
TACKBOARD
SUSPENDED
ICU
OR
LDRP
MRI
MICU
LTC
PT
PACU
OT
CS
CT
ER
STEEL
STANDARD
UNLESS NOTED OTHERWISEUNO
CUT STONE
STEEL
PLYWOOD
FINISH WOOD
CONT WD FRAMING
WOOD BLOCKING
MATERIAL SYMBOLS
LVC FILL
GRANULAR FILL
CONCRETE MASONRY
FACE BRICK
CONCRETE
EARTH
EXISTING CONSTRUCTION
ASPHALT
GLASS
RIGID OR TAPERED
INSULATION, EIFS
BATT INSULATION
GYPSUM BOARD
DRAWING SYMBOLS
95.00
TOC
98.5
TOC
98.5 E
B
NEW ELEVATION
ELEVATION DESCRIPTION
EXISTING CONTOUR
NEW CONTOUR
TEST BORING (SITE PLANS ONLY)
EXISTING ELEVATION
ELEVATION DESCRIPTION
PROPERTY LINE
/1 A101
/1 A101 MATCHLINE
SHT. REFERENCE
ELEVATION DATUM
(SECTIONS, ELEVATIONS ONLY)
BUILDING SECTION
WALL SECTION
DETAIL DRAWING
BUILDING ELEVATION
AI-201
INTERIOR ELEVATION
A100
WINDOW ID TAG
DOOR NUMBER
ROOM NAME
ROOM NAME & NUMBER
PARTITION SYMBOL
1 REVISION TAG
COLUMN LINE GRID
EQUIPMENT NUMBER
SITE PLAN NOTES
DEMOLITION PLAN NOTES
VICINITY MAP
NO SCALE
PRECAST CONCRETE
WALL PANEL TAG
XXX
AE-101
A-4 ALTERNATE TAG
PT-XX PAINT COLOR TAG
# PLAN NOTES &
ROOF PLAN NOTES
PROJECT
LOCATION
AE-201
AE-301
AE-310
N
600 EAST 7TH STREET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
A
B
C
D on e e ig ht h in ch o ne fo ot on e q ua rt er i nc h th re e e ig ht hs o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e a nd on e h al f in ch es o ne f oo t th re e in es ne f oo t
1 2 3 4 5 6
A
B
C
D
1 2 3 4 5 6
VA FORM 08-6231
Office of Construction and Facilities Management
Department of Veterans AffairsDwg.
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
CONSULTANTS: ARCHITECT OF RECORD:
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
2550 UNIVERSITY AVE. W., SUITE 423-S
ST. PAUL, MINNESOTA 55114
651.251.7570
330 N MEAD ST, SUITE 100
WICHITA, KANSAS 67202
316.262.2500
GI001
TITLE SHEET
RENOVATE & EXPAND
UROLOGY CLINIC
800 HOSPITAL DRIVE COLUMBIA, MO 65201
03-22-2024
589A4-23-050
RENOVATE & EXPAND UROLOGY CLINIC
HARRY S. TRUMAN MEMORIAL VETERANS' HOSPITAL
DEPT OF VETERANS AFFAIRS
800 HOSPITAL DRIVE COLUMBIA, MO 65201
FINAL BID DOCUMENTS
FINAL BID DOCUMENTS
589A4-23-050
JSJIEP
SHEET INDEX
GENERAL
GI001 TITLE SHEET
GI002 ABAAS SHEET
GI003 ABAAS SHEET
GI104 LIFE SAFETY PLAN - 1ST FLOOR
GI110 PHASING PLANS - 1ST FLOOR
GENERAL: 5
STRUCTURAL
S-100 FLOOR PLAN - 1ST FLOOR
STRUCTURAL: 1
ARCHITECTURAL
AD100 DEMOLITION RCP - BASEMENT - ABOVE CEILING
AD101 DEMOLITION PLAN - 1ST FLOOR
AD110 DEMOLITION RCP - 1ST FLOOR
AE101 FLOOR PLAN - 1ST FLOOR
AE102 FLOOR PLAN - DIMENSIONS - 1ST FLOOR
AE120 REFLECTED CEILING PLAN - 1ST FLOOR
AE401 ENLARGED PLANS
AE501 DETAILS
AE601 SCHEDULES
ARCHITECTURAL: 9
ARCHITECTURAL INTERIORS
AI101 FINISH PLAN & SCHEDULE - 1ST FLOOR
AI201 EQUIPMENT PLAN & SCHEDULE - 1ST FLOOR
AI301 WALL PROTECTION PLAN - 1ST FLOOR
AI401 INTERIOR ELEVATIONS
AI402 INTERIOR ELEVATIONS
AI403 INTERIOR ELEVATIONS
AI501 MILLWORK SECTION DETAILS
AI601 SIGNAGE PLAN & SCHEDULE - 1ST FLOOR
ARCHITECTURAL INTERIORS: 8
FIRE SUPPRESSION AND ALARM
FG101 FIRE SUPPRESSION SYMBOLS LEGEND, GENERAL NOTES, AND DETAILS
FD101 FIRE SUPPRESSION DEMOLITION PLAN - 1ST FLOOR
FX100 FIRE SUPPRESSION ZONING PLAN - 1ST FLOOR
FX101 FIRE SUPPRESSION PLAN - 1ST FLOOR
FA101 FIRE ALARM PLAN - 1ST FLOOR
FIRE SUPPRESSION AND ALARM: 5
MECHANICAL
MG101 MECHANICAL SYMBOLS LEGEND AND GENERAL NOTES
MD101 MECHANICAL DEMOLITION PLAN - 1ST FLOOR
MH101 HVAC PLAN - 1ST FLOOR
MP101 MECHANICAL PIPING PLAN - 1ST FLOOR
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-701 MECHANICAL SCHEDULES
MECHANICAL: 7
PLUMBING
PD101 PLUMBING DEMOLITION PLAN - 1ST FLOOR
PL100 PLUMBING PLAN - BASEMENT
PL101 PLUMBING PLAN - 1ST FLOOR
PM101 MEDICAL GASES PLAN - 1ST FLOOR
P-501 PLUMBING DETAILS
P-701 PLUMBING SCHEDULES
PLUMBING: 6
ELECTRICAL
EG101 ELECTRICAL SYMBOLS LEGEND AND GENERAL NOTES
ED101 ELECTRICAL DEMOLITION PLAN - 1ST FLOOR
EL101 LIGHTING PLAN - 1ST FLOOR
EP101 POWER & SPECIAL SYSTEMS PLAN - 1ST FLOOR
E-501 ELECTRICAL DETAILS
ELECTRICAL: 5
TOTAL SHEETS: 46
# Revision Date
Figure 302.2 Carpet Pile Height
Figure 303.2 Vertical Change in Level
1/ 2" m ax
1/ 4" m ax
Figure 302.3 Elongated Openings in Floor or
Ground Surfaces d ir ec ti o n o f tr av el lo n g d im d o m in an t p er p en d ic u la r to
1/2" max dominant direction of travel
Figure 303.3 Beveled Change in Level
1/
1/
1/
1/
Figure 304.3.1.2 Circular Turning Space - Existing
Buildings Size and Overlap
Figure 304.3.1.1 Circular Turning Space - New Buildings Size and Overlap m ax
Overlap of knee and toe clearance Overlap of knee and toe clearance
6.
2.
m ax
P er ø 5' - 7" min ø 5' - 0" min
Figure 304.3.2.2 T-Shaped Turning Space New Buildings - Size and Overlap ar m ar m base
Figure 304.3.2.1(A) T-Shaped Turning Space New Buildings - Option 1 ar m ar m base
68" min min
16" min
36" min
16" m in m in36 m in
Figure 304.3.2.1(B) T-Shaped Turning Space New Buildings - Option 2 ar m ar m base
64" min min
11" min
42" min
11" m in m in m in
Figure 304.3.2.1(C) T-Shaped Turning Space New Buildings - Option 3 ar m ar m base
64" min min
12" min
40" min
12" m in m in m in
60" min min
12" min
36" min
12" m in36 m in m in
Figure 305.3.2 Clear Floor or Ground
Space- Existing Buildings
Figure 305.5 Position of Clear Floor or Ground Space
Figure 305.7.1 Maneuvering Clearance in an
Alcove, Forward Approach
Figure 305.7.2 Maneuvering Clearance in an
Alcove, Parallel Approach
(a) forward
(b) parallel
Figure 305.3.1 Clear Floor or Ground Space- New Buildings
52" min m in
48" min m in
30" min m in
48" min m in
36" min
X
4"
60" min
X
5"
Figure 306.2 Toe Clearance
Figure 306.3 Knee Clearance
(b) plan
(a) elevation
9"
6" max m in
17"- 25"
(b) plan
(a) elevation m in
25" max
11" min
8" min m in
Figure 307.2 Limits of Protruding Objects
4" max
X
7"
X
0"
Figure 307.3 Post-Mounted Protruding Objects
(b)(a)
0"
12" max 12" max m ax X > 12"
X > 12" m in
Figure 307.4 Vertical Clearance
M ax
X
Figure 308.3.1 Unobstructed Side Reach
Figure 308.3.2 Unobstructed High Side Reach
Figure 308.2.2 Obstructed High Forward Reach
Figure 308.2.1 Unobstructed
Forward Reach
(a) (b)
(b)(a) m in m ax m ax
20" max m ax
20"- 25" max
10" max m in m ax
10" max 10" - 24" max m ax m ax m ax m ax
B U
IL
D
IN
G
B L
O C
K S
Figure 403.5.2 Clear Width at Turn Existing Buildings
Figure 403.5.1 Clear Width of an Accessible Route
(a) 180 degree turn
(b) 180 degree turn
(Exception)
Figure 403.5.2.1 Clear Width at Turn
(A) 180 degree turn
New Buildings - Option 1 m in
(B) 180 degree turn
New Buildings - Option 2 m in
(C) 180 degree turn
New Building - Option 3 m in
38" min m in
36" min m in
Figure 403.5.3.1 Clear Width At 90-Degree Turn
36" min m in
4" min 28" min
4" m in m in
Figure 403.5.3.2 Clear Width At 90-Degree Turn
Existing Buildings
36" min m in
Figure 403.5.3.1 Clear Width At 90-Degree Turn
Existing Buildings
36" min m in
36" min
X<52"
36" min 42" min
X<52"
42" min 43" min
X<52"
43" min m in m in
42" min
X<48"
42" min 36" min
X<48"
36" min
32" min
36" min
32" min
36" min m ax m in m ax
(a) 90 degree trun
New Building - Option 1
(b) 90 degree trun
New Building - Option 2
(c) 90 degree trun
New Building - Option 3
A C
C E
S S
IB
L
E R
O U
T E
S
Figure 404.2.4.3 Maneuvering Clearance at Recessed Doors and Gates
Figure 404.2.4.2 Maneuvering Clearance at Sliding and Folding Doors
Figure 404.2.4.1 Maneuvering Clearance at Manual Swinging Doors and Gates
Figure 404.2.3 Clear Width of Doorways
Figure 404.2.6 Doors in Series and Gates in Series
(e) hinge approach, pull side
(j) latch approach, push side
(k) latch approach, push side
*48 min if door provided with closer
(i) latch approach, pull side
*54 min if door provided with closer
(h) latch approach, pull side
(f) hinge approach, push side
(g) hinge approach, push side
*if door provided with both closer and latch ** 48 min if both closer and latch provided
(b) front approach, push side
(c) front approach, push side
*if door provided with both closer and latch
(a) front approach, pull side
(a) hinged door
(b) sliding door
(c) folding door
(d) doorways without doors
(a) pull side
(b) push side
(c) push side, door provided with both closer and latch
(a) front approach
(b) side approach
*48 min at front approach
(c) pocket or hinge approach
(d) stop or latch approach
(d) hinge approach, pull side
(a)
(c)
(b)
(d) front approach symbol
.00
32" min
32" min
32" min
36" min
18" min m in m in
*12" min
36" min 60 m in
42" min m in
2" m in
22" min* 12" min m in
24" min
24" min m in m in m in
22" min m in m in
24" min m in
18" min
X >8
X >8 m in m in
12" min
X >8
48" min
48" min
48" min m in
66" min D O
O R
S A
N D
G A
T E
S
Figure 703.6.1 Pictogram Field
MEN not in pictogram field
6" M in
Figure 705.1 Size and Spacing of Truncated Domes base diameter of 0.9"-1.4" top diameter of 50%-65% of the base diameter
(a) elevation (enlarged)
(b) plan
.6 5"
M in
1.6" - 2.4"
1.
6"
.4
Figure 707.6.2 Numeric Key Layout
(a) 12-key ascending
(b) 12-key descending
1 2 3
4 5 6
7 8 9
* 0 #
7 8 9
4 5 6
1 2 3
* 0 #
Figure 703.2.5 Height of Raised
Characters
LIBRARY
5/ 8"
"0.
2"
Figure 703.3.1 Braille Measurement single braille cell blank cell space between words raised dot no raised dot
Figure 703.3.2 Position of Braille
AREA OF
REFUGE
3/ 8" m in
3/ 8" m in
Figure 703.7.2.1 International Symbol of Accessibility
Figure 703.7.2.2 International TTY Symbol
Figure 703.7.2.3 Volume-Controlled Telephone
Figure 703.7.2.4 International Symbol of Access for
Hearing Loss
Figure 704.2.1.1 Parallel Approach to
Telephone
Figure 704.2.1.2 Forward Approach to
Telephone
Figure 703.4.1 Height of Tactile Characters
Above Floor or Ground
Figure 703.4.2 Location of Tactile Signs at Doors
AREA OF
REFUGE
centered on tactile characters
AREA OF
REFUGE
.00
M ax
M ax
M in
M ax
18" Min
M in distance between corresponding dots from one cell directly below distance between dots in the same cell distance between corresponding dots in adjacent cells distance between dots in the same cell base diameter
C O
M M
U N
IC
A
T
IO
N E
L E
M E
N T
S A
N D
F E
A T
U R
E S m in
48" min
Figure 1104.1.1 Clear Floor Space
For type B Unit
(a) front or rear entry
(b) side entry
Figure 802.1.3 Depth of Wheelchair Spaces in
Assembly Area
(a) single space
(b) two spaces
Figure 802.1.2 Width of Wheelchair Spaces in
Assembly Area
36" min 33" min 33" min m in m in
Figure 802.4(a) Depth of Wheelchair Spaces in Assembly Area - New Building m in
W H
E E
L C
H A
IR
S
P A
C E
S
Figure 903.3 Bench Size And Clear Space
42" min
Figure 903.4 Bench Back Support
(a) (b) m in
2" m ax
2 1/2" max
Figure 904.4.1 Sales And Service Counters - Parallel Approach
Figure 904.4.2 Sales And Service Counters - Forward Approach
Elevation
Plan
30" min m ax m ax
Elevation
Plan
36" min m ax m ax
B U
IL
T
IN
E L
E M
E N
T S
1. ALL CONSTRUCTION & RENOVATION SHALL MEET THE ARCHITECTURAL BARRIERS ACT
ACCESSIBILITY STANDARD (ABAAS).
2. SUPPLEMENTAL TO THE (ABAAS), CONSTRUCTION & RENOVATION IN HEALTH FACILITIES OF
THE DEPARTMENT OF VETERAN AFFAIRS (VA) SHALL COMPLY WITH THE VA BARRIER FREE
DESIGN STANDARD: A SUPPLEMENT TO THE ARCHITECTURAL BARRIERS ACT
ACCESSIBILITY STANDARDS (PG-18-13).
GENERAL NOTES
OVERRIDE BY VA BARRIER FREE
DESIGN STANDARD
MINIMUM REQUIREMENTS
• SITES - PARKING SPACES ACCESSIBLE 1% GREATER THAN ABAAS
• SPINAL CORD INJURY/DISORDER (SCI/D) FACILITIES: 0.2 ACCESSIBLE SPACES PER
INPATIENT BED; 0.5 PER LONG-TERM CARE BED; 5.6 PER OUTPATIENT EXAM ROOM.
DEDICATED FOR SCI/D PATIENTS
• HOSPITAL OUTPATIENT FACILITIES 10% OF TOTAL SPACES
• REHABILITATION AND OUTPATIENT
PHYSICAL THERAPY FACILITIES 20% OF TOTAL SPACES
• BUILDING-ACCESSIBLE SEATING, ASSEMBLY AREAS 1% GREATER THAN ABAAS
ACCESSIBLE ROUTE
• WIDTH, MIN. PATIENT CARE AREAS 6'-0"
• WIDTH, MIN. ADMINISTRATIVE AREA 5'-0"
• SLOPE, MAXIMUM (INCLUDING PARKING SPACES) 1:50 (2%)
• MINIMUM GRADIENT OF WALK REQUIRING REST
AREAS EVERY 200' 1:50 (2%)
• TURNING RADIUS 5'-6"
• TURNING RADIUS, BARIATRIC 6'-0"
• T-SHAPED TURNING SPACE 5'-6" x 5'-6"
• T-SHAPED TURNING SPACE, BARIATRIC 6'-0" x 6'-0"
FLOOR SURFACES
• CHANGES IN LEVEL NOT PERMITTED ON SCI FLOORS
• CARPET CUSHION OR PADDING NOT PERMITTED
PARKING & PASSENGER LOADING ZONES
• ACCESS AISLE REQUIREMENT FOR ACCESSIBLE
PARKING SPACES 5'-0" EACH SIDE
• PASSENGER LOADING AREA
"COMMUNICATION SYSTEM" FOR ASSISTANCE AT SCI UNITS YES
CURB RAMPS
• WIDTH, MINIMUM 4'-0"
RAMPS
• MAXIMUM SLOPE 1:20
• MAXIMUM LENGTH, WITHIN RANGE OF 1:33 - 1:26 40'
• MAXIMUM LENGTH, WITHIN RANGE OF 1:25 - 1:20 35'
• MINIMUM CLEAR WIDTH 4'-0"
• MINIMUM SIZE LEVEL LANDING,
WHERE DOORS SWING INTO LANDING 6'-0" X 6'-0"
STAIRS
• HANDRAIL HEIGHT 34"
ELEVATOR (PASSENGER)
• MINIMUM WIDTH OF ELEVATOR DOORS 4'-0"
• MINIMUM CAR SIZE 8'-0" X 6'-2" PLATFORM SIZE
• DOUBLE SET OF HANDRAILS YES
WINDOWS
• SILL HEIGHT IN PATIENT BEDROOMS 24" MAXIMUM
DOORS & DOORWAYS
• PATIENT CARE DELIVERY AREAS WITH PATIENT BED,
STRETCHER OR GURNEY ACCESS, MINIMUM WIDTH 4'-0"
WATER CLOSETS - INPATIENT NURSING UNITS
• GRAB BAR CONFIGURATION: DOUBLE SWING-UP BARS FOR ALL PATIENT TOILETS/SHOWER
ROOMS ON NURSING UNITS.
TOILET STALLS
• MINIMUM ACCESSIBLE STALL SIZE 5'-6" X 6'-0"
• MINIMUM SIZE WHEELCHAIR "FRONT-TRANSFER" STALL 3'-6" X 6'-0"
• GRAB BARS REQUIRED IN ALL STALLS
SHOWER STALLS (PATIENT)
• MINIMUM STALL DIMENSIONS 4'-0" X 4'-0"
• GRAB BARS HORIZONTAL PLUS VERTICAL BARS
TOILET ROOMS
• INPATIENT BEDROOM TOILET ROOMS,
MINIMUM WIDTH OF TOILET ROOM ENTRANCE DOORS 48"
CAFETERIAS
• KNEE CLEARANCE, FOR MINIMUM 5% TABLES 2'-3" & 2'-5" FOR AT LEAST 5%
• CUTLERY AND SUPPLY HEIGHT 40" - 48"
HEALTH CARE FACILITIES
• MEDICAL/SURGICAL NURSING UNITS,
PERCENT OF PATIENT BEDROOMS ACCESSIBLE 100%
• MEDICAL/SURGICAL NURSING UNITS,
PERCENT OF TOILET ROOMS ACCESSIBLE 100%
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
600 EAST 7TH STREET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
ARCHITECT OF RECORD:
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
2550 UNIVERSITY AVE. W., SUITE 423-S
ST. PAUL, MINNESOTA 55114
651.251.7570
330 N MEAD ST, SUITE 100
WICHITA, KANSAS 67202
316.262.2500
GI002
ABAAS SHEET
RENOVATE & EXPAND
UROLOGY CLINIC
800 HOSPITAL DRIVE COLUMBIA, MO 65201
03-22-2024
589A4-23-050
FINAL BID DOCUMENTS
JSJIEP
Figure 611.4 Height of Laundry
Compartment Opening
(a) top loading
(b) front loading m ax
Figure 604.2 Water Closet
Location
(a) wheelchair accessible water closets
(b) ambulatory accessible
Water closets
Figure 604.3.1 Size of Clearance at
Water Closets
Figure 604.3.2 (exception) Overlap of Water Closet Clearance in Residential
Dwelling Units
Figure 604.5.1 Side Wall Grab Bar at
Water Closets
Figure 604.5.2 Rear Wall Grab Bar at Water Closets
Figure 1104.11.1.1 Swing-up Grab Bar for Water Closet
Figure 604.7 Dispenser Outlet Location
Figure 604.8.1.2 Wheelchair Accessible Toilet
Compartment Doors
Figure 604.8.1.4 Wheelchair Accessible Toilet Compartment Toe Clearance
Figure 604.8.2 Ambulatory Accessible
Toilet Compartment
Transfer Side comply with section 609.3
(a) adult wall hung water closet
(b) adult floor mounted water closet and children's water closet
(b) elevation children
(a) elevation adult
(c) plan alternate door location
Figure 604.9.2.3 Wheelchair Toilet Compartments Alternate
Wheelchair Toilet Compartment m in
60" min
Figure 604.8.1.1 Size of Wheelchair Accessible Toilet Compartments m in
60" min m in
60" min 42 m in
4" max
4" m ax m in m in
35" - 37"
6" m in
6" min
6" min
9" m in m in6" min
Partition m in m ax7" - 9"
18" min 18" min
15 3/4" 15 3/4"36" min
24" min min
12" 12" max 42" min
54" min
42" m in
39" - 41" m in m in
60" min
18" min m in
60" min
16" - 18"
17" - 19"
P L
U M
B
IN
G E
L E
M E
N T
S A
N D
F A
C
IL
IT
IE
S
Figure 602.2.1 (A) Clear Floor Space at Wheelchair Drinking
Fountains
Figure 602.2.1 (B) Clear Floor Space at Wheelchair Drinking Fountains Primarly for
Children's use Exception
Children Adults
Figure 602.2.3 Wheelchair Drinking
Fountain Spout Height and Location
-4 m ax
-4 m ax
Figure 602.3.2 Standing use Drinking Fountain Spout Height and Location
Figure 602.3.3 Drinking Fountain
Spout Location m ax m ax
Children Adults
5" max (602.2.4)
15" min for Adults
D R
IN
K
IN
G
F O
U N
T A
IN
S
Figure 609.2.2 Grab Bar Non-Circular Cross Section
4" - 4.8" perimeter
2" m ax 2" max
(a) (b)
Figure 607.2 Clearance for Bathtubs
Figure 607.4.1 Grab Bars for Bathtubs with
Permanent Seats
Figure 607.4.2 Grab Bars for Bathtubs with Removable In-Tub Seats
Figure 607.5 Bathtub Control
Location
Figure 610.2 Bathtub Seats back wall head end wallcontrol end wall back wall head end wall control end wall
(b) plan back wall head end wall control end wall back wall head end wall control end wall
(a) removable in-tub seat
(b) permanent seat control end wall
(a) Removable In-Tub seat
(b) Permanent seat
(a) elevation
(b) plan
Length of Bathtub m in
Length of Bathtub 12" min m in
(a) elevation
8"
0"
15" max12" max m in
8"
0" m in
24" min
12" max 24" max m in
15" min15" - 16"
Figure 608.3.1 Grab Bars for Transfer-
Type Showers
Figure 608.3.2 Grab Bars for Standard Roll-In Type Showers
Figure 608.3.3 Grab Bars for Alternate Roll-In Type Showers seat wall control wall back wall back wall side wall side wall back wall back wall front wall side wall side wall side wall side wall
(b) with seat
Figure 608.2.1.2(B) Transfer-Type Shower Compartment Clearances
New Buildings- Option 2 seat wall control wall back wall
52" max m ax
4" max
Figure 608.2.1.2(C) Transfer-Type Shower Compartment Clearances
Existing Buildings- Option 2 seat wall control wall back wall m ax
48" max
18"
4" M ax
6" m ax
6" m ax
6" max 6" max
6" max6" max
6" m ax
Figure 608.5.1 Transfer-Type Shower Compartment Control
Location
Figure 608.5.2 Standard Roll-In Type Shower Compartment
Control Location
Figure 608.5.3 Alternate Roll-In Type Shower Compartment Control Location
Figure 609.3 Spacing of Grab Bars side wall back wall can be located on any wall of shower
(a) without seat
(b) with seat
(a) projecting objects
(b) recessed objects side wall back wall
(a) with seat
(elevation)
(b) with seat
(elevation)
(d) with seat
(plan)
(c) without seat
(plan) side wall side wall side wall side wall back wallback wall front wall front wall
15" max m in m ax m ax m ax
Figure 610.3 Extent of Seat
Figure 610.3.1 Rectangular Shower Seat
Figure 610.3.2 L-Shaped Shower Seat seat wall seat wall
(a) size
(b) distance from wall seat wall
(a) rectangular
(b) L-shaped compartment entry compartment entry
15" max m in
1/
2" m ax
3" m ax
3" m ax
(a) without seat
2 1/2" max
15" - 16"
1/
2" m ax
2 1/2" max15" - 16"
22" - 23"
1/
2" m ax m in m ax
27" max m in m ax m in
6" m ax
6" max
" T U
B S
A N
D S
H O
W E
R S
27" MAX
Sanitary Napkin Disposal
Sanitary Napkin Dispenser m ax
Soap Dispenser
Paper Towel Dispenser
T .O
. d is p en se r
O P
G m ax
Baby Changing Station to B
.O m in to h ig h es t p ar t m ax
LINE OF WALL
Coat/Robe Hook
4' -0
A
C C
5' -4
T
Y P
Door Viewer
3' -7
A
C C
5' -0
T
Y P
Mirror Height to g la ss
Fire Extinguisher Cabinet m ax t o t h e h an d le m ax
Fire Extinguisher to t h e h an d le m ax
Hand Dryer
Trash Receptacle m ax w o rk s u rf ac e o f w o rk s u rf ac e
T .O
. o p er ab le p o rt io n m ax
Toilet Seat Cover Dispensed
M O
U N
T
IN
G H
E
IG
H T
S
NOTE: MOUNTING HEIGHT OF OPERABLE PARTS OF ANY ACCESSORIES SHALL NOT EXCEED 48".
1. ALL CONSTRUCTION & RENOVATION SHALL MEET THE ARCHITECTURAL BARRIERS ACT
ACCESSIBILITY STANDARD (ABAAS).
2. SUPPLEMENTAL TO THE (ABAAS), CONSTRUCTION & RENOVATION IN HEALTH FACILITIES OF
THE DEPARTMENT OF VETERAN AFFAIRS (VA) SHALL COMPLY WITH THE VA BARRIER FREE
DESIGN STANDARD: A SUPPLEMENT TO THE ARCHITECTURAL BARRIERS ACT
ACCESSIBILITY STANDARDS (PG-18-13).
GENERAL NOTES
OVERRIDE BY VA BARRIER FREE
DESIGN STANDARD
MINIMUM REQUIREMENTS
• SITES - PARKING SPACES ACCESSIBLE 1% GREATER THAN ABAAS
• SPINAL CORD INJURY/DISORDER (SCI/D) FACILITIES: 0.2 ACCESSIBLE SPACES PER
INPATIENT BED; 0.5 PER LONG-TERM CARE BED; 5.6 PER OUTPATIENT EXAM ROOM.
DEDICATED FOR SCI/D PATIENTS
• HOSPITAL OUTPATIENT FACILITIES 10% OF TOTAL SPACES
• REHABILITATION AND OUTPATIENT
PHYSICAL THERAPY FACILITIES 20% OF TOTAL SPACES
• BUILDING-ACCESSIBLE SEATING, ASSEMBLY AREAS 1% GREATER THAN ABAAS
ACCESSIBLE ROUTE
• WIDTH, MIN. PATIENT CARE AREAS 6'-0"
• WIDTH, MIN. ADMINISTRATIVE AREA 5'-0"
• SLOPE, MAXIMUM (INCLUDING PARKING SPACES) 1:50 (2%)
• MINIMUM GRADIENT OF WALK REQUIRING REST
AREAS EVERY 200' 1:50 (2%)
• TURNING RADIUS 5'-6"
• TURNING RADIUS, BARIATRIC 6'-0"
• T-SHAPED TURNING SPACE 5'-6" x 5'-6"
• T-SHAPED TURNING SPACE, BARIATRIC 6'-0" x 6'-0"
FLOOR SURFACES
• CHANGES IN LEVEL NOT PERMITTED ON SCI FLOORS
• CARPET CUSHION OR PADDING NOT PERMITTED
PARKING & PASSENGER LOADING ZONES
• ACCESS AISLE REQUIREMENT FOR ACCESSIBLE
PARKING SPACES 5'-0" EACH SIDE
• PASSENGER LOADING AREA
"COMMUNICATION SYSTEM" FOR ASSISTANCE AT SCI UNITS YES
CURB RAMPS
• WIDTH, MINIMUM 4'-0"
RAMPS
• MAXIMUM SLOPE 1:20
• MAXIMUM LENGTH, WITHIN RANGE OF 1:33 - 1:26 40'
• MAXIMUM LENGTH, WITHIN RANGE OF 1:25 - 1:20 35'
• MINIMUM CLEAR WIDTH 4'-0"
• MINIMUM SIZE LEVEL LANDING,
WHERE DOORS SWING INTO LANDING 6'-0" X 6'-0"
STAIRS
• HANDRAIL HEIGHT 34"
ELEVATOR (PASSENGER)
• MINIMUM WIDTH OF ELEVATOR DOORS 4'-0"
• MINIMUM CAR SIZE 8'-0" X 6'-2" PLATFORM SIZE
• DOUBLE SET OF HANDRAILS YES
WINDOWS
• SILL HEIGHT IN PATIENT BEDROOMS 24" MAXIMUM
DOORS & DOORWAYS
• PATIENT CARE DELIVERY AREAS WITH PATIENT BED,
STRETCHER OR GURNEY ACCESS, MINIMUM WIDTH 4'-0"
WATER CLOSETS - INPATIENT NURSING UNITS
• GRAB BAR CONFIGURATION: DOUBLE SWING-UP BARS FOR ALL PATIENT TOILETS/SHOWER
ROOMS ON NURSING UNITS.
TOILET STALLS
• MINIMUM ACCESSIBLE STALL SIZE 5'-6" X 6'-0"
• MINIMUM SIZE WHEELCHAIR "FRONT-TRANSFER" STALL 3'-6" X 6'-0"
• GRAB BARS REQUIRED IN ALL STALLS
SHOWER STALLS (PATIENT)
• MINIMUM STALL DIMENSIONS 4'-0" X 4'-0"
• GRAB BARS HORIZONTAL PLUS VERTICAL BARS
TOILET ROOMS
• INPATIENT BEDROOM TOILET ROOMS,
MINIMUM WIDTH OF TOILET ROOM ENTRANCE DOORS 48"
CAFETERIAS
• KNEE CLEARANCE, FOR MINIMUM 5% TABLES 2'-3" & 2'-5" FOR AT LEAST 5%
• CUTLERY AND SUPPLY HEIGHT 40" - 48"
HEALTH CARE FACILITIES
• MEDICAL/SURGICAL NURSING UNITS,
PERCENT OF PATIENT BEDROOMS ACCESSIBLE 100%
• MEDICAL/SURGICAL NURSING UNITS,
PERCENT OF TOILET ROOMS ACCESSIBLE 100%
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
600 EAST 7TH STREET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
ARCHITECT OF RECORD:
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
2550 UNIVERSITY AVE. W., SUITE 423-S
ST. PAUL, MINNESOTA 55114
651.251.7570
330 N MEAD ST, SUITE 100
WICHITA, KANSAS 67202
316.262.2500
GI003
ABAAS SHEET
RENOVATE & EXPAND
UROLOGY CLINIC
800 HOSPITAL DRIVE COLUMBIA, MO 65201
03-22-2024
589A4-23-050
FINAL BID DOCUMENTS
JSJIEP
JT
JT
JT
FE
FEC
FEC
FEC
F E
F E
C
FEC
JT
JT
JT
JT
JT
JT
FEC
JT
JT
JT
CODE NOTES
1. DRAWING PURPOSE: RENOVATION
2. FACILITY REVIEWED FOR COMPLIANCE WITH THE FOLLOWING
CODES:
2021 NFPA 101 LIFE SAFETY CODE
2021 INTERNATIONAL BUILDING CODE
2021 NATIONAL ELECTRICAL CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL FIRE CODE
2010 ARCHITECTURAL BARRIERS ACT (ABA)
3. OWNER:
HARRY S TRUMAN MEMORIAL HOSPITAL
800 HOSPITAL DR
COLUMBIA, MO 65201
PH (573) 814-6000
4. DATE DEVELOPED: SEE DATE IN TITLE BLOCK
6. ARCHITECTS SEAL: SEE STAMP IN TITLE BLOCK
7. FIRE SERVICE: CITY OF COLUMBIA FIRE DEPARTMENT
8. INSPECTION: VISN 15 SAFETY OFFICER
9. OCCUPANCY GROUP TYPE:
5. ARCHITECT:
STONE GROUP ARCHITECTS
600 EAST 7TH STREET
SIOUX FALLS, SD 57103
PH (605) 271-1144
RENOVATION: EXISTING AMBULATORY HEALTHCARE (NFPA); I-2 (IBC)
10. CONSTRUCTION TYPE: NFPA TYPE II (222)
11. HEIGHT & AREA LIMITATIONS:
ALLOWABLE AREA: UNLIMITED
HEALTH CARE OCCUPANCY (MOST RESTRICTIVE IN BUILDING)
ALLOWABLE HEIGHT /
STORIES
4 OR MORE
ACTUAL HEIGHT / STORIES 7 OCCUPIABLE STORIES
(UNCHANGED)
13. MINIMUM CONSTRUCTION REQUIREMENTS (NFPA 220-TABLE 4.1.1):
CONSTRUCTION
EXISTING AMBULATORY HEALTHCARE
BEARING WALLS:
A. EXTERIOR
B. INTERIOR
C. INT/EXT (ROOF ONLY)
TYPE II
(222)
2 HR
2 HR
1 HR
NON-BEARING WALLS:
A. EXTERIOR
B. INTERIOR
0 HR
NON-
COMBUSTIBLE
COLUMNS:
A. SUPPORT FLOORS
B. SUPPORT ROOF ONLY
2 HR
1 HR
BEAMS/GIRDERS/TRUSSES:
A. EXTERIOR:
B. INTERIOR:
2 HR
1 HR
FLOOR CONSTRUCTION: 2 HR
ROOF CONSTRUCTION: 1 HR
NOTE: ENTIRE FACILITY IS FULLY SPRINKLED
14. ACTIVE FIRE SAFETY FEATURES:
(A) AUTOMATIC SUPPRESSION SYSTEMS:
- SPRINKLER SYSTEM (FULLY SPRINKLED)
- AUTOMATIC AIR-HANDLING SHUT-DOWN
(B) FIRE ALARM SYSTEM - SIMPLEX, ADDRESSABLE, AUTO DIAL-UP
(C) GENERATOR POWERED EMERGENCY LIGHTING, GENERATOR
POWERED EXIT LIGHTING.
(D) SMOKE DETECTORS AT ALL CORRIDORS, ALL SMOKE DOORS AND
MISC AREAS AS REQ'D (ALSO IN SOME DUCTS)
(E) PORTABLE EXTINGUISHERS
15. WATER SUPPLY: CITY OF COLUMBIA, MO/UMC (SECONDARY)
16. SEWAGE TREATMENT: CITY OF COLUMBIA, MO
17. ACCESSIBILITY PROVISIONS (VA STANDARDS): ACCESSIBLE ROUTE,
TOILETS, LAVATORIES, SIGNAGE.
18. STORM SEWER: UMC/CITY OF COLUMBIA, MO
12. MEANS OF EGRESS (NFPA 19.2):
DEAD-END CORRIDORS:
COMMON PATH OF TRAVEL:
EXIT ACCESS TRAVEL DISTANCE:
30' MAX
100' MAX
200' MAX
LEGEND
BUILDING & LIFE SAFETY REQUIREMENTS
DESCRIPTION
WALL
RATING
NEW
PARTITION KEY NFPA 101-2021
OPENINGS DAMPERS
RATING RFRNC. TYPE RFRNC.
BUILDING SEPARATION:
FIRE BARRIER
90 MIN
OCCUPANCY/AREA SEPARATION
FIRE BARRIER
2 HR
90 MIN
HORIZONTAL EXIT (& REFUGE AREA)
FIRE BARRIER
90 MIN
VERT. OPG. (EXIT ENCLSR/SHAFT)
FIRE BARRIER
(2 HR = 4 OR MORE STORIES)
(1 HR = LESS THAN 4 STORIES)1 HR
2 HR
60 MIN
90 MIN
HAZ./INCIDENTAL USE
FIRE BARRIER
45 MIN
HAZ./INCIDENTAL USE
SMOKE PARTITIONS
(SPRINKLERED)
NR-
RESIST
SMK
NR
SELF OR AUTO
CLOSING
SUBDIVIDING SPACES
SMOKE BARRIER (I-2 OCCUPANCY)
20 MIN
SUITE SEPARATION
SMOKE PARTITION
NR
*NR
SELF OR AUTO
CLOSING
EXIT ACCESS CORRIDORS (I-2)
SMOKE PARTITIONS (SPRINKLERED)
NR-
RESIST
SMK
NR
EXIT ACCESS CORRIDORS (B & AHC)
NON-RATED PARTITIONS
NR
NR
VERT. OPG. (SHAFT)
FIRE BARRIER 60 MIN
1 HR
2 HR
60 MIN
90 MINEXIT PASSAGEWAY (HORIZ.)
FIRE BARRIER
6.1.14.4.1
7.1.3.2
8.7.1.1
8.5
8.4.2
8.4.2
21.3.6
7.2.6
8.2.1.3
8.6
8.6
8.7.1.2
8.3.3.2.2 TBL
8.3
8.3.3.2.2 TBL
8.3 8.7.1.1
8.3.3.2.2 TBL
19.3.7.8
8.3.3.2.2 TBL
8.3
8.3.3.2.2 TBL
8.3
8.3.3.2.2 TBL
8.3
8.3.3.2.2. TBL
8.3
8.3.3.2.2TBL
8.7.1.2
8.3.3.2.2 TBL
8.4
8.4.3
N/A
FIRE
90 MIN
FIRE
90 MIN
FIRE
90 MIN
NOT
ALLOWED
UNLESS
SERVING
STAIR
ONLY
N/A
VARIES
SMOKE
90 MIN
VARIES
VARIES
NONE
N/A
NOT
ALLOWED
8.3.4.8 9.2.1
8.3.4.8 9.2.1
8.3.4.8 9.2.1
N/A
8.5.5.3
8.6.4
N/A
N/A
8.4.4
8.4.4 8.4.6.2
8.4.4 8.4.6.2
N/A
8.3.3.2.2 TBL
8.3
1 HR
1 HR
2 HR
SYMBOLS
NO. OCC. EXITING
(SMALLER ROOMS)
MAXIMUM OCCUPANCY
AREA
OCC. LOAD
FACTOR
REQ'D. EXIT WIDTH
NO. OF OCC. EXITING
ACTUAL EXIT
WIDTH
NO. OF OCC./
NO. OF EXITS
1:50
10/1
2"
34"
FEC
STARTING
LOCATION
TRAVEL DISTANCE
TRAVEL PATH
FIRE EXTINGUISHER CABINET
NOTES
[A] DAMPERS ARE NOT REQUIRED IN DUCT PENETRATIONS OF
SMOKE BARRIERS WHERE HVAC SYSTEMS ARE FULLY DUCTED.
(NFPA 101-18.3.7.3(2))
[B] AIR TRANSFER OPENINGS IN SMOKE PARTITIONS SHALL
HAVE DAMPERS. (NFPA 101-8.2.4.4.3) (IBC 710.7)
[C] SMOKE DAMPERS ARE NOT REQUIRED WHERE OPENINGS IN
DUCT ARE LIMITED TO A SINGLE SMOKE COMPARTMENT &
DUCTS ARE MADE OF STEEL. (IBC 716.5.5)
[D] TRANSFER GRILLES ARE NOT ALLOWED IN CORRIDOR
WALLS OR DOORS WITHOUT EXCEPTION. (NFPA 101-18.3.6.4.1)
XX = ##
TD: EXIST TRAVEL DISTANCE
CP: COMMON PATH OF TRAVEL
FIRST FLOOR KEY PLAN
N
1:50
NAVIGATOR
SWAMP
D150
TLT.
D150A
TLT.
C177A
EXAM #1
C101A
EXAM #3
C101C
EXAM #5
C101E
TLT.
C181
MSA
C178
WAITING
C177
EXAM #2
C101BEXAM #4
C101D
CLEAN UTILITY
C179
EXAM #6
C101F
NAVIGATOR
C183TLT.
C180
TLT.
C182
URO
PROCEDURE
C186
STOR.
C185
PROVIDER
SWAMP
C187
SOILED
C188
TLT.
C189
URO
PROCEDURE
C184
1:50
1:150
1:150
1:150130
1:150115
1:50
1:150
1:50
1:50
1:150
1:150 EXAM #7
C101G
1:150
1:150
1:150
1:15
TD = 149'-11"
TD = 80'-5"
48/1
9.6"
84"
R 75' - 0"
R 75' - 0"
420 MAX
420/1
84"
84"
C P
4' -6
C P
3' -1
0"
C192
C191
C105
C103 C102
C1C2
D151
C1C2 C1C1
#6
D100A
C1D9 C1C9
C108
C1D1
C1D5
C137C125C126C127 C128
C133
C133
C124
C123
C134
C135
C136
B168
B169
B121
B120 B122 B123
C175C174
C171C170C168
C1C15
C176
C173C172C167
C146A
#5
#4
#3 #2 #1
D101A
D101
D149 D101B
D102
D102G D103
A166
A157
D152
D155D179D180
C1C22 D191
D191A
D189E
D192
D193C
D193
C142AC142C140AC140C139C138C137
C107
C1C6
C1B5
C1B3
C156A
C176
D102B
D102H
D102A
D129
C1D4A
D128
D127
D159A
D159B
D158
D157
D159
D194
SCOPE OF WORK LEGEND
SHADED AREA NOT IN SCOPE OF WORK
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
600 EAST 7TH STREET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
ARCHITECT OF RECORD:
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
2550 UNIVERSITY AVE. W., SUITE 423-S
ST. PAUL, MINNESOTA 55114
651.251.7570
330 N MEAD ST, SUITE 100
WICHITA, KANSAS 67202
316.262.2500
GI104
LIFE SAFETY PLAN - 1ST FLOOR
RENOVATE & EXPAND
UROLOGY CLINIC
800 HOSPITAL DRIVE COLUMBIA, MO 65201
03-22-2024
589A4-23-050
FINAL BID DOCUMENTS
JSJIEP
N
1/8" = 1'-0" D2
LIFE SAFETY PLAN - 1ST FLOOR
0' 4'-0" 8'-0" 16'-0"
FEC
FEC
FEC
PHASING LEGEND
AFFECTED AREA
NOTES:
1. TEMPORARY CONSTRUCTION BARRIERS SHALL BE MIN. 1 HOUR RATED FIRE BARRIER
ASSEMBLY.
2. ALL CEILINGS DISTURBED DURING AFTER-HOURS ABOVE CEILING WORK SHALL BE RE-
INSTALLED, CLEANED UP AND OPERATIONAL PRIOR TO END OF EACH WORK SHIFT.
3. ALL OPENINGS THROUGH CONCRETE FLOORS (RATED), MUST BE FIRESTOPPED OR
INFILLLED PRIOR TO END OF EACH WORK SHIFT.
TEMPORARY CONSTRUCTION BARRIER
EXISTING AREA
AFTER-HOURS AFFECTED AREA
5PM-6AM PLUS WEEKENDS & HOLIDAYS ONLY
TEMPORARY UPGRADE OF EXISTING WALL TO 1-HR RATED FIRE BARRIER
SCOPE OF WORK LEGEND
SHADED AREA NOT IN SCOPE OF WORK
FIRST FLOOR KEY PLAN
N
SOILED UTIL
TLT
URO
PROCEDURE TLT. DR. DICT. IT
TLT TLT
R E
C E
P T
WAITING
EXAM EXAM
EXAM
EXAM
MSA
EXAM
INSTRUMENT
PREP
URO
PROCEDURE
RM
EQUIP STOR
EQUIP STOR
S O
IL
E
D U
T
IL
ELECTRICAL
ELEV
TLT
TLT
ELEC.
CLOSET
P R
O C
E D
U R
E R
M
P
R O
C E
D U
R E
R M
1.04
M
IN
MIN.
6' - 0"
1.04
1.06
1.20
TLT.
M
IN
1.04
M
IN
1.04
1.05 1.06
M
IN
1.08
1.081.07
IT
TLT TLT
ELECTRICAL
ELEV
ELEC.
CLOSET
P R
O C
E D
U R
E R
M
P
R O
C E
D U
R E
R M
TLT
TLT.
NAVIGATOR
SWAMP
TLT.
EXAM #1EXAM #3EXAM #5
WAITING
MSACLEAN
UTILITY
EXAM #2EXAM #4EXAM #6NAVIGATOR
EXAM #7TLT.
TLT.
URO
PROCEDURE
URO
PROCEDURE
SOILED
STOR.
PROVIDER
SWAMP
IT
TLT TLT
ELECTRICAL
ELEV
ELEC.
CLOSET
P R
O C
E D
U R
E R
M
P
R O
C E
D U
R E
R M
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
600 EAST 7TH STREET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
ARCHITECT OF RECORD:
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
2550 UNIVERSITY AVE. W., SUITE 423-S
ST. PAUL, MINNESOTA 55114
651.251.7570
330 N MEAD ST, SUITE 100
WICHITA, KANSAS 67202
316.262.2500
GI110
PHASING PLANS - 1ST FLOOR
RENOVATE & EXPAND
UROLOGY CLINIC
800 HOSPITAL DRIVE COLUMBIA, MO 65201
03-22-2024
589A4-23-050
FINAL BID DOCUMENTS
JSJIEP
KEYNOTES
KEY VALUE KEYNOTE TEXT
1.04 MAINTAIN 6 FT MIN. CLEAR CORRIDOR FOR THE ENTIRE LENGTH OF
CONSTRUCTION.
1.05 MAINTAIN ACCESS FOR SINK FROM PROCEDURE RM #1 FOR THE ENTIRE LENGTH
OF CONSTRUCTION.
1.06 THIS BATHROOM SHALL BE COMPLETED AND FULLY FUNCTIONAL BEFORE PHASE
2 CAN BE INITIATED.
1.07 PHASE 2.1: THIS SECTION OF CONSTRUCTION BARRIER SHALL BE INSTALLED AND
COMPLETED FIRST.
1.08 PHASE 2.2: THIS SECTION OF CONSTRUCTION BARRIER CAN BE INSTALLED ONLY
AFTER COMPLETION AND REMOVAL OF PHASE 2.1 CONSTRUCTION BARRIERS.
THIS IS TO PROVIDE EMERGENCY ACCESS WITH HOSPITAL BED FROM THE CATH
LAB TO OR.
1.20 THIS AREA CAN BE OCCUPIED BY CONTRACTOR IN BOTH PHASE 1 & 2.
0' 5'-4" 10'-8" 21'-4"
N
0' 5'-4" 10'-8" 21'-4"
N
3/32" = 1'-0" B4
PHASING PLAN - 1ST FLOOR - PHASE 1
3/32" = 1'-0" C4
PHASING PLAN - 1ST FLOOR - PHASE 2
0' 5'-4" 10'-8" 21'-4"
N
3/32" = 1'-0" D4
PHASING PLAN - 1ST FLOOR - PHASE 3
F
IE
LD
V
E R
IF
Y
ROUGHEN HOLE AND CONCRETE
SIDE TO SLOPE SHOWN
APPLY SIKADUR 32
HI-MOD TO SURFACE
TO RECEIVE CONCRETE
NEW CONC SLAB
(E) CONC SLAB
NOTES:
FOR OPENINGS GREATER THAN 8" IN ANY
DIMENSION, CONTACT E.O.R. FOR REINFORCING
REQUIREMENTS PRIOR TO PLACEMENT.
Q P Nb Ma M L K J
21' - 7" 19' - 9 1/2" 2' - 2" 21' - 2 1/2" 21' - 7" 21' - 8" 21' - 8"
FIRST FLOOR KEY PLAN
N
SCOPE OF WORK
(E) CONC COL
NOTES:
1. NO REINFORCEMENT MAY BE CUT. PRIOR TO DRILLING
ANY HOLES IN THE SLAB, THE REINFORCING MUST BE
LOCATED BY GROUND PENETRATING RADAR (GPR), X-RAY,
OR OTHER MEANS.
2. SUMMATION OF LENGTHS A, B, C, ETC PROJECTED
ALONG COLUMN FACE SHALL NOT EXCEED THE
VALUES NOTED BELOW.
INTERIOR COLUMN: 16"
EXTERIOR COLUMN: 12"
RE-ENTRANT CORNER COL:12"
CORNER COLUMN: 8"
3. FOR ADDITIONAL SLEEVE / HOLE OPENING
REQUIREMENTS
C
B
A
NOTES:
1. D = OUTSIDE DIAMETER OF SLEEVE.
2. FOR INDIVIDUAL SLEEVE SPACED AT LEAST 2D APART (D OF LARGER SLEEVE) REFER TO DETAIL 'A'.
3. ALL SLAB PENETRATIONS SHALL BE APPROVED BY THE EOR.
DETAIL 'A'
INDIVIDUAL SLEEVE
D 2D
M A
X C
LE
A
R 6"
M
IN
NEW PENETRATION
REF MEP DRAWINGS
DEMO LEGEND - FLOOR PENETRATIONS
EXISTING PIPE PENETRATION
TO BE INFILLED (SEE 2 / S-100)
NEW PIPE PENETRATION
& (SEE 4 / S-100)(SEE 3 / S-100)
GENERAL STRUCTURAL NOTES
1 DESIGN CRITERIA:
1.1 BUILDING CODES USED FOR DESIGN:
1.1.1 IBC 2018 with state amendments.
1.2 STRUCTURAL TESTS AND SPECIAL INSPECTIONS:
1.2.1 Special inspections shall be performed by an independent testing agency according to IBC Chapter 17.
1.2.2 Qualifications of special inspectors and frequency of tests and inspections shall be as defined in CASE 962C - Guideline for International Building
Code-Mandated Special Inspections and Tests and Quality Assurance.
1.3 FUTURE CONSTRUCTION:
1.3.1 VERTICAL: None.
1.3.2 HORIZONTAL: None.
1.4 DESIGN LOADS:
1.4.1 Risk Category:
From IBC Table 1604.5
Risk Category . . . . . . . . . . . . IV
1.4.2 DESIGN LIVE LOADS:
First Floor . . . . . . . . . . . . . . 150 PSF
2 DESIGN STRENGTHS:
2.1 CONCRETE:
2.1.1 All concrete shall be stone aggregate unless noted. See Specifications for additional durability requirements.
2.1.2 Minimum concrete 28-day compressive strength shall be as follows:
Class f'c Type Add'l Location
(PSI) Remarks
A 3000 NWT Slab Infill
2.2 CONCRETE REINFORCEMENT:
Carbon Fiber Reinforced Polymer: . . . . . . Fu = 181 KSI
3 CONCRETE:
3.1 REFERENCES:
ACI 315 ACI Detailing Manual
ACI 318 Building Code Requirements for Reinforced Concrete
CRSI MSP Manual of Standard Practice
4 MISCELLANEOUS:
4.1 DEFERRED STRUCTURAL SUBMITTALS
4.1.1 The design and documentation of some components defined using performance-based specifications may be deferred until after a building permit is obtained.
4.1.2 Deferred submittals include, but are not limited to, the items listed below.
4.1.3 For the following deferred submittals, the Contractor shall submit shop drawings and calculations signed and stamped by a professional engineer registered in the state where components are installed. These shall be submitted for review prior to fabrication.
Carbon Fiber Reinforced Polymer (Only required if rebar in slab is cut)
4.1.4 In addition to the deferred submittals listed above, the Contractor shall engage a professional engineer registered in the state where the project is located for the design of any necessary shoring, bracing, underpinning, or any other portion of the Contractor’s means & methods which could impact existing structure.
Contractor shall submit certified calculations and shop drawings for review upon request.
4.2 NON LOAD BEARING PARTITION WALLS:
4.2.1 Non load bearing partition walls are generally not shown on the structural drawings. Care shall be taken by the Contractor to maintain a deflection space between the top of partition walls and floor or roof structure above.
4.2.2 See Typical Details and deflection requirements of horizontal framing members in Section 1 of these Notes for minimum deflection space between top of non load bearing partition walls and overhead structure.
4.3 VERIFICATIONS:
4.3.1 The General Contractor shall verify all openings sizes, pad sizes, and locations with the respective Subcontractors.
4.4 CORE DRILLING:
4.4.1 All core drilling shall be done by the Mechanical and Electrical Subcontractors for their own work under the supervision of the General Contractor. No reinforcing steel shall be cut. Verify location of reinforcing steel before core drilling. Do not core through beams or columns. The maximum core hole through slabs shall be 12". If these requirements cannot be met, contact the Engineer.
4.5 NEW WORK IN CONJUNCTION WITH EXISTING CONSTRUCTION:
4.5.1 VERIFICATION: The Contractor shall verify, by field check, all sizes, dimensions, elevations, locations, etc. of elements of the existing construction which are relative to the new construction.
4.5.2 DIMENSIONS: All dimensions involving new Work tying into or governed by existing construction shall be field checked by the Contractor and furnished to the
Subcontractors prior to fabrication of any Work. The verified dimensions shall appear and be noted as such on the first shop drawing submitted.
4.5.3 ASSUMPTIONS: The Engineer has made assumptions concerning the soundness of the existing buildings and these assumptions are that this building was designed and constructed in conformity with good design and construction practices. The
Contractor shall take extraordinary precautions concerning preservation of the building during demolition and new construction Work. Further, the Contractor shall agree to assume all responsibility for the preservation of this property.
4.5.4 NOTIFICATION: The Contractor shall notify the Architect/Engineer immediately of any discrepancies between construction documents and actual field conditions.
4.5.5 HOLES: All holes through existing construction shall be core drilled or saw cut.
4.5.6 NEW OPENINGS IN EXISTING SLABS: New openings in existing slabs shall be cut in such a manner as to minimize cutting existing slab reinforcement. The slab shall not be overcut unless approved by the Engineer.
4.6 GENERAL:
4.6.1 These drawings do not include necessary components for construction safety.
4.6.2 The structural design is based only on the building in its completed state.
Contractors and their subs shall take whatever precautions are necessary to withstand all horizontal and vertical loadings that may be encountered during the construction prior to completion of the building.
4.6.3 During construction, the Contractor may encounter existing conditions which are not now known or are at variance with project documentation (Discovery). Such conditions may interfere with new construction or required protection and/or support of existing Work during construction, or may consist of damage or deterioration to structural materials or components which could jeopardize the structural integrity of the building(s).
4.6.4 The Contractor shall notify the Engineer of all Discoveries that the Contractor believes may interfere with proper execution of the Work or jeopardize the structural integrity of the building(s) prior to proceeding with Work related to such Discoveries.
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
589A4-23-050
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
RENOVATE & EXPAND
UROLOGY CLINIC
800 HOSPITAL DRIVE COLUMBIA, MO 65201
CONSULTANTS:
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
ARCHITECT OF RECORD:
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
2550 UNIVERSITY AVE. W., SUITE 423-S
ST. PAUL, MINNESOTA 55114
651.251.7570 Department of
Veterans Affairs
330 N MEAD ST, SUITE 100
WICHITA, KANSAS 67202
316.262.2500
A u to d e s k D o c s /2
-1
V A
U ro lo g y
C o lu m b ia
M O
/S
V A
U ro lo g y
C o lu m b ia M
O .r v t
/2
/2
:2
:3
P
M
S-100
FLOOR PLAN - 1ST FLOOR
FINAL BID DOCUMENTS
CSF CJB03-22-2024
3/4" = 1'-0"S-100
2 EXISTING OPENING INFILL DETAIL
1/4" = 1'-0"S-100
1 FLOOR PLAN - 1ST FLOOR
1" = 1'-0"S-100
3 CONCRETE - OPENING LAYOUT DIAGRAM AT COLUMN
1" = 1'-0"S-100
4 CONCRETE - VERTICAL SLEEVE THRU (E) SLAB
INFORMATION ON THIS PLAN REGARDING EXISTING STRUCTURE
WAS TAKEN FROM EXISTING CONSTRUCTION DOCUMENTS.
ACTUAL FIELD CONDITION MAY VARY FROM WHAT IS SHOWN.
ALL DIMENSIONS, ELEVATIONS AND CONDITIONS OF EXISTING
STRUCTURE TO BE FIELD VERIFIED PRIOR TO FABRICATION.
NORTH
Revision # Description Date: 3-22-2024
GENERAL DEMOLITION NOTES
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO WORK BEGINNING. THE
CONTRACTOR IS RESPONSIBLE FOR INFORMING THE ARCHITECT OF ANY CONDITIONS THAT
DIFFER FROM THE INFORMATION INDICATED IN THE DRAWINGS.
B. PROTECT ALL EXISTING BUILDING COMPONENTS WHICH ARE TO REMAIN. REPAIR ANY
DAMAGED AREAS AS REQUIRED TO RETURN THEM TO THEIR ORIGINAL CONDITION.
C. VERIFY EXTENT OF DEMOLITION WORK WITH INFORMATION SHOWN IN THE DRAWINGS AND
WORK THAT IS NOT SHOWN AND MAY BE REQUIRED TO COMPLETE THE INTENDED WORK.
D. ALL WORK SHALL COMPLY WITH REQUIRED LOCAL CODES. CONTRACTOR IS RESPONSIBLE
FOR OBTAINING REQUIRED PERMITS AND INSPECTIONS FOR ALL WORK ASSOCIATED WITH
THIS CONTRACT.
E. CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS AS REQUIRED TO MATCH
SURROUNDING EXISTING FINISHES NOT DISTURBED.
F. TYPES OF FLOOR, WALL, AND CEILING FINISHES INDICATED FOR REMOVAL BY DEMOLITION
NOTES ARE FOR GENERAL INFORMATION ONLY FROM INFORMATION OBTAINED FROM
EXISTING PLANS AND OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY MATERIAL TYPES
ON SITE PRIOR TO BID AND INCLUDE NECESSARY WORK IN HIS BID.
G. ALL APPLIANCES, FURNITURE, AND EQUIPMENT TO REMAIN THE PROPERTY OF THE
OWNER - CONTRACTOR TO COORDINATE REMOVAL, RELOCATION AND STORAGE OF
EQUIPMENT FROM DEMO AREAS WITH OWNER.
H. MISCELLANEOUS FLOOR PENETRATIONS AND DEMO FOR NEW MECHANICAL AND
ELECTRICAL WORK SHALL BE COORDINATED FROM ARCHITECTURAL, MECHANICAL, AND
ELECTRICAL PLANS.
I. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL DEMO PLANS FOR DEMOLITION,
SALVAGE AND RE-USE OF EXISTING ITEMS.
J. ELEMENTS INDICATED WITH A DASHED LINE ARE TO BE DEMOLISHED AND DISPOSED OF AS
A PART OF THIS PROJECT, UNLESS NOTED OTHERWISE.
K. IN EXISTING AREAS, RENOVATION AND DEMOLITION WORK SHALL BE ACCOMPLISHED WITH
MINIMAL DISRUPTION TO OPERATIONS. IF REQUIRED, THE OWNER RESERVES THE RIGHT TO
TEMPORARILY STOP WORK OF SPECIFIC CONSTRUCTION OPERATIONS SHOULD THE
OWNER IDENTIFY AN EMERGENCY OR DANGER EXISTS TO THE WELFARE OF THE
OCCUPANTS ON ACCOUNT OF SUCH WORK OR OPERATIONS.
L. CONTRACTOR SHALL REMOVE AND DISPOSE OF IN A LEGAL MANNER ALL MATERIAL NOT
SCHEDULED FOR REUSE UNDER THIS PROJECT.
M. IN ALL WALLS AND CEILINGS THAT ARE TO BE REMOVED THE CONTRACTOR SHALL BE
RESPONSIBLE FOR DISCONNECTING AT SOURCE AND REMOVING ELECTRICAL, PLUMBING,
GAS LINES AND MECHANICAL DUCTWORK THAT ARE NOT SCHEDULED FOR REUSE BACK TO
MAIN OR JUNCTION BOX. CONTRACTOR SHALL REROUTE AND CONTINUE ANY SYSTEM THAT
MUST BE RETAINED FOR NEW CONSTRUCTION. CONTRACTOR SHALL REROUTE AND KEEP
OPERATIONAL ALL SYSTEMS SERVING SPACES IN THE SURROUNDING AREAS TO THE
PROJECT.
N. ALL ELECTRICAL CIRCUITS FOR EQUIPMENT THAT ARE TO BE REMOVED SHALL BE
DISCONNECTED AT SOURCE AND REMOVED BACK TO PANEL.
O. ALL PIPING GAS, WATER SUPPLY, VENT, DRAIN LINES, ETC. SUPPLYING EQUIPMENT THAT
ARE TO BE REMOVED SHALL BE DISCONNECTED, REMOVED AND CAPPED ABOVE CEILING
OR BELOW FLOOR. CONTRACTOR SHALL REROUTE AS NECESSARY, TO BE BEHIND NEW
CONSTRUCTION. PATCH FLOOR BACK PRIOR TO TOPPING.
P. ALL SLAB PENETRATIONS NEED TO BE PROPERLY FILLED TO PREVENT IMPERFECTIONS.
Q. RETURN ALL SIGNAGE AFFECTED BY CONSTRUCTION TO OWNER.
R. SECURITY CAMERAS TO BE FUNCTIONAL AT ALL TIMES DURING CONSTRUCTION.
S. ALL UTILITY PENETRATIONS TO MATCH THE HOST WALL FIRE RATING AT ALL TIME.
T. PATCH FLOOR AT REMOVED WALLS AND CASEWORK, PREPARE FLOOR TO REVEIVE NEW
FLOORING AS REQUIRED.
U. ALL HOLES IN EXISTING SLAB LEFT FROM REMOVAL OF FIXTURES TO RECEIVE INFILL PER
STRUCTURAL DETAILS ON S-100.
V. REMOVE ALL STAINLESS STEEL CORNER GUARDS CAREFULLY AND RETURN TO OWNER.
W. REMOVE ALL PLUMBING FIXTURES AND EQUIPMENT WITHIN ROOMS SCHEDULED TO BE
DEMOLISHED, SEE MEP PIPING DRAWINGS.
X. ANY ITEMS THAT CREATE NOISE, SMELLS, OR DISRUPTS OTHER AREAS OF THE HOSPITAL
WILL NEED TO BE PERFORMED ON 5PM-6AM, WEEKENDS, OR HOLIDAYS ONLY.
2.59
2.56 2.57
2.57
2.57
2.57
2.57
2.57 2.58
FIRST FLOOR KEY PLAN
N
C002
C002B C002A
CBD4
C001
C008
C009B
C009C
C009
C009E
C009GC009J
C009H
C009M C009J
CBC3B
C009I C009K C001
CBD6 CBD3
D0276 D025
D030
CBD5
D028 D029
D031
CBD7
C001
C009F
SCOPE OF WORK LEGEND
SHADED AREA NOT IN SCOPE OF WORK
DIAGONAL HATCH AREA INDICATES CONSTRUCTION WORK IN EXISTING
SPACES NOT VACATED AND THAT NEED TO REMAIN OPERATIONAL.
COORDINATION WITH COR IS NEEDED TO ACCOMPLISH WORK AFTER HOURS,
NIGHTS AND WEEKENDS.
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
600 EAST 7TH STREET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
ARCHITECT OF RECORD:
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
2550 UNIVERSITY AVE. W., SUITE 423-S
ST. PAUL, MINNESOTA 55114
651.251.7570
330 N MEAD ST, SUITE 100
WICHITA, KANSAS 67202
316.262.2500
AD100
DEMOLITION RCP - BASEMENT -
ABOVE CEILING
RENOVATE & EXPAND
UROLOGY CLINIC
800 HOSPITAL DRIVE COLUMBIA, MO 65201
03-22-2024
589A4-23-050
FINAL BID DOCUMENTS
JSJIEP
0' 2'-0" 4'-0" 8'-0"
N
1/4" = 1'-0" D3
DEMOLITION RCP - BASEMENT
KEYNOTES
KEY VALUE KEYNOTE TEXT
2.56 THIS ROOM IS UNDER CONSTRUCTION AT THE TIME OF DESIGN TO BECOME A COOLER. GC
TO PLAN FOR ACCESSING ABOVE THE COOLER AS NECESSARY FOR DEMO/INSTALL OF MEP
ELEMENTS (SEE MEP PLANS).
2.57 TEMPORARILY REMOVE EXISTING CEILING GRID AND TILES AS NECESSARY FOR
DEMO/INSTALL OF MEP ELEMENTS (SEE MEP PLANS); REINSTALL GRID AND TILE AND
REPAIR ANY DAMAGES THAT OCCURRED DURING CONSTRUCTION.
2.58 REMOVE EXISTING GYP CEILING AS NECESSARY FOR DEMO/INSTALL OF MEP ELEMENTS
(SEE MEP PLANS); REPLACE, PATCH AND PAINT CEILING WHERE AFFFECTED BY
CONSTRUCTION. ADD ACCESS PANELS AS REQUIRED TO SERVICE NEW MEP ELEMENTS.
2.59 THIS AREA WILL BE UNDER CONSTRUCTION ABOUT THE SAME TIME. GC TO COORDINATE
CLOSELY WITH VA AND OTHER GC FOR DEMO/INSTALL OF MEP ELEMENTS (SEE MEP
PLANS); REPLACE, PATCH AND PAINT CEILING WHERE AFFECTED BY CONSTRUCTION.
FEC
T T
T
GENERAL DEMOLITION NOTES
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO WORK BEGINNING. THE
CONTRACTOR IS RESPONSIBLE FOR INFORMING THE ARCHITECT OF ANY CONDITIONS THAT
DIFFER FROM THE INFORMATION INDICATED IN THE DRAWINGS.
B. PROTECT ALL EXISTING BUILDING COMPONENTS WHICH ARE TO REMAIN. REPAIR ANY
DAMAGED AREAS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .